Loading...
HomeMy WebLinkAbout20211564 Ver 1_More Information Received_20211203Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 1 20211564 Is this project a public transportation project?* Yes • No Reviewer List: * Colleen Cohn:eads\cmcohn Select Reviewing Office: * Raleigh Regional Office - (919) 791-4200 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information Name: Emma Radford, WPIT Who is submitting the information? Email Address: emma.radford@kimley-horn.com Project Information Existing ID #: 202121125 20170001(no dashes) Existing Version: 1 1 Project Name: Sunnybrook Apartments (SAW-2021-00812) Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Wake Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document PermitDrawings_Sunnybrook_Updated_20211202.... 7.6M B SitePlans_Updated 11292021.pdf 2.21 MB Sunnybrook SOA 120221—Mitigation UPDATE. pdf 164.22KB Sunnybrook_Fig3_JDFeatures_Update.pdf 1.41 MB Updated Pages from Sunnybrook PCN 188.21 KB Application_20211202.pdf Only pdf or kmz files are accepted. Describe the attachments or comments: Based on a Request for Additional Information from Lyle Phillips with the USACE, we are attaching the above updates for Sunnybrook Apartments (SAW-2021-00812): We would like to move forward with a revised PJD, making wetlands W1 and W4 jurisdictional. We agree that W1 and W4 are not isolated under pre-2015 WOTUS rules. This will result in 0.04 acres in additional wetland impacts. Revised project figures and permit drawings are attached reflecting these changes. Additional mitigation has been reserved for these impacts. See attached updated SOA. We have revised the site plan to further tighten grading surrounding W3 and reduce impacts to W3 associated with stormwater pond's berm are now under 0.10 acres. We are requesting the use of a NWP 18 for this impact along with NWP 29 for the remainder of the proposed impacts. Revised pages from the PCN with revised text shown in red, revised permit drawings, and updated mitigation reservation letters are attached to reflect the use of a NWP 18 and 29 as well as the addition of impacts to wetlands W1 and W4. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically.