HomeMy WebLinkAboutNCC216765_Site Plan or Location Map_20211207GENERAL NOTES: 1. ALL MATERIALS, WORKMANSHIP AND METHODS SHALL BE IN ACCORDANCE WITH THE NCDOT "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES", LATEST EDITION AND THE "NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" EXCEPT AS MODIFIED BY THESE PLANS OR THE RELATED SPECIFICATIONS FOR THIS PROJECT. 2. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING "NC ONE CALL" AND ALL NON-MEMBER UTILITY OWNERS IN THE PROJECT AREA AT LEAST 72 HOURS PRIOR TO ANY CONSTRUCTION ACTIVITY. ALL EXISTING UTILITIES ARE NOT SHOWN ON THESE PLANS AND THE LOCATIONS OF UTILITIES SHOWN MAY HAVE BEEN ESTIMATED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATIONS OF ALL EXISTING UTILITIES AND PROTECT ALL EXISTING UTILITIES AND STRUCTURES FROM DAMAGE. ANY DAMAGE TO EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS INCORRECTLY SHOWN ON THESE PLANS OR NOT SHOWN ON THESE PLANS SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE UTILITY OWNER. THE CONTRACTOR SHALL TAKE PARTICULAR PRECAUTION WHEN WORKING WITHIN AND ADJACENT TO THE DUKE ENERGY TRANSMISSION LINES AND SHALL FOLLOW ALL POWER COMPANY REQUIREMENTS AND RECOMMENDATIONS. 3. THE CONTRACTOR SHALL PERFORM ALL WORK IN A LOGICAL CONSTRUCTION SEQUENCE AS REQUIRED TO STREAMLINE AND EXPEDITE THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL CONSTRUCTION & SCHEDULING WITH OTHER CONTRACTORS, SUBCONTRACTORS, TRADESMEN, UTILITIES AND ALL OTHER PARTIES WORKING WITHIN THE PROJECT AREA AS NEEDED TO EXPEDITE AND SUCCESSFULLY COMPLETE THE PROJECT. THE CONTRACTOR SHALL ALLOW TIME FOR COORDINATION AND DELAYS CAUSED BY OTHERS WORKING WITHIN AND USING THE PROJECT AREA. 4. THE CONTRACTOR IS RESPONSIBLE FOR STAKING OUT ALL WORK RELATED TO THIS PROJECT AND VERIFYING ALL DIMENSIONS AND GRADES PRIOR TO COMMENCING CONSTRUCTION. ALL STAKEOUT WORK SHALL BE PERFORMED BY A QUALIFIED NC PROFESSIONAL LAND SURVEYOR ENGAGED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. SHOULD ANY CONFLICTS OR OTHER PROBLEMS EXIST IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE CIVIL ENGINEER AND AWAIT FURTHER INSTRUCTION PRIOR TO COMMENCING CONSTRUCTION ON THE PROJECT. ANY DIMENSIONS OR LENGTHS SHOWN OR INDICATED ON THE PLANS ARE HORIZONTAL MEASUREMENT AND PARALLEL OR PERPENDICULAR TO BUILDING LINES, CURB LINES OR BASE LINES UNLESS SPECIFICALLY NOTED OTHERWISE. 5. THE CONTRACTOR IS RESPONSIBLE FOR ANY DEMOLITION, CLEARING, GRUBBING AND DISPOSAL OF ALL WASTE MATERIALS AS NECESSARY TO SATISFACTORILY COMPLETE ALL CONSTRUCTION WHETHER SHOWN ON THESE PLANS, NOT SHOWN ON THESE PLANS OR INCORRECTLY SHOWN ON THESE PLANS. ALL WASTE MATERIALS SHALL BE REMOVED AND DISPOSED OF OFF THE PROJECT PROPERTY BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS AT THE CONTRACTOR'S EXPENSE. 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ACCEPTABLE ACCESS TO ALL PARTIES THROUGHOUT THE PROJECT AREA AND OTHER AFFECTED PROPERTIES THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE AND INSTALL MAINTENANCE STONE, TEMPORARY WALKWAYS AND OTHER MEASURES AS MAY BE NECESSARY TO MAINTAIN PEDESTRIAN AND VEHICLE ACCESS IN A CONDITION ACCEPTABLE TO THE OWNER, JACKSON COUNTY, THE CIVIL ENGINEER, NCDOT, OTHER CONTRACTORS AND ANY OTHER PARTIES AFFECTED BY CONSTRUCTION ACTIVITIES. 7. SHOULD GROUNDWATER BE ENCOUNTERED DURING CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN AN ADEQUATE DEWATERING SYSTEM. DEWATERING EQUIPMENT SHALL BE USED IN A MANNER WHICH PREVENTS DAMAGE TO ANY PUBLIC OR PRIVATE PROPERTIES. 8. THESE PLANS HAVE BEEN DEVELOPED UTILIZING ELEVATION AND LOCATION SURVEYS BY DAVENPORT, IVEY & ASSOC., INC. (DRAWING NUMBERS J-1804-SUB, DATED 3/17/20 AND J-2054, DATED 4/13/21). IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL ACTUAL SITE CONDITIONS AND NOTIFY THE ENGINEER OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO COMMENCING CONSTRUCTION. SURVEY INFORMATION SHOWN ON THESE PLANS SHOULD NOT BE USED FOR THE SALE OR CONVEYANCE OF LAND OR RIGHT OF WAYS. 9. CONSTRUCTION SIGNING AND TRAFFIC CONTROL ARE THE CONTRACTOR'S SOLE RESPONSIBILITY. ALL CONSTRUCTION SIGNING AND TRAFFIC CONTROL MATERIALS, METHODS AND MEANS SHALL BE IN ACCORDANCE WITH NCDOT STANDARDS, THE LATEST EDITION OF THE "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" AND ANY PROJECT SPECIFIC REQUIREMENTS IMPOSED BY THE OWNER AND THE LOCAL NCDOT OFFICES. 10. THESE PLANS REPRESENT MINIMUM RECOMMENDED MEASURES FOR EROSION CONTROL. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING ADDITIONAL MEASURES IF NECESSARY TO PREVENT THE LOSS OF SEDIMENTATION. 11. GROUND COVER (TEMPORARY SEEDING, PERMANENT SEEDING OR GRAVEL SURFACE) SHOULD BE ESTABLISHED IN 7 WORKING DAYS OR LESS. 12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL SECURITY AND SAFETY RELATED TO THIS PROJECT. 13. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTIES FROM DAMAGE RELATED TO CONSTRUCTION ACTIVITIES. ANY DAMAGE AS A RESULT OF CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER AND THE OWNER. 14. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AN ACCURATE SET OF AS -BUILT DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE ENGINEER WITH AN ACCURATE AS -BUILT SURVEY COMPLETED BY A QUALIFIED NC PROFESSIONAL LAND SURVEYOR AT THE CONTRACTOR'S EXPENSE. THE SURVEY SHALL BE PROVIDED IN BOTH SEALED HARD COPY AND DIGITAL (AUTOCAD COMPATIBLE WITH ALL RAW SURVEY DATA POINTS) FORMATS. THE AS -BUILT SURVEY SHALL INCLUDE ALL AREAS AFFECTED BY CONSTRUCTION AND SHALL BE PREPARED ON PLAN HORIZONTAL AND VERTICAL DATUMS PROVIDED AND SHALL PROVIDE 1 FT VERTICAL CONTOUR INTERVALS; ALL CRITICAL ELEVATIONS; ALL LOCATIONS AND ELEVATIONS OF ALL PAVEMENTS, SIDEWALKS, CURB AND GUTTER, WALLS; ALL STORM PIPE AND STRUCTURE LOCATIONS, INVERTS AND INLET ELEVATIONS; SEWER LOCATIONS, INVERTS AND APPURTENANCES, WATER LINES AND APPURTENANCES, ALL KNOWN UTILITY LOCATIONS AND ELEVATIONS; AND ANY OTHER MANMADE IMPROVEMENTS (WHETHER EXISTING PRIOR TO OR FOLLOWING THE CONSTRUCTION OF THIS PROJECT). THE SURVEY SHALL INCLUDE ALL PORTIONS WITHIN THE PROJECT CONSTRUCTION LIMITS. THE AS -BUILT SURVEY SHALL BE PROVIDED TO THE ENGINEER PRIOR TO RELEASE OF FINAL PAYMENT. 15. THE CONTRACTOR SHALL, AT HIS EXPENSE, FURNISH ALL FILL SELECT BACKFILL, BORROW, SPECIAL BEDDING AND OTHER MATERIALS AND DISPOSE OF ALL WASTE AND EXCESS MATERIALS OFF -SITE AS NECESSARY FOR THE PROPER COMPLETION OF THE PROJECT TO THE SATISFACTION OF THE ENGINEER. 16. WHEN AVAILABLE, THE CONTRACTOR SHALL STRIP ALL TOPSOIL AND SOD AND STOCKPILE IN A LOCATION WHICH DOES NOT INTERFERE WITH CONSTRUCTION. STOCKPILED TOPSOIL SHOULD BE RELATIVELY FREE OF WOOD, ROCK, LARGE ROOTS OR OTHER OBJECTIONABLE MATERIALS. STOCKPILED TOPSOILS SHALL BE REDISTRIBUTED AND COMPACTED AS THE FINAL 4" THICK SURFACE OF ANY DISTURBED AREAS HAVING SLOPES OF 25% AND LESS (WITH THE EXCEPTION OF PROPOSED BUILDING LOCATIONS). EXCESS TOPSOILS SHALL BE DISPOSED OF OFF THE OWNER'S PROPERTY BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 17. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING AND PREVENTING PROBLEMS DUE TO DUST OR MUD TO THE SATISFACTION OF THE OWNER, ENGINEER AND REGULATORY AGENCIES. 18. THE CONTRACTOR SHALL FINE GRADE, RAKE AND REMOVE ALL STONES AND OTHER OBJECTIONABLE MATERIALS FROM THE FINISHED GROUND SURFACES PRIOR TO SEEDING TO THE ENGINEER'S AND OWNER'S SATISFACTION. 19. IT IS THE OWNER'S RESPONSIBILITY TO ENGAGE THE SERVICES OF A QUALIFIED NC GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION TO PERFORM EVALUATIONS AND MAKE PROJECT SPECIFIC RECOMMENDATIONS RELATED TO CONSTRUCTION. ALL EARTHWORK PERFORMED BY THE CONTRACTOR SHALL BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE OWNER'S GEOTECHNICAL ENGINEER MADE DURING CONSTRUCTION 20. THE NC PROFESSIONAL WALL ENGINEER AND BUILDING STRUCTURAL ENGINEER ENGAGED BY THE OWNER SHALL COORDINATE THEIR DESIGN WITH THE OWNER'S GEOTECHNICAL ENGINEER AND THE ARCHITECT RESPONSIBLE FOR BUILDING DESIGN. THE WALL ENGINEER SHALL BE RESPONSIBLE FOR COORDINATING THEIR DESIGN TO INSURE THAT THE FINAL WALL DESIGNS AND WALL DRAINAGE ARE FULLY COMPATIBLE WITH THE SITE GEOMETRY, BUILDING LOCATIONS AND FOUNDATIONS, DRAINAGE AND UTILITY LOCATIONS AS NEEDED. THE OWNER IS RESPONSIBLE FOR ENGAGING THE SERVICES OF QUALIFIED NC PROFESSIONAL WALL AND STRUCTURAL ENGINEERS AND THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING CONSTRUCTION IN ACCORDANCE WITH THE FINAL DESIGNS PROVIDED BY THE OWNER'S ARCHITECT, NC PROFESSIONAL GEOTECHNICAL ENGINEER, NC PROFESSIONAL WALL ENGINEER, NC PROFESSIONAL STRUCTURAL ENGINEER AND OTHER PROFESSIONALS ENGAGED BY THE OWNERS. 21. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING ALL CONSTRUCTION ACTIVITIES TO AREAS WITHIN THE LIMITS OF SITE IMPROVEMENTS SHOWN, THE OWNER'S PROPERTY OR APPLICABLE RIGHT-OF-WAYS. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THE USE OF OFF -SITE STORAGE AND STAGING AREA(S) AS NECESSARY TO COMPLETE THE PROJECT AT THEIR EXPENSE. 22. THE CONTRACTOR SHALL COORDINATE ANY UTILITY RELOCATIONS REQUIRED ON BEHALF OF THE OWNER. THE OWNER SHALL BE RESPONSIBLE FOR PAYING ANY RELOCATION FEES IMPOSED BY UTILITY COMPANIES. THE CONTRACTOR SHALL NOT RECEIVE ANY ADDITIONAL COMPENSATION DUE TO DELAYS NECESSARY FOR UTILITIES TO COMPLETE RELOCATIONS OR OTHER UTILITIES MODIFICATIONS AND INSTALLATIONS. 23. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND COORDINATING ALL SITE VISITS BY THE ENGINEER AT STAGES OF CONSTRUCTION SPECIFIED BY THE ENGINEER. THIS MAY REQUIRE THAT TRENCHES REMAIN OPEN FOR A PERIOD OF TIME UNTIL SUCH SITE VISITATION IS CONDUCTED. SECURITY AND SAFETY OF OPEN TRENCHES IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 24. THE CONTRACTOR SHALL INCLUDE IN THEIR BID, ADEQUATE ALLOWANCES FOR SECURING ALL CONSTRUCTION AREAS FROM UNAUTHORIZED ACCESS USING TEMPORARY CHAIN LINK FENCING, BARRICADES, BARRIERS OR OTHER SUITABLE METHODS TO INSURE A SECURE AND SAFE JOBSITE. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION RELATED SECURITY AND SAFETY. 25. THE "ENGINEER" OR "CIVIL ENGINEER", WHEN REFERENCED ON THE CIVIL SITE PLANS AND ASSOCIATED SPECIFICATIONS SECTIONS, IS LOFQUIST & ASSOCIATES, INC. THE "OWNER" WHEN REFERENCED ON THE CIVIL SITE PLANS AND ASSOCIATED SPECIFICATIONS SECTIONS, IS ADE 806, LLC. 26. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL ALL WATER, SEWER AND APPURTENANCES IN STRICT ACCORDANCE WITH NCDOT STANDARDS, NCDEQ AND NC PUBLIC WATER SUPPLY REGULATIONS, THE NC BUILDING AND PLUMBING CODES, AWWA STANDARDS, TWSA STANDARDS AND ALL OTHER APPLICABLE LOCAL, STATE AND NATIONAL REGULATIONS AND STANDARDS. WHERE STANDARDS OR REGULATIONS CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL BE ADHEARED TO AS INTERPRETED BY THE ENGINEER. 27. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING THE USE OF ANY NEW WATER OR SEWER COMPONENTS UNTIL ALL TESTING AND WATERLINE DISINFECTION IS SUCCESSFULLY COMPLETED AND THE ENGINEER HAS ISSUED A CERTIFICATION FOR THE INSTALLATION. 28. WATER MAINS AND SEWER LINES SHALL BE SEPARATED BY A MINIMUM OF 10 HORIZONTAL FEET AT ALL LOCATIONS. WHERE IT IS ABSOLUTELY NECESSARY FOR A WATER AND SEWER LINE TO CROSS, THE SEWER LINE SHALL BE INSTALLED BELOW THE WATER LINE WITH A MINIMUM 18 INCHES OF VERTICAL CLEARANCE BETWEEN THE TOP OF THE SEWER PIPE AND THE BOTTOM OF THE WATER LINE WHILE MAINTAINING 3 FT. OF COVER ON THE WATERLINE. WHERE THESE CONDITIONS CANNOT BE ACHIEVED, THEN BOTH THE SEWER LINE AND WATER LINE SHALL BE AWWA STANDARD PC350 DUCTILE IRON PIPE AND FITTINGS FOR A MINIMUM DISTANCE OF 12 HORIZONTAL FEET ON ALL SIDES OF THE CROSSING AS MEASURED FROM THE POINT OF CROSSING. 29. ALL SEWER LINES AND STORM DRAINS OR OTHER UTILITIES SHALL BE SEPARATED BY A MINIMUM CLEAR VERTICAL SPACE OF 2 FT. ALL WATER LINES SHALL BE SEPARATED FROM STORM DRAINS BY A CLEAR VERTICAL SPACE OF 18 INCHES. 30. THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS TO PREVENT EARTH, ROCK, DEBRIS, GROUNDWATER OR OTHER CONTAMINANTS FROM ENTERING PIPING AND UTILITIES DURING CONSTRUCTION. INSTALL A TEMPORARY, WATERTIGHT PLUG AT THE END OF EACH WORKDAY. 31. ALL WATER LINE PIPE, VALVES, FITTINGS AND APPURTENANCES SHALL HAVE A MINIMUM WORKING PRESSURE RATING OF 250 PSI ALL JOINTS AND FITTINGS SHALL BE ADEQUATELY RESTRAINED FOR A 250 PSI WORKING PRESSURE PLUS A 100 PSI ALLOWANCE FOR WATER HAMMER. CAUTION: EXISTING BURIED GAS, TELEPHONE, WATER, EWER, ELECTRIC, COMMUNICATION INCLUDING FIBER OPTIC AND OTHER UTILITIES ARE LOCATED THROUGHOUT THE PROJECT AREA. ALL EXISTING UTILITIES ARE NOT SHOWN ON THE PLANS AND THOSE SHOWN ARE NOT NECESSARILY SHOWN IN CORRECT LOCATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATIONS OF ALL UTILITIES AND PROTECT THEM FROM DAMAGE THROUGHOUT CONSTRUCTION. BEFORE YOU DIG STOP CALL 1 800 632-4949 N.C. ONE -CALL CENTER IT'S THE LAW REVISION NO. DESCRIPTION DATE BY 1 MODIFY PARKING AT BUILDING #36, GRADING, DRAINAGE, EC & ADD GREASE TRAP FOR RESTAURANT AT OWNER'S REQUEST. 8-11-21 VWL O2021, Lofquist & Associates, Tne., All rights reserved. Any reproduction or reuse of this document without the express permission of Lofquist & Associates, Tnc., is strictly prohibited. N R T H 40 20 0 20 40 80 1 INCH = 40 FEET 511 moo• / ti 0 o, ySMl�sl / / / Ni yIG rir rir L'f�I�S10 TqC rir /�� ti JLLI]WHEE 2 '� O IrI ilr pr bIII n 242 III III III � III III nl R II II III y nl rn nl it QI III %% 1 � %�• �;;, .,sue - d, APPROXIMATE LOCATION OF PROPERTY BOUNDARY PER DAVENPORT, IVEY & ASSOC., INC., TYPICAL EXISTING GRADE SPOT ELEVATION, TYPICAL LP I - Il %/XN EXISTING GRADES, TYPICAL 5b �1 x \ �� 2� \ \ \ \ \\ \ \ rlr 2 5bx \ \ I 0� \ \ I \ \ \ S x2 x2h \-q1x 410 2 �x eb to �� x2 x \2° ��x I L� L r� 3 \ i it � IIIr�p�� max �` 11 gyp? I A \ \ \ P ' 2 5 III II 2*2 x \ \ \ \\ I x Illl w III /% �L� \ \ 2°�� \ x / q�° 22• \ \ I\ I �v Ill l I IIS Z ££ // a�\\ hex / x2 2 I \ \ \ d \ I EB III x�2 � \ 1 x px 1 II II �� ^ �r� 2.0\\ as �2 1 �^ / 21� \I I /� --- ��\ry \ I 111 32 ^~ \12 x� QS I II l \ x \ �i �� o^2 II I I - - -j I'll x I v y�� 1� I Q I It�II b 30 ` °• x o I I I J I- / // //I / m // x s, \ r I \ r� // �ti x �p 2 x I \`� \�'\ S\ �° �o ^�` L 1x �� I IN P❑❑L DECK \ N , �; x x b, a I z°~ x2� \ 1 1 I \ I// I P ❑ ❑ L \�� /; II / \ i8'I£ 12�2 2x °° \ M // I 6b Z£ +' c� b �? 22 x I I I ` / - Irr AREA " '` I �° 1 2 ax LL - lIr Q S\ N c� I# x 2P' �_====== _ _ Ill •1/l +i c^ i/ Cbx20 \ I I70 I EB \\ �I - 28 IrII/�� ��q," \2oO~ 220 �2x \\ I I I 0 Vill /i i ' 2 o x 2 �5b cl_� • 4 U - - I Ill-= _ - II ,LjjllI E B r; ' WC, pa 2�`'° III I III 11 l 0 l llll / A/ �° ell `0 0 Lo • x 1?/ I� III - 11 l y / / d/ 2 Oj �i x ^� -ill /r/ ° /r JQ�r / /// �2 I °'? 2 '� / // O or II � III fll �,sa 2 x � �C L - J - u IrI W llr /r° �,io�' LP* ul 111 z 32 /r/\��/ // / x 0 20 x II f I III /// G/\ / $4 a x / II - 111 23 CONTRACTOR TO COORDINATE ALL UTILITY RELOCATIONS NECESSARY TO N o IL ACCOMMODATE PROPOSED / ^� z x r / 3 �'� \ x o Ni - - + iii CONSTRUCTION ON OWNER'S BEHALF. ij�B awi/ / x�~ " CONTRACTOR IS TO ALLOW FOR DELAYS // ��� II I p �� F /i ^� x� ` 2 IMPOSED BY UTILITY COMPANIES IN �� � � // / � _III THEIR BID. ANY RELOCATION COSTS /r �/�'�/ 2 Ill // 1\ °¢1 / ` 6�lnn ram% y'££ �1 z S46 2 ul T THAT MAY BE ASSESSED BY THE UTILITY /t.� a + COMPANY WILL BE PAID FOR BY THE / ti s r III I p C /i / /o 0 x r III III OWNER. TYPICAL ALL ABOVE AND BELOW /r r � "rio �• ~ 00 B 31 GROUND UTILITIES. „� / //rrr � �/ "' as O/ E B I„II- - - I- - iii °i o° \ nl n e� iii /o x w21 (b o 0 _ ££ 12 2 xji / / 1z / \\ 20 /�° v�v VI �� mod, // •� �s� E / \ '\ o O \ v x'/ / \� \ ����\ ///. / �1 r\ I❑BST /(D \a \ �\ z a\ \ 41/ I 'le y v 101/P// 0 //v � CO \ ;f 4 CHENEY f/ 2199-1308 CD 5 �s S oO � ar \ �G IEBERMAN C_ 1136-111 ,' Lofquist & Associates, Inc, PLANNING ENGINEERING DESIGN 11 Citrus Drive Svlva, NC28779 (828) S86 - 1424 Firm License No.: C-2288 Professional Service Dedicated to Clients & Employees Drawn By: CADD Checked By: VWL File: A01-CA1-R2.dwg Project No.: 2104J02 Plot Date: 6/21/21, REV.8/11/21 Scale: AS NOTED EXISTING SITE PLAN 1 INCH = 40 FEET CAA,,,. A 6355 ik , �I h I ylGy TqC NEATLY SAW CUT AND REMOVE CURBS, SIDEWALKS AND OTHER PAVEMENTS ONLY AS NEEDED TO ACCOMMODATE NEW CONSTRUCTION AS INDICATED ON PLANS. TYPICAL, ALL LOCATIONS. F,p <rNF RICE 1792-786 GENERAL INFORMATION & EXISTING SITE PLAN CLEARING. GRUBBING AND DEMOLITION NOTES 1. EXISTING SITE TOPOGRAPHY, LOCATION SURVEYS AND BOUNDARY DEED PLOTS FROM DRAWING NO. J-1804, DATED 1/30/18 BY DAVENPORT, IVEY AND ASSOC., INC. THE PROPERTY LINE INFORMATION SHOWN ON THIS PLAN REPRESENTS DEED PLOTS AND SHALL NOT BE USED IN ANY WAY FOR THE SALE OR CONVEYANCE OF LAND OR RIGHT-OF-WAYS. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXISTING SITE CONDITIONS AND ALL SITE MEASUREMENTS, INCLUDING THE LOCATIONS AND DEPTHS OF UTILITIES AND DRAINAGE, PRIOR TO CONSTRUCTION AND TO NOTIFY THE ENGINEER OF ANY AMBIGUITIES OR CONFLICTS. 3. THIS PLAN IS NOT INTENDED TO SHOW ITEMS TO BE DEMOLISHED AND REMOVED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR -SITE ANY ITEMS NECESSARY, WHETHER SHOWN ON THESE PLANS, NOT SHOWN ON THESE PLANS DEMOLISHING, REMOVING AND DISPOSING OF OFF OR INCORRECTLY SHOWN ON THESE PLANS, TO ACCOMMODATE THE CONSTRUCTION OF THIS PROJECT AT THE CONTRACTOR'S EXPENSE. ALL TREES, VEGETATION, STRUCTURES, UTILITIES AND OTHER EXISTING ABOVE GROUND AND UNDERGROUND SITE FEATURES ARE NOT SHOWN ON THIS PLAN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE TO CONDUCT THE NECESSARY INVESTIGATIONS AND INCLUDE ALL CLEARING, GRUBBING, DEMOLITION AND DISPOSAL IN THEIR BID NECESSARY FOR THE PROPER COMPLETION OF THE PROJECT. 4. CONTRACTOR SHALL NOT ALTER OR DEMOLISH ANY UTILITIES, STRUCTURES OR OTHER SITE IMPROVEMENTS THAT ARE TO REMAIN IN SERVICE. 5. CONTRACTOR TO COORDINATE ON THE OWNER'S BEHALF, THE RELOCATION OF ANY OVERHEAD AND UNDERGROUND UTILITIES AS NECESSARY FOR THE SUCCESSFUL COMPLETION OF THE PROJECT. 6. NO EXISTING WATER, SEWER, IRRIGATION, STORM DRAINAGE OR OTHER UTILITIES TO BE DEMOLISHED SHALL BE REMOVED BEFORE FACILITIES ARE IN PLACE TO ADEQUATELY REPLACE THEIR FUNCTION. DEMOLITION ACTIVITIES SHOULD BE PERFORMED IN A LOGICAL SEQUENCE AS NECESSARY TO PREVENT SITE DAMAGE, EROSION, NUISANCE CONDITIONS OR OTHER SITUATIONS WHICH, IN THE OPINION OF THE ENGINEER, ARE UNFAVORABLE. 7. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL ACTIVITIES WITH THE OWNER, UTILITY COMPANIES, OTHER CONTRACTORS AND ALL OTHER PARTIES AFFECTED BY CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHOULD ALLOW FOR DELAYS AS REQUIRED TO ACCOMMODATE ALL OTHER ACCESS, ACTIVITIES AND WORK. 8. THE OWNER HAS THE EXCLUSIVE RIGHT TO SELECT TO RETAIN OWNERSHIP OF ANY REMOVED MATERIALS. ANY MATERIALS TO REMAIN OWNER'S PROPERTY SHALL BE REMOVED BY THE CONTRACTOR UNDAMAGED AND MOVED TO AN ON -SITE LOCATION TO BE SPECIFIED BY THE OWNER. ALL MATERIALS NOT TO BE RETAINED BY THE OWNER SHALL BE DISPOSED OF OFFSITE, IN ACCORDANCE WITH APPLICABLE REGULATIONS, AT THE CONTRACTOR'S EXPENSE. 9. PLUG ANY CUT OR DEAD -ENDS OF WATER, SEWER, IRRIGATION & STORM PIPING TO BE ABANDONED IN PLACE WITH A WATER TIGHT, RESTRAINED PLUG OF THE SAME MATERIAL AND GRADE AS THE PIPE BEING PLUGGED. ANY WATER IRRIGATION STORM OR SEWER PIPING WHICH IS ABANDONED OR TO BE ABANDONED THROUGH THE COMPLETION OF THIS PROJECT SHALL BE COMPLETELY REMOVED AND DISPOSED OF OFFSITE BY THE CONTRACTOR IF IT IS UNDER OR LOCATED WITHIN 5 FT OF A PROPOSED PAVEMENT SURFACE, PROPOSED STRUCTURE, FOUNDATION OR PROPOSED BUILDING. 10. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROTECTING ALL GRASS, SHRUBBERY, TREES & OTHER VEGETATION TO REMAIN FROM DAMAGE THROUGHOUT CONSTRUCTION. S R. 1367 w w 0 PROJECT SITE S � 1330 VILLAGE OF >\h FOREST HILLS PROJECT LOCATION MAP NOT TO SCALE CIVIL PLAN INDEX CY, 0 GENERAL INFORMATION & EXISTING SITE PLAN C2.0 EROSION CONTROL PLAN C3.0 SITE GEOMETRY & PAVING PLAN C4, 0 WATER & SEWER SERVICE PLAN C5.0 GRADING & DRAINAGE PLAN C6.0 EROSION CONTROL & STORM DRAINAGE DETAILS C7.0 SITE &MISCELLANEOUS DETAILS C8,0 WATER & SANITARY SEWER DETAILS PROPOSED SITE IMPROVEMENTS FOR PROSPECT WESTERN COMMERCIAL AREA ADE 806, LLC - OWNER Jackson County, North Carolina SHEET NUMBER C 1 .0