Loading...
HomeMy WebLinkAbout20211801 Ver 1_ePCN Application_20211209 DW R Divi.ha of ware.Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6,2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS#Assigned* Version#* 20211801 1 Is a payment required for this project? No payment required Fee received Reviewing Office* Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Emergency Haywood Bridge 382 Replacement la.Who is the Primary Contact?* Dave McHenry 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* dgmchenry@ncdot.gov (828)586-2141 Date Submitted 12/9/2021 Nearest Body of Water Dutch Cove Creek Basin French Broad Water Classification C Site Coordinates Latitude: Longitude: 35.521909 -82.814467 A. Processing Information County(or Counties)where the project is located: Haywood Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: DF17614.2044019 WBS#M DF17614.2044019 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted? Yes No 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project? Yes No 2.Owner Information 2a.Narri on recorded deed: NCDOT Division 14 2b.Deed book and page no.: 2c.Contact Person: Dave McHenry 2d.Address Street Address 253 Webster Road Address Line 2 City State/Province Region Sylva NC Postal/Zip Code Country 28779 USA 2e.Telephone Number: 2f.Fax Number: (828)586-2141 2g.Email Address: dgmchenry@ncdot.gov C. Project Information and Prior Project History 1.Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Canton 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address SR 1835(Israel Road) Address Line 2 City State/Province/Region Canton NC Postal/Zip Code Country 28716 USA 3. Surface Waters 3a.Name of the nearest body of water to proposed project:" Dutch Cove Creek 3b.Water Resources Classification of nearest receiving water:" C 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 060101050600 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is in a rural portion of Haywood County SE of Canton where Haywood Bridge 382 was washed-out on August 17,2021 by TS Fred. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 250 4h.Explain the purpose of the proposed project: The purpose of the work is to replace a permanent and reliable bridge access to properties in SR 1835. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: The original bridge is gone,so the work will involve reconfiguring the temporary roadway,drilling new bridge piers,pouring caps,placing rip rap and then setting the new bridge deck in place.Final bridge approaches will be constructed and the roadway paved.Then the temporary detour on site,adjacent to the existing new bridge will be pulled.Track-hoes,dumps and other conventional heavy construction equipment will be used. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Dave McHenry Agency/Consultant Company: NCDOT Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 3. Stream Impacts ❑3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S7 bank protection at pipe Permanent Bank Stabilization J Dutch Cove Creek Perennial Both 20 11 Average(feet) pinear feet) S2 dewatering as needed Temporary Dewatering Dutch Cove Creek Perennial Both 20 10 Average(feet) (linear feet) S3 bank protection around Permanent Bank Stabilization Dutch Cove Creek Perennial Both 20 44 bridge Average(feet) pinear feet) S4 Temporary detour pipes and Temporary Dewatering Dutch Cove Creek Perennial Both 20 52 dewatering as needed Average(feet) pinear feet) S5 bank protection Permanent Bank Stabilization Dutch Cove Creek Perennial Both 20 30 Average(feet) pinear feet) S6 dewatering as needed Temporary Dewatering Dutch Cove Creek Perennial Both 20 10 Average(feet) pinear feet) 31.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 85 72 3i.Total stream and ditch impacts: 157 3j.Comments: E. Impact Justification and Mitigation u 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: A bridge is being used here instead of the original design for a culvert. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Excavation will be avoiding in flowing water. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The projects only permanent impacts are for minor rip rap stabilization of already highly eroded stream banks.The work will not result in a loss or appreciable diminution of stream habitats. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no,explain why: Not in a buffer area. 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?" Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?" Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No Comments:* This work qualifies under Minimum Criteria for exemption from preparation of an environmental document. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?" Yes No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. This is a maintenance project that will not increase capacity or access to undeveloped areas. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?" • Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* Yes No Unknown What Federal Agency is involved? FEMA 5e.Is this a DOT project located within Division's 1-8? Yes No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g.Does this project involve bridge maintenance or removal? Yes No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? Yes No If you answered"Yes"to 5g(1),did you discover any signs of bat use? Yes No Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On site surveys by qualified personnel and IPAC and NHP data. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NMFS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* The NCDOT cultural resources reviewed the project under the Section 106 PA. 8. Flood Zone Designation (Corps Requirement) Sa.Will this project occur in a FEMA-designated 100-year floodplairl Yes No 8c.What source(s)did you use to make the floodplain determination?* NC Floodmaps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document DF17614.2044019_Haywood Bridge 382_404 and 401 Permit Application Package.pdf 17.8MB File must be PDF or KMZ Comments Signature U * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature aDwlk Qua { ty Date 12/9/2021