Loading...
HomeMy WebLinkAbout20140209 Ver 1_SMP 7 Bio#1 REVISED_20210412t\,0tTPI 0 DETAINING WALL (<2') CLEAN -OUT (TYPICAL) 4" PVC (TYPICAL) 26� BOTTOM SURFACE AREA = 2,376 SF (ELEV.=323.0) 20'1-016\ SAN. SEWER EASE Pvc° ' GN V . J 3I8e :WETLANDS fl"FICAL) / / / 9 G Fl 1 1 11 1 ',EIV OVE EX. 1 5" `\ EES $ INSTALL HEADWALL INV.=323.5G (±) FO�EBAY 'ETAI N I N G WALL (<3') \ \ \ \ \ \ \ STO*WWATE� BMP ACCESS * MAINTENANCE EASEMENT TOP Of BEAM 325.5 EM€RG NCY SPILLWAY _EWER eENCY 5-PILL-WA DITCH 5'x5' RIP- SAP PAD (D5o=G") 1- For cr=l appllcatieoe, or ea directed by geotechnirai enpkleer -when &hi co:Atkins require, piece drainage orpopeelle. P1kan r1WN (or equlreIont) tnsleller t, 2/3 wan help hI arsl 30% coverage. 4" perforated PVC Dra€nape Ti..'le.. . oulJet every 5C' J.C. (when See Coneltions FereA el See nate below. Pe rid 4" Ferreratad PVC or IMPS Drainage Tlie. Ctuet every 5 ' 0.C, Note; Aa elm:led by enploevr whoa Co corehborte require, wrap itrishsapli, 111 W. or ALir YRiehod rltrxte end Sea. lacnloayvan Pier febdo rive stem wild drek+ape 09411patlt or apiiittGecbi Cede dr ain mil• I1plcai Reinforced Wall SeCtlan____ n Cap Uf1Rt Goit Jokye F5I .._ 014° Creehe Rock C.r $181*) thireinforG4 t47' Crhelte€l Levollop Ike. Note; BOIL SEARING CAPACITY OF 3,000 PSF IS ASSUMED NOTES: 1. RETAINING WALLS MUST BE A MEDIUM OR DARK BROWN OR RUST COLOR. 2. RETAINING WALL DETAIL REPRESENTS THE WALL TYPE TO BE USED AT THIS 5CM. i BIOETENTION LAYOUT: STANDARD COSS-SECTION PERMENANT CLEANOUT POST W/ CLEANOUT MARK BOTTOM AND SLOPES STABILIZED CAPPED CLEAN WITH BERMUDA OUT PIPE SOD 2" PONDING I- ---11 1 FILL SOIL MEDIA MIX: 85-8,5% SAND, 8-1 2% FINES, 3-5% ORGANIC DEPTH TREES/SHRUBS=3ft. GRASS= 2ft. 4 WASHED SAND 21+ DISTANCE TO WATER TABLE -UNDERDRAIN_ -FILTER FABRIC - (OR CHOKING - ITIN) II III - -WATER TABLE- • BIORETENTION AREA DESIGN MINIMUM WEIR LENGTH (FT) 10 UNDERDRAIN PIPE DIAMETER (IN) 4 MINIMUM NUMBER OF UNDERDRAIN PIPES 2 CLEANOUT ELEVATION (FT) 323.25 TOP OF BIORETENTION SOIL MIXTURE ELEV. (FT) 323.00 BOTTOM OF BIORETENTION SOIL MIXTURE ELEV. (FT) 321.00 SPILLWAY (WEIR) ELEVATION (FT) 324.50 TOP OF BERM ELEVATION (FT) 325.50 MINIMUM DEPTH= 12" %/ RIP -RAP D5o= 6" -•• ii�i BOTTOM WIDTH = 2' WITH GEOTEXTILE LINER EXISTING GROUND EMERGENCY SPILLWAY DITCH DETAIL N.T.S. UNDERDRAIN PIPE SHALL BE SCHEDULE 40 PVC, SDR35, OR SMOOTH WALL CORRUGATED PLASTIC PIPE WITH %" PERFORATIONS AT G" ON CENTER (4 HOLES PER ROW) REFER TO TABLE FOR PIPE SIZE. 12 ///� j/\ /\//\\//\\//\\\.1/\\/ \//\//\ .\/ ////V1 BIORETENTION SOIL CLASS "C" GEOTEXTILE FABRIC AROUND WASHED STONE #57 STONE UNDERDRAIN PIPE TO BE INSTALLED AT 0.5% MIN. SLOPE NATIVE SOIL, NO COMPACTION UNDEKDRAIN CROSS SECTION (NTS) WALL rviry ENGINEERED FILL MATERIAL HDP CLEAENOUT 100-YEARSTORM EL=325.0 I'9Y I 0-YEAR STORM EL - 324.8 I -YEAR STORM EL - 324.6 TOP OF BIORETENTION POND BOTTOM OF - ENGINEERED FILL MATERIAL PERMEABLE FILTER FABRIC LINING ENTIRE BIORETENTION CELL WASHED 57 STONE ENVELOPE UNUNED SLOTTED HDPE UNDERDRAIN PERMEABLE FILTER FABRIC OVER ENVELOPE TOP OF EARTH DAM EL - 325.5 TOP OF EMERGENCY SPILLWAY EL = 324.5 OUTLET PIPE INVERT OUT BIO-RETENTION BMP CROSS-SECTION (N.T.5.) BIORETENTION SOIL NOTES: 03/09/21 REVISION: THE PURPOSE OF THIS REVISION IS TO APPROVE THE GRADING AND RETAINING WALLS NECESSARY TO PROVIDE 3: I INTERIOR SLOPES FOR THE SCM. THE SCM DESIGN PARAMETERS SHALL BE CONFIRMED BY THE CONTRACTOR FOR CERTIFICATION. ANY LANDSCAPING PLANTINGS IMPACTED BY GRADING SHALL BE REPLACED. NOTES: I . ALL MATERJALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY TAKEN FROM A DIGITAL FILE PROVIDED BY BARRY SCOTT SURVEY COMPANY. 3. TOPOGRAPHIC INFORMATION TAKEN FROM WAKE COUNTY GIS FILES. 4. THIS SITE HAS BEEN REVIEWED FOR WETLANDS AND STREAM BUFFERS BY ENVIRONMENTAL SERVICES INC. AND THE DELINEATED ENVIRONMENTAL FEATURES HAVE BEEN SHOWN. 5. PER FEMA MAP #37200721 OOJ DATED 02 MAY 200G, NO 100-YEAR FLOODPLAIN TRAVERSES THE PROPERTY. 6. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (I-800-632-4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 7. THIS SITE I5 LOCATED WITHIN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE BIO-RETENTION AREA SHALL BE LOCATED WITHIN A DRAINAGE EASEMENT WITH ACCESS TO A PUBLIC RNJ. 9. THE BACKFILL OF THE 4-INCH OUTLET PIPES FROM THE BIO-RETENTION CELLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF STANDARD PROCTOR (ASTM D698). I O. RETAINING WALLS SHALL BE SEGMENTED BLOCK TINTED MEDIUM OR DARK BROWN OR RUST IN COLOR. ALL PERMITTING WILL BE HANDLED AS A SEPARATE SUBMTTAL. I I . FENCING SHALL BE INSTALLED AT THE TOP OF RETAINING WALLS IF REQUIRED BY THE BUILDING CODE. 1 2. CONTRACTOR SHALL CONFIRM THAT FILL SOILS USED FOR 5CM CONSTRUCTION HAVE BEEN ADQUATELY COMPACTED. BIOETENTI ON CELL: EOREDAY DETAIL GRASS L W L J. W ,M W II CLASS B RIP -RAP DSO= 1311 30" ///\\//�\/ OUTLET PIPE REFER TO GRADING PLAN FOR TOP OF DAM ELEVATION \I/ \I/ 5' WEIR LENGTH �_ REFER TO GRADING PLAN FOR SPILLWAY ELEVATION I/ \I/ \I/ \I/ \I \// //,>- //!//f/ ///;/;f/f/• SPILLWAY BOTTOM AND SLOPES TO BE STABILIZED WITH PERMANENT EROSION CONTROL MAT PERMANENT EROSION MAT TO BE P-300 BY NORTH AMERICAN GREEN, MIRAMAT BY MIFAFI CORP., OR APPROVED EQUAL SECTION THROUGH SPILLWAY (NTS) STRUCTURAL BMP CONSTRUCTION SEQUENCE: THE FOLLOWING MUST OCCUR PRIOR TO FINAL PLAT AND/OR CERTIFICATE OF OCCUPANCY (CO): I . ALL STRUCTURAL BMPS MUST BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS. 2. THE DESIGN ENGINEER MUST SUBMIT AN AS -BUILT PACKAGE WHICH MEETS ALL REQUIREMENTS PRESENTED IN THE TOWN SPEC BOOK INCLUDING A SIGNED AND SEALED CERTIFICATION STATEMENT. 3. SUBMIT THE APPROPRIATE SIGNED STRUCTURAL BMP OEM AGREEMENT AND MAINTENANCE GUARANTEE TO THE DEVELOPMENT PROJECTS COORDINATOR IN CONSTRUCTION MANAGEMENT AT 249-3394. 4. A FINAL INSPECTION BY THE ENVIRONMENTAL PROGRAMS MANAGER SHALL BE CONDUCTED ONCE THE AS -BUILT SUBMITTAL HAS BEEN RECEIVED. ONCE APPROVED, THE ENVIRONMENTAL PROGRAMS MANAGER WILL SEND A BMP APPROVAL LETTER TO THE OWNER. 5. IN LIEU OF STRUCTURAL BMP COMPLETION AND FINAL APPROVAL BY THE ENVIRONMENTAL PROGRAMS MANAGER, THE TOWN MAY ACCEPT A PERFORMANCE GUARANTEE IN ACCORDANCE WITH UDO SECTION 6. 1 . 1 2(G). IF THE CONTRIBUTING DRAINAGE AREA FOR THE BMPS 15 UNSTABLE AT THE TIME OF FINAL PLAT APPROVAL FOR A SUBDIVISION, THE TOWN WILL ALLOW A SKIMMER SYSTEM TO BE CONNECTED TO THE EMERGENCY DRAIN SIZED TO DE -WATER THE VOLUME OF THE BASIN OVER A 2-3 DAY PERIOD. POROUS BAFFLES SHALL EITHER CONTINUE TO BE MAINTAINED (IF CONVERTING FROM A SEDIMENT BASIN) OR BE INSTALLED. ANY ORIFICES MUST BE CAPPED OR PLUGGED. 6. ALL STRUCTURAL BMPS ARE REQUIRED TO BE COMPLETED PRIOR TO A FINAL CO FOR A SITE PLAN AND ISSUANCE OF 90% OF COS WITHIN A SUBDIVISION. IF THE SUBDIVISION 15 TO BE PHASED, ALL STRUCTURAL BMPS SHALL BE COMPLETED PRIOR TO ISSUANCE OF 90% OF COS WITHIN THAT PHASE. 7. IF A STRUCTURAL BMP COUNTS TOWARDS RCA, THE REQUIRED LANDSCAPING SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AND COORDINATED WITH THE TOWN ZONING COMPLIANCE OFFICER AT 249-3426. BIORETENTION SOIL MIXTURE (DSM): SHALL BE PLACED AND GRADED USING LOW GROUND -CONTACT PRESSURE EQUIPMENT OR BY EXCAVATORS AND/OR BACKHOES OPERATING ON THE GROUND ADJACENT TO THE BIORETENTION FACILITY. NO HEAVY EQUIPMENT SHALL BE USED WITHIN THE PERIMETER OF THE BIORETENTION FACILITY BEFORE, DURING, OR AFTER THE PLACEMENT OF THE BSM. THE DSM SHALL BE PLACED IN HORIZONTAL LAYERS NOT TO EXCEED 12 INCHES FOR THE ENTIRE AREA OF THE BIORETENTION FACILITY. THE DSM SHALL BE COMPACTED BY SATURATING THE ENTIRE AREA OF THE BIORETENTION FACILITY AFTER EACH LIFT OF DSM 15 PLACED UNTIL WATER FLOWS FROM THE UNDERDRAIN. WATER FOR SATURATION SHALL BE APPLIED BY SPRAYING OR SPRINKLING. AN APPROPRIATE SEDIMENT CONTROL DEVICE SHALL BE USED TO TREAT ANY SEDIMENT -LADEN WATER DISCHARGED FROM THE UNDERDRAIN. IF THE DSM BECOMES CONTAMINATED DURING THE CONSTRUCTION OF THE FACILITY, THE CONTAMINATED MATERIAL SHALL BE REMOVED AND REPLACED WITH UNCONTAMINATED MATERIAL AT NO ADDITIONAL COST TO THE ADMINISTRATION. FINAL GRADING OF THE BSM SHALL BE PERFORMED AFTER A 24-HOUR SETTLING PERIOD. FINAL ELEVATIONS SHALL BE WITHIN 2 INCHES OF ELEVATIONS SHOWN ON THE CONTACT PLANS. THE BIORETENTION SOIL MIXTURE (BSM) SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS, OR OTHER SIMILAR OBJECTS LARGER THAN 2 INCHES EXCLUDING MULCH. NO OTHER MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. PRIOR TO PLACING THE UNDERDRAIN AND THE BSM, THE BOTTOM OF THE EXCAVATION SHALL BE ROTO-TILLED TO A MINIMUM DEPTH OF 6 INCHES TO ALLEVIATE ANY COMPACTION OF THE FACILITY BOTTOM. ANY SUBSTITUTE METHOD FOR ROTO-TILLING MUST BE APPROVED BY THE ENGINEER PRIOR TO USE. ANY PONDED WATER SHALL BE REMOVED FROM THE BOTTOM OF THE FACILITY AND THE SOIL SHALL BE FRIABLE BEFORE ROTO-TILLING. 0 5 10 GRAPHIC SCALE 20 THE SIGNATURES AFFIXED BELOW CERTIFY THAT THIS SHEET HAS BEEN REVIEWED AND APPROVED SOLELY PER THE CERTIFICATIONS SIGNED ON THE COVER SHEET OF THESE CONSTRUCTION PLANS. N/A Melton 04/13/2021 5.03.22 PM PW - TRANSPORTATION N/A sewens 04/19/2021 8:27:52 AM BUILDING INSPECTION Approved jrlillon 04/19/2021 10:29:28 AM WR - UTILITY ENGINEERING N/A rsmith 04/12/2021 2:01:16 PM ELECTRIC N/A WR - 5 * E Approved Pol„04,12/.214:20.9 DATE WR - STORMWATER Approved abunce 04/12/2021 211:30 PM DATE PLANNING ,.e N/,. ,eM".2"AM DATE PLANNING - TRANSPORTATION N/A khue9erich 04/12/2021 3:20:31 PM DATE FIRE N/A areincke 04/12/2021 1:21:56 PM DATE DATE DATE DATE DATE PARKS, RECREATION $ CULTURAL RES, DATE N EERI NG, PLLC V Z W Construction Management 221 N. SALEM ST, SUITE 001 PO BOX 1062 APEX, NC 27502 Office: 919-387-1174 Registration: P-0151 www.jonesalossen.com 2 0 _Q���S'SF/r08y.�. SEA D. 0 CONSTRUCTION DRAWINGS WAKE COUNTY, NORTH CAROLINA TOWN Of APEX SCALE 111 0 En DRAWN DATE REVISION 03/13/14 1 st TRC COMMENTS 04/1 7/1 5 510-AREA GRADING GRADING REVISION TRC COMMENTS TRC COMMENTS SHEET 7 PROJECT DESIRED BIORETENTION SOIL MIXTURE PH LIES BETWEEN 5.5 AND 6.5.