Loading...
HomeMy WebLinkAbout20191578 Ver 1_Site Inspection (Non-compliant)_20211214Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20191578 NCDOT - Replace Bridge 2 on NC141 (BR-0011) Cherokee NCDOT - Replace Bridge 2 on NC141 (BR-0011) NC DOT Division 14 - Sylva 12/13/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 56' 44''+35° 05' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on December 13, 2021. Kenny Corn was present during the inspection. The following are items that require attention: - Station 14+00 L-RT - Pressure release from the directional bore has caused measures to be overwhelmed. This has resulted in a sediment release into a JS. High turbidity was observed in Slow Creek downstream of the project as a result of the release. I have been communicating with the inspector to address the situation. Additional measures are needed to prevent this from recurring. All off site sediment needs to be removed from the stream. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20191578 12/13/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Additional erosion control measures are needed during directional bore. Pressure release from the activity has caused off site sedimentation and turbidity into a JS. Comment: page:2