HomeMy WebLinkAboutNCC216806_ESC Approval Submitted_20211209November 5, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Lee Park Baptist Church Attention: Christopher Latta, Executive pastor 2505 Morgan Mill Road Monroe, North Carolina 28110 RE: Project Name: Lee Park Church Baseball Field Acres Approved: 5.0 Project ID: UNION-2021-074 County: Union, City: Monroe Address: Morgan Mill Rd. River Basin: Catawba Stream Classification: Other Submitted By: James Magennis, PE, CMEC, PC Date Received by LQS: October 22, 2021 Plan Type: Revised Dear Mr. Latta: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.tgov/NCGOI. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 _ 704-663-1699 Q;w �4 65r�cp , Letter of Approval with Modifications Lee Park Baptist Church November 5, 2021 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: James Magennis, PE Letter of Approval with Modifications Lee Park Baptist Church November 5, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Lee Park Church Baseball Field Project ID: UNION-2021-074 County: Union 1. The Emergency Spillway (EMS) for basin shall be installed a minimum 1.5' below top of dam. Therefore, the EMS should be at Elev. 572.5' at a minimum. 2. In Phase 1 (Sheet E-1), a rock check dam (3' top crest width & 3' high) shall be installed below the 30" HDPE during pipe installation. The rock check dam can be blended into the outlet protection upon completion of pipe installation. Silt fence shall be installed along toe of fill and HW2 to keep fill slope from washing into outlet protection. Adequate inlet protection shall be provided around HW2. This can consist of silt fence & stone outlets, rock pipe inlet protection (see attached detail), etc. or a combination of these measures. A rock check dam and adequate liner shall be installed in graded portion of channel upstream of proposed rip -rap (leading to HWI). 3. In Phase 2 (Sheet E-2), the minimum area necessary shall be disturbed until the diversion berm can be installed to divert disturbed area to basin. Adequate inlet protection shall be provided around HWL In addition, a diversion berm shall be provided above HW1 to direct disturbed area to basin at all times (to prevent site from draining to HW 1). This diversion berm shall be provided throughout remaining phases of construction. 4. In Phase 4 (Sheet E-4), the silt fence shall remain intact and functional (located below basin) upon removal of basin from service. Approval to remove basin shall be obtained from DEMLR. Natural Ground Figure 6.55a Rock pipe inlet protection plan view and cross-section view 6.55.2 Rev. 6/06