Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3211201_Application Review Completeness Checklist_20211206
Application Completeness Review Checklist IZ141ZJ Project Name: rn�4�[/ ��� Date Delivered to CO: BIMS Received/Accepted Date: /Z/GIZI Project County/Location: 13301 f�rov,a�2hCF RoJ Un:un *BIMS Acknowledged Date: (yz':(/� Rule(s): Phase II E]OWR/HQW E1WSWS Goose ONSW Other Permit Action Ne / Major Mod / Minor Mod / Renewal / Transfer 77**New Permit #: SW 37-JI'Zol Permit Type: 4Tb,/ LID / LD Overall / HD &LD Combo Existing Permit #: General Permit / Offsite / Exempt / Rescission OPE Cert on File? SCM Type(s): [� , ' r2o �'Offsite to SW: Development Type: Commercia ResidentiaOther ir SinleSubdividedx dvFor New or Tran Terre` ermits Permittee is: PropertyOwner(s) ElDeveloper ElLesseeE]Purchaser❑HOA Master PE Cert on File? Stream Class: OSA Map 0ORW Map Paperwork Emailed Engineer on: � Supplement(s) (1 original per BMP) ©O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) Application with correct/original signatures ®Email Address: Design Engineer Corp or LLC: Sig. Auth. per SoS or Signature Authorization letter or report Email Address: Property Owner ®$505 (within 6mo) Check#(s): �156 FiNo fee 1' Deed ®Soils Report: w/SHWT or General Report ®-Email Address: Lessee ®Calculations (signed/sealed) Lease Agreement ©Deed Restrictions, if subdivided: Email Address: Purchaser ®**Signed & Notarized Template Purchase Agreement ®Correct Template (Comm Res g &LD) or Dec. Covenants & Rest. Email Address: Developer Recorded Covenants E]Email Address: HOA Representative Recorded Plats FT0% or more Lots Sold List Project Narrative ®USGS Map Plans ®2 Sets ®Wetlands: elineate . or No Wetlands ®Vicinity Map Project Boundaries ®Legend Layout (proposed BUA dimensions) ©DA Maps ®Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) ©Existing Conditions ©Landscape Plan ®Grading ®PE Seal REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet **FOR NEW Projects -Enter New Permit # on Supplements & Deed Restiction Templates. G MQ%Reference Library\Procedures\Checklists\Completeness Review Checklist_2018 03 13