Loading...
HomeMy WebLinkAbout20211813 Ver 1_Non-Reporting_B-4805_Ironworks Bridge_ Rockingham County_20211202 Carpenter,Kristi From: Conchilla, Ryan Sent: Thursday, December 02, 2021 3:17 PM To: Parker, Jerry A; Della Moore Cc: Carpenter,Kristi; David.E.Bailey2@usace.army.mil Subject: Non-Reporting_B-4805_Ironworks Bridge_ Rockingham County Attachments: REVISED IRONWORKS BRIDGE DRAWING OCT.21.pdf, B4805_Rdy_tsh-Default.pdf, FW: [EXTERNAL] FW: B-4805 Follow Up Flag: Follow up Flag Status: Flagged Jerry, Thank you for providing the information attached for utility upgrades with proposed wetland and buffer impacts for the project referenced above. In review of the attached plans, the wetland impacts (hand anchor) appear to be below reporting thresholds (1/10ac). The locations and descriptions provided for installation for the proposed utility poles in the riparian buffer qualify as exempt activities. Let me know if you need anything further at this time. Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality From: Parker,Jerry A<japarker3@ncdot.gov> Sent:Thursday, December 2, 2021 9:41 AM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Cc: 'dmoore@rkk.com' <dmoore@rkk.com> Subject: FW: B-4805 Rya n, This is the email with the attachment we discussed. It was slightly revised from what I originally submitted with a utility pole now in the buffer and a utility pole in the wetland. Let me know if you have any questions. Jerry From: Eason, Patty P<psaan( ncdaategaa_v> Sent: Monday, November 22, 2021 6:48 PM To: Parker,Jerry A<iagarker3@ncdot. ov> Subject: B-4805 1 Jerry: This is a bridge replacement project in Rockingham that Tim is letting. The permit shows no permitted sites or impacts but drawing file attached has Duke with two PUEs, one in the buffer zone and one in a wetland area. Are these impacts so small that no permit is needed? I just want to be sure because Tim has let the project and I am trying to get utilities going. Let me know or we can discuss. Thanks. Patty Eason, PE Division Construction Engineer 336-487-0000 it all correspondence e Cxo and frorr ffils soirdcr is sulcjcc. lo Hie IN C I':"ulc Ic.IRcc;ords I ow and i°r ay be disclosed lo ffili'd Icartio;,,, 2