Loading...
HomeMy WebLinkAbout20140209 Ver 1_9 Bio-Retention 2_20211130�2J CB #22 BOTTOM SURFACE AREA = 2,327 SF (ELEV.=338.8) FOREBAY REMOVE EX. 15" FE5 $ EXTEND 4'- 15" RCP (INV.=339.50) NEW VAR. PUBLIC DRAINAGE EASE. \N. G;SS n��� y-c0?-T -ctNN rt BIORETENTION SOIL NOTES: BIORETENTION SOIL MIXTURE (BSM): SHALL BE PLACED AND GRADED USING LOW GROUND -CONTACT PRESSURE EQUIPMENT OR. BY EXCAVATORS AND/OR BACKHOES OPERATING ON THE GROUND ADJACENT TO THE BIORETENTION FACILITY. NO HEAVY EQUIPMENT SHALL BE USED WITHIN THE PERIMETER OF THE BIORETENTION FACILITY BEFORE, DURING, OR AFTER THE PLACEMENT OF THE BSM. THE BSM SHALL BE PLACED IN HORIZONTAL LAYERS NOT TO EXCEED 12 INCHES FOR THE ENTIRE AREA OF THE BIORETENTION FACILITY, THE BSM SHALL BE COMPACTED BY SATURATING THE ENTIRE AREA OF THE BIORETENTION FACILITY AFTER EACH LIFT OF B5M IS PLACED UNTIL WATER FLOWS FROM THE UNDERDRAIN. WATER FOR SATURATION SHALL BE APPLIED BY SPRAYING OR SPRINKLING. AN APPROPRIATE SEDIMENT CONTROL DEVICE SHALL BE USED TO TREAT ANY SEDIMENT -LADEN WATER DISCHARGED FROM THE UNDERDRAIN. IF THE BSM BECOMES CONTAMINATED DURING THE CONSTRUCTION OF THE FACILITY, THE CONTAMINATED MATERIAL SHALL BE REMOVED AND REPLACED WITH UNCONTAMINATED MATERIAL AT NO ADDITIONAL COST TO THE ADMINISTRATION. FINAL GRADING OF THE B5M SHALL BE PERFORMED AFTER A 24-HOUR SETTLING PERIOD. FINAL ELEVATIONS SHALL BE WITHIN 2 INCHES OF ELEVATIONS SHOWN ON THE CONTACT PLANS. THE BIORETENTION SOIL MIXTURE (B5M) SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS, OR OTHER SIMILAR OBJECTS LARGER THAN 2 INCHES EXCLUDING MULCH. NO OTHER MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. PRIOR TO PLACING THE UNDERDRAIN AND THE BSM, THE BOTTOM OF THE EXCAVATION SHALL BE ROTO-TILLED TO A MINIMUM DEPTH OF 6 INCHES TO ALLEVIATE ANY COMPACTION OF THE FACILITY BOTTOM. ANY SUBSTITUTE METHOD FOR ROTO-TILLING MUST BE APPROVED BY THE ENGINEER PRIOR TO USE. ANY PONDED WATER SHALL BE REMOVED FROM THE BOTTOM OF THE FACILITY AND THE SOIL SHALL BE FRIABLE BEFORE ROTO-TILLING. DESIRED BIORETENTION SOIL MIXTURE PH LIES BETWEEN 5.5 AND 6.5. STRUCTURAL BMP CONSTRUCTION SEQUENCE: THE FOLLOWING MUST OCCUR PRIOR TO FINAL PLAT AND/OR CERTIFICATE OF OCCUPANCY (CO): I . ALL STRUCTURAL MAPS MUST BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS. 2. THE DESIGN ENGINEER MUST SUBMIT AN AS -BUILT PACKAGE WHICH MEETS ALL REQUIREMENTS PRESENTED IN THE TOWN SPEC BOOK INCLUDING A SIGNED AND SEALED CERTIFICATION STATEMENT. 3. SUBMIT THE APPROPRIATE SIGNED STRUCTURAL BMP O$M AGREEMENT AND MAINTENANCE GUARANTEE TO THE DEVELOPMENT PROJECTS COORDINATOR IN CONSTRUCTION MANAGEMENT AT 249-3394. 4. A FINAL INSPECTION BY THE ENVIRONMENTAL PROGRAMS MANAGER SHALL BE CONDUCTED ONCE THE AS -BUILT SUBMITTAL HAS BEEN RECEIVED. ONCE APPROVED, THE ENVIRONMENTAL PROGRAMS MANAGER WILL SEND A BMP APPROVAL LETTER TO THE OWNER. 5. IN LIEU OF STRUCTURAL BMP COMPLETION AND FINAL APPROVAL BY THE ENVIRONMENTAL PROGRAMS MANAGER, THE TOWN MAY ACCEPT A PERFORMANCE GUARANTEE IN ACCORDANCE WITH UDO SECTION G. I . 1 2(G). IF THE CONTRIBUTING DRAINAGE AREA FOR THE BMPS I5 UNSTABLE AT THE TIME OF FINAL PLAT APPROVAL FOR A SUBDIVISION, THE TOWN WILL ALLOW A SKIMMER SYSTEM TO BE CONNECTED TO THE EMERGENCY DRAIN SIZED TO DE -WATER THE VOLUME OF THE BASIN OVER A 2-3 DAY PERIOD. POROUS BAFFLES SHALL EITHER CONTINUE TO BE MAINTAINED (IF CONVERTING FROM A SEDIMENT BASIN) OR. BE INSTALLED. ANY ORIFICES MUST BE CAPPED OR PLUGGED. G. ALL STRUCTURAL BMPS ARE REQUIRED TO BE COMPLETED PRIOR TO A FINAL CO FOR A SITE PLAN AND ISSUANCE OF 90% OF COS WITHIN A SUBDIVISION. IF THE SUBDIVISION 15 TO BE PHASED, ALL STRUCTURAL BMPS SHALL BE COMPLETED PRIOR TO ISSUANCE OF 90% OF COS WITHIN THAT PHASE. 7. IF A STRUCTURAL BMP COUNTS TOWARDS RCA, THE REQUIRED LANDSCAPING SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AND COORDINATED WITH THE TOWN ZONING COMPLIANCE OFFICER AT 249-3426. L___ I ----r----1-----J I I I- I 1 I _ L_ - _ 1 I--- - - - --I SLOPES ABOVE RETAINING WALL ARE AT2:I SWALE TO DRAIN RETAINING WALL (3'±) 4" PVC (TPYI CAL) -------------------------__________ rw-r=33 TW=34I .5 - - -- TOP Ofg5ERM =34 I .30 EXCAVATE $ REPLACE SOFT 50IL4 WITh FABRIC RIP -RAP TREATMENT 4� TREE PROTECTION FENCE (TYP) CLEAN -OUT (TYPICAL) 740. ' jj ' I 1 �STORMWATEK BMP ACCESS $ MAINTENAI EASEMENT GENCY SPILLWAY $ RIP -RAP BLANKET Approximate Limits of Excavation. For cut appiire directed by geotechnlcal enginecxe when elle dark:Mk: s require, --- place Ceakrage rxtmixiaiie wt£raii G 100N (or equivalent) inntailei to 213 wit height and 30% owernae. Gec .Cap Unit 4* Perforated PVC Drainage Tile. Outlet every 5O O.C. (when Sitrr Coedyk)ne Require) See mate below. 4` Perforated PVC cr. HOPE Drainage Ti16. Wet every 50` O.C. Aa dligr?ited by (HVYTTRAt wileri elte contilthxof iT+viv, wwtl drFikaegrrtfia tf3 #5r° zrr 1/97 moiled atone and Bez. Der/awn/1 Miff tabrlt: and Wax"e) w1l11 dia£rrego mitiprAtto cw yatn bart drein ly&tarn.. Typical Reinforced Wail Suction Unit Drainage Fill (314" Cruehed Rea. or Stone) nGt?tDna dictate, Nr tlidl or geate;hnical F£niahad Grade Urlrelnfo 'J Crze1 rat Crdstied Slrlrre Leveling Pad F IN13 C/lPAClTY OF PBSUMED NOTES: I . RETAINING WALLS MUST BE A MEDIUM OR DARK BROWN OR RUST COLOR. 2. RETAINING WALL DETAIL REPRESENTS THE WALL TYPE TO BE USED AT THIS 5CM. 3. RETAINING WALL DESIGN WILL BE BY OTHERS. 12" DEEP RIP -RAP (CLASS B )\ GEOTEXTILE LINER PINNED AT TOP AND BOTTOM OF SLOPE NOTES: I . SLOPE SURFACE TO BE REVIEWED BY GEOTECHNICAL ENGINEER FOR POSSIBLE IMPROVEMENT PRIOR TO PLACEMENT OF FABRIC AND RIP -RAP. 2. RIP -RAP SHALL EXTEND TO THE EDGE OF THE GEOTEXTILE LINER. FADRIC $ RIP -AP DETAIL N.T.5. G" PVC INV.=335.0G $ RIP -RAP PAD \IG 1 BIOETENTION LAYOUT: STANDARD COSS-SECTION PERMENANT CLEANOUT POST WI CLEANOUT MARK 11 STABILIZE BOTTOM AND SLOPES WITH CENTIPEDE SOD L- FILL SOIL MEDIA MIX: 85-83% SAND, 8 12% FINES, 3-5% ORGANIC DEPTH• TKEE5/5hRU65 3ft. GP.ASS=2ft. -IN I SITU SOIL I TO WATERNCE: TABLE -UNDERDRAIN CAPPED CLEAN OUT PIPE -WATER TABLE- BIORETENTION AREA AS -BUILT REVISION MINIMUM WEIR LENGTH (FT) 10 10 UNDERDRAIN PIPE DIAMETER (IN) 4 4 MINIMUM NUMBER OF UNDERDRAIN PIPES 4 4 CLEANOUT ELEVATION (FT) 338.7 339.05 TOP OF BIORETENTION SOIL MIXTURE ELEV. (FT) 338.0 338.80 BOTTOM OF BIORETENTION SOIL MIXTURE ELEV. (FT) 336.0 336.80 SPILLWAY (WEIR) ELEVATION (FT) 339.59 340.30 TOP OF BERM ELEVATION (FT) 34 I .07 341.30 MINIMUM DEPTH= 1 2" RIP -RAP Dso=6" 2•\, ,>, BOTTOM WIDTH = 2' WITH GEOTEXTILE LINER NOTE: RIP -RAP SHALL EXTEND TO THE EDGE OF THE GEOTEXTILE LINER. EXISTING GROUND EMERGENCY SPILLWAY DITCH DETAIL N.T.5. UNDERDRAIN PIPE SHALL BE SCHEDULE 40 PVC, SDR35, OR SMOOTH WALL CORRUGATED PLASTIC PIPE WITH %" PERFORATIONS AT 6" ON CENTER (4 HOLES PER ROW) REFER TO TABLE FOR PIPE SIZE, 1 2" BIORETENTION SOIL CLASS "C" GEOTEXTILE FABRIC AROUND WASHED STONE #57 STONE UNDERDRAIN PIPE TO BE INSTALLED AT 0.5% MIN. SLOPE NATIVE SOIL, NO COMPACTION UNDERDRAIN CROSS SECTION (NTS) WALL�virv� ENGINEERED FILL MATERIAL HDPE CLEANOUT 100-YEAR STORM EL - 340.8 M'41' I 0-YEAR STORM EL - 340.6 I -YEAR STORM EL - 340.4 TOP OF BIORETENTION POND BOTTOM OF ENGINEERED FILL MATERIAL PERMEABLE FILTER FABRIC LINING ENTIRE BIORETENTION CELL WASHED 57 STONE ENVELOPE iimermainuirms UNUNED SLOTTED HDPE UNDERDRAIN PERMEABLE FILTER FABRIC OVER ENVELOPE TOP OF EARTH DAM EL = 341.07 TOP OF EMERGENCY SPILLWAY EL = 339.59 OUTLET PIPE INVERT OUT BIO-RETENTION BMP CROSS-SECTION (N.T.S.) MINIMUM DEPTH= 12" BOTTOM WIDTH = 2' WITH JUTE MESH LINER SWALE DETAIL N.T.S. EXISTING GROUND NOTES: 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY TAKEN FROM A DIGITAL FILE PROVIDED BY BARRY SCOTT SURVEY COMPANY. 3. TOPOGRAPHIC INFORMATION TAKEN FROM WAKE COUNTY GIS FILES. 4. THIS SITE HAS BEEN REVIEWED FOR WETLANDS AND STREAM BUFFERS BY ENVIRONMENTAL SERVICES INC. AND THE DELINEATED ENVIRONMENTAL FEATURES HAVE BEEN SHOWN. 5. PER FEMA MAP #37200721 OOJ DATED 02 MAY 2006, NO 100-YEAR FLOODPLAIN TRAVERSES THE PROPERTY. 6. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 7. THIS SITE I5 LOCATED WITHIN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE BIO-RETENTION AREA SHALL BE LOCATED WITHIN A DRAINAGE EASEMENT WITH ACCESS TO A PUBLIC RAM. 9. THIS 5CM WAS CERTIFIED ON 05/05/20 BUT NOT ACCEPTED BY THE TOWN OF APEX BECAUSE THE MADISON HOA OBJECTED TO PROVIDING A LETTER ACCEPTING MAINTENANCE OF THE CONSTRUCTED EMBANKMENT SLOPES. BIORETENTION CELL: EOREBAY DETAIL GRASS 18" CLASS B RIP -RAP Dso= 1 3" 30" PABRe (SEE NOTE 3 UNDER I0/25/21 REVISION) 10'x 1 0' (±) PLUNGE POOL • OUTLET PIPE REFER TO GRADING PLAN FOR TOP OF DAM ELEVATION s/<\\ \\�' \\•� \\ / 3 I.I. 5' WEIR LENGTH REFER TO GRADING PLAN FOR SPILLWAY ELEVATION I. \I. .I. \I. \I :�AA�i:\irk\i��\i,\�i��\ '` SPILLWAY BOTTOM AND SLOPES TO BE STABILIZED WITH PERMANENT EROSION CONTROL MAT .I. < \/f\/;\'` "A \ A\ A\ A PERMANENT EROSION MAT TO BE P-300 BY NORTH AMERICAN GREEN, MIRAMAT BY MIFAFI CORP., OR APPROVED EQUAL SECTION SPILLWAY (NTS) 0 10 20 GRAPHIC SCALE 03/09/21 REVISION: THE PURPOSE OF THIS REVISION 15 TO APPROVE THE GRADING AND RETAINING WALLS NECESSARY TO PROVIDE 3: I INTERIOR SLOPES FOR THE SCM. THE 5CM DESIGN PARAMETERS SHALL BE CONFIRMED BY THE CONTRACTOR FOR CERTIFICATION. ANY LANDSCAPING PLANTINGS IMPACTED BY GRADING SHALL BE REPLACED. 09/08/21 REVISION: I . BERM DOWNSLOPE STABILIZATION OPTION 2. THIS REVISION INCLUDES THE REMOVAL OF THE GEOTEXTILE FABRIC UNDER THE FOREBAY RIP -RAP. NONE WAS INSTALLED IN THE ORIGINAL CONSTRUCTION AND IS EXPECTED TO PROVIDE BC I I ER, INFILTRATION OF STORMWATER. 10/25/21 REVISION: I . GEOTECHNOLOGIES, INC. COMPLETED A FIELD INVESTIGATION OF THE BERM FILL AND DO NOT RECOMMEND ANY MODIFICATIONS AT THE CREST; HOWEVER, REMEDIAL WORK IS RECOMMENDED ALONG THE BERM DOWNSLOPE FACE AS OUTLINED IN THEIR 10/2 1/2 I REPORT AND SHOWN HEREON. 2. IT IS RECOMMENDED THAT GEOTECHNOLOGIES, INC. BE RETAINED TO OBSERVE THE REMEDIAL WORK AND PROVIDE DIRECTION FOR NECESSARY REPAIRS. 3. FABRIC SHALL BE PLACED UNDER THE RIP -RAP FOR THE FOREBAY IF INSTALLED DIRECTLY ON IN -SITU SOILS AND/OR. FILL. IF THE RIP -RAP I5 PLACED ON SOIL MEDIA, NO FABRIC I5 REQUIRED. 4. RETAINING WALLS SHALL BE SEGMENTED BLOCK TINTED MEDIUM OR DARK BROWN OR RUST IN COLOR. ALL PERMITTING WILL BE HANDLED AS A SEPARATE SUBMTTAL. 5. FENCING SHALL BE INSTALLED AT THE TOP OF RETAINING WALLS IF REQUIRED BY THE BUILDING CODE. 40 THE SIGNATURES AFFIXED BELOW CERTIFY THAT THIS SHEET HA5 BEEN REVIEWED AND APPROVED SOLELY PER THE CERTIFICATIONS SIGNED ON THE COVER. SHEET OF THESE CONSTRUCTION PLANS. N/A rdalton 12/01/2021 11:18:15 AM PW - TRANSPORTATION N/A sewens 11/30/2021 2:39:16 PM BUILDING INSPECTIONS. / A smiller 12/02/2021 2:01:35 PM WR - UTILITY/A ENGINEERING N rsmith 11/30/2021 4:21:29 PM ELECTRIC N/A 1 4011noa0212:10:37 PM WR-5.E Approved gem 1-1r30rz021 2:,0,0 PM DATE - STORMWATFR Approved abunce 12/06/2021 12:21:39 PM DATE PLANNING DATE N / A DATE svanevery 12/01/2021 7:06:40 AM DATE PLANNING - TRANSPORTATION DATE N/A khuege"ch 11/30/2021 11:49:21 AM DATE FIRE N/A areincke 11/30/2021 2:05:32 PM DATE DATE PARKS, RECREATION 4 CULTURAL RES. DATE C tACD (,) 0 N EERI NG, PLLC V Z 11' C) 0 Construction Management Civil Engineering 221 N. SALEM ST. SUITE 001 PO BOX 1062 APEX, NC 27502 Office: 919-387-1174 Registration: P-0151 www.jonescnossen.com ‘,4:0J. .GINe .- °e R D. CONSTRUCTION DRAWINGS WAKE COUNTY, NORTFI CAROLINA TOWN Of APEX SCALE NO -RETENTION DRAWN 5MJ REVISION 03/13/14 10/30/20 11/17/20 03/09/21 1st TRC COMMENTS POND GRADING GRADING REVISION TRC COMMENTS TRC COMMENTS BERM DOVVNSLOPE SHEET 9 PROJECT