Loading...
HomeMy WebLinkAbout20140209 Ver 1_7A Dry Pond 1_20211130STORMWATER BM P ACCESS $ MAINTENANCE EASEMENT I EM BAN KM E OJT REPAIR AREA TO RECEIVE EABIRIC $ RIP -RAP TRETM ENT t1,0 \-\tt" pC MAX. WATER LEVEL DURING 100-YEAR STORM = 326.5 SHOULDER GRADE = 328.67 (±) TRASH RACK TOP OF RISER = 326.29 I' WEIR SLOT = 325.66 INLET# I 3'x3' RISER _ 1=I �TT� 8" PVC INVERT = 322.63 1= III lllffi 111 _ T-I11-11 18" RCP OUTLET BARREL @ 5.09% DAY PO\D DETAIL RIP- RAP PROTECTION EXISTING FENCE 24" NOTES: I . FABRICATE TRASH RACK BY WELDING #4 REBAR SPACED 8" ON CENTER. 2. BOLT BOTTOM OF TRASH RACK TO TOP OF 36"x3G" RISER SUCH THAT IT MAY BE REMOVED FOR ACCESS. 3G" DETAIL - TRASH RACK INLET# 16 TOP RISER = 326.29 I ' WEIR SLOT = 325.66 INV. IN = 322.GG INV. OUT = 322.63 1 5" 1-ES (G'L) INV.=325.3 I O' Lx 3' Wx 1 8"D CLASS B KIP-KAP (Dso= 1 3") TOP =329.I8 INV. IN = 322.28 INV. OUT = 322.0 II II II I 1 MINIMUM DEPTH= 1 2" 24" DEEP RIP —RAP D5o=24" 2.\ \//'�" BOTTOM WIDTH = 3' WITH GEOTEXTILE LINER NOTE: RIP —RAP SHALL EXTEND TO THE EDGE OF THE GEOTEXTILE LINER. RIP -RAP DITCH DETAIL N.T.S. ;•:>/r EXISTING GROUND 12" DEEP RIP —RAP (CLASS B) GEOTEXTILE LINER PINNED AT TOP AND BOTTOM OF SLOPE NOTES: I . SLOPE SURFACE TO BE REVIEWED BY GEOTECHNICAL ENGINEER FOR POSSIBLE IMPROVEMENT PRIOR TO PLACEMENT OF FABRIC AND RIP —RAP. 2. RIP —RAP SHALL EXTEND TO THE EDGE OF THE GEOTEXTILE LINER. FABRIC $ RIP -RAP DETAIL N.T.S. NOTES: REMOVE EX. 1 5" EES $ EXTEND EX. 1 5" RCP 4' AT EX. SLOPE CONSTRUCT NEW YI TOP GRATE=329.0 (MLD VERI -Y) INV. IN=325.98 INV. OUT 325.78 PROVIDE 3: I SLOPE, AS MUCI-1 AS PRACTICAL, FOK ACCESS TO DRY POND BOTTOM FOK MAINTENANCE I . ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY INFORMATION FROM A DIGITAL FILE BY BARRY SCOTT SURVEY COMPANY. 3. TOPOGRAPHIC INFORMATION TAKEN FROM WAKE COUNTY GIS DATA. 4. THIS SITE HAS BEEN REVIEWED FOR WETLANDS AND STREAM BUFFERS BY ENVIRONMENTAL SERVICES, INC. AND THE DELINEATED ENVIRONMENTAL FEATURES HAVE BEEN SHOWN. 5. PER FEMA MAP #3720072 1 OOJ DATED 02 MAY 200G, NO 100—YEAR FLOODPLAIN EXISTS ON THIS SITE. G. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (I—800—G32-4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 7. THIS SITE IS LOCATED WITHIN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. ALL PERMANENT SLOPES SHALL BE GRADED TO 3: I OR FLATTER ON THE INSIDE SLOPE OF THE DRY POND. ALL PERMANENT SLOPES GRADED FROM BETWEEN 2: I AND 3: I SHALL BE STABILIZED IN GENERAL ACCORDANCE WITH THE FABRIC AND RIP —RAP DETAIL. 9. THE BOTTOM OF THE DRY POND SHALL BE SODDED. 10. THE DRY DETENTION POND SHALL BE LOCATED WITHIN A DRAINAGE EASEMENT WITH ACCESS TO A PUBLIC RNV. I I . THIS SCM WAS CERTIFIED ON I I /05/ 1 9 AND 05/07/20 BUT NOT ACCEPTED BY THE TOWN OF AEX BECAUSE THE MADISON 110A OBJECTED TO PROVIDING A LETTER ACCEPTING MAINTENANCE OF THE CONSTRUCTED EMBANKMENT SLOPES. 0 5 10 20 07/06/2 1 03/09/21 REVISION: THE PURPOSE OF THIS REVISION IS TO APPROVE THE GRADING AND RETAINING WALLS NECESSARY TO PROVIDE 3: I INTERIOR SLOPES FOR THE SCM. ANY LANDSCAPE PLANTINGS IMPACTED BY GRADING SHALL BE REPLACED. 09/08/21 REVISION: 1. THE PURPOSE OF THIS REVISION 15 TO APPROVE THE STORM DRAINAGE ADDITION AND ARMORING OF IMPROVED 2: 1 SLOPES WITH RIP —RAP. ANY LANDSCAPE PLANTINGS IMPACTED BY THIS WORK SHALL BE REPLACED. 2. THE EXISTING TOPO AND DRY POND INFORMATION WAS TAKEN FROM AN AS —BUILT SURVEY. 10/25/21 REVISION: I . GEOTECHNOLOGIES, INC. COMPLETED A FIELD INVESTIGATION OF THE DRY POND FILL SOILS AND ENCOUNTERED SOFT MATERIAL THAT REQUIRES REMOVAL AND REPLACEMENT AS OUTLINED IN THEIR 10/21/21 REPORT AND SHOWN HEREON. 2. IT I5 RECOMMENDED THAT GEOTECHNOLOGIES, INC. BE RETAINED TO OBSERVE THE REMEDIAL WORK AND PROVIDE DIRECTION FOR NECESSARY REPAIRS. THE SIGNATURES AFFIXED BELOW CERTIFY THAT THIS SHEET HAS BEEN REVIEWED AND APPROVED SOLELY PER THE CERTIFICATIONS SIGNED ON THE COVER SHEET OF THESE CONSTRUCTION PLANS. N/A Melton 12/01/2021 11:1747 AM PW — TRANSPORTATION N/A sewens 11/30/2021 2:41:11 PM BUILDING INSPECTIOJ � A smiller 12/02/2021 2.01.14 PM WR — UTILITY ENGINEERING N/A rsmith 11/30/2021 4:20:06 PM ELECTRIC N/A Approved DATE WR — STORMWATER DATE a"a�,ce Approved PM DATE PLANNING N/A svanevery 12/0112021 ]:05:36 AM DATE DATE PLANNING — TRANSPORTATION DATE N/A khuegerich 11/30/2021 11:48:40 AM DATE FIRE N/A areincke 11/30/2021 2:05:40 PM DATE U J J a_ z w w z z w 0) 73 Construction Management 0) c .L w w C .; V 221 N. SALEM ST. SUITE 001 PO BOX 1062 APEX, NC 27502 Office: 919-387-1174 Registration: P-0151 www.jonescnossen.com _.��gSg�FC47C�&1r1.� AU eoF�nssioAG SEAL 1 D. CV-?,,,IAe 6g n?d6:51Sliti SCALE I"=10' 0 z 0 0 DETENTION L.� 0 DRAWN PDC DATE APRIL 2 I , 20 15 REVISION 08/2 I /20 GRADING REVISION 11/17/20 TRC COMMENTS 03/09/2 1 TRC COMMENTS 09/08/2 I STORM DRAINAGE GRADING REVISION SHEET 7A GRAPHIC SCALE WR — 5 E DATE PARKS, RECREATION $ CULTURAL RES. DATE PROJECT I302