HomeMy WebLinkAbout20211027 Ver 1_Bridge 560145 Madision Catawba Nation Response Letter_20211210
July 20, 2021
Attention: Roger Bryan
NC Department of Transportation
55 Orange Street
Asheville, NC 28801
Re. THPO # TCNS # Project Description
2021-193-125 Proposed bridge replacement project in Madison Co., NC – Bridge 145
Dear Mr. Bryan,
The Catawba have no immediate concerns with regard to traditional cultural properties,
sacred sites or Native American archaeological sites within the boundaries of the
proposed project areas. However, the Catawba are to be notified if Native American
artifacts and / or human remains are located during the ground disturbance phase
of this project.
If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail
Caitlin.Rogers@catawba.com.
Sincerely,
Wenonah G. Haire
Tribal Historic Preservation Officer
Catawba Indian Nation
Tribal Historic Preservation Office
1536 Tom Steven Road
Rock Hill, South Carolina 29730
Office 803-328-2427
Fax 803-328-5791