Loading...
HomeMy WebLinkAbout20211069 Ver 1_Pre-Filing Meeting Information_20211213DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* 20211069 1 Washington Regional Office - (252) 946-6481 Garcy Ward Pre-Filing Me eting Reque st submitte d 7/6/2021 John McNulty jmcnulty@kcaeng.com BP2.R018.1 NCDOT (Division 2) Pitt City Kinston State / Province / Region NC Postal / Zip Code 28504 Country Pitt Street Address 2815 Rouse Road Extension Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Garcy Ward Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date State project BP2.R018.1 will consist of replacing the structurally deficient NCDOT bridge #730015 on SR 1565 over Chicod Creek. The proposed replacement structure is a 2-span (1@55;1@50'’) 21” PCCS with 2.5’ caps with an out-to-out deck width of 30’ which will replace the existing 3-span (1@30'-5", 1@30’-0”, 1@30'-7”). Roadway fill slopes will be 3:1 or flatter, with the exception around the bridge opening, and will all be grassy to encourage a diffuse flow pattern and passive stormwater treatment. Stormwater runoff from the bridge and approach slabs will be collected by traffic bearing grated inlets where it will discharge to roadside swales with rip rap dissipator pads at the pipe outlets. All areas in which fill slopes impact existing ditches will be replaced by a swale to maintain existing drainage patterns. BP2.R018.1_Redline_Plans.pdf 12.69MB BP2.R018.1 DRAFT_NRTR.pdf 7.79MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 7/6/2021