HomeMy WebLinkAboutSW3211201_Supplement-EZ Form_20211206SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Hemby Place
2
Project Area ac
43.82
3
Coastal Wetland Area ac
0
4
Surface Water Area ac
0
5
Is this pro'ect High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of ve etated setbacks provided feet
50
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
NIA
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level S reader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
25
LF11terra
26
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title;
Chris Bridges, P.E.
28
Organization:
R. Joe Harris & Associates
29
Street address:
1186 Stonecrest Blvd.
30
City, State, Zip:
Toga Ca , SC 29708
31
Phone numbers :
803 802-1799
32
Email:
cbridges@rjoeharris.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and alt supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
0�es Al
SEAL
C-4168
0.
l y . FR/NG & 5 Q�
qR /S & PISS�G�
riiiria�itir
Q ofESSIO��'y%�
w SEAL'
N 043341 �z
0:
� N
op.. R•��P�\N
SigN//�
Date
V 22/-Lo L I
DRAINAGE AREAS
1 :Is this a high densitV promect?
Yes
2
if so, number of drainage areaslSCMs
1
3
Does this prowect have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
2,988,614
811.523
6
Onsite drainage area (sq ft
1,908,799
811.523
7
Offsite drainage area (sq ft
1,079,815
0
8
Total BUA in project (sq ft
346114 sf
304045 sf
9
New BUA on subdivided lots (subject to
permitting)s ft
20fi266 sf
199722 sf
10permitting)
New BUA not on subdivided lots (subject to
s
108073 sf
104323 sf
11
Offsite BUA (sq ft
31775 sf
NIA
12
Breakdown of new BUA not on subdivided lots:
Parkin s (t)
0 sf
10805 sf
0 sf
- Sidewalk (sq ft
8705 sf
Roof (sq ft
0 sf
0 sf
Roadway s ft
9726$ sf
95618 sf
Future (sq ft
0 sf
0 sf
0 sf
- Other, please specify in the comment box
below (sq ft
0 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
0 sf
0 sf
14 Isubdivided
New infiltrating permeable pavement not on
lots (sq ft
0 sf
0 sf
15permitting)
Existing BUA that will remain (not subject to
s ft
0 sf
0 sf
16
Existing BUA that is already permitted (sq ft
0 sf
0 sf
17
Existing BUA that will be removed (sq ft
44,896 sf
35,087 sf
18
Percent BUA
11.58%
37.47%
19
Design storm inches
5.25 in
20
Design volume of SCM cu ft
303318 cf
21 i
Calculation method for design volume
SCS 24-hr Preci
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
The design storm is based off the 10-yr storm event for this site.
WET POND
1 Drainage area number 1
2 Minimum required treatment volume cu ft 45637 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V ?
2:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
No
9
What is the method for dewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
NIA
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SAIDA
19
Has a sta elstora a table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) ffmsl
675.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
676.00
221
Elevation of the bottom of the vegetated shelf fmsl
682.00
23
Elevation of the permanenl pool fmsl
682-00
683.00
683.50
24
Elevation of the top of the vegetated shelf fmsl
25
Elevation of the temporary col fmsl
26
Surface area of the main permanent pool (squarefeet
_
20,503 sf
27
Volume of the main permanent pool cubic feet
100359 cf
28
Average depth of the main pool feet
4.89 ft
29
Avera a depth euation used
Equation 2
30
If using equation 3, main Pool perimeter,(feet)
NIA
31
If using equation 3, width of submerged veg. shelf feet
NIA
32
Volume of the foreba cubic feet
17215 cf
33
Is this 15-20% of the volume in the main ool?
Yes
34
Clean -out depth for foreba inches
72 in
35
Desi n volume of SCM cu ft
303318 cf
36
Is the outlet an orifice or a weir?
Weir
37
If orifice, orifice diameter inches
N/A
38
if weir, weir height inches
12 in
39
if weir, weir length inches
24 in
40
Drawdown time for the temporary pool (days)
3.02
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebav at entrance inches
84 in
44
Depth of forebay at exit inches
76.2 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf feet
6 ft
47
Slope of vegetated shelf H:V
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
No
49
Does the pond minimize impacts to the receiving channel from the 1-
r 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 3 is met.
No
51
Is a trash rack or other device provided to protect the cutlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
See info below
541
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
The dam & embankment will use the ChadottelMecklenburg FACW Meadow seed
mix. The vegitation shelf uses several different turfs as well. All of this can be seen
in more detail on the BMP planting plan (C4.03).