HomeMy WebLinkAbout20070211 Ver 1_Acceptance Letter_20070726O~O~ W A T ~9QG
r
~ y
~ ~
July 26, 2007
EXPRESS REVIEW ACCEPTANCE LETTER
Zapolski and Rudd, LLC
Attn: Mr. Luis A. Rios
501 Washington Street
Durham, NC 27701
Project Name: Williams Corner
Coleen H. Sullins, Director
Division of Water Quality
Chatham County
On July 19, 2007, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a request
from Mr. Kevin Yates of John R. McAdams Company, regarding a project known as "Williams Corner" for
acceptance into the Express Review Program. This letter advises you that your project will be accepted into the
Express Review Program once the following items are received:
~.
1) The application fee of $2,000.00 [for 401 Water Quality Certification with major impacts and Stormwater
Management Plan Review], made payable to the North Carolina Division of Water Quality];
2) Five (5) complete and collated copies of the PCN Application;
3) One (1) completed copy of the Addendum to the PCN Application;
4) Five (5) copies of all site plan information pertaining to this project (please refer to the Addendum
http://h2o. enr.state. nc.us/ncwetlands/appadd5.pdf);
5) Three (3) copies of the stormwater management plan and all required information (refer to
http://h2o.enr.state.nc.us/ncwetlands/documents/MicrosoftWord-PCN_Addendum_ 10_01 _06_000.pdf).
Please be aware that under Condition No. 4 of GC 3631, DWQ can require stormwater management plans
for developments that have, or are anticipated to have, 30% or greater of impervious surface area.
Furthermore, it is DWQ's policy that areas of concentrated development within a project must treat
stormwater runoff. Stormwater management shall be designed to remove 85% TSS according to the latest
version of DWQ's Stormwater Best Management Practices Manual at a minimum. Additionally, in
watersheds that are classified as Nutrient Sensitive Waters (NSW), the Division shall require that extended
detention wetlands, bio-retention areas, or detention ponds followed by forested filter strips be constructed
as part of the stormwater management plan.
Thank you for your attention to this matter. The clock for this project will not start until receipt of the completed
application package and required fee are received. If the impacts are greater than indicated on the Initial Interest
Form and/or the services are different, you may be required to remit an additional fee. If you have any questions
or wish to discuss these matters further please do not hesitate to call Lia Myott at 919-733-9502.
Sincerely,
~Pt-C-~+
Cyndi Karoly, Su rvisor
401/Express Review Oversite Unit
CBK/lem
cc: File copy
Kevin Yates, John R. McAdams Company, 2905 Meridian Pkwy., Durham, NC 27713
401 Oversight I Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
None Carolina
~tura!!y
An Equal OpportunitylAffirmativeAaion Employer- 50% Recycled110% Post Consumer Paper