Loading...
HomeMy WebLinkAboutNC0043176_Annual Performance Report_2005020991 0892887'1 '' Public Works 02:13:19 p.m. 2005-02109 2/3 CITY OF DUNN POST OFFICE BOX .1065 • DUNN \NORTH CAROLINA 28335 PUBLIC WORKS DEPARTMENT • (910) 892-2948 • FAX (910) 892-8871 CITY OF DUNN WASTE WATER TREATMENT PLANT ANNUAL PERFORMANCE REPORT I. GENERAL INFORMATION: Facility Name: Black River Wastewater Treatment Plant Contact Person: Billy Addison Responsible Entity: City of Dunn Applicable Permit #: NC0043176 Telephone Number: 910-892-2948 DESCRIPTION OF TREATMENT PROCESS: The City of Dunn/Black River Waste Water Treatment Plant uses the extended aeration mechanical and biological processes to treat the waste water entering the plant. The raw waste water enters the plant through a 30" gravity sewer main which goes through three enclosed 1580 GPM each lift pumps and one standby T-12 4000 GPM Gorman Rupp standby pump to handle higher flows in emergency situations. The flow then passes thru a mechanical barscreen which removes floating material and then passes thru an aerated grit chamber which allows flow to flow less than 1 foot per second which allows any heavy materials (sand and organics, etc.) to be removed. The flow then goes ' thru a partial flow measuring devise, where flows are measured and samples are taken 24 hours per day for operation and analytical control. The flow goes then to a diversion box that splits the flow between aeration basins where diffused air is forced under pressure by three turbin blowers for the bacteria to live function, reproduce in the biological process. The flow leaves the aeration basins thru a trough at the end of each basin and goes to another diversion box where the flow is split again and is divided and sent to three 60 ft. diameter clarifiers. The flow leaves clarifiers and goes over the. V-notch weirs and flows to a CL2 contact chamber where disinfection and declorination takes place before the flow enters into the wet well of a final pumping station where 3 5000 GPM pumps 'which are on variable speed drive controls and pump the final treated effluent 3 % miles to the Cape Fear River where it is discharged. In the clarification process, sludge is settled in the clarifiers and siphoned to a return sludge pumping station where the sludge is recycled to the head of the aeration basins. A portion of the sludge is pulled thru a DAF (Diffused Air Flotation Unit) where fme air bubbles and polyemers are added to thicken Home ofMaj. Gen. William C. Lee bisf . sakariaC (y 11 I I I( "Father of the Airborne" 9108928871 Public Works 02:13:36 p.m. 2005.-02-09 3 /3 R the sludge before it is pumped to an aerobic digester where air is added for final stabilization of the sludge. The sludge is then pumped to a 600,000 holding tank where the sludge is held until volumes and hold times are met so as to meet all vector requirements. The sludge is then hauled .out to by tanker trucks and applies to an EPA permitted farm site and applied for fertilization at agronomic rates. II. PERFORMANCE: The City of Dunn Waste Water Treatment Plant received only one (1) permit violation for 2004 which was a flow violation for September 2004 and was below the 10% acceptance limit, and was due to extremely high rain fall total for September 2004. M. This report was published in The Dunn Daily Record local newspaper and run on the City Local Government cable tv channel. If you have questions concerning this report, please contact Billy Addison at the City of Dunn Public Works Department (910) 892-2948 or Bobby Burnette at the Black River Waste Water Treatment Plant at (910) 892-2935. IV. CERTIFICATION: I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the or customers of the named system and that the users have been notified of its availability. Billy Ad son Assis Public Works Director City of Dunn - NC