HomeMy WebLinkAbout20211775 Ver 1_Shoreline Stabilization_20211209Shoreline Stabilization Application Form
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email *
Owner Information:
Name: *
Email: *
Phone Number:*
Mailing Address: *
rclaws35@earthlink.net
Please provide an email address for payment and requests for more information here.
Jom Morse
jamorsel@gmail.com
(704)516-7935
(xxx)xxx-xxxx
Street Address
2124 Sablewood Drive
Address Line 2
City
Charlotte
Postal / Zip Code
28205-3635
Is there an agent working on the project?*
Yes
No
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name: * 4321 Bluffs Way
State / Province / Region
NC
Country
US
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. *
Upload File
Look up address
Upload Map: 4321 The Bluffs Way Directions.pdf 818.43KB
Latitude:*
35.153890
Longitude: *-81.020261
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
4321 Bluffs Way Site plan Sketch.pdf 513.96KB
Please use the diagram at the link below:
https://edocs.deq. nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)*
4321TheBluffsWayPics.pdf 27.02MB
4. Location of the property (where work is to be conducted)
Nearest Town:* Belmont
County: * Gaston
Lake/ river/ ocean adjacent to Wylie
property:
Subdivisions name or site address: *
Reflection Point
Include phase/lot number
Directions to site: *
See Map
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
Future Residential Home Site
Residential, undeveloped, etc.
6. Property Size .445
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
Property is right off main channel and is see plenty of signs of erosion.
More boat traffic when high water exist is causing erosion as well.
Stabilizing before home is constructed makes more since.
8. How will the work be done? *
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
0
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
648
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
A total of 5 substantial trees are needing to come out because of beaver
damaged , roots exposed or leaning/fallen. Everything else that gets
removed is under brush and sapplings. As seen in pictures.
Sketch: 4321 The Bluffs Way Agent and Buffer
Form.pdf
Application Fee:
1.68MB
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
• $240.00 for impacts to lake (below normal water level) of less than 1 acre
a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
a I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Randall S Clawson
Signature:
Submittal Date: 12/6/2021
Initial Review
Is this accepted into the review process?* - Yes No
Project Number:* 20211775 Version:* 1
Select Reviewer: * Alan Johnson:eads\adjohnsonl
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received? * No Payment Needed
Fee Received
• Need Fee - send electronic notification
What amount is owed?*
• $240.00
$570.00
4321 The Bluffs Way
13MIN 1 5.6M1 fai
Est. fuel cost: $0.72
Trip time based on traffic conditions as of 8:21 AM on October 27,
2021. Current Traffic: Light
i
Scan this QR code for !�
directions In your mobile
device:
Print a full health report of your car with HUM
vehicle diagnostics (800) gob 2501
1. Start out going northeast on Nixon Rd toward Southpoint Rd/NC-273.
Then 0.21 miles
2. Turn right onto Southpoint Rd/NC-273. Continue to follow Southpoint Rd.
If you are on RL Stowe Rd and reach Township Pkwy you've gone about 0.1 miles
too far.
Then 4.58 miles
14 3. Turn right onto Reflection Pointe Blvd.
Reflection Pointe Blvd is 0.5 miles past Reese Wilson Rd.
If you reach Boat Launch Rd you've gone about 0.1 miles too far.
0.21 total miles
4.79 total miles
Then 0.29 miles 5.07 total miles
I4. Turn left onto Lake Pointe Dr_
Lake Pointe Dr is just past Beauhaven Ln.
If you reach Hermitage Ct you've gone about 0.3 miles too fa
Then 0.50 miles 5.57 total miles
5. Turn left onto The Bluffs Way.
If you reach Watermead Ln you've gone about 0.4 miles too far.
Then 0.03 miles 5.60 total miles
6. 4321 The Bluffs Way, Belmont, NC 28012-6754, 4321 THE BLUFFS WAY is on
the right.
if you are on Lake Pointe Dr and reach Arbors Ford Ct you've gone about 0.1 miles
too far.
013 Save to My Maps
Use of directions and maps is subject to our Terms of Use. We don't guarantee accuracy, route conditions or usability.. You assume all risk of use.
River
Cramerton
ot)
. 2
E
a,
L.)
c,olithOt3111t
( 0 L whn
it
I
ighvq
Oivo )floc
11(3a -Ike. biucf,v
e loilt0 4/6 e;e0/42
004 ."-t •
k f-ctio /355f. Ft
(F; z
3) 1 ,eef F-e,1 /964e-5-5 732
17) 3, s- /041 114 / rank VrY
f?. -1-:(:(
e
*624‘i4--041-A
PROPERTY LEGAL DESCRIPTION:
LOT NO:
gy
PLAN NO:
STREET ADDRESS:
3;1 - Sty s tAhLy
5 ot.a��,
Please print:
Property Owner:
Property Owner:
Rrus i\ 0(6E-
PARCEL ID: 2c 3 C7,13
The undersigned, registered property owners of the above noted property, do herebyauthorize
Randall Clawson
, of Clawsons Pile Driving and
Construction
Contractor/Agent) (Name of consulting firm)
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this
permit or certification and any and all standard and special conditions attached.
Property Owners Address (if different than property above):
S 6lR-Weed Dr.
N a. toa-a-e , N-c.. au--e5
Telephone: 70t/ ,SUR - 7135
We --reby certify the above information submitted in this application is true and accurate tothe
b-.t f our knowledge.
Date
Authorized Signature
Date
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: t 3 g 1 TGt� l�lul�rs (iJt j 1 into , /U C 2€ai2County:
Owner: )11,4
Pr
Contractor/age t: N ( (0,44)5UrL-
PrinttC/sd„S (;'1C- �r� ✓<'IA) ; P
Cv►ls-tr c-td �--
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
ture
C-ta5-4-o n
Signature
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
I, 0 5 VV\be.s% , hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner):
Date:
ib 2')/1