Loading...
HomeMy WebLinkAboutNCC204756_NOT Closeout Documents_20211208North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: Duke Energy Staging Area at West New River basin: Neuse Person financially responsible: DUKE ENERGY PROGRESS LLC -Tim Same, Project #: CRAVE-2020-027 Manager Substation Engineer Address: 410 SOUTH WILMINGTON ST, Raleigh, NC 27602 1. Project Location: US 70 & NC 43, NEW BERN Pictures: Yes - Digital 2. Weather and soil conditions: sunny, cool, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: December 01, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of 10. Comments: coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: httt)s:Hedocs.dea.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: November 23, 2021 Time arriving on site: 12:35 PM Time leaving site: 12:45 PM cc: