Loading...
HomeMy WebLinkAboutNCG550375_Compliance Evaluation Inspection_20211214 December 14, 2021 William Arnold Price PO Box 598 Dillsboro, NC 28725 SUBJECT: Compliance Inspection Report 2376 Dicks Creek Road NPDES WW Permit No. NCG550375 Jackson County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the 2376 Dicks Creek Road on 11/30/2021. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NCG550375. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact me at 828-296-4500 or via email at stephanie.williams@ncdenr.gov. Sincerely, Stephanie Williams, Environmental Specialist Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS: Inspection Report Ec: Laserfiche DocuSign Envelope ID: B535F225-AFA6-48C3-A573-8D6FE479C0DC EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NCG550375 21/11/30 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) 2376 Dicks Creek Road 2376 Dicks Creek Rd Whittier NC 28789 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 09:30AM 21/11/30 20/11/20 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data 10:15AM 21/11/30 25/10/31 Name, Address of Responsible Official/Title/Phone and Fax Number William Arnold Price,PO Box 598 Dillsboro NC 28725//828-586-3548/Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Operations & Maintenance Self-Monitoring Program Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Lauren E Armeni DWR/ARO WQ/828-296-4500/ Stephanie A Williams DWR/ARO WQ/828-296-4500/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 DocuSign Envelope ID: B535F225-AFA6-48C3-A573-8D6FE479C0DC 12/13/2021 12/13/2021 12/13/2021 NPDES yr/mo/day 21/11/30 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Stephanie Williams and Lauren Armeni, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection of the single-family wastewater disposal system that services 2376 Dicks Creek Road on November 30, 2021. This inspection was conducted to determine if the system is being operated and maintained in compliance with General permit no. NCG550000. The homeowner, Mr. Arnold Price, was present during the inspection. No deficiencies were noted during the inspection. The septic system is well-maintained and appeared to be in compliance with the General Permit. Mr. Price stated that the system does not discharge, and no discharge was observed during the inspection. Mr. Price has the septic system checked regularly and pumped as needed. NCG550375 17 (Cont.) Page#2 DocuSign Envelope ID: B535F225-AFA6-48C3-A573-8D6FE479C0DC Permit:NCG550375 Inspection Date:11/30/2021 Owner - Facility: Inspection Type: 2376 Dicks Creek Road Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Septic Tank Yes No NA NE (If pumps are used) Is an audible and visual alarm operational? Is septic tank pumped on a schedule? Are pumps or syphons operating properly? Are high and low water alarms operating properly? The septic tank was pumped on 6/16/2017.Comment: Sand Filters (Low rate)Yes No NA NE (If pumps are used) Is an audible and visible alarm Present and operational? Is the distribution box level and watertight? Is sand filter free of ponding? Is the sand filter effluent re-circulated at a valid ratio? # Is the sand filter surface free of algae or excessive vegetation? # Is the sand filter effluent re-circulated at a valid ratio? (Approximately 3 to 1) Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Page#3 DocuSign Envelope ID: B535F225-AFA6-48C3-A573-8D6FE479C0DC Permit:NCG550375 Inspection Date:11/30/2021 Owner - Facility: Inspection Type: 2376 Dicks Creek Road Compliance Evaluation Effluent Sampling Yes No NA NE Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? The system does not currently discharge. If the system ever begins to discharge, annual sampling will be required. Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? The effluent pipe is located approximately 100 feet upstream of the bridge which leads to the home. No discharge was observed at the time of the inspection. Comment: Page#4 DocuSign Envelope ID: B535F225-AFA6-48C3-A573-8D6FE479C0DC