Loading...
HomeMy WebLinkAbout20211782 Ver 1_Shoreline Stabilization_20211209Shoreline Stabilization Application Form 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * JEFF.PAGE@YAHOO.COM Please provide an email address for payment and requests for more information here. Owner Information: Name: * Nathan and Cindy Page Email: * Npsg241@aol.com Phone Number:* (910)818-8879 (xxx)xxx-xxxx Mailing Address:* Street Address 607 Melba Street Address Line 2 City Fayetteville Postal / Zip Code 28301 Is there an agent working on the project?* Yes No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * 116 Tamarind Drive State / Province / Region NC Country USA If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Upload Map: 116 Tamarind Vicinity.pdf 349.96KB Latitude:* 35.360190 Longitude: *-80.058420 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* 116 Tamarind Site.pdf 251.88KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* 116 Tamarind Photo.pdf 415.18KB 4. Location of the property (where work is to be conducted) Nearest Town: * Troy County: * Montgomery Lake/ river/ ocean adjacent to Tillery property: Subdivisions name or site address: * 116 Tamarind Drive in Carolina Forrest Include phase/lot number Directions to site: * From NC-731 Norwood, NC Take Indian Mound Rd, NC-24 E/NC-27 E, and River Rd to Greenbriar Rd in Montgomery County Take Suwanne Rd to Tamarind Dr Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Residential. See attached Photo Residential, undeveloped, etc. 6. Property Size .41 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): New 1200 sq ft boat dock and 186' Rip Rap shoreline 8. How will the work be done? * From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 372 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 372 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) See attached photo Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Jeff T. Page Signature: Aft 7 Submittal Date: 12/6/2021 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20211782 Version:* 1 Select Reviewer: * Chad Turlington:eads\ccturlington Select Reviewing Office: Fayetteville Regional Office - (910) 433-3300 Has payment been received? * No Payment Needed Fee Received • Need Fee - send electronic notification What amount is owed?* • $240.00 $570.00 I4 • Full Pond/ Normal Water Level Shoreline Lake (At Full Pond/Normal Water Level) />() g°44//r/ `.r ,//, Xi/J} j v %2 e Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 r L.�r. (At Full P► j al Water Level) nt ca E L 0 01 c nD 0 //4,7e' 47Y/://f Side View a LL FORM: SSGP 09-2020 Page 5 of 6