Loading...
HomeMy WebLinkAbout20211014 Ver 1_Riprap and soil maps_20211117 Area 1 Area 2 REPI Section Project locations and soil map There are three shoreline sections associated with the overall project. Construction of project only involves impacts to open water of the Neuse River. The riprap will be located between 15 to 30 feet offshore. Marsh grass will be hand planted within the intertidal zone of the existing shoreline.