HomeMy WebLinkAbout20191578 Ver 1_Site Inspection (Non-compliant)_20211214Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20191578
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
Cherokee
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
NC DOT Division 14 - Sylva
12/13/2021
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 56' 44''+35° 05'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on December 13, 2021. Kenny
Corn was present during the inspection. The following are items that require attention:
- Station 14+00 L-RT - Pressure release from the directional bore has caused measures to be overwhelmed. This has
resulted in a sediment release into a JS. High turbidity was observed in Slow Creek downstream of the project as a
result of the release. I have been communicating with the inspector to address the situation. Additional measures are
needed to prevent this from recurring. All off site sediment needs to be removed from the stream.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20191578
12/13/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Additional erosion control measures are needed during directional bore. Pressure release from the
activity has caused off site sedimentation and turbidity into a JS.
Comment:
page:2