Loading...
HomeMy WebLinkAboutWQ0006239_Regional Office Historical File Pre 2018I 01M 64 Iteyt RECSIVFD State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor George T. Everett, Ph.D William W. Cobey, Jr., Secretary Director May 27, 1992 Mr. Jerry Cox, City Manager City of Monroe P.O. Box 69 Monroe, N.C. 28111-0069 Subject: Permit No. WQ0006239 City of Monroe Northwest Corridor Annexation Contract 5 Sewer Extension Union County Dear Mr. Cox: In accordance with your application received March 9, 1992, we are forwarding herewith Permit No. WQ0006239 dated May 26, 1992, to the City of Monroe, for the construction and operation of the subject wastewater collection extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. Regional Offices Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 9191733-2314 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer you need addition One set of approved plans information concerning this matter, Union County Health td specifications is being forwarded to you. ease contact Mr, Michael Allen at 919(733-50 -5iincerely, eorge T. E I NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO THE City of Monroe Union County FOR THE construction and operation of approximately 23,222 linear feet of 8 inch gravity sewer, approximately 5,113 linear feet of 12 inch gravity sewer, approximately 1,140 linear feet of 15 inch gravity sewer, approximately 1,116 linear feet of 10 inch gravity sewer, a 80 GPM pump station with duplex pumps and high water alarms, approximately 3,300 linear feet of 4 inch force main, a 230 GPM pump station with duplex pumps and high water alarms, approximately 2,800 linear feet of 6 inch force main, a 25 GPM pump station with duplex pumps and high water alarms, and approximately 800 linear feet of 2 inch force main to serve Northwest Corridor Annexation, and the discharge of 212,000 GPD of collected domestic, commercial and industrial wastewater into the City of Monroe's existing sewerage system, pursuant to the application received March 9, 1992, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. The sewage and wastewater collected by this system shall be treated in the Monroe Wastewater Treatment Facility prior to being discharged into the receiving stream. 5. This permit is not transferable. In the event there is a desire for the facilities to change' ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to 6. o interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7 . Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 8. A copy of the approved plans and specifications shall be mainta adIon file by the Permittee for minimum of five years from the date of the completion of 9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying omp lying with an agenciesd all 10. regulations, or ordinances which may be imposed by . S statutes, rules, (local, state, and federal) which have jurisdiction. 11. The Permittee shall provide for the pump station and force main the following items: a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in the pump station. b. An air relief valve located at all high points along the force main. c. A screened vent for the wet well. d. Fillets located in the wet well at the intersection of the flooring and sidewalls. e. Three feet of cover (minimum) over the force main or the use of ferrous material where three feet cannot be maintained. f. Sufficient devices which will protect the pump station from vandals. g . Flood protection if the pump station is located below the 100-year flood elevation. 12. In the event that the facilities fail to perform satisfactorily, act onincludi including those as may be required the creation of nuisance conditions, the Permittee shall take immediate by this Division, such as the construction of additional or replacement wastewater collection facilities. r13. NONCOMPLIANCE NOTIFICATION: The Permittee shall report by telephone to the Mooresville Regional Office, telephone no. 704/6 following 1699 as soon as possible, but in no case ��nat' 24 ce of either of the following: or on the next day the occurrence or first knowledge of th a. Any process unit failure, due to known otr unknown ����� �a�lectrical failures render the of incapable of adequate wastewater transport pumps, line blockage or breakage, etc. b. Any failure of a pumpi ng station or sewer line resulting in a by-pass directly to receiving Raters without treatment of all or any portion of the influent to such station or facility. . . Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the 27th day of May, 1992 7-14ORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION George T. Everett, Division of Enviro s i r .. agement By Authority of the Environmental Management Commission Permit Number WQ0006239 rPermit No. WQ006239 May 27, 1992 • ENGINEER'S CERTIFICATION I , as a duly registered Professional Engineer in the State of North Carolina, having•been authorized to observe (periodically, weekly, full time) the construction of the for the project, Project Name Location Permittee hereby state that, to the best of my abilities,be built wince was used in the observation thin substantial compliance and of the construction such that the construction was observed to intent of the approved plans and specifications. Signature Date Registration No.