Loading...
HomeMy WebLinkAbout20210399 Ver 1_MP Plan Review Process_20211210DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 CESAW-RG/Tugwell July 7, 2020 SUBJECT: NCIRT Mitigation Plan Review Process for NCDMS Projects From: Todd Tugwell, USACE Wilmington District NCIRT Chair To: North Carolina Interagency Review Team and North Carolina Division of Mitigation Services As the chair of the North Carolina Interagency Review Team (NCIRT), the U.S. Army Corps of Engineers Wilmington District (District) is required by the 2008 Final Mitigation Rule to provide the NCIRT with an opportunity to comment on proposed mitigation plans. In order to achieve this review for all North Carolina Division of Mitigation Services (NCDMS) projects instituted after the approval of their new instrument (July 28, 2010), a Mitigation Plan Review section has been established on NCDMS's SharePoint site. This process has been set up to comply with the timeframes established in 33 CFR Section 332.8(g)(2) of the Mitigation Rule, which explains the Streamlined Review Process. Review of proposed mitigation plans will now precede NCDMS's submittal of permit applications, which will allow the District and NCIRT to comment on and, if necessary, modify mitigation plans before permits are issued. This process will be routinely updated to include improvements and comply with changes in the regulations. (Please note that an additional review may be conducted by the NC Division of Water Resources (NCDWR), who is the lead agency and NCIRT co-chair for all projects that also propose mitigation for state buffer or nutrient rules or mitigation related solely to Section 401 of the Clean Water Act.) For all Draft Plan submittals, NCDMS will provide a hardcopy and a digital copy (either by disc containing PDF files of all materials or through the NCDMS SharePoint Site) to the Wilmington District Mitigation Office. For all Final Mitigation Plans, only a digital copy needs to be provided. Paper and electronic copies should also be provided to the appropriate NCDWR Office, as specified by NCDWR. Submittal of Preconstruction Notification (PCN) applications is now conducted using electronic PCN submittal procedures, which is an online process that provides copies of necessary documents to both the District and NCDWR. More information about this process can be found on the District website. The following procedure has been set up for NCIRT review and comment for proposed NCDMS Mitigation Plans: Obtain access to the IRT SharePoint site. In order to gain access to the site, you must contact Lindsay Crocker with NCDMS by e-mail (Lindsay.Crocker@ncdenr.gov) or by phone (919-807-8944) to request an invitation. 2. Once you receive the e-mail invitation, click on the link provided to access the homepage. You must set up a Microsoft account using the same e-mail address where you received the invitation. If you have designated others to comment on mitigation plans, they must also contact NCDMS so they can gain access to the site. Please provide the Corps with a list of all individuals designated to review plans as we have established email distribution lists for different regions/counties. Lastly, if you do not want to continue to receive these emails, please let us know and we will remove your name from the distribution lists. 3. Once NCDMS is ready to begin the review of a Draft Mitigation Plan, they will email the District Mitigation Office that a plan has been posted for review and send a paper copy and a digital copy (pdf) of the plan to the mitigation office. Once the paper copy has been received, we will send out an email to all NCIRT members (using regional distribution lists) that a plan is available for download from the portal, with instructions and timeframes for conducting the review. A flow chart detailing this process is attached. 4. The IRT SharePoint is located at the following site: https://ncconnect.sharepoint.com/sites/deg ext/dwm in/default.aspx A. Draft Mitigation Plan will be posted on t h i s page and are available for viewing or download. B. Following review, comments should be provided directly to the District Mitigation Office at SAWMIT(a)usace.army.mil. Please provide comments directly in the body of the email or by attaching a Word Document with the comments. C. You may also choose to upload a document with your comments under the Draft Mitigation Plan Review section. Uploaded documents should be titled to indicate the contents and author. 5. NCIRT agency representatives will have 30 days to review the Draft Mitigation Plan and post comments. An extension to this timeframe may be requested by NCDMS if they or their providers need more time to accommodate necessary changes to the Draft Mitigation Plan based on comments they have received. Additionally, NCIRT members may also request an extension to this timeframe, but NCIRT extension requests must be approved by the District Mitigation Office in consultation with NCDMS. The review period may be extended to accommodate office or on -site meetings necessary to address concerns of NCIRT members. Time extensions will generally be limited in an effort to ensure that delays in reviewing Draft Mitigation Plans are minimized. If NCIRT members have concerns regarding a project that is serious enough to consider initiating the Dispute Resolution Process described in Section 332.8(e) of the Mitigation Rule, please be sure to state this in your comment. Comments should be made only by specific individuals identified by the NCIRT members to conduct these reviews on behalf of their agency. This is critical to keep the process moving and to keep agency comments consistent. If there are others who you would like to comment on a plan, please let us know. PLEASE DO NOT SEND THESE EMAILS OUT TO OTHERS IN YOUR AGENCY FOR THEM TO MAKE COMMENT WITHOUT FIRST DISCUSSING THIS WITH US. COMMENTS COMING FROM PEOPLE WHO ARE NOT DESIGNATED AS THE NCIRT REPRESENTATIVE FOR THEIR AGENCY MAY NOT BE CONSIDERED. 6. At the end of the 30-day comment process (or the end of the extension) and within 60 days of sending out the initial email beginning the review, the District Mitigation Office will evaluate all comments and make a determination as to whether to approve a plan. NCIRT members will be notified by email of the District's Intent to Approve or Disapprove the mitigation plan. NCDMS will be copied with this notice. Once we have notified the NCIRT of our Intent to Approve or Disapprove a project, NCDMS may not withdraw plans from this process without starting the review from the beginning. For plans that are approved, NCDMS will provide a response to comments via an errata sheet included as an addendum to the Final Mitigation Plan. In some cases, comments may require further coordination with NCDMS and the mitigation site provider prior to the District issuing an Intent to Approve. NCDMS may also choose to withdraw Draft Mitigation Plans from the portal based on comments received during the 30-day comment period. Any withdrawn mitigation plans must restart the review process from the beginning. If plans are withdrawn by NCDMS, we will notify the NCIRT that the mitigation plan is no longer available for comment. 7. If the NCIRT reviewing agencies choose to do so, they may notify the District that they are initiating the dispute resolution process. We must receive this notification within 15 days from the date of our notice of intent to approve or disapprove a project. This process is intended to address major concerns with mitigation plans and can only be initiated by a letter from senior official of the agency. Please do not initiate this process without trying to resolve concerns during the 30-day comment period first — this is not intended as a procedure to be used to extend the review process or address minor concerns. If the dispute resolution process is initiated during this step, we will follow the procedures outlined in Section 332.8(e) of the Mitigation Rule, in which case the following steps will be delayed until the resolution of this process. 8. At the end of the 15-day dispute resolution notification period (or following the completion of the dispute resolution process), we will provide NCDMS with notice of approval or disapproval of the mitigation plan, with a copy provided to all NCIRT members. This notice will include all comments generated during the 30- day comment period, and it will identify all issues that must be addressed in the Final Mitigation Plan. Any major issues that were not resolved during the comment process may lead to disapproval. If a project is disapproved, the issues or concerns will have to be addressed and the project must be resubmitted for review, starting the process over. 9. NCDMS coordinates with the mitigation provider to finalize the mitigation plan and incorporate the comments/concerns. 10. NCDMS submits the Nationwide Permit (NWP) 27 ePCN application along with the Final Mitigation Plan to the District mitigation office and NCDWR (and DCM if appropriate) for 404/401/CAMA approval. If it is determined that the project does not require a Department of the Army permit, NCDMS must still provide a copy of the Final Mitigation Plan, along with a copy of the approval letter, to the District mitigation office at least 30 days in advance of beginning construction of the project. The following apply to permit applications submitted for NCDMS projects: A. NCDMS must be listed as the permit applicant or co -applicant. If NCDMS is listed as a co -applicant, the full -delivery provider should also be listed as a co - applicant. B. Contracted design firms or other consulting firms may be listed as authorized agents. C. The application and mitigation plan must be submitted by NCDMS, not the providers. D. The permit application must include a copy of the Final Mitigation Plan and a copy of the mitigation plan approval letter identifying all the required modifications to the mitigation plan, including references to where the comment responses are addressed in the mitigation plan (page number and paragraph or figure). Failure to include the approval letter will result in the permit application being returned to NCDMS. E. District review will focus primarily on the applicability of NWP 27. This review will also verify that any comments provided in the approval letter are addressed in the Final Mitigation Plan, which is why it is critical to identify the location that comments are addressed in the mitigation plan. Failure to adequately address concerns included in the approval letter may result in a delay in the issuance of the NWP 27 until those concerns are adequately addressed, or the inclusion of permit conditions in the permit authorization to address the stated concerns. F. In some cases, additional authorization using other NWPs may be required for road crossings or utility line crossings that are constructed as part of the project. The District will identify these cases when commenting on the Draft Mitigation Plan. 11. NWP 27 authorization is verified; project construction can begin. NCDMS is responsible for ensuring compliance with the permit conditions, including returning the Post -Construction Compliance Form (attached to the permit) at the completion of the authorized work. Approval of the project and/or issuance of the permit authorization does not guarantee that the project will generate the requested amount of mitigation credit. Unforeseen issues may arise during construction or monitoring of the project may require maintenance and may lead to changes in the credit amounts proposed in the mitigation plan. For questions regarding this process, please contact the District Mitigation Office at SAWMIT(a)usace.army.mil, or by calling 919-554-4884. Mitigation Comment & Approval Streamlined Review Process, 33 CFR 332.8(g)(2; START DMS posts mitigation plan to sharepoint, provides paper copy to USACE/DWR Process DMS withdraws DMS emails notification to District Start of 60 days Engineer and provides link for review project from review process to address DMS modifies comments project to address p roJ DE forwards email to IRT and USACE county PMs comments Yes IRT reviews mitigation plan and posts comments on sharepoint Within 30 days of receipt of email from DE Do IRT members identify serious DE reviews comments and attempts to concerns with resolve concerns with DMS DE may extend mitigation plan? timeline per DMS o LNo -TW IRT request > DE notifies IRT & DMS of Intent to Approve or Disapprove Within 60 days of email Yes notification to DE, unless extension is granted Within 15 days of DE notification of intent to approve/disapprove Do RT members initiate Proceed with dispute Yeses dispute resolution resolution process per 33 process? CFR 332.8(e)' DMS decides Does DE whether to Approve? No revise and No resubmit project Yes Does DE DMS Completes Mitigation Plan Approve? Yeses Comment Process &Sends Permit NO Application to USACE and/or DWR No June16, 2015 Revisions Mitigation Plan Comment Process End of Process ID No. IMP.PR0.01.01.01 Page 1 of 1 DE must be notified by letter from a senior official of the agency represented on the Owner: 06/29/2011 IRT within 15 days of receipt of DE's notification of intent to approve the modification Jurek, Jeff Rev. 0 per 33 CFR 332.8(e) From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] Notice of NCDMS Mitigation Plan Review / Colonial Farms / SAW-2021-00346 / Edgecombe Co. Date: Monday, December 13, 2021 7:35:30 AM Attachments: NCDMS Mitioation Plan Review Process 20200707.odf Laserfiche Upload: Email & Attachment DWR#: 20210399 v.1 Doc Type: Mitigation Information From: Haywood, Casey M CIV USARMY CESAW (USA)[mailto:Casey.M.Haywood@usace.army.mil] Sent: Friday, December 10, 2021 9:42 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; kathryn_matthews@fws.gov; fritz.rohde <fritz.rohde@noaa.gov>; Twyla Cheatwood - NCAA Federal (twyla.cheatwood@noaa.gov) <twyla.cheatwood@noaa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org> Cc: Crocker, Lindsay < Lindsay. Crocker@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge@usace.army.miI> Subject: [External] Notice of NCDMS Mitigation Plan Review / Colonial Farms / SAW-2021-00346 / Edgecombe Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced Draft Mitigation Plan has been posted by NCDMS on the Draft Mitigation Plan Review section of the DIMS & IRT SharePoint Site and on RIBITS. Per Section 332.8(g) of the 2008 Mitigation Rule, this review period will remain open for 30 calendar days from this email notification. Please provide comments by 5 PM on the 30-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to initiate the Dispute Resolution Process described in Section 332.8(3) of the Mitigation Rule. Comments provided after the 30-day comment deadline (shown below) may not be considered. This comment period may be extended at the request of NCDMS if they determine that additional time is necessary to make changes to the Draft Mitigation Plan. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT of the District Engineer's intent to approve or disapprove this project. More information, including instructions to access and use the SharePoint Site, and a flow chart detailing the process are included in the updated document attached to this email notice. Please send comments to the USACE Mitigation Team only. 30-Day Comment Start Date: December 10, 2021 30-Day Comment Deadline: January 09, 2022 60-Day Intent to Approve Deadline: February 08, 2022 Proiect information is as follows: Name: Colonial Farms RFP: 16-20200207 (Issued 05/15/2020) Project#: 100191 DWR#: 2020-0399 Corps#: SAW-2021-00346 River Basin: Tar -Pamlico CU#: 03020103 County: Edgecombe Assets: 15.004 Riparian Wetland Mitigation Units (WMU) Provider: Eco Terra Partners, LLC DMS PM: Jeremiah Dow ieremiah.dowC@ncdenr.gov The Crane mitigation plan is posted to the SharePoint for IRT review: DMS/IRT SharePoint RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278::::RP.278:P278_BANK_ID:5958 Hope you all have a great weekend, Casey Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG °