Loading...
HomeMy WebLinkAbout20140209 Ver 1_7 Bio-Retention 1_20211130F\-Nct tt-c l D RETAINING WALL (2'±) CLEAN -OUT (TYPICAL) 4" PVC F I CAL) SOTTO IV S U FAC E AREA = 2,33G SE '} (ELEV.=322.65) 20' 5E OA 5AN' EASE. ►� at Corners Appantr ato Lireao En evallon OttIailead HAD For cot applications: or as directed by geotechteral meiotic when site ctieditions radalre,-- piece drainage c rrintattia Mkali GIOON for equivrleui) installari it 20- wa33 he phi and 30% coverage. °" Mkt. Low Petreaa We Sziii a' Perforated PVC Drainage Tile,_ Outlet query 5fi' 0.C, (when Site Conditions Require) Sae rote betow. 4' Perforated PVC or HOPE Dralnega outlet every ,O' O.C. Nr�t�t: As directed by isediester v fs rt a32a candltiona tedukrn, wrap deer/svelte In Pa or Y%i W I stone and Sox nonw'vrati Met Nano and pla'm with deefnc>LWW oaroptasfia iwytqwedadt bank &sift eyxrmn, Typical Reinforced Wall Section :r=i? Ciatea.da FiTi 3;4• Crashed Pnsk r Stone) Levelled Ped Nate:. ebiL SEARING CAPACITY OF 3,fitT,7 PSF IS ASSUMED NOTES: I . RETAINING WALLS MUST BE A MEDIUM OR. DARK BROWN OR RUST COLOR. 2. RETAINING WALL DETAIL REPRESENTS THE WALL TYPE TO BE USED AT THIS SCM. • • • • G" PVE INV. 318.p1 WETLANDS (TYPICAL) 0`2 EIV OVEX. I 5" �\ EES $ INSTALL HEADWALL INV. =323.66 (-I-) FOREBAY DETAINING WALL (<3') \ \ \ \ STORMWATEBfVP ACCESS fVAINTENANCE EASEMENT \ \ \ \ TOP Of BEAM -325. 15 E/ E KG ► N CY SPILLWAY CEIVIE_Kt ENCY -- 5-I-LLWA DITCH 5'x 5' I P- RAP PAD (D5o=") STRUCTURAL BMP CONSTRUCTION SEQUENCE: THE FOLLOWING MUST OCCUR. PRIOR TO FINAL PLAT AND/OR CERTIFICATE OF OCCUPANCY (CO): 1. ALL STRUCTURAL BMP5 MUST BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS. 2. THE DESIGN ENGINEER MUST SUBMIT AN AS -BUILT PACKAGE WHICH MEETS ALL REQUIREMENTS PRESENTED IN THE TOWN SPEC BOOK INCLUDING A SIGNED AND SEALED CERTIFICATION STATEMENT. 3. SUBMIT THE APPROPRIATE SIGNED STRUCTURAL BMP OEM AGREEMENT AND MAINTENANCE GUARANTEE TO THE DEVELOPMENT PROJECTS COORDINATOR IN CONSTRUCTION MANAGEMENT AT 249-3394, 4. A FINAL INSPECTION BY THE ENVIRONMENTAL PROGRAMS MANAGER SHALL BE CONDUCTED ONCE THE AS -BUILT SUBMITTAL HAS BEEN RECEIVED. ONCE APPROVED, THE ENVIRONMENTAL PROGRAMS MANAGER WILL SEND A BMP APPROVAL LETTER TO THE OWNER. 5. IN LIEU OF STRUCTURAL BMP COMPLETION AND FINAL APPROVAL BY THE ENVIRONMENTAL PROGRAMS MANAGER, THE TOWN MAY ACCEPT A PERFORMANCE GUARANTEE IN ACCORDANCE WITH UDO SECTION 6. I . 12(G). IF THE CONTRIBUTING DRAINAGE AREA FOR THE BMP5 I5 UNSTABLE AT THE TIME OF FINAL PLAT APPROVAL FOR. A SUBDIVISION, THE TOWN WILL ALLOW A SKIMMER SYSTEM TO BE CONNECTED TO THE EMERGENCY DRAIN SIZED TO DE -WATER THE VOLUME OF THE BASIN OVER A 2-3 DAY PERIOD. POROUS BAFFLES SHALL EITHER CONTINUE TO BE MAINTAINED (IF CONVERTING FROM A SEDIMENT BASIN) OR BE INSTALLED. ANY ORIFICES MUST BE CAPPED OR PLUGGED. 6. ALL STRUCTURAL BMPS ARE REQUIRED TO BE COMPLETED PRIOR TO A FINAL CO FOR. A SITE PLAN AND ISSUANCE .OF 90% OF COS WITHIN A SUBDIVISION. IF THE SUBDIVISION'S TO BE PHASED, ALL STRUCTURAL BMPS SHALL BE COMPLETED PRIOR TO ISSUANCE OF 90% OF COS WITHIN THAT PHASE. 7. IF A STRUCTURAL BMP COUNTS TOWARDS RCA, THE REQUIRED LANDSCAPING SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AND COORDINATED WITH THE TOWN ZONING COMPLIANCE OFFICER AT 249-3426. BIOETENTION LAYOUT: STANDARD COSS-SECTION I I I I I III -IN SITU SOIL PERMENANT CLEANOUT POST WI CLEANOUT MARK BOTTOM AND SLOPES STABILIZED CAPPED CLEAN WITH BERMUDA OUT PIPE SOD L 1 2" PONDING FILL SOIL MEDIA MIX: 85-88% SAND, 8-I 2% FINES 3 5% ORGANIC DEPTH: TREES/SHRUBS-aft. GRASS=2ft. 4" W' 21+ DISTANCE TO WATER TABLE HED SANE -UNDERDRAIN �FILTER FABRIC_ (OR CHOKING - STONE) - -WATER TABLE- BIORETENTION AREA AS-DUILT REVISION MINIMUM WEIR LENGTH (FT) 10 10 UNDERDRAIN PIPE DIAMETER. (IN) 4 4 MINIMUM NUMBER OF UNDERDRAIN PIPES 2 2 CLEANOUT ELEVATION (FT) 323. 17 323.17 TOP OF BIORETENTION SOIL MIXTURE ELEV. (FT) 322.65 322.65 BOTTOM OF BIORETENTION SOIL MIXTURE ELEV. (FT) 320.65 320.65 SPILLWAY (WEIR) ELEVATION (FT) 324.04 324.15 TOP OF BERM ELEVATION (FT) 324.82 325.15 MINIMUM DEPTH= 12" ('•?., \///\/\ RIP -RAP D5o=6" BOTTOM WIDTH = 2' WITH GEOTEXTILE LINER NOTE: RIP -RAP SHALL EXTEND TO THE EDGE OF THE GEOTEXTILE LINER. EXISTING GROUND EMVEKGENCY SPILLWAY DITCH DETAIL N.T.S. UNDERDRAIN PIPE SHALL BE SCHEDULE 40 PVC, SDR35, OR SMOOTH WALL CORRUGATED PLASTIC PIPE WITH 3/8' PERFORATIONS AT 6" ON CENTER (4 HOLES PER ROW) REFER TO TABLE FOR PIPE SIZE. \��/\\\/\\ /�\ \/\\//\//\ /f\\//\�' \//\\/�\\// \/` \<\• CLASS "C" GEOTEXTILE FABRIC AROUND WASHED STONE UNDERDRAIN PIPE TO BE INSTALLED AT 0.5% MIN. SLOPE 4i TOP OF BIORETENTION POND BOTTOM OF ENGINEERED FILL MATERIAL PERMEABLE FILTER FABRIC LINING ENTIRE BIORETENTION CELL WASHED 57 STONE ENVELOPE RETAINING WALL ENGINEERED FILL MATERIAL HOPE CLEANOUT 1 O0-YEAR STORM EL - 324.65 10-YEAR STORM EL - 324.45 I -YEAR STORM EL - 324.25 UNUNED SLATTED HDPE UNDERDRAIN PERMEABLE FILTER FABRIC OVER ENVELOPE TOP OF EARTH DAM EL m 325.15 TOP OF EMERGENCY SPILLWAY EL - 324.15 OUTLET PIPE INVERT OUT BIO-RETENTION BMP CROSS-SECTION (N.T.S.) BIORETENTION SOIL NOTES: BIORETENTION SOIL MIXTURE (BSM): SHALL BE PLACED AND GRADED USING LOW GROUND -CONTACT PRESSURE EQUIPMENT OR BY EXCAVATORS AND/OR BACKHOES OPERATING ON THE GROUND ADJACENT TO THE BIORETENTION FACILITY. NO HEAVY EQUIPMENT SHALL BE USED WITHIN THE PERIMETER OF THE BIORETENTION FACILITY BEFORE, DURING, OR AFTER THE PLACEMENT OF THE BSM. THE BSM SHALL BE PLACED IN HORIZONTAL LAYERS NOT TO EXCEED 12 INCHES FOR THE ENTIRE AREA OF THE BIORETENTION FACILITY. THE BSM SHALL BE COMPACTED BY SATURATING THE ENTIRE AREA OF THE BIORETENTION FACILITY AFTER EACH LIFT OF BSM 15 PLACED UNTIL WATER FLOWS FROM THE UNDERDRAIN. WATER FOR SATURATION SHALL BE APPLIED BY SPRAYING OR SPRINKLING. AN APPROPRIATE SEDIMENT CONTROL DEVICE SHALL BE USED TO TREAT ANY SEDIMENT -LADEN WATER DISCHARGED FROM THE UNDERDRAIN. IF THE BSM BECOMES CONTAMINATED DURING THE CONSTRUCTION OF THE FACILITY, THE CONTAMINATED MATERIAL SHALL BE REMOVED AND REPLACED WITH UNCONTAMINATED MATERIAL AT NO ADDITIONAL COST TO THE ADMINISTRATION. FINAL GRADING OF THE BSM SHALL BE PERFORMED AFTER A 24-HOUR SETTLING PERIOD. FINAL ELEVATIONS SHALL BE WITHIN 2 INCHES OF ELEVATIONS SHOWN ON THE CONTACT PLANS. THE BIORETENTION SOIL MIXTURE (BSM) SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS, OR OTHER SIMILAR OBJECTS LARGER THAN 2 INCHES EXCLUDING MULCH. NO OTHER MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. PRIOR TO PLACING THE UNDERDRAIN AND THE BSM, THE BOTTOM OF THE EXCAVATION SHALL BE ROTO-TILLED TO A MINIMUM DEPTH OF 6 INCHES TO ALLEVIATE ANY COMPACTION OF THE FACILITY BOTTOM. ANY SUBSTITUTE METHOD FOR ROTO-TILLING MUST BE APPROVED BY THE ENGINEER PRIOR TO USE. ANY PONDED WATER. SHALL BE REMOVED FROM THE BOTTOM OF THE FACILITY AND THE SOIL SHALL BE FRIABLE BEFORE ROTO-TILLING. NOTES: 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY TAKEN FROM A DIGITAL FILE PROVIDED BY BARRY SCOTT SURVEY COMPANY. 3. TOPOGRAPHIC INFORMATION TAKEN FROM WAKE COUNTY GIS FILES. 4. THIS SITE HAS BEEN REVIEWED FOR WETLANDS AND STREAM BUFFERS BY ENVIRONMENTAL SERVICES INC. AND THE DELINEATED ENVIRONMENTAL FEATURES HAVE BEEN SHOWN. 5. PER FEMA MAP #37200721 OOJ DATED 02 MAY 2006, NO 1 00-YEAR FLOODPLAIN TRAVERSES THE PROPERTY. 6. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 7. THIS SITE IS LOCATED WITHIN THE PRIMARY WATERSHED PROTECTION OVERLAY DISTRICT. 8. THE BIO-RETENTION AREA SHALL BE LOCATED WITHIN A DRAINAGE EASEMENT WITH ACCESS TO A PUBLIC R/W. 9. THIS SCM WAS CERTIFIED ON I I/02/19 AND 05/07/20 BUT NOT ACCEPTED BY THE TOWN OF AEX BECAUSE THE MADISON H0A OBJECTED TO PROVIDING A LETTER ACCEPTING MAINTENANCE OF THE CONSTRUCTED EMBANKMENT SLOPES. W BIOETENTI ON CELL: FO.EBAY DETAIL GRASS /f \ ,,,„//X/\/% 11 CLASS B RIP -RAP D5o= 1311 3011 FABRI-C (SEE NOTE 3 UNDER I0/25/21 REVISION) I O'x 10' (±) PLUNGE POOL • i \ //\ OUTLET PIPE REFER TO GRADING PLAN FOR TOP OF DAM ELEVATION 5' WEIR LENGTH REFER TO GRADING PLAN FOR SPILLWAY ELEVATION 3 • SPILLWAY BOTTOM AND SLOPES TO BE STABILIZED WITH PERMANENT EROSION CONTROL MAT PERMANENT EROSION MAT TO BE P-300 BY NORTH AMERICAN GREEN, MIRAMAT BY MIFAFI CORP., OR APPROVED EQUAL SECTION ThROUGI-1 SPILLWAY (NT5) 0 5 GAPI-11C SCALE 20 03/09/21 REVISION: THE PURF'OSE OF THIS REVISION 15 TO APPROVE THE GRADING AND RETAINING WALLS NECESSARY TO PROVIDE 3:1 INTERIOR SLOPES FOR THE 5CM. THE SCM DESIGN PARAMETERS SHALL BE CONFIRMED BY THE CONTRACTOR FOR CERTIFICATION. ANY LANDSCAPING PLANTINGS IMPACTED BY GRADING SHALL BE REPLACED. 09/05/21 REVISION: I. THE F'URPOSE OF THIS REVISION 15 TO APPROVE THE SCM A5 ORIGINALLY CONSTRUCTED INCLUDING ALL EXISTING SLOPES. THE UNDERSTANDINGI5 THAT THEHOA WILL PROVIDE A LETTER OF ACCEPTANCE FOR THIS REVISION. 2. THIS REVISION INCLUDES THE REMOVAL OF THE GEOTEXTILE FABRIC UNDER THE FOREBAY RIP -RAP. NONE WA5 INSTALLED IN THE ORIGINAL CONSTRUCTION AND IS EXPECTED TO PROVIDE BETTER INFILTRATION OF STORMWATER. 3. THE EXISTING TOPO AND BIO-RETENTION INFORMATION WAS TAKEN FROM AN AS -BUILT SURVEY. I. GEOTECHNOLOGIES, INC. COMPLETED A FIELD INVESTIGATION OF THE BERM FILL AND DO NOT RECOMMEND ANY MODIFICATIONS A5 OUTLINED IN THEIR I 0/21/2 I REPORT. 2. THE REHABILITATION WORJK OUTLINED UNDER THE 03/09/2 I REVISION AND SHOWN HEREON SHALL BE IMPLEMENTED FOR 5CM CERTIFICATION UNLESS A LETTER FROM THE MADISON HOA IS PROVIDED ACCEPTING THE 5CM AS CONSTRUCTED WITHOUT CONDITIONS. 3. FABRIC SHALL BE PLACED UNDER THE RIP -RAP FOR, THE FOREBAY IF INSTALLED DIRECTLY ON IN -SITU 50IL5 AND/OR FILL. IF THE RIP-RAPI5 PLACED ON SOIL MEDIA, NO FABRIC IS REQUIRED. 4. RETAINING WALLS SHALL BE SEGMENTED BLOCK TINTED MEDIUM OR DARK BROWN OR RUST IN COLOR. ALL PERMITTING WILL BE HANDLED AS A SEPARATE SUBMTTAL. 5. FENCING SHALL BE INSTALLED AT THE TOF' OF RETAINING WALLS IF REQUIRED BY THE BUILDING CODE. THE SIGNATURES AFFIXED BELOW CER,TIFY THAT THIS SHEET HA5 BEEN REVIEWED AND APPROVED SOLELY PER THE CERTIFICATIONS SIGNED ON TI1E COVER SHEET OF THESE CONSTRUCTION PLANS. PW - TRANSPORTATION DATE BUILDING INWNTIONS unifier 12/02/2021 2:00:58 PM WR, - UTILITY ENGINEERING rsmith 11/30/2021 4:19:42 PM ELECTRIC Approved Approved DATE PLANNING DATE DATE DATE PLANNING - TRANSPORTATION DATE DATE FIRE DATE DATE PARKS, RECREATION CULTURAL RES, DATE Jones & Cnossen ENGINEER Construction Management Civil Engineering SUITE 001 PO BOX 1062 APEX, NC 27502 Office: 919-387-1174 Registration: P-0151 ' y; ,24 CONSTRUCTION DRAWINGS SCALE DATE aL OZ Lil 0 TOWN OF DRAWN 5MJ REVISION 03/1 3/1 4 1st TRC COMMENTS 04/17/15 BIO-AREA GRADING GRADING REVISION TRC COMMENTS TRC COMMENTS 09/08/2 1 GRADING REVISION SHEET 7 PROJECT DESIRED BIORETENTION SOIL MIXTURE PH LIES BETWEEN 5.5 AND 6.5.