HomeMy WebLinkAbout20211761 Ver 1_ePCN Application_20211203DW R
mrlsloa of ware. Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1, 2021 Ver 4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
BIMS # Assigned*
Version#*
20211761
1
Is a payment required for this project?
No payment required
What amout is owed?*
Fee received
$240.00
Fee needed - send electronic notification
$570.00
Reviewing Office*
Select Project Reviewer*
Raleigh Regional Office - (919) 791-4200
Colleen Cohn:eads\cmcohn
Information for Initial Review
1a. Name of project:
2017 Aerial Sewer Replacement Project
la. Who is the Primary Contact?*
Joseph Turner
1 b. Primary Contact Email: * 1c. Primary Contact Phone:*
joseph.turner1 @aecom.com (704)716-0779
Date Submitted
12/3/2021
Nearest Body of Water
Walnut Creek
Basin
Neuse
Water Classification
C; NSW
Site Coordinates
Latitude: Longitude:
35.7567-78.6189
A. Processing Information
County (or Counties) where the project is located:
Wake
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Pre -Filing Meeting Information
Is this a courtesy copy notification?*
Yes No
ID#
Version
Pre -fling Meeting or Request Date
Attach documentation of Pre -Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
File type most be PDF
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
Please provide the date of the previous submission."
5/28/2019
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
58 - Utility Line Activities for Water and Other Substances (frequently used)
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
City of Raleigh
2b. Deed book and page no.:
401 Water Quality Certification - Express
Riparian Buffer Authorization
Yes No
Yes No
2c. Contact Person:
City of Raleigh Public Utilities Department (Raleigh Water)
2d.Address
Street Address
One Exchange Plaza
Address Line 2
Suite 620
City
Raleigh
Postal / Zip Code
27601
2e. Telephone Number:
(919)996-3474
2g. Email Address:
dennis.lassiter@raleighne.gov
4. Agent/Consultant (if applicable)
4a. Name:
Joseph Turner
4b. Business Name:
AECOM Technical Services of North Carolina, Inc.
4c.Address
Street Address
6000 Fairview Road
Address Line 2
Suite 200
City
Charlotte
Postal / Zip Code
28210
4d. Telephone Number:
(704)522-0330
0. Email Address:*
joseph.turner1 @aecom.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
N/A
1c. Nearest municipality / town:
Raleigh
2. Project Identification
2a. Property Identification Number:
N/A
2c. Project Address
Street Address
Multiple Locations
Address Line 2
Information is for the first site, State Street
City
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Walnut Creek
3b. Water Resources Classification of nearest receiving water:*
C; NSW
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
N/A
State / Province / Region
Country
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202011101
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
There are 2 project sites located within existing sanitary sewer easements and on public and private properties. The general land use in the vicinity of the project sites are residential and
recreational (near greenway system). More information on the project is included in the attached exhibit.
The Banbury location alignment had to be moved closer to the unknown tributary due to complications with easements and property owner. The new alignment triggered different riparian
buffer impacts than initially reported.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
Yes No Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
Previous 401 Certification DWR#19-0724 initially issued under NWP 12. See attached 2017 Aerial Sewer Replacement Project_DWR.pdf
SAW-2019-00988 - approved under a non -notifying 12 for Utility Lines. See attached SAW-2019-00988 Waiver.pdf
4f. List the total estimated acreage of all existing wetlands on the property:
NA
4g. List the total estimated linear feet of all existing streams on the property:
NA
4h. Explain the purpose of the proposed project:
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
Wetlands and impacts shown in the exhibit are estimated from the National Wetlands Inventory Data.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2019-00988
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Ross Sullivan
Agency/Consultant Company: U.S. Army Corps of Engineers
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
July 12, 2019
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
N/A
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
2a1 Reason (?)
2b. Impact type* M
2c. Type of W.
2d. W. name*
2e. Forested"
2f. Type of Jurisdicition"
M
29. Impact
area
W1
Sewer Replacement
T
Unknown
Unknown
No
Both77:: 1
0.637
ac es)
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.637 0.000
2g. Total Wetland Impact
0.637
21. Comments:
Wetlands and impacts shown in the attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf are estimated from the National Wetlands
Inventory Data.
3. Stream Impacts
1-1
3a. Reason for impact (?)
3b.lmpact type*
3c. Type of impact*
3d. S. name*
3e. Stream Type*
[3f. Type of
3gSwidth*
3h. Impact
Murisdiction*
length*
S1
Sewer
Temporary
Workpad/Causeway
Walnut Creek
Perennial
Both
30
22
Replacement/Temporary
Average (feet)
(linear feet)
stream crossing
S2
Sewer
Temporary
Workpad/Causeway
Gatling Branch
Perennial
Both
5
ReplacementlTemporary
Average (feet)IEI-
31.
stream crossing
Total jurisdictional ditch impact in square feet:
0
31. Total permanent stream impacts: 3i. Total temporary stream impacts:
0 47
31. Total stream and ditch impacts:
47
3j. Comments:
N/A
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
' Neuse Tar -Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
6b. Impact Type 11
6b. Impact Type 11
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
69. Zone 2 impact
Exempt, B1
T
Walnut Creek
No
2,174
1,201
Allowable, B2
P
Walnut Creek
No
2,039
1,240
Exempt, B3
T
Gatling Branch
No
2,066
1,289
Allowable, B4
P
Gatling Branch
No
2,236
1,316
Exempt, BS
T
UT to Beaverdam Creek
No
3,593
3,362
Allowabble, B6
P
UT to Beaverdam Creek
No
4,256
4,351
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 7,833.00 5,852.00
Zone 1
Zone 2
Total Permanent impacts: 8,531.00
6,907.00
Zone 1
Zone 2
Total combined buffer impacts: 16,364.00 12,759.00
61. Comments:
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf for proposed work plan and description of work.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
At State Street the project is replace -in -place of existing infrastructure.
At Banbury Road the project is replace -in -place of existing infrastructure, abandoning a permanent utility easement, and addition of new sanitary line. Less than 150 linear feet of the
stream bank will disturbed. 15a ncac 02b .0714.(gg)(i) and (jj) deems this allowable.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
3. Stormwater Requirements
3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of
downstream surface waters.*
Stormwater Management Plan Antidegradation Calculations
Comments:
Project will not result in the creation of additional impervious surfaces.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstatellocal) funds or the use of public (federal/state) land?
Yes No
1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments:
N/A
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
Yes No
3b. If you answered "no," provide a short narrative description.
Infrastructure is being replaced in -place; no additional development. See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Information for Planning and Consultation system, Raleigh Office USFWS webiste and mapping tools.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA Essential Fish Habitat Mapper, Raleigh Office USFWS website and mapping tools.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
State Historic Preservation Office Historic Properties Map; topographical and SUE survey.
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8b. If yes, explain how project meets FEMA requirements:
The State Street site is located in FEMA Zone AE. No new structures or will be placed in the floodplain.
8c. What source(s) did you use to make the floodplain determination?*
State Street Site - located within a special flood hazard area per FEMA FIRM Map 37020171300J, effective 05/02/2006. Banbary Road Site - located
within an area of minimal flooding per FEMA FIRM Map 3720079400J, effective 05/02/2006
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
2017 Aerial Sewer Replacement Project_DWR.pdf 624.69KB
SAW-2019-00988 Waiver.pdf 377.9KB
PCN Exhibit 2017 Aerials Sewer Rehabilitation_Resubmittal.pdf 36.41 MB
CORPUD 2017 Aerials —AGENT AUTHORIZATION FORM_Signed_2021 1203.pdf 1.21VIB
File must be PDF or KMZ
Comments
See attached PCN Exhibit 2017 Aerial Sewer Rehabilitiaton_Resubmittal.pdf for all relevant information
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Joseph Turner
Signature
Date
12/3/2021