Loading...
HomeMy WebLinkAbout20211747 Ver 1_ePCN Application_20211130DW R mrlsloa of ware. Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver 4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* 20211747 Is a payment required for this project? No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Mitchell Anderson:eads\mlanderson Information for Initial Review 1a. Name of project: COURTESY COPY 9526 Lake James Road la. Who is the Primary Contact?* Bobby Glenn Fuller, Jr. 1 b. Primary Contact Email: Bobby@fullerandco.com Date Submitted 11 /30/2021 Nearest Body of Water Lake James Basin Catawba Water Classification WS-IV,B;CA Site Coordinates Latitude: 35.760074 A. Processing Information County (or Counties) where the project is located: McDowell Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Pre -Filing Meeting Information Longitude: -81.933717 Version# * 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (704)913-4109 U Is this a courtesy copy notification?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (N W P) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 198200030 - Work in Waters of Lakes and Reservoirs le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Nil Sine Numine Investments, LLC 2b. Deed book and page no.: 01319, pg. 410 2c. Contact Person: Bobby Glenn Fuller, Jr. 2d.Address Street Address 697 Saint Marks Church Road Address Line 2 City Bessemer City Postal / Zip Code 28016 2e. Telephone Number: (704)435-4139 2g. Email Address:* Bobby@fullerandeo.com 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country Gaston 2f. Fax Number: (704)240-8854 Yes No Yes No C. Project Information and Prior Project History 1. Proiect Information 1 b. Subdivision name: (if appropriate) Grey Ridge 1c. Nearest municipality / town: Nebo, NC 2. Project Identification 2a. Property Identification Number: 172400946437 2c. Project Address Street Address 9526 Lake James Road Address Line 2 City Nebo Postal / Zip Code 28761 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Lake James 3b. Water Resources Classification of nearest receiving water:* WS-IV,B;CA 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501010303 4. Project Description and History 2b. Property size: 1.784 State / Province / Region NC Country McDowell 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * Existing conditions are lightly wooded with little to no underbrush down to the shore of Lake James. Project site is approximately 120' from the full pond elevation line into Lake James. General Land Use in the vicinity is single family residential homes along the shore of Lake James. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project: * The purpose of the project is to undergo light dredging to provide for a navigable path from deeper waters for small watercraft traffic to a floating pier within the permitted distance of the lakeside property at 9526 Lake James Road Nebo, NC and to provide suitable depth for draft of the floating pier to house small watercraft. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * By the use of a tracked excavator atop a floating barge, alluvial materials will be dredged from the lake bottom in the immediate area of the proposed floating pier to allow for positioning and draft of the floating pier. Additionally, a tracked excavator atop a floating barge will dredge alluvial materials from the bottom of the lake to provide a pathway for navigation of small watercraft from deeper water to the floating pier. All dredged materials will be placed on an additional floating support barge to capacity. The dredged materials will then be transported over water on the floating support barge to 9622 Lake James Road Nebo, NC where the dredged spoil will be offloaded using excavation equipment into trucks and hauled to a permitted fill site at 7836 US-70 E Nebo, NC. The dredged area for the floating pier is proposed to be 50' x 52' to 10' of water depth. The dredged area for the navigation path from deeper waters is proposed to be 12' x 30' to 10' of water depth. Once dredging is complete, the floating pier will be moored in place by the use of wooden pilings and a floating gangway 88' long will be connected for pedestrian access to the shore. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbod y type 4f. Impact area Navigation T Lake James -Catawba River Dredging Lake 0.07 4g. Total temporary open water Impacts: 0.07 4g. Total open water impacts: 0.07 4h. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 4g. Total permanent open water impacts: 0.00 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The manager of Lake James (Duke Energy) was contacted and a variance to permitted dock length was requested. The longer dock was requested to allow for a longer gangway to access the proposed floating pier while mooring it in deeper/navigable waters. The variance request was denied thereby resulting in the need to dredge for the purpose of navigation and mooring the floating pier. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The original plan to access the area to be dredged through the Lake James buffer would have involved truck traffic within that buffer such that dredged spoils could be loaded into the trucks and hauled away. To avoid impacts to the buffer of Lake James, the use of a tracked excavator mounted atop a floating barge was employed such that the spoils could be moved to an existing ramp area for unloading. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The impact area does not exceed allowable permit thresholds and thereby does not require compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No U If no, explain why: The project site is within the riparian limits of Lake James and all impacts of dredging are contained to the waters of Lake James. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/statellocal) funds or the use of public (federallstate) land?* Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? We contacted our representative with NCDWQ and were notified that the size of the project did not require determination of these impacts. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA Fisheries Essential Fish Habitat Mapper (online) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* We contacted the Catawba Indian Nation Tribal Historic Preservation Office. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplairl Yes No 8c. What source(s) did you use to make the floodplain determination?"` The project will take place within Lake James and not within the flood plain. Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document USGS TOPO MAP 9526 Lake James Road Nebo NC 2021.11.30.pdf 1.41 MB NRCS Soil Map_ 9526 Lake James Road Nebo NC.pdf 664.24KB 9526 Lake Jame Road Vicinity Map 2021.11.30.pdf 10.24MB 9526 Lake James Road Site Plan 2021.11.30.pdf 794.16KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Bobby Glenn Fuller, Jr. Signature Date 11/30/2021 J I � N O O N O Fco x y y s r ,y� "� $:»ter' � y�v � �♦ s �'=f`5D f o, �ix';'lil kxiP�'t �5i!Ml�ai'fnir Q) �� J CO ia FU LRd a Ke Ja�eg c c LO �wp (6 LUL, O 0 U o0 z UU d Z C, o z O N � O E U m oJ z� T T o U m' o U) owes£ m �a 3 3 I I Q m 75 O U) 0 Z /W V W J a a) N m O > m y mO > O Uy U)m N '6 a) a) o y � O O u! Z Q U m 'o U O N U) '� a) a) O O m E .N E — E S. m UA O Can)> N a) C C'E O m N O _ a) ) m U c a) �6 y a U (n m C O m C N a) 3 N O o_ N Q a) a) 00 m (`") Q y a) N 0 m> a) U Z E U C m ' m E m N a) CJ Ot �Q N Z (6N -N m Ems_ E V N m C d a) y m Q U NN O ON a) m C O O p E U W m � N U) (`� ZN O� 7 O E N CL L U y O O C y m N O _ D Z Q a) Q a) O N U) U u) O c O 3 a) U) N i C .0 U -o O C 'J O E a) 3 O) N U N — N T a) E +' U y U) -O U) --L L -lc a) N m 7 U) U O N � 0 -O O U O 2i O O 7 C C E -O 7 N N a) U) a) .O Q '6 '6 O w a) U) o N -E ,O O U) cm m~ m 0 N o a) Q .— o U) U) C N— a) a) y a) Z E a) Q °� a) >+ m m L N a) (6 a) O 06 m N m m N m w> a) -o o m m m E y o m m N Q Q '6 y m w m >, a) �_ 3 _ 2i C m m U .� >, m >, m O N t> m y 'E C m O E 0 O .o E m a U o o a) a) a) N m N Q N Q m a) a) tll '0 s — a) E5 O o 0 m U) U)i a) _0 U y U) o > C- a) 7> U a) 7> U a) a) m~ Uj C U) a) a) U) m 0 E o N m m a) a) �5-0 O O a) O Q 2 a) 3 m 0 W U D� L — L 0 7 — L 0 7 m w Q o p V 0 U — o O N m 0 FL E u) > U 2 Q 'O Q m H O (n (n (n (n } m tl) O O_ m U) N y � y 4 O R Q L Q Li O L >, 0 a) Q O J R a) O O O L Q U) O Q R R p Q' m d O U) O N N N y O R O N L y a U U) U) > O U")'in g S v Q � R C R � � a) * R 4 R5 R F m y C O O y Q o .� U) a° a° N c N CL ay oQU >C >C >C a) a R o w 3 R >> o aO Q Q O ° o` LU Y Qo ao O o m , a)O Q E O a) UQ)y 3 R O > o —oo 0 0 O O > n n n m o o m R o o p a m U) U) U) in U) U) w a R cun Q y a) U m Z Q m 75 O U) 0 Z /W V W J a a N N O N 3 C O O E C � Y N O N E U) -0 O O O N L N U E N = O > !Ea) m a) C N Q O w Q > Q — m E m E N a) E i Q O C s � o O N O O 'O) (D O 'O Q O 'O Q m s C U) E o_ m t 70 o a� o2Qa) c a� E m 15 H 0 . U) m Z g Soil Map —Burke County, North Carolina, and McDowell County, North Carolina 9526 Lake James Road Nebo NC Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI FaC2 Fairview sandy clay loam, 8 to 15 percent slopes, moderately eroded 2.6 1.3% RhE Rhodhiss sandy loam, 25 to 45 percent slopes 0.8 0.4% Subtotals for Soil Survey Area 3.4 1.7% Totals for Area of Interest 206.4 100.0% Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BrB2 Braddock clay loam, 2 to 6 percent slopes, eroded 4.8 2.3% BrC2 Braddock clay loam, 6 to 15 percent slopes, eroded 40.4 19.7% EvD Evard loam, 10 to 25 percent slopes 9.0 4.4% EwE Evard-Cowee complex, 25 to 60 percent slopes 55.9 27.2% HaC Hayesville loam, 6 to 15 percent slopes 11.2 5.5% HcC2 Hayesville clay loam, 6 to 15 percent slopes, eroded 2.2 1.1 % HeD Hayesville-Evard complex, 15 to 25 percent slopes 28.8 14.0% W Water 49.8 24.2% Subtotals for Soil Survey Area 202.0 98.3% Totals for Area of Interest 206.4 100.0% USDA Natural Resources Web Soil Survey 11/30/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 11 /30/21, 7:46 PM TNM Download v2 TNM Download (v2.0) Help vs Share Link Contact Us Datasets Products Cart ®® Select products below and then hit "Search Products" �® Area of Interest: how Map Inde Sx Map Extent/Geometry - � Q Extent Polygon Point Enter Coords Clear Geometry ►Advanced Search 3earcn rroaucts Reset Map Upload shapefile GeoPDF Show Availability Hide Legend Index of Available Maps - Published 2018 or earlier Index of Available Maps - Published 2019 Index of Available Maps - Published 2020 Index of Available Maps - Published 2021 in a ress or p ace f{r Project Area JY L -'- - I — ❑ Historical Topographic Maps XY-81.930726°, 35.764817° n Data 600 ft DOI Privacy Policy Legal :: Accessibility Site Map Contact USGS U.S. Department of the Interior DOI Inspector General White House E-gov Open Government No Fear Act FOIA https://apps.nationalmap.gov/downloader/#/ A Al 2: '. _ �—■ -- � �-.. � �� a� a sg €r' �, �, i lip L