HomeMy WebLinkAboutNCC216897_Site Plan or Location Map_202112143
5
7
n
0
DRAWING NUMBER
CFD-NCR 195-E-0001-180241
t
F
E
0
0
SITE
VICINITY MAP
N.T.S.
[)LIKE ENERGY
At
-ildim):6119
0
PROGRESS
IclPERAT
AIRPORT ROAD
MAXTONI, NORTH CAROLINA 28364
C ENTER
SCOTLAND COUNTY, PIN#010262 0100303
100% BID AND PERMIT DRAWINGS
PROJECT NUMBER: 2021110496
DATE: OCTOBER 27. 2021
REVISED: NOVEMBER 11, 2021
OWNER:
DUKE ENERGY PROGRESS
410 S. WILMINGTON, NC 27601
CONTACT: MARK DALTON
EMAIL: MARKS. DALTON @AM.J LL.COM
PHONE: (919) 417-8405
Know wnars below.
Call before you dig.
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
SHEET IN
C0.01
C1.01
C6.00
C6.02
C6.03
COVER SHEET
PROJECT NOTES
NS
DEMOLITION PLAN'
EROSION CONTROL
GE 1 PLAN
TAJaE OSION CONTROL STAGE 2 PLAN
EROSION CONTROL DETAILS
EROSION CONTROL DETAILS
G
F
E
0
C
IQ
0
a DUENERGY.
MAILING ADDRESS:
P.O. BOX 1007
CHARLOTTE, NC 28201
Safety Expectations:
ILLNESS Reduce Risk
"ER Remove Exposures to Hazards
Reinforce Safe Behavior
The John R. McAdams Company, Inc.
"
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
j/^ j�
MCADAMS
www.mcadamsco.com
SEAL
MAXTON
OPERATIONS CENTER
AIRPORT ROAD
MAXTON, NORTH CAROLINA
Cn
F-
Z
W
M
O
U
U'
z
0
1,1
W
a
>
U
�
Z
0
I_
W
Cn
Z
0
w
m
o
0
N
W
I
H
Q
I
Y
a
1
00
1
1
r7
N
1
O
PROJECT No: 2021110496
DRAWING NUMBER
CFD-NCR 195-E-0001-180241
ELECTRONIC FILE NAME: 2021 1 10496—EC 1
DRAWN BY: CW
CHK'D BY: DAA
E-MAIL: COVIL@MCADAMSCO.COM
THIS DESIGN DRAWING IS THE EXCLUSFVE PROPERTY OF DUKE ENERGY
CORPORATION AND IS CONSIDERED CONFIDENTIAL. IT SHALL NOT BE
MODIFIED, COPIED, OR DISTRIBUTED WITHOUT PRIOR APPROVAL. THIS
INFORMATION SHOULD ONLY BE USED FOR THE SPECIFIC PROJECT
INTENDED.
SHEET TITLE:
C OVER
SHEET NO.
CO.00
3 1 4
5
IX
7
PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION
8 1 9