Loading...
HomeMy WebLinkAboutWQ0002712_Staff Report_20211115State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Attn: (Erick Saunders Central Office Permitting Group) Facility name: City of Lincolnton RLAP From: (Edward Watson in MRO) Choose an item. Regional Office Application No.: WQ0002712 Note: This form has been adapted from the non -discharge facility staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 11/05/2021 b. Site visit conducted by: Inspection report attached? ['Yes or ® No c. Person contacted: Robert Pearson and their contact information: (704) 736 - 8970 ext. e. Driving directions: 2. Discharge Point(s): No Discharge Points. Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: No discharge to surface waters. N/A Classification: River Basin and Sub basin No. Describe receiving stream features and pertinent downstream uses: II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Mike Cox Certificate #:LA 13191 Backup ORC: Alex Fox Certificate #:LA 1009594 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: Lincolnton Municipal WWTP Current permitted flow: 6.0 MGD. Current avg. daily flow of 2.1 MGD Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: FORM: WQROSSR 04-14 Page 1 of 4 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? n Yes or ® No 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A 11. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: No significant compliance issues Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 12. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 13. Check all that apply: No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ® Yes n No N/A If no, please explain: 14. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A If yes, please explain: 15. Possible toxic impacts to surface waters: As a non -discharge system, the residuals should not enter surface waters. If there's a spill or improper application there may be a threat of nutrient & inorganics loading. 16. Pretreatment Program (POTWs only): N/A FORM: WQROSSR 04-14 Page 2 of 4 III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like the Non -Discharge Unit Central Office to obtain through an additional information request: Item Reason 1 Modified Land Application maps with updated buffering for fields LT-55-1&2 and CA-48-15. 3. Recommendation: and modified maps) ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ® Issue upon receipt of needed additional information (see below for missing soils data n Issue ❑ Deny (Please state reasons: ) 4. Signature of report preparer: Edward Watson 11-12-2021. Docu Signed by: Signature of regional supervisor: ... Date: 11.15.21 F161F669A2D84A3 FORM: WQROSSR 04-14 Page 3 of 4 ADDITIONAL REGIONAL STAFF REVIEW ITEMS The following four fields are being added: William Heafner fields LT-55-1 &2 totaling 105.2 acres, Mike Davis LT-48-13 & 15, 23.6 acres; Randy Leatherman, CA-48-10, 22.2 acres and LT-47-2, 45.2 acres, totaling 196.9 acres. Including the application field acreage changes, the new total acreage in the City ofLincolnton's RLAP permit will be 734.6 acres. Additionally, Fields NC-LT-55-1&2 have surface drainage features that have culverts to direct flow through the conveyance present on these fields. The application map will be modified to indicate these areas will be buffered. A depression is present in west portion of field NC-LT-48-15. The Land Application area will be re -drawn to exclude the depression form receiving residual material. A redefined compliance boundary is requested for the wells that are centrally located between site CA-48-10 and LT-47- 2. FORM: WQROSSR 04-14 Page 4 of 4