Loading...
HomeMy WebLinkAbout20211027 Ver 1_Bridge 560145 Madision Catawba Nation Response Letter_20211210 July 20, 2021 Attention: Roger Bryan NC Department of Transportation 55 Orange Street Asheville, NC 28801 Re. THPO # TCNS # Project Description 2021-193-125 Proposed bridge replacement project in Madison Co., NC – Bridge 145 Dear Mr. Bryan, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and / or human remains are located during the ground disturbance phase of this project. If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail Caitlin.Rogers@catawba.com. Sincerely, Wenonah G. Haire Tribal Historic Preservation Officer Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 Office 803-328-2427 Fax 803-328-5791