HomeMy WebLinkAboutNCG550710_Inspection_20160708United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 I5 I 3 I NCG550710 111 12 I 16/07/08 117
Type
18 I_ j
I I I I I
Inspector Fac Type
19 I S I 201 I
211 I I I I I I I I I II I I I I I I I I I I I I I I I I I
I II
66
I I I I I 1
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I I 70I I 71 I I 72 I r,, I 73I I I74 71
1
1 1 1 1 1 1 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
840 Emma Road
840 Emma Rd
Asheville NC 28806
Entry Time/Date
09:35AM 16/07/08
Permit Effective Date
13/08/01
Exit Time/Date
10:45AM 16/07/08
Permit Expiration Date
18/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Michael Morgan,840 Emma Rd Asheville NC 28806//828-258-8821/
Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance Records/Reports Self -Monitoring Program
Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Linda S Wiggs ARO WQ//828-296-4500 Ext.4653/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type
31
NCG550710 111 121 16/07/08 117 18 g
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The inspector (Linda Wiggs) met onsite with the owner, Mike Morgan. Kathy Jimison and Mikal Willmer
with DWR were also present.
The chlorine tablet tubes are very long/tall. Getting the tablets to lay flat will be a challenge, regardless
this needs to be attempted for proper contact with the wastewater for disinfection.
At the time of the inspection, photos in the tubes indicated tablets were lodged sideways.
It is also required that caps be placed on the chlorine tubes; none were present during the inspection.
The effluent pipe is below the water surface. The owner states and it did appear to be the case during
the inspection, that the effluent pipe also carries a small spring flow. There is no way to sample prior to
this comingling
Permittee has not conducted the required annual sampling event. The permittee must sample the
system annually. Any samples obtained by DWR do not count towards the permittees required annual
sampling.
The design of the system does not allow for effluent sampling without comingling with spring/stream
water. Regardless, sampling shall take place at the effluent pipe for compliance. If the stream is
running turbid, it is not suggested that samples be obtained until the stream is running clear. It is also
suggested that upstream samples be obtained in concert with the effluent sampling event for
comparison. This will assist in making sure the stream is not contributing pollutants to the effluent
samples.
DWR obtained samples.
Effluent:
Fecal 43 col/100m1
TSS 21 mg/I
BOD 6.6 mg/I
Upstream:
Fecal 100 col/100m1
Page# 2
Permit: NCG550710 Owner - Facility: 840 Emma Road
Inspection Date: 07/08/2016
Inspection Type: Compliance Sampling
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Septic Tank
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Comment: The septic tank was pumped on 11/5/2015.
Disinfection -Tablet
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Yes No NA NE
• ❑ ❑ ❑
Yes No NA NE
❑ ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
Yes No NA NE
❑ ❑ • ❑
• ❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑ •
Comment: The chlorine tablet tubes are very long/ tall. Getting the tablets to lay flat will be a challenge,
but this needs to be attempted for proper contact with the wastewater for disinfection.
At the time of the inspection, photos in the tubes indicated tablets were lodged sideways.
It is required that caps be placed on the chlorine tubes; none were present during the
inspection.
Effluent Pipe
Yes No NA NE
Page# 3
Permit: NCG550710 Owner - Facility: 840 Emma Road
Inspection Date: 07/08/2016
Inspection Type: Compliance Sampling
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Yes No NA NE
• ❑ ❑ ❑
❑ ❑ • ❑
Comment: The effluent pipe is below the water surface. The owner states and it did appear to be the
case during the inspection, that the effluent pipe also carries a small spring flow. There is
no way to sample prior to this comingling.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes No NA NE
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ • ❑ ❑
Comment: Permittee has not conducted the required annual sampling event.
As noted above, the design of the system does not allow for effluent sampling without
comingling with spring/stream water. Regardless, sampling shall take place at the effluent
pipe for compliance. If the stream is running turbid, it is not suggested that samples be
obtained until the stream is running clear. It is also suggested that upstream samples be
obtained in concert with the effluent sampling event for comparison. This will assist in
making sure the stream is not contributing pollutants to the effluent sample results.
Page# 4