HomeMy WebLinkAbout20211069 Ver 1_Pre-Filing Meeting Information_20211213DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low and include location information.*
20211069 1
Washington Regional Office - (252) 946-6481
Garcy Ward
Pre-Filing Me eting Reque st submitte d 7/6/2021
John McNulty
jmcnulty@kcaeng.com
BP2.R018.1
NCDOT (Division 2)
Pitt
City
Kinston
State / Province / Region
NC
Postal / Zip Code
28504
Country
Pitt
Street Address
2815 Rouse Road Extension
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Garcy Ward
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
State project BP2.R018.1 will consist of replacing the structurally
deficient NCDOT bridge #730015 on SR 1565 over Chicod Creek.
The proposed replacement structure is a 2-span (1@55;1@50'’) 21”
PCCS with 2.5’ caps with an out-to-out deck width of 30’ which will
replace the existing 3-span (1@30'-5", 1@30’-0”, 1@30'-7”).
Roadway fill slopes will be 3:1 or flatter, with the exception around the
bridge opening, and will all be grassy to encourage a diffuse flow
pattern and passive stormwater treatment. Stormwater runoff from the
bridge and approach slabs will be collected by traffic bearing grated
inlets where it will discharge to roadside swales with rip rap dissipator
pads at the pipe outlets. All areas in which fill slopes impact existing
ditches will be replaced by a swale to maintain existing drainage
patterns.
BP2.R018.1_Redline_Plans.pdf 12.69MB
BP2.R018.1 DRAFT_NRTR.pdf 7.79MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
7/6/2021