Loading...
HomeMy WebLinkAbout19890051 Ver 4_DCM-MP-2_Excavation_and_Fill_-_rev_1_20211013DocuSign Envelope ID: C67938C7-58F8-429D-BA6A-5134D757F070 Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Channel (NLW or NWL) Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater Other (excluding shoreline stabilization) Length 382' Width 190.6' Avg. Existing Depth -8.5' NA NA Final Project Depth DS'1_ 8' (_6 + _2') NA NA WW 1. EXCAVATION ■ This section not applicable a. Amount of material to be excavated from below NHW or NWL in os cubic yards IIt 2,790 CY New Area (East and South) 2,230 Currently Permitted c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas: To provide clearance from bottom of marina for boats. bb.,"'�1Type of material to be excavated. r1A/4Sand and sediment - testing report for (W �t) spoil material is attached. d. High -ground excavation in cubic yards. N/A 2. DISPOSAL OF EXCAVATED MATERIAL ['This section not applicable a. Location of disposal area. Contractor -provided, permitted disposal location. Agreement or consent agreement to be in place before dredging begins. c. (i) Do you claim title to disposal area? ❑ Yes No ❑NA (ii) If no, attach a letter granting permission from the owner. Letter will be provided prior to dredging activity commencing. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑ CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: To safely dispose of waste sediment in appropriate area. b. Dimensions of disposal area. Will be provided once location is selected. d. (i) Will a disposal area be available for future maintenance? ❑ Yes ®No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑ Yes No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 DocuSign Envelope ID: C67938C7-58F8-429D-BA6A-5134D757F070 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION (If development is a wood groin, use MP-4 — Structures) ['This section not applicable a. Type of shoreline stabilization: 0 Bulkhead Riprap ❑Breakwater/Sill ['Other: c. Average distance waterward of NHW or NWL: 3.75' e. Type of stabilization material: PZ22 Steel Sheet Pile x 30' 0" (Epoxy Coat Upper 20') g. Number of square feet of fill to be placed below water level. Bulkhead backfill 3,000 SF Riprap Breakwater/Sill Other i. Source of fill material. Permitted borrow site b. Width: 22" d. Maximum distance waterward of NHW or NWL: 4.31' Length: 415' (east side); 260' (south side) f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. Clean sand and drainage stone 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) ®This section not applicable a. (i) Will fill material be brought to the site? ❑Yes ❑No If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ['None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Floating turbidity curtains c. (i) Will navigational aids be required as a result of the project? ❑Yes No ❑NA (ii) If yes, explain what type and how they will be implemented. b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Backhoe, pile driver, long reach excavators, xcavator on barge d. (i) Will wetlands be crossed in transporting equipment to project site? ['Yes No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 10/13/2021 Date TOCB Boat Basin Revitalization Project Name Mark weiss Applicant Name Applicant Signature �DocuSigned by: Mot. ss F8154E6DD835445... 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06