Loading...
HomeMy WebLinkAbout20121140 Ver 1_Stormwater Info_20130827Higgins, Karen From: Lucas, Annette Sent: Tuesday, August 27, 2013 1:23 PM To: Higgins, Karen; Matthew Flynn Subject: FW: DWQ 2012 -1140 SW Cary Parkway Daycare Attachments: Conceptual Layout_7- 19- 13.pdf, Kilarney Pointe storm water management report 6 25 2013.pdf Good afternoon, I'd like to discuss this with you both. Thanks, Annette From: Brad Haertling [ mailto :bhaertlinaCa)bellsouth.net] Sent: Tuesday, August 27, 2013 1:15 PM To: Lucas, Annette Subject: FW: DWQ 2012 -1140 SW Cary Parkway Daycare Brad Haertling Hugh J Gilleece,lll, & Associates P.A. 875 Walnut St. Ste. 360 Cary NC 27511 (0) 919- 469 -1101 (M) 919 - 605 -5562 (F) 919- 460 -7637 From: Donald Sever [mailto:donald.sever(a)att.net] Sent: Friday, July 19, 2013 3:25 PM To: Annette Lucas Cc: Jay Gilleece; Brad Haertling Subject: DWQ 2012 -1140 SW Cary Parkway Daycare Annette, attached is a revised site plan that now uses a bioretention basin on site for storm water management. A copy of a drainage report has been developed for this bioretention basin. Please advise if you have any further questions. Don Donald A. Sever, P.E. Hugh J. Gilleece, III & Associates, P.A. 875 Walnut Street Suite 360 Cary, NC 27511 919 469 -1101 Hugh J. Gilleece, III & Associates, P.A. 875 Walnut Street, Suite 360 Cary, North Carolina 27511 Consulting Engineers — (919) 469 -1101 gilleece@bellsouth. net June 25, 2013 NCDENR DWQ Wetlands, Buffers, Stormwater - Compliance (Webspace) Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 Attention: Annette Lucas Re: DWQ 2012 -1140 Wake County SW Cary Parkway Daycare Additional Information Dear Ms. Lucas: This letter is to provide for additional information for the above referenced project. The attached site plan shows a revised layout with a bioretention basin for storm water management purposes. The storm water management report shows the pre / post condition for the parcel. An impervious area of 38,000 square feet is used in the computations. A larger surface area is being provided then what is needed to contain the larger storm event within the one foot maximum ponding within the BMP. This is conceptual layout only. Should you have any questions or requests, please contact me at the phone number or e- mail address donald.sever @att.net. Sincerely, DIJ, Donald A. Sever, P.E. CC: Lyle Garner (LBJ Cary Associates LLC) Jay Keller Jay Gilleece "0 �� ... ..... r�tGSSIOjy ®•. ®� _ SENL 's 02.4621 Z:\Jobs \1700\Kilarney Pointe_ 50 \Documents \Letters \6 24- 2013_NCDENR_DWQ2012- 1140.doc Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 kilarney.gpw Tuesday, Jun 25, 2013 Watershed Model Schematic ...................................................... ............................... 1 Hydrograph Return Period Recap .............................................. ............................... 2 - Year SummaryReport .......................................................................................... ............................... 3 HydrographReports .................................................................................... ............................... 4 Hydrograph No. 1, SCS Runoff, Pre condition .......................................... ............................... 4 Hydrograph No. 2, SCS Runoff, Post development .................................. ............................... 5 Hydrograph No. 3, Reservoir, Post through pond ..................................... ............................... 6 PondReport - Biopond 1 ...................................................................... ............................... 7 2 - Year SummaryReport .......................................................................................... ............................... 8 HydrographReports .................................................................................... ............................... 9 Hydrograph No. 1, SCS Runoff, Pre condition .......................................... ............................... 9 Hydrograph No. 2, SCS Runoff, Post development ................................ ............................... 10 Hydrograph No. 3, Reservoir, Post through pond ................................... ............................... 11 5 - Year SummaryReport ........................................................................................ ............................... 12 HydrographReports .................................................................................. ............................... 13 Hydrograph No. 1, SCS Runoff, Pre condition ........................................ ............................... 13 Hydrograph No. 2, SCS Runoff, Post development ................................ ............................... 14 Hydrograph No. 3, Reservoir, Post through pond ................................... ............................... 15 10 -Year SummaryReport ........................................................................................ ............................... 16 HydrographReports .................................................................................. ............................... 17 Hydrograph No. 1, SCS Runoff, Pre condition ........................................ ............................... 17 Hydrograph No. 2, SCS Runoff, Post development ................................ ............................... 18 Hydrograph No. 3, Reservoir, Post through pond ................................... ............................... 19 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) E Hydrograph Return Period Rec &y� y raflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff - - - - -- 3.253 4.529 - - - - - -- 6.575 8.242 10.57 12.46 14.40 Pre condition 2 SCS Runoff - - - - -- 4.391 5.525 - - - - - -- 7.207 8.521 10.32 11.76 13.23 Post development 3 Reservoir 2 3.759 5.249 - - - - - -- 7.023 8.303 10.05 11.47 12.93 Post through pond Proj. file: kilarney.gpw Tuesday, Jun 25, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Summary Report K Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 3.253 2 718 6,511 - - - - -- - - - - -- - - - - -- Pre condition 2 SCS Runoff 4.391 2 716 9,233 - - - - -- - - - - -- - - - - -- Post development 3 Reservoir 3.759 2 720 6,189 2 420.86 3,729 Post through pond kilarney.gpw Return Period: 1 Year Tuesday, Jun 25, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 1 Pre condition Hydrograph type = SCS Runoff Peak discharge = 3.253 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 6,511 cuft Drainage area = 1.600 ac Curve number = 79 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre condition Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 2 Post development Hydrograph type = SCS Runoff Peak discharge = 4.391 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 9,233 cuft Drainage area = 1.250 ac Curve number = 92 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 ON 3.00 2.00 1.00 0.00 0.0 2.0 4.0 Hyd No. 2 6.0 8.0 Post development Hyd. No. 2 -- 1 Year Q (cfs) 5.00 II 3.00 2.00 1.00 --- I I I I 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 3 Post through pond Hydrograph type = Reservoir Peak discharge = 3.759 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 6,189 cuft Inflow hyd. No. = 2 -Post development Max. Elevation = 420.86 ft Reservoir name = Biopond 1 Max. Storage = 3,729 cuft Storage Indication method used. Post through pond You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Pond Report ' Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Pond No. 1 - Biopond 1 Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 420.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 Contour area (sqft) Incr. Storage (cult) Total storage (cult) = .013 .013 0.00 420.00 Orifice Coeff. 4,200 0.60 0 0.60 Exfil.(in /hr) = 0.000 (by Contour) 0 = n/a No 1.00 421.00 4,500 4,349 4,349 2.00 422.00 4,500 4,500 8,848 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 0.00 0.00 0.00 Crest Len (ft) = 16.00 10.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 420.71 420.80 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 417.00 0.00 0.00 0.00 Weir Type = 1 Rect - -- - -- Length (ft) = 60.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 1.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 422.00 421.80 421.60 421.40 421.20 421.00 420.80 420.60 420.40 420.20 420.00 0.00 6.00 12.00 18.00 24.00 30.00 36.00 42.00 48.00 54.00 60.00 66.00 Total Q Discharge (cfs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 4.529 2 718 9,123 - - - - -- - - - - -- - - - - -- Pre condition 2 SCS Runoff 5.525 2 716 11,787 - - - - -- - - - - -- - - - - -- Post development 3 Reservoir 5.249 2 718 8,743 2 420.90 3,890 Post through pond kilarney.gpw Return Period: 2 Year Tuesday, Jun 25, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 1 Pre condition Hydrograph type = SCS Runoff Peak discharge = 4.529 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 9,123 cuft Drainage area = 1.600 ac Curve number = 79 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre condition Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 2 Post development Hydrograph type = SCS Runoff Peak discharge = 5.525 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 11,787 cuft Drainage area = 1.250 ac Curve number = 92 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post development Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 3 Post through pond Hydrograph type = Reservoir Peak discharge = 5.249 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 8,743 cuft Inflow hyd. No. = 2 -Post development Max. Elevation = 420.90 ft Reservoir name = Biopond 1 Max. Storage = 3,890 cuft Storage Indication method used. Post through pond You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Summary Report 12 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 6.575 2 716 13,306 - - - - -- - - - - -- - - - - -- Pre condition 2 SCS Runoff 7.207 2 716 15,654 - - - - -- - - - - -- - - - - -- Post development 3 Reservoir 7.023 2 718 12,609 2 420.93 4,030 Post through pond kilarney.gpw Return Period: 5 Year Tuesday, Jun 25, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 1 Pre condition Hydrograph type = SCS Runoff Peak discharge = 6.575 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 13,306 cuft Drainage area = 1.600 ac Curve number = 79 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre condition Q (cfs) Hyd. No. 1 -- 5 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 2 Post development Hydrograph type = SCS Runoff Peak discharge = 7.207 cfs Storm frequency = 5 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 15,654 cuft Drainage area = 1.250 ac Curve number = 92 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 8.00 "I 0.00 0.0 2.0 Hyd No. 2 Post development Hyd. No. 2 -- 5 Year 4.0 6.0 8.0 10.0 12.0 Q (cfs) 8.00 IS 2.00 14.0 16.0 18.0 20.0 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 3 Post through pond Hydrograph type = Reservoir Peak discharge = 7.023 cfs Storm frequency = 5 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 12,609 cuft Inflow hyd. No. = 2 -Post development Max. Elevation = 420.93 ft Reservoir name = Biopond 1 Max. Storage = 4,030 cuft Storage Indication method used Q (cfs) 8.00 KO 0.00 0.0 2.0 Hyd No. 3 Post through pond Hyd. No. 3 -- 5 Year 4.0 6.0 8.0 Hyd No. 2 10.0 12.0 14.0 16.0 18.0 O Total storage used = 4,030 cuft You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) Q (cfs) 8.00 SS 2.00 0.00 20.0 Time (hrs) Hydrograph Summary Report 16 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2011 by Autodesk, Inc. v8 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 8.242 2 716 16,765 - - - - -- - - - - -- - - - - -- Pre condition 2 SCS Runoff 8.521 2 716 18,727 - - - - -- - - - - -- - - - - -- Post development 3 Reservoir 8.303 2 718 15,682 2 420.95 4,125 Post through pond kilarney.gpw Return Period: 10 Year Tuesday, Jun 25, 2013 You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 1 Pre condition Hydrograph type = SCS Runoff Peak discharge = 8.242 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 16,765 cuft Drainage area = 1.600 ac Curve number = 79 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre condition Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 2 Post development Hydrograph type = SCS Runoff Peak discharge = 8.521 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 18,727 cuft Drainage area = 1.250 ac Curve number = 92 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 . 99 M 2.00 0.00 0.0 2.0 Hyd No. 2 Post development Hyd. No. 2 -- 10 Year 4.0 6.0 8.0 10.0 12.0 Q (cfs) 10.00 IS M 2.00 14.0 16.0 18.0 20.0 Time (hrs) You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2011 by Autodesk, Inc. v8 Tuesday, Jun 25, 2013 Hyd. No. 3 Post through pond Hydrograph type = Reservoir Peak discharge = 8.303 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 15,682 cuft Inflow hyd. No. = 2 -Post development Max. Elevation = 420.95 ft Reservoir name = Biopond 1 Max. Storage = 4,125 cuft Storage Indication method used. Post through pond You created this PDF from an application that is not licensed to print to novaPDF printer (http: / /www.novapdf.com) MAN'ti"Ahl NCDENR Permit Number: (to be provided by DWQ) OaO� W ATF9QG � v o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact name Phone number Date Drainage area number Kilarney Donald A. Sever, P. E. June 25, 2013 1 Site Characteristics Drainage area 54,000 ft' Impervious area 38,000 ft' Percent impervious 70.4% o Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? N (Y or N) 1 -yr, 24 -hr runoff depth in 1 -yr, 24 -hr intensity in /hr Pre - development 1 -yr, 24 -hr peak flow ft3 /sec Post - development 1 -yr, 24 -hr peak flow ft3 /sec Pre/Post 1 -yr, 24 -hr peak control ft3 /sec Storage Volume: Non -SA Waters Minimum volume required 3,080.0 ft' Volume provided 3,085.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume ft 3 Pre - development 1 -yr, 24 -hr runoff ft 3 Post - development 1 -yr, 24 -hr runoff ft 3 Minimum volume required 0 ft3 Volume provided ft 3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 4,200.0 ftz OK Length: 60 ft OK Width: 70 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 12 hr OK Drawdown time, to 24 inches below surface 36 hr OK Drawdown time, total: 48 hr In -situ soil: Soil permeability 1.00 in /hr OK Planting media soil: Soil permeability 2.00 in /hr OK Soil composition % Sand (by volume) 87% OK • Fines (by volume) 10% OK Form SW401- Bioretention -Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 1 of 3 % Organic (by volume) 3% OK Total: 100% Phosphorus Index (P- Index) of media 10 (unitless) OK Permit Number: (to be provided by DWQ) Form SW401- Bioretention -Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 2 of 3 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation 421.00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? n (Y or N) Is this a cell with trees /shrubs? y (Y or N) OK media depth Planting elevation (top of the mulch or grass sod layer) 421 fmsl Depth of mulch 3 inches OK Bottom of the planting media soil 418 fmsl Planting media depth 3 ft Depth of washed sand below planting media soil 0.33 ft Are underdrains being installed? y (Y or N) How many clean out pipes are being installed? 5 OK What factor of safety is used for sizing the underdrains? (See 2 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 416.67 fmsl SHWT elevation 414 fmsl Distance from bottom to SHWT 2.67 ft OK Internal Water Storage Zone (IWS) Does the design include IWS Y (Y or N) Elevation of the top of the upturned elbow 419 fmsl Separation of IWS and Surface 2 ft OK Planting Plan Number of tree species 2 Number of shrub species 3 Number of herbaceous groundcover species 3 OK Additional Information Does volume in excess of the design volume bypass the y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed (Y or N) OK through a vegetated filter? y What is the length of the vegetated filter? 20 ft Does the design use a level spreader to evenly distribute flow? n (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if (Y or N) OK SA waters)? y Is the BMP localed at least 100 feet from water supply wells? y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? y (Y or N) OK Is the BMP located in a proposed drainage easement with access (Y or N) OK to a public Right of Way (ROW)? y Inlet velocity (from treatment system) 1 ft/sec OK Is the area surrounding the cell likely to undergo development in the n (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20%? n (Y or N) OK Is the drainage area permanently stabilized? y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3 -5 ft of grass) x Grassed swale OK Forebay Other Form SW401- Bioretention -Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 3 of 3 Pond Worksheet 90% TSS Removal Project: Killarney Pointe Basin: 1131O #1 z:\ Jobs\ 1700\ Documents \Reports \PondWork #1.xls Total Area = 54800 s. f. = 1.26 acres Impervious = Lawn, etc. _ Factors used on this worksheet: Woods, etc. _ Rational C = The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* _ (P - 0.2S) 112 /(P + 0.8S) Storm Rational C SCS CN Woods, etc. 0.21 76 Lawn, etc. 0.22 79 Impervious 0.96 98 The following formulas from the SCS method are used: S = 1000 /CN - 10 Tp = Vol. /1.39Qp Q* _ (P - 0.2S) 112 /(P + 0.8S) Storm I i h Qp cfs P in. Q* in. Tp min. 1 year 4.52 4.20 3.00 2.1772 28.4 2 year 5.76 5.36 3.60 2.7497 28.1 5 year 6.58 6.12 4.65 3.7665 33.7 10 year 7.22 6.71 5.38 4.4802 36.5 25 year 8.19 7.62 6.41 5.4930 39.5 50 year 8.96 8.33 7.21 6.2827 41.3 100 year 9.72 9.04 8.00 7.0643 42.8 Treatment volume = 1 0.0707 acre -ft. = 3078 Surface Area Required Wet Retention Pond Depth = 3 ft. Impervious = 69.3 % SA /DA Ratio = Surface Area Required = 1 2174 s. f. SCS CN = SCS S = Impervious 1= Rv = Bio- Retention Area (7% x C Factor x area Surface Area Required = 2812 s. f. Sand Filter (Required volume and area) Chamber Volume = 1 679 c. f. (540 c. f. /ac.) Chamber Surface Area = 1 453 s. f. 1(360 s. f. /ac.) Date To Basin 38000 16800 0 0.733 3.97 % 92.2 0.8489 69.34 % 0.6741 6/25/13 a° z z SW CAPe t2p6'��/ _------ _ - - -NI g6 _B 435 d pp iC6 VNI-10HVO HIHON') -LNno0 3Nvm kVM)IUVd MVO MS (�f iv aazvrus �ad�Ada �.dnn�aVd Aad� nns T i b tlOj -Lno kv1 �31IS AHVNIWI1E3Idd a° z z SW CAPe t2p6'��/ _------ _ - - -NI g6 _B 435