HomeMy WebLinkAboutSWG010034_Email_20211208
Farkas, Jim J
From:Fleet Temple <fleet@ftempleengineering.com>
Sent:Wednesday, December 8, 2021 11:26 AM
To:Jason Godwin; Jamie Holland
Cc:Farkas, Jim J
Subject:\[External\] FW: SWG010034 & SWG010035; Brothers Steel Erectors and Welding LLC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jamie,
Please send four hard copies of the attached to:
Jim Farkas
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
Reference SWG010034 & SWG010035; Brothers Steel Erectors and Welding LLC
Fleet Temple, PE
910-658-2446
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Wednesday, December 8, 2021 11:20 AM
To: Fleet Temple <fleet@ftempleengineering.com>; morales80.jcm@gmail.com
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; jason@enochengineers.com
Subject: RE: SWG010034 & SWG010035; Brothers Steel Erectors and Welding LLC
Per the email below, please send in two additional hard copies of the plan sheets that were provided with this
submission (each permit needs two sets of plans and the plans that I have on-file from the SW6210701 submission show
a proposed pond which has since been removed).
Thanks,
-Jim
From: Farkas, Jim J
Sent: Monday, November 22, 2021 9:30 AM
To: Fleet Temple <fleet@ftempleengineering.com>; morales80.jcm@gmail.com
1
Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; jason@enochengineers.com
Subject: SWG010034 & SWG010035; Brothers Steel Erectors and Welding LLC
Good Morning,
We received your applications for the above mentioned projects on 11/18/2021. Reviews under the standard permitting
process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey
Anen, no longer works for the State, so this review will probably be closer to 45 days than 30). Please upload all
documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the
Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SWG010034 (for the Even Morales Bautista Property) and SWG010035 (for the Juan Carlos
Morales Bautista Property)
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
P.S. – The 30-45 calendar day thing is standard boilerplate that gets sent out to everyone. Since these are general
permits, the review time should be much quicker than that. Please also send in two additional hard copies of the plan
sheets that were provided with this submission (each permit needs two sets of plans and the plans that I have on-file
from the SW6210701 submission show a proposed pond which has since been removed).
Thanks,
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources – Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkas@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
3