Loading...
HomeMy WebLinkAboutNCC200148_NOT Closeout Documents_20211209North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Chatham Project: Cape Fear CCP 1985 Basin Haul Road River basin: Cape Fear Person financially responsible: Duke Energy Progress, LLC - Issa J Zarzar, Project #: CHATH-2019-009 GM - CCP Central Projects Address: 410 S Wilmington Street, Raleigh, NC 27601 1. Project Location: C P & L Road, Moncure Pictures: No 2. Weather and soil conditions: sunny, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jonathan Stamas Inspection report: Sent Report 9. Corrective action needed: Title: project manager Date given/sent: October 01, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required and the project is released under the SPCA. If this project has a Certificate of Coverage (COC) under the NCGO1 permit, then complete the electronic Notice of Intent (eNOT) form at degnc.gov/NCGOI. Reported by: Diane Adams Others present: Date of inspection: September 23, 2021 Time arriving on site: 11:30 AM Time leaving site: 11:40 AM cc: