Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0035402_Regional Office Historical File Pre 2018
Nart Beverly Eaves Perdue Governor City of Salisbury David Treme, City Manager 217 South Main Street Salisbury, NC 28144 Dear Mr, Treme, NCDENR Caro ma Department of Environment and Natura Res© Division of Water Quality Coleen H. Sullins Director June 10, 2011 Dee Freeman Subject: Permit No. WQ0035402 Sanitary Sewer Extension to Serve Whitney Industrial Park Wastewater Collection System Rowan County, North Carolina In accordance with your application received on June 6, 2011, we are forwarding herewith Permit No. WQ0035402 dated June 10, 2011, for the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee.. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T: 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application, It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Salisbury for the construction and operation of approximately 117 linear feet of 8- inch gravity sewer, and the discharge of 3000 gallons per day of collected domestic wastewater into Salisbury -Rowan WWTP (Grants Creek Train) existing sewerage system pursuant to the application Mooresville retlonal Office Location; 610 Fast Center Ave„ Suite 301 Mooresville, NC 281'15 Phone: (704) 663-1699 ti Fax: (704) 663.6040 \ Customer Service.: 1-877-623-6748 Internet: 'http !/portaLncdenr.m.l ebb{wq/home/ro fay ',h.Carol i n,1 Page 2 June 10, 2011, received June 6, 2011, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Town Creek Wastewater Treatment Facility WWTP (NPDES No.NC0023884) prior to being discharged into the receiving stream. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of the City of Salisbury, The City of Salisbury must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits and the WQCS00019 permit requirements. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter„ please contact Mr. Samar Bou- Ghazale at (704) 663-1699. for Coleen . Sullins, Director cc: Mooresville Regional Office, Collection System Permit Files Surface Water Protection Central Files PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local,, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 28 ,0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2E3 .0200 and 15A NCAC 2H 0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699 as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following a. Any process unit failure,, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, ar.. b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part 1 of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 10th day of June 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -73 for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0035402 3 Fast Track EngineeringCertificatipn June 1O,2U11 OwnmrfWQCS Permit No, VVOUU354O2 City ofGa|inbury-Attn: David Treme 217 South Main Street Salisbury, NC28144 PE Darryl LWagoner, P.E. Salisbury Engineering &Planning 516-ANorth Main Street Salisbury, NC28114 Complete and submit this form hzthe permit issuing regional office with the fo8owing: * One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension w Supporting design calculations (selected pumps, system cume, operating point, aumiieNe storage if portable genenator(s)orstorage greater than longest past three year outage reliability option selected) for any pump stations permitted eopart nfthis project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are, required for any chanqes resultinq in non-compliance with this permit, requlations or minimum desiqn criteria. This prcjertohaU not be considered complete nor a|��eU tooperateuntK this Engineer's Certification and all required *UppmrUn8documentation have been received bvthe Division, Therefore, itU$highly recommended that this certification be sent in o manner that provides proof of receipt bythe Division, ENGINEER'S CERTIFICATION Partial Fj Final F1 i .asaduly registered Profes�� ona|�n�eerhntheS�keofNo�hCaro|�a.Mev�gbeen authorized to observe ( El periodically, 1 weekly, F— full time) the construction of Sanitary Sewer Extension to serve Whitney Industrial Park' a City of Salisbury project for the Pemnittee, hereby state that. to the best of my ebi|ihem, due ceny and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit 15A NCAC 2T; the Division of VVabar Quality's(Division) Gravity 8ovver Minimum Design Chbahm adopted February 12' 1898 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting ofPump Stations and Force Mains adopted Juno l.2OOUasapp|iceb|e�and other supporting materials. North Carolina Professional Engineer's seal, signature, and dahe� SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS K80]RESVILLEREGIONAL OFFICE SURFACE WATER PROTECTION @1&EAST CENTER AVENUE, SUITE 301 K0OORESVlLLENC 28115 The i | .b|efo tracking allpartialce�i�msUmn�V�un0o�na|oa��cahnn�1neoe.wed.Anv_�_��. —wastewater flow ---- made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! OwnerlPermittee: City of Salisbury Full Legal Name (company, municipality, HOA, ut David W. Treme, City Manager gning Official Name and Title (Please review 1A NCAC 2T .01 The legal entity who will own this system is: 0 Individual 0 Federal Municipality D State/County 0 Priv 0 1 d. P. O. Box 479 Mailing Address 1f. N.C. Application Number: (to be completed by OWQ) z State 1 h, 704-638-5200 Telephone 704.638-8458 Facsimile uthorized signing officials!) e Partnership 0 Corporation 0 Other (specify): e. Salisbury Dig, ISI , , OF City g 28145 mm. Zip Code dmikk@salisbury pv L E-mail 2. Project (Facility) Information: Extension to serve Whitney Industrial Park 2b. Rowan 2a. Sanitary Sewer County Where Project is Located Brief Project Name (perrnit will refer to this name) 3. Contact Person: 3a, Darryl Wagoner , Owner Salisbury __- Engineering & Planning Name and Affiliation of Someone Who Can Answer Questions About this Application. 3b. 704-633-8550 Phone Number Project is 4 New 0 Modification (of an existing permit) 2. Owner is Public (skip to item B(3)) 2a. If private, applicant will be: 0 Retaining Ownership (re. store, church, single office, etc. 0 Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) City of Salisbury Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 3c. seandp@aol,cam E-mail flora, Permit No.: i TY 2(a)) 2b. If sold, 0 ed by a (must choose one) 0 Public Utility (Instruction C) 0 Homeowner Assoc./Developer (Instruction D) 4a. Salisbury -Rowan WWTP (Grants Creek Train) _ 4b. NC 0023884 Name of WWTF WW TF Permit No. City of Salisbu y, Owner of Downs 5b. 8" Sewer Receivin Sewer Size 0 Force Main 6. The origin of this wastewater is (check alt that apply): 0 Residential Subdivision 0 Apartments/Condominiums 0 Mobile Home Park 0 School 0 Restaurant 0 Office Gravity c. WQ0019009 Permit # of Downstream Sewer (Instruction E) 0 Retail (Stores, shopping 0 Institution 0 Hospital 0 Church Nursing Horne Other (specify): Industrial sites en ers) Volume of wastewater to be allocated or permittedfor this particular project: 3,000 *Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: 100 % Domestic/Commercial °A, Industrial (attach description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): ga ons per day 0 Pump Station, Outfail or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) }-9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for 2 the value in Item B(7) ANDIOR the design flow for line or pump station sizing if a reduced or zero flow is being requested in C Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use la data in accordance with 15A NCAC 2T .0114 (f). CL m' 31ots at 1000 GPD 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) _--_8" _.---_-__-- Length (feet)1 117' New Gravity or Additional Force Main Gravity 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional _1 sheets as necessary) Pump Station Location ID (self chosen - as shown on planslmap for reference) Design Flow ;Operational Point (MGD) GPM @TDH i - Power Reliability Option 1 - permanent generator w1ATS; 2 - portable generator wIMTS Force Main Size ' Force Main Length r i 1 1 Pump Station Location ID (self chosen - as shown on plans/map for reference) i I i 1 Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator wlATS; 2 - portable generator wIMTS Force Main Size Force Main Length 12. ■ Will the Yes 0 wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? No If Yes, permit number of 2id treatment facility E(RO — if "yes" to B,12 please contact the Central Office PERCS Unit) i13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? 0 Yes ■ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION Flave the fallowing permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? 0 Yes 0 No 0 N/A Sedimentation and Erosion Control Plan? Yes 0 No 0 N/A Stormwater? 0 Yes 0 No N/A 15, Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lineswillbe considered high priority and must be checked once every six months Check if Yes: 0 and provide details 1 a. Owner/Permittee°s Certification; (Signature of Signing Official and Project Name) 1, David W. Treme, attest that this application for Sanitary Sewer Extension to serve Whitney Industrial Park has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application am not completed and that if all required supporting documentation and attachments are not included, this application package is subj"ect to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor; which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signin'frcial Signature Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMi 11 AL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY; TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 Z Q 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, Darryl L. Wagoner. attest that this application for Sanitary Sewer Extension to serve Whitney Industrial Park has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Critena for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10, o0o as well as civil penalties up to $25,000 per violation„ 2a. Darryl L. Wagoner Professional Engineer Name 2b. Salisbury Engineering & Planning Engineering Firm 2c. 516-A North Main Street Mailing Address 2d, Salisbury 2e. N.C. 2f, 28144 City State Zip 2g, 704-633-85 0 2h. 704-633-8550 21, seandp@ac«i. om Telephone Facsimile E-mail NC PE SeDate Tltepartrne State of North Carolina ironmcnt and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTS,i- 0/07) t Applicant Name. City of Salisbr. , t Name for which flow is being requested;. Sttxut:acy Sewer Extension to serve Whitney industrial_ Part More than one F7 k`-10/07 may he required fir a single project a tl owner rsf the 14 W `JP is not responsible for trll pump stations along the route of the ,proposed wastewater . 1. Complete this section only if you are the owner of the treatment plant. a, WWTP Facility Name: Salisbury -Rowan. WWIPlcirant Wreck Train b. WWII' Facility Permit # . _b. NC00238f84,. c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWII, e. WWTP facility's actual avg. flow f.. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used ll. Complete this secti proposed wastewater flow i istpump stations located between the project connection point and the, Mil' All flows are in M( D 7.500 1.306 5.028 0003 _5.337 71.16 Pump Station Name or each pump station you are responsible for along the route of this Approx. Capacity, MOD Approx. Current Avg. Daily Flow,'MOD (Finn/Design) cation Stateinc Joncs, , certify that, to tlyc best of my knowiedge, the addition of the',olurne of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the Clow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any.downstream. ptrinp station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which. I am the responsible party, Signature of this form indicates acceptance of this wastewater llo / nu SAL SBURY EERI -A PLANNING June 2, 2011 DENR. Division of Water Quality 610 East Center Ave.,.Suite 301 Mooresville, N. C. 28115 RE Sanitary Sewer Extension to serve Whitney Industrial Park Rowan County Dear Sir o Madam: Y.% N 28144 DARRYL 1, . WAGONER, RE, 704-833 8550 Please find enclosed two applications and a flow/tracking acceptance letter for approval for the above referenced project Please advise nvnediately if additional information is required. Our email address is seandp@a aol,corn.. Sincerely, Ray Capps Enclosures Central Files: APS SWP 06/10/11 Permit Number WQ0035402 Permit Tracking Slip Program Category Non -discharge Permit Type Fast Track Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer samar.bou-ghazale Coastal SW Rule Permitted Flow 3000 Facility Status Active Project Type New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Sanitary sewer Ext. to Whitney Industrial Parkl Location Address Owner Major/Minor Minor Region Mooresville County Rowan Facility Contact Affiliation Owner Name City of Salisbury Dates/Events Owner Type Government - Municipal Owner Affiliation David W. Treme City Manager PO Box 479 Salisbury NC 281450479 Orig Issue 06/10/11 App Received Draft Initiated 06/06/11 Regulated Activities Industrial/Commercial wastewater Wastewater collection Outfall NULL Scheduled Issuance Public Notice Issue Effective 06/10/11 06/10/11 Requested/Received Events Additional information received Additional information requested Expiration Waterbody Name Stream Index Number Current Class Subbasin Fast Track Engineering Certification June 10, 2011 Owner/VVQCS PE Permit No, WQ0035402 Darryl L. Wagoner, P.E. City of Salisbury- Attn: David Treme Salisbury Engineering & Planning 217 South Main Street 516-A North Main Street Salisbury, NC 28144 Salisbury, NC 28114 Complete and submit this form to the permit issuing regional office with the fo owing: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form, Pe modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineers Certification and all required supporting documentation have: been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides 'roof of receipt by the Division: ENGINEER'S CERTIFICATION Partial 0 Final 1, t>ARIe-sfl^ vu1400,^Ax, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ( periodically, 0 weekly, 0 full time) the construction of Sanitary Sewer Extension to serve Whitney Industrial Park, a City of Salisbury project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's(Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicabie; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineers seal, signature, and date: \\ CAR r - SEAL r1,, 9572 SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING AD RESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee irepinsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to compietion of this Engineers Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, 4