HomeMy WebLinkAbout20190231 Ver 1_Project Withdrawn_20211213 DocuSign Envelope ID: E556587D-707E-4523-B17E-3A7B8B3DF858
5a
f
• may'{�}■
ROY COOPER °'�'1
Governor NORTH CAROLINA
ELIZABETH S. BISER EfrOrbnMoorrml Quarrry
Secretary
S. DANIEL SMITH
Director December 13,2021
Mr.Philip S.Harris,III,P.E.,CPM
Environment Analysis Unit Head
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh,North Carolina,27699-1598
Subject: Withdrawal of the 401 Water Quality Certification for Proposed Extension of Highway 84,TIP U-3467
NCDWR Project No.20190231
Dear Mr.Harris:
On April 19,2021 NC DOT submitted a request to withdraw the 404/401 approval for extending and
relocating part of Highway 84 in Union County,North Carolina. Reason for the withdrawal was stated as
being lack of adequate funding for the foreseeable future.
This letter serves as the official notification that the project has been withdrawn per NC DOT's request,
effective date of April 20,2021,the date of receipt by the 401 permitting agency,DEQ-DWR. Should this
project receive adequate funding in the future and need 404/401 approval, a complete PCN resubmittal and
approval will be required.
If we can be of further assistance,do not hesitate to contact us.
Sincerely,
DocuSigned by:
0.w Cyr,u�
9C9886312DCD474...
S.Daniel Smith,Director
Division of Water Resources
Attachments
Electronic copy only distribution:
Eric Alsmeyer,US Army Corps of Engineers,Raleigh Field Office
Joel Howard,Division 10 Environmental Officer
Michael Turchy,NC Department of Transportation
Amanetta Somerville,US Environmental Protection Agency
Holland Youngman,US Fish and Wildlife Service
Andrea Leslie,NC Wildlife Resources Commission
Donna Hood,NC Division of Water Resources Mooresville Regional Office
File Copy
QE North Carolina Department of Environmental Quality I Division of Water Resources
c am 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
919.707.9000