Loading...
HomeMy WebLinkAboutNCC201184_NOT Closeout Documents_20211208North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 Brunswick EMC 230kV Capacitor County: Brunswick Project: Bank - Royal Oak River basin: Lumber Person financially responsible: Duke Energy Progress, LLC - Alan Lewis, Project #: BRUNS-2019-051 Manager Address: 410 S Wilmington St, Raleigh, NC 27601 1. Project Location: Roayal Oak Road, Lockwood Folly Pictures: No 2. Weather and soil conditions: 70's raining, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): None Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: September 10, 2021 10. Comments: Project appears complete and stabilized. File will be closed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Reported by: Caroline Dalis Others present: Date of inspection: September 09, 2021 Time arriving on site: 2:30 PM Time leaving site: 2:45 PM cc: