Loading...
HomeMy WebLinkAboutSW8970128_HISTORICAL FILE_20170621STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 °11 G a (8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20V) bin ZI YYYYMMDD Energy. Mineral & Land Resources EN 'I RON MEN T AL QUALITY June 21, 2017 UNC Wilmington Attn: Vice Chancellor for Business Affairs c/o %lark Morgan, .Associate Vice Chancellor for Business Affairs -Facilities 601 S College Rd Wilmington, NC 28403 ROY COOPER Gomrm r MICHAEL S. REGAN Serrewy TRACY DAVIS Dvector Subject: State Stormwater Management Permit No. S«'8 970128 L1VC Wilmington — Honors, International, and Privatized Housing, and Associated Parking Lot Improvements Phase I High Density Project New Hanover County Dear Mr Morgan The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on June 13, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 (1995 Rules) as amended by Session Laxv (SL) 2006-246, SL 2008-211, and as subsequently amended on January 1, 2017 (2107 Rules), as applicable. We are forwarding modified Permit No SW8 970128 dated June 21. 2017. for the construction, operation and maintenance of the stormwater control measures (SCMs), built -upon areas, as well as the stormwater collection system and/or vegetated conveyance system associated with the subject project. Please add the attached plans to the previously approved plan set. Please replace the previous application (SWU-101), the previous supplement and operation and maintenance agreement with the attached modified versions This permit shall be effective from the date of issuance until March 7, 2019 and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that ma_v be required Please pay special attention to the permit conditions regarding the operation and maintenance of the SCMs, stornnvater collection system, and/or vegetated conveyances; the limitation of built -upon area; modification of the.project; the procedures for changing ownership of and/or transferring the permit; and the need to renew the permit Please also pay attention to the permit conditions that requires the recordation of deed restrictions and protective covenants, easements, and the maintenance agreement, which must all be provided along with certification upon completion of the project. Failure to comply with these requirements will result in future compliance problems Please refer to Attachment 1 for a detailed description of the current proposed major modification and a list of all the past modifications approved during the effective period of the permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State or North Camlina I Ermnonmental Quality. Energy. F6nerml and Land Resources 1A41mington Regional Office 1 127 Cardinal Drive Gtenslnn I Wihnington, NC 28405 Pill 796 7215 StateStormwaierPermn\o SWS970128 -- - --- - -- - -- --- - - - -- -- --- - Page 2of2 If you have any questions, or need additional tnforntatlon concernine this matter, please contact Christine Hall in the Wilmington Regional Office, at (910) 796-7215. Sincerely, 7 Tracy Davis; RE , Director Division of Energy, Mineral and Land Resources Fnclosures Attachment A — Designer s Certification Form Attachment 1 — Permnnng History GDS/canh %Stormwater\Permits & Projects\1997\970125 HD\201 7 06 permit 970128 cc Cory George, McAdams New Hanover County Building Inspections Wilmington Regional Office Stormwater File Statcof North Carolina I Envn'onmerit aI Qualfty I Energy. Mineral and Land Resumres Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. NC 25405 910 796 7215 State Stormwater Management Permit No SW8 970128 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO UNC Wilmington Honors, International, and Privatized Housing and Associated Parking Lot Improvements, Phase 1 Walton Drive and Community Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of one (1) wet detention pond ("stormwater control measures" or "SCMs") in compliance with the provisions of Title 15A NCAC 2H .1000 (1995 Rules) and as amended by Session Law (SL) 2006-246, SL 2008-211, and as subsequently amended on January 1, 2017 (2017 Rules), as applicable (collectively, the "stormwater rules") and the approved stormwater management plans, application, supplement(s), specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until March 19, 2019 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the management and volume of stormwater described in the approved plans and specifications. The maximum amount of built -upon area (BUA) allowed for the entire project is 793,931 square feet. 2 The drainage area for the on -site stormwater system will be limited to the amount of built -upon area indicated in this permit and the approved plans and specifications The runoff from all built - upon area within the permitted drainage area of this project must be directed into the permitted stormwater control measure. The stormwater control measure has been designed using the runoff treatment method to handle the runoff from 778,802 square feet of impervious area. The built -upon area for the future development is limited to 85,000 square feet. This permit approves 15,129 square feet of built -upon area that was not able to be collected and treated in a stormwater control measure due to grading to bypass the system. Within the areas subject to Session Law 2006-246, a 30-foot wide vegetated buffer must be provided and maintained adjacent to all surface waters. Within the areas subject to Session Law 2008-211 and the 2017 rules, a 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters. This buffer / setback is measured horizontally from the normal pool elevation of impounded structures. from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline in accordance with the stormwater rules and the approved plans and specifications Page 1 of 4 I It State Stormwater Management Permit No. SW8 970128 4 The stormwater control measure is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These stormwater control measures must be provided and maintained at the design condition. The approved supplement is incorporated by reference into this permit 5 The peak flow from the 10-year storm event shall not cause erosion downslope of the stormwater outlet discharge point. 6. Decorative spray fountains will be allowed in the stormwater treatment system if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. 7. When using a wet pond for irrigation; it is recommended that some water be maintained in the permanent pool; the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 8 The landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established. the operation and maintenance agreement must be followed It. SCHEDULE OF COMPLIANCE 1 The project shall be constructed in accordance with the conditions of this permit and the approved plans and specifications 2 The on -site stormwater system shall be entirely constructed, vegetated, and operational prior to the construction of any development, per the approved plans and specifications. 1 During construction. erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4 All stormwater control measures; stormwater collection systems vegetated conveyance systems; and/or maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. 5. The permittee shall at all times provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement, to assure that all components of the permitted on -site stormwater system functions at the approved design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. 7 Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken 8. If final plats for the project are recorded with the Office of the Register of Deeds, the recorded plat must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans 9. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the maximum allowed by this permit. Page 2 of 4 State Stormwater Management Permit No SW8 970128 10 Upon completion of the project, the permittee shall determine whether or not the project is in compliance with the permitted plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the permitted plans; then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications Deviations may require approval from the Division: u. A copy of the recorded maintenance agreement; iii Unless already provided, a copy of the recorded deed restrictions and protective covenants, and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable b If the permittee determines that the project is not in compliance with the permitted plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline; to bring the site into compliance 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below: a. Any modification to the approved plans and specifications, regardless of size including the stormwater control measures, built -upon area, details, etc b. Redesign or addition to the approved amount of built -upon area or to the drainage area c. Further development, subdivision, acquisition; lease or sale of any; all or part of the project area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, or resizing of any component of the approved stormwater control measure, stormwater collection system and/or vegetative conveyance system shown on the approved plan e The construction of any allocated future BUA. f. The construction of any permeable pavement for BUA credit that was not included in the approved plans and specifications. The request must include a, and a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. g. The construction of any 57 stone area or trails to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director 12, The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. 13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system is in compliance with all permit conditions Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1 Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any and all other permits or approvals that are required in order for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215 1, and subject to enforcement procedures pursuant to NCGS 143-215.6 Page 3 of 4 State Stormwater Management Permit No SW8 970128 In the event that the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed State Stormwater Request Form for Permit Transfer or Permit Information Update, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants, b. Bankruptcy, c. Foreclosure, subject to the requirements of Session Law 2013-121 d. Dissolution of the partnership or corporate entity; subject to NCGS 57D-2-01(e) and NCGS 57 D-6-07, e. A name change of the current permittee; f A name change of the project, g. A mailing address change of the permittee; The permittee is responsible for compliance with all of these terms and conditions until such time as the Division approves the transfer request Neither the sale of the protect, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit 6. The permittee grants Division Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted project 7. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission however, these actions do not stay any permit conditions 8. Approved plans, application, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H 1000 and NCGS 143-215.1 et.al 11. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit modified and reissued this the 2111 day of June 2017. NORTH CARROLIN�A ENVIRONMENTAL MANAGEMENT COMMISSION '✓ Tracy Dav P.E , Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 970128 Page 4 of 4 State Stormwater Management Permit No SW8 970128 UNC Wilmington — Honors; Ihternational, and Privatized Housing and Associated Parking Lot Improvements Phase 1 Stormwater Permit No. SW8 970128 New Hanover County Designer's Certification I, . as a duly registered in the State of North Carolina; having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification Noted deviations from approved plans and specifications Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office New Hanover County Building Inspections Page 1 of 2 State Stormwater Management Permit No. SW8 970128 General Certification Requirements: 1 The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 All slopes are grassed with permanent vegetation. & Vegetated slopes are no steeper than 3.1 T The inlets are located per the approved plans and do not cause short-circuiting of the system. 8. The permitted amounts of surface area and/or volume have been provided 9. All required design depths are provided. 10 All required parts of the system are provided 11. The required dimensions of the system are provided, per the approved plan. 12. All components of the stormwater control measure are located in either recorded common areas; or recorded easements. Wet Pond Certification Requirements: The outlet/bypass structure elevations are per the approved plan. 2. The outlet structure is located per the approved plans 3 Trash rack is provided on the outlet/bypass structure. 4 Required drawdown devices are correctly sized per the approved plans. Page 2 of 2 SW8 970128 - UNC Wilmington - Honors, International, and Privatized Housing and Associated Parking Lot Improvements Phase 1 Attachment 1 - Permitting History Approval Permit Action BIMS Description of the Changes Comments Dale Version 5/13/1997 Original Approval 1.0 6/25/2002 Plan Revision - Revision to the site layout. No increase in BUA. 3/7/2005 A1odification 1 1 Increasing project area; drainage area, and 13UA for the Privatized Mousing project 4/23/2008 Plan Revision 1.2 Reducing the service lot behind Wagoner I lall. 606 sf of Future BUA made available. Adding 42,210 sf of BUA to account for 13UA 12/19/2008 Modification 1.3 approved under SW8 080406 that is directed to this system Adding 3,206 sf of BUA for the construction of a Offsite areas identified 5/5/2009 Modification 1.4 building and changes to the pavement/sidewalk related to the reginal energy plant. separately in the permit * Increasing project area, drainage area, and 13UA for Phase 1 of the parking improvements which include expanding Lot IA and adding Lot 1 B. Including an allocation of future BUA. Phis expansion is subject to the 2017 Rules. 6/21/2017 Major Modification 1.5 * Clarifying the drainage area and BUA directed to the pond to match the as -built condition. Better documentation of adjacent permits directing runoff to the pond. * Increasing the size of the wet pond and re -permitting it under the 2017 Rules. Page 1 of 1 'N . DEMLR USE ONLY ' Date Received Fee Paid Permit Number * la 17 4G7 1 5 T 7 0 1 a Applicable Rules: (select all that apply) ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION AY �' 2017 1. Project Name (subdivision, facility, or establishment name -should be consiste i project name on ans, specifications, letters, operation and maintenance agreements, etc.): BY: UNC Wilmington - Honors, International, and Privatized Housing, and Associated Parking Lot Improvements Phase 1 2. Location of Project (street address): Walton Drive and Community Drive, adjacent to Wagoner Dining Hall City: Wilmington County: New Hanover Zip: 28403 3. Directions to project (from nearest major intersection): Project is located at the SE corner of the intersection of Walton Drive & Community Drvie 4. Latitude: 34' 13' 25" N Longitude: 77' 51' 56" W of the main entrance to the project. IL PERMIT INFORMATION: 1.a.Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt t Renewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 970128 , its issue date (if known)May 13, 1997 and the status of construction: ❑Not Started ❑Partially Completed* ®Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ❑No ®Yes If yes, see S.L. 2012-200, Part VI: httl2:Hportal.ncdenr.org/web/Ir/rules-and-regulations FormSWU-101 Version Oct. 31,2013 Page Iof6 IIL CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: UNC Wilmington Signing Official & Title: Mark Morgan / Associate Vice Chancellor for Business Affairs -Facilities b. Contact information for person listed in item la above: Street Address:601 S. College Road City:Wilmington State:NC Zip:28403 Mailing Address (if City: Phone: ( 910 ) 962-3761 Email: morganm@uncw.edu State: Zip: Fax: (910 ) 962-7140 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Mailing Address (if applicable): City: State: Phone: ( ) Fax: 3. a. (Optional) Print the name and title of another contact such as the project's person who can answer questions about the project: Other Contact Zip: Zip: Signing Official & Title:Galen Jamison PE / Project Manager v. b. Contact information for person listed in item 3a above: mAY 12 2017 Mailing Address:601 South College Road City:Wilniington State:NC Zip:28403 Phone: (910 ) 962-2677 Email:iamisong@uncw.edu 4. Local jurisdiction for building permits: Point of Fax: (910 ) 962-7140 Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of '01 � IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Development onsite consists of the construction of two new parking lots. Impervious created from the construction of the lots will be directed into the existing regional stormwater pond, which is to be modified from the construction of this oroiect 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph Il - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 26.39 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':28.39 acres * Total project area shall be calculated to exclude the follozing the normal pool of imppou��nded structures, the area between the banks of streams and rivers, the area belt mo the Normal Higgh� Water (NHw) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. B. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 56.40 % 9. How many drainage areas does the project have?i (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Stream Class * Stream Index Number Total Drainage Area (soSee Attachment A On -site Drainage Area (so Off -site Drainage Area (so Proposed Impervious Area** s Im ervious Area** total Impervious— Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area On -site Buildings/Lots (so On -site Streets (so On -site Parking (so See Attachment A On -site Sidewalks (sf) Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (so: ' Stream Class and Index Number can be determined at: htt : ortal.ncdenr.or v+b v sa a do s Impervious area is defined as the built upon area including, but not limited to, bt l lings, roads, parking arell sidewalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do BYt rappit __ __ that is to be removed and which will be replaced Inj new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 C, SW8 970128 UNW-16050 .V E a' L 0 0 ATTACHMENT A Drainage Area/Impervious Breakdown 1111asin Information^- --' j Drainage Area to Pond Receiving Stream Name - I - UT Bradley Creek i Drainage Area BYPASS UT Bradley Creek_-! i Drainage j Area TOTAL UT Bradley Creek _ SC; FiQW_ - Stream Class SC; H W SC; H W_ j- Q Q - iStream Index Number 1 Total Drainage Area (sf) i On -site Drainage r Aeas v _ _ _ _ ( Off --site Drainage Area (sf) _ -- --- 18 87-24 4 (1) _! 1,480,114 - 1,186,970 - 293,144 _ 18-87-24-4-(1) j 49,626 _ _ - j---_-49,626 1 _ 18-87-24-4_-(1) -� _1,5_29,740 _ I j 1,236,596 793,931 �Total Proposed Impervious Area (sf) i Onsrte Proposed Impervious Area 778,802 669,464 15,129 --! 15-129 _ (-- 684,593 --- - 51.90% 0% 55.36% 'Total % Impervious Area ! 52.62%� ! 30.49% --------.._-. --- --------- - - -_ -_- - -- lOnsite % Im_pervious Area ! 56.40% 30.49%_- Iervious S mpurface Area i Drainage Area to Pond _ ; Drainage Area BYPASS _ Drainage Area TOTAL On -site Buildings/Lots (st)- - - On-site Streets (sf) ! 0 0 -�� ) 0 _- 0-_-- 0 On -site Parking (sf) 1 2,410 81,125 _7_8,715 ,On -site Sidewalks (sf) ( 1,g`' Cm I1988-2008 9,823 410,231 1 6,941 3,688413,919 16,764 ----� 2008-2017 (Clal,S �bs 63,951 j 454 i 64,405 1 SW8021218 0 0 -- 0 19,7_ -12,242 --- --------------- SW8 061204 ( I.O" 4« 19,786 0 SW8080406 ;imX a4V ISW8020404 _ (� I sia 1SW8980427 (t� I,6„ ;a 12,242 41,857 1,814 j 0 ! 0 i--- p ----P----- I 41,85_7 I 1,814 - -- I (@ 15" Future ------------- i0ff--site (sf) 1988-2008 (� I,D�� -Ae` -- --- - --- aRm lOff-site(sf)20_08-_2017 (� 1,4„ BxistPre-1988 BUA (sfl (�I,S" �t mg 85,000 - - - --- 29446 -- 4,193 -j -- 21,744 -- 0 :_ O L -- - -- . _ --- -�- 0 1,636 --.__ -.,� 85,000 I II -29,446-- ---- 4,193 23,380 -__- Total (st); - 778,802 _ -- 15,129 _- j 793,931 4 son R,du, A* 1Tq5 R45 04AL ,SL aGDs-all - 6/8/2017 11- How was the off -site impervious area listed above determined? Provide documentation. Projects in Union Countv: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Is 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V11 below) T 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or theJ receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. 1 4= C E f VE e. North arrow. 1M I. Scale. MAY 12 2()1) g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW Imp-af-twaters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to de ths) as well as a man of the borin locations with the existin 11113 11. g P g elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to venfij the SHWT prior to submittal, (910) 796-7378.) A copy of the most current property deed. Deed book: 7 Page No: 18 For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secreta!y.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://12ortal.ncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Cortege, PE, PLS Consulting Firm: McAdams Mailing Address: 2905 Meridian Parkway City: Durham State: NC Zip: 27713 Phone: (919 ) 361-5000 Fax: (919 1 361-2269 Email: george@mcadamsco.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or hype name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Infonnation, item la) with (pnnt or hjpe name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 ECEINVE MAY 1 2 2017 Page 5 of 6 BY' As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. I, , a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 111VA11 My commission expi X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Mark Morgan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000 and any other applicable state stormwater requirements. Signature: r;G.!.tT -.. Date: S w I/��aY1C� F Aevarrider a Notary Public for the State of County of I'l "mer- , do hereby certify that�a 6(Y1Qti . personally appeared before me this [Q_ day of ? a4 cP&7, an wledge the due e c tion of the application for a stormwater permit. Witness my hand and official seal,_ Ce� t tF IA/ to ����i. Not . v�; New No!Y ttc 70 Y Ccmm�vUbS1Or CoU ty X 07/03/201640ire, OCAR SEAL My commission expires �ECEIVE MAY 12 20V F. BY: Fomi SWU-101 Version Oct. 31, 2013 Page 6 of o o rb ts MEMORY TRANSMISSION REPORT TIME :06-21-2017 14:27 FAX NO.1 :9103502004 NAME :Mainfax FILE NO. 404 DATE 06.21 14:23 TO :n 919193612269 DOCUMENT PAGES 10 START TIME 06.21 14:25 END TIME 06.21 14:27 PAGES SENT 10 STATUS OK MEMORY TRANSMISSION REPORT TIME :06-21-2017 14:25 FAX NO.1 :9103502004 NAME :Mainfax FILE NO. 403 DATE 06.21 14:23 TO :n 99627140 DOCUMENT PAGES 10 START TIME 06.21 14:23 END TIME 06.21 14:25 PAGES SENT 10 STATUS OK Hall, Christine From: Stubbs, Rebecca <rstubbs@mcadamsco.com> Sent: Tuesday, June 13, 2017 5 32 PM To: Hall, Christine Cc: Perry, Daniel; George, Cory; Caldwell, James Subject: RE: 2nd request for additional info - SW8 970128 Attachments: 2017-06-13- UNCW Parking Improvements- Sendout to C Hall pdf Christine, Those modifications have been made and revised package is attached Enjoy your vacation! Rebecca Stubbs, El I Designer I, Water Resources+ Infrastructure McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361, 5000 x224 I direct 919. 287. 0740 1 rstubbs(@mcadamsco.com www.mcadamsco.com I linkedin I twitter I mstagram I ioin our team U MCA.DAMS creating experiences through experience From: Hall, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, June 13, 2017 4:14 PM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Cc: Perry, Daniel <dperry@mcadamsco.com>; George, Cory <george@mcadamsco.com>; Caldwell, James <ca Idwel I @ mcadamsco.com> Subject: RE: 2nd request for additional info - SW8 970128 Thanks. A couple comments... The supplement doesn't look like it has been updated to match the latest information. For instance: 1. The total BUA listed in the supplement doesn't match the total BUA for the site, including future. 2. The minimum required volume doesn't match the volume shown in the revised tab 5 calculations. Also, a couple comments on the calculations: 1. 1 don't see the provided storage volume at 25.3 ft listed in the calculations anymore. Can you remind me where in the calculations it is reported? I was trying to confirm the provided volume listed in the supplement. 2. The drawdown calculations in Tab 5 seem to use the water quality elevation (25.29 ft) instead of the provided head (25.3 ft). The drawdown for the minimum required storage volume should be based on the provided head, not the required head. Page 9 of Chapter B and Page 14 of Chapter A-4 of the design manual give examples. I know its not a big deal on this one but the information needs to be consistent. It also good to keep on the radar for other outlets where the provided storage is much more different than the required storage. If you can take a look at these items, that would be great. I'm taking the rest of the week off and will be back on Monday. Christine Christine Hall Environmental Engineer Division of Energy. Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct Christine. hall()ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 (Nothing Compares. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Stubbs, Rebecca [mailto:rstubbs@mcadamsco.comj Sent: Tuesday, June 13, 2017 10:20 AM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Perry, Daniel <dperry@mcadamsco.com>; George, Cory <Reoree@mcadamsco.com>; Caldwell, James <ca Idwell@mcadamsco.com> Subject: RE: 2nd request for additional info - SW8 970128 Christine, I have attached the updated Supplement Form and the revised WQv calculations. The numbers should now be consistent with was shown in Attachment A. Please let me know if you have any further questions. Thank you! Rebecca Stubbs, El I Designer I, Water Resources + Infrastructure McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 I direct 919. 287. 0740 [ rstubbs@mcadamsco.com www.mcadamsco.com I linkedin [ twitter [ instagram [ join our team 'Jl M.CA oA M s creating experiences through experience From: Perry, Daniel Sent: Monday, June 12, 2017 5:12 PM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: FW: 2nd request for additional info - SW8 970128 Daniel Perry, El [ Project Manager, Water Resources 3 Hall, Christine From: Stubbs, Rebecca <rstubbs@mcadamsco.com> Sent: Tuesday, June 13, 2017 10.20 AM To: Hall, Christine Cc: Perry, Daniel; George, Cory, Caldwell, James Subject: RE: 2nd request for additional info - SW8 970128 Attachments: 2017-06-13- UNCW Parking Improvements- Sendout to C. Hall pdf Christine, I have attached the updated Supplement Form and the revised WQv calculations. The numbers should now be consistent with was shown in Attachment A. Please let me know if you have any further questions. Thank you! Rebecca Stubbs, El I Designer 1, Water Resources + Infrastructure McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 j direct 919. 287. 0740 1 rstubbs@mcadamsco.com www.mcadamsco.com I linkedin j twitter j instagram j ioin our team '.J MCADAMS creating experiences through experience From: Perry, Daniel Sent: Monday, June 12, 2017 5:12 PM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: FW: 2nd request for additional info - SW8 970128 Daniel Perry, El j Project Manager, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x134 I direct 919. 287. 0795 j mobile 919. 614.6212 1 dperry@mcadamsco.com www.mcadamsco.com j linkedin j twitter j instagram I join our team =j MCADAMS creating experiences through experience From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Monday, June 12, 2017 5:10 PM To: George, Cory <george@mcadamsco.com>; cadwell@mcadamsco.com; Perry, Daniel <dperrv@mcadamsco.com>; Galin Jamison (jaimsong@uncw.edu) <jaimsong@uncw.edu> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: 2nd request for additional info - SW8 970128 Hall, Christine From: Hall, Christine Sent: Monday, June 12, 2017 5'10 PM To: George, Cory (george@mcadamsco.com); 'cadwell@mcadamsco.com'; Perry, Daniel; Galin Jamison (jaimsong@uncw.edu) Cc: Weaver, Cameron Subject: RE2nd request for additional info - SW8 970128 All, I left Daniel a voice mail message but wanted to follow up with an e-mail. I have had a chance to look at the items received today for the subject project and have a few follow up questions / issues: Tab 4 of the calculations packet: The sum of the drainage areas listed in tab 4 are 0.61 acres greater than the total drainage area listed in the summary and presented in attachment A. Why the discrepancy? The drainage area should be a constant. Tab 5 of the calculations packet: The total drainage area listed in the summary is greater than the total drainage area presented in Attachment A. The sum of the individual drainage areas also greater than both of these. In general, an allocation of future BUA does not change the total drainage area. The intent of future BUA is that it can be used within the delineated drainage area. Please double check the drainage are is consistent between all of these sources Supplement: With the recently submitted changes, shouldn't the supplement also been updated to reflect those changes? I didn't see a copy of the revised supplement in the package. Technically, only 2 request for additional information are allowed. I'm hoping these can be resolved quickly so this permit can get issued. Let me know if you have any questions. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct Christine hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 ''Nothing Compares _- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hall, Christine Sent: Monday, June 05, 2017 8:43 AM The John R. McAdams Company, Inc. Raleigh / Durham, NC 2905 Meridian Parkway Durham, North Carolina 27713 (919) 361-5000 Charlotte, NC 3436 Tonngdon Way Suite 110 Charlotte, North Carolina 28277 (794) 527-0800 �jNO low) ,I1� June 9, 2017 Ms. Christine Hall, Environmental Engineer State of North Carolina Environmental Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RECEIVER"' JUN 12 201/ BY; Re: UNC Wilmington Parking Improvements Stormwater Project No.: SW8 970128 Response to Preliminary NCDEQ Review Comments UN W-16050 The following are the response comments for the above -mentioned project. Our response comments are in bold. Christine Hall 1. 15A NCAC 02H.1042(2)(a)(iv): The sum of the on -site and off -site drainage areas presented in Attachment A is 21 square feet short of the total presented. Please confirm the total drainage area to the pond and that it is presented consistently between the application documents. McAdams Response: The discrepancy between total areas has been reconciled and is consistent on all documents. 2. 15A NCAC 02H.1042(2)(f): Please confirm or provide the following information in the calculations: a. On the Wet Detention Basin Summary sheet, the total impervious area to the pond is listed as being 17.77 acres. However, Attachment A lists the total impervious area as being 777,029 square feet or 17.84 acres. It is noted that separate calculations were provided for the future impervious allocation. If the future impervious area is not included in this set of calculations, please confirm the information is consistent with Attachment A. Recommendation: Include the future in a single set of calculations to reduce possible errors and improve consistency (refer to Item 92.c) McAdams Response: The total impervious area to the pond has been updated and confirmed to be consistent on all corresponding design calculations (see Section 4). Future impervious calculations have been updated and provided in Section 5. Mcadamsco.com Designing Tomorrow's Infrastructure & Communities Ms. Christine Hall State of North Carolina Environmental Quality UNC Wilmington Parking Improvements, Project No.: SW8 970128 June 9, 2017 Page 2 of 3 b. In the Determination of Water Quality Volume sheets, the total areas and impervious areas do not appear to reflect the recent changes. For instance, the previously permitted 1988-2008 section lists these areas as being 10.0 acres; however, the sum of these categories in the revised Attachment A appears to be 410,231 + 27,983 = 438,214 square feet or 10.06 acres. The recent changes also appear to impact the previously permitted 2008-2017 category. McAdams Response: The Water Quality Volume calculation sheet has been updated to be consistent with Attachment A. c. if it is desired to determine the impact from the future built -upon area separately, please ensure the design information is consistent with the intended future design. For instance, the total drainage area and total impervious areas to the pond are not consistent with the information presented in Attachment A. McAdams Response: The future impervious calculations have been updated and corrected to be consistent with Attachment A. 3. 15A NCAC 02H.1042(h) and .1053: Please provide a complete cross- section view of the wet pond that includes vegetated shelf design. McAdams Response: A cross section view incorporating the vegetated shelf design has been added to sheet SW-2. 15A NCAC 02H.1053(2): In response to Item #9 of the request for additional information dated May 19, 2017, it was noted that the average depth calculation was revised to follow Equation 3 on page 8 of Chapter C-3. Please provide the variables used to determine the volume over the vegetated shelf, including the perimeter of the permanent pool at the bottom of the vegetated shelf. McAdams Response: The average depth calculation has been modified to follow Equation 2 on page 8 of Chapter C-3. MDC 2 states that "the applicant shall have the option of excluding the submerged portion of the vegetated shelf from the calculation of average depth." We are choosing to include the volume of the submerged portion of the shelf in our calculation. Equation 2 states UN W-16050 Ms. Christine Hall State of North Carolina Environmental Quality IJNC Wilmington Parking Improvements, Project No.: SW8 970128 June 9, 2017 Page 3 of') that it is to be applied "when the shelf is not submerged or the shelf is being included in the average depth calculation." 5. Due to the potentially minor nature of these comments, the express additional information review fee has been waived. McAdams Response: Thank you. Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at (919) 361-5000. Sincerely, THE JOHN R. McADAMS COMPANY, INC. mes Caldwell, PE 4000 Assistant Director, Water Resources & Infrastructure JC/hc EGE' 09 jUN 12 2017 BY: UN W-16050 Energy. Mineral & � v,o- Land Resources ENVIRONMENTAL QUALITY \ June 5, 2017 QVVNO`N `I C,C,� Vice Chancellor for Business Affairs UNC Wilmington c/o Mark Morgan, Associate Vice Chancellor for Business Affairs -Facilities 601 S. College Rd. Wilmington, NC 28403 Subject: Request for Additional Information ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director Stormwater Project No. SQ1'8 970128 t1CW Wilmington - Honors, International, and Privatized ]lousing and Associated Parking Lot Improvements, Phase 1 New Hanover County Dear Mr. Morgan: The Wilmington Regional Office received and accepted a modified Express State Stormwater Management Permit Application for the subject project on May 12, 2017 with additional information received on May 31, 2017. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: i ✓l . 15A NCAC 021-1.1042(2)(a)(iv): The sum of the on -site and off -site drainage areas presented in Attachment A is 21 square feet short of the total presented. Please confirm the total drainage area to the pond and that it is presented consistently between the application documents. �" DA n�k 15A NCAC 021 i.1042(2)(f): Please confirm or provide the following information in the calculations: ,—j a. On the Wet Dentation Basin Summary sheet; the total impervious area to the pond is listed as being 17.77 acres. However, Attachment A lists the total impervious area as being 777,029 square feet or 17 84 acres. It is noted that separate calculations were provided for the future impervious allocation. If the future impervious area is not included in this set of calculations, please confirm the information is consistent with Attachment A. Recommendation: Include the future in a single set of calculations to reduce possible errors and improve consistency (refer to Itenn #2.c) b. In the Determination of Water Quality Volume sheets, the total areas and impervious areas do not appear to reflect the recent changes. For instance; the previously permitted 1988-2008 section lists these areas as being 10.0 acres; however, the sum ofthese categories in the revised Attachment A appears to be 410,231 _ 27,983 = 438,214 square feet or 10.06 acres. The recent changes also appear to impact the previously permitted 2008-2017 category. \ _�7 c. If it is desired to determine the impact from the future built -upon area separately, please ensure the design information is consistent with the intended future design. For instance, the total drainage area and total impervious areas to the pond are not consistent with the information presented in Attachment A. 3. 15A \CAC 021-1.1042(h) and .1053: Please provide a complete cross-section view of the wet pond that includes vegetated shelf design. /. 15A \'CAC 021-I.1053(2) In response to Item 49 of the request for additional information dated May 19, 2017, it was noted that the average depth calculation was revised to follow Equation 3 on page 8 of Chapter C-3. Please provide the variables used to determine the volume over the vegetated shelf, including the perimeter of the permanent pool at the bottom of the vegetated shelf. State of North Carolina I Environmental Quality I Energy. Mineral and land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No. Sw8 970128 Page 2 of 2' f 5. Due to the potentially minor nature of these comments, the express additional information review fee has been waived. Please keep In mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 12, 2017, or the application will be returned as incomplete. Please note that only two letters requesting additional information is allowed in the State Stormwater Program. If the information is not satisfactorily provided after the second request, the project will he returned If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review date and will need to resubmit all of the required items at that time, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the email address or fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information, which shall be no later than 5 business days past the original due date. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of\CGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express' and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at christine.hall@ncdenr.gov. Sincerely, ��Q CAt �44 Christine I [a]l Environmental Engineer GDS/canh: A\\StormwaterAPermits & Projects\1997\970128 HD\2017 06 addinfo 970128 cc: Cory George / James Caldwell, McAdams Galin Jamison, UNCW Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 Hall, Christine From: Hall, Christine Sent: Monday, June 05, 2017 8:43 AM To: George, Cory (george@mcadamsco.com); 'cadwell@mcadamsco com'; Galin Jamison (aimsong@uncw.edu) Cc: Weaver, Cameron Subject: 2nd request for additional info - SW8 970128 Attachments: 2017 06 addinfo 970128.pdf Gentlemen, A pdf of the 2nd request for additional information for the modification to the UNCW permit SW8 970128 is attached. As always, please let me know if you have any questions or concerns. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine hall@ncdenr gov 127 Cardinal Drive Ext. Wilmington, NC 28405 -^/ Nothing Compares� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1� WADAMS LETTER OF TRANSMITTAL To: Ms. Christine Hall 127 North Cardinal Drive Wilmington, North Carolina 28405 (919)796-7215 Re: UNC Wilmington Parking Lot Improvements Phase 1 I am sending you the following item(s)' Date: June 9, 2017 FEDERALEXPRESS Job No.: UNW-16050 COPIES DATE NO. DESCRIPTION 2 Construction Drawing Sets 1 SIA 1 Response to Comments These are transmitted as checked below: ® As requested ❑ For your use ® For approval ��/ ❑ ❑ For review and comment � IM 8 JUN 11 2011 Remarks: It Copy to: Raleigh -Durham 2905 Meridian Parkway Durham, North Carolina 27713 (919)361-5000 Signed. Cory George, PLS, PE Protect Manager, Institutional Charlotte 3436 Toringdon Way, Suite 110 Charlotte, North Carolina 28277 (704)527-0800 Designing Tomorrow's Infrastructure & Communities McAdamsCo.com The John R. McAdams Company, Inc. Raleigh / Durham, NC 2905 Meridian Parkway Durham, North Carolina 27713 (919)361-5000 Charlotte, NC 3436 Tonngdon Way suite 110 Charlotte, North Carolina 28277 (704) 527-0800 MCADAMS May 30, 2017 Ms. Christine Hall Energy, Mineral, and Land Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 VEFJ MAY 3 12017 BY: Re: UNCW Parking Improvements Stormwater Project No: SW8-970128 Response to Stormwater Review Comments UNW-16050 The following are the response comments for the above mentioned project. Our response comments are in bold. STORMWATER Christine Hall 910-796-7215 15A NCAC 02H.1042(2)(a)(i): Please confirm the project name desired to describe this project area listed in Section I.1 of the application. Previously, this project name was "UNCW Honors, International, and Privatized Housing." The recently submitted application lists the project name as "Parking Lot Improvements Phase 1." Recommendation: The project name should be descriptive of the entire areas the project encompasses. McAdams Response: The project name listed on the application has been altered to represent the entire project area. 2. 15A NCAC 02H.1003(1) and .1042(2): a. Please confirm that the percent of impervious area draining to the pond presented in Attachment A. the supplement, and calculations are consistent with the intended design. For instance, Attachment A and the supplement identify this drainage area as having 58% impervious area while the calculations indicate it has 47%. McAdams Response: The percent impervious area draining to the pond presented in Attachment A, the supplement, and calculations are now consistent with the intended design. b. Recommendation: Include a future allocation for contingencies and increased flexibility if future development is desired within the delineated drainage area. Mcadamsco.com Designing Tomorrow's Infrastructure & Communities F MAY 3 1 2017 11 Ms. Christine Hall UNCW Parking Improvements gy: May 30, 2017 Page 2 of 5 McAdams Response: Future development allocation has been analyzed and calculations have been included. 3. 15A NCAC 02H.1042(2)(g)(ii): Please provide dimensioned project or project phase boundary with bearings and distances. McAdams Response: A dimensioned project boundary with northings and castings has been provided on BUA-2. Please refer to Attachment B for the complete list of points. 4. 15A NCAC 02H.1042(2)(g)(vii): Please provide the details of the stormwater collection system, including the inverts of the piped collection system on plan sheet C-12 or a citation of where this information can be located within the provided plan set. McAdams Response: Storm Structure data has been added to sheet C-12. 5. 15A NCAC 02H.1042(h): Please provide a cross-section view of the wet pond that includes the sub -items of this section of the rule. McAdams Response: Cross -sectional views of the wet pond have been provided. See sheet SW-2. 15A NCAC 02H.1042(2)(h)(ii) and .1053(3): The forebay bottom elevation is set at 19 ft with a sediment accumulation elevation of either 19.5 ft or 20 ft (refer to Item #9). The invert of the forebay inlet appears to be set at an elevation of 19.17 ft. which would be located within this sediment removal elevation. Please confirm the intended design and ensure that any sediment accumulation will not impede the water from entering the system and that the system can still be operated and maintained as outlined in the signed operation and maintenance agreement. McAdams Response: The forebay bottom elevation has been set to 18 ft with a sediment accumulation elevation of 19 ft. The sediment accumulation elevation is now less than the invert elevation to the forebay (19.17 ft). 7. 15A NCAC 02H.1042(3)(b): Please provide the following information to support the intended design: CRC-14010 Ms. Christine Hall UNC W Parking Improvements May 30, 2017 Page 3 of 5 A MAI 31 2�131 a. Please adjust the number of decimals shown on the supplement to correctly display the intended design. For instance, the supplement indicates the bottom elevation of the vegetated shelf will be 24 ft, however the other application documents indicate this elevation will be 23.5 ft. McAdams Response: Number of decimals shown on the supplement has been adjusted. b. Under the "compliance with the applicable stormwater program" section of the supplement, please identify the stormwater program that applies to this project. Based on the permitting history and proposed changes, this review assumed the built -upon area is subject to the 1995 rules, Session Law 2006-246, Session Law 2008-211, and the 2017 rules while the SCM is subject to the 2017 rules. McAdams Response: The "compliance with applicable stormwater program" section of the supplement has been revised to reflect the permitting history and proposed changes. c. Please identify the surface area at the temporary pool elevation in the calculations. McAdams Response: The surface area at the temporary pool elevation has been shown in the design calculations. 15A NCAC 02H.1053(1): Please note that the required surface area determined from the SA/DA ratio is only for the main pool and does not include the forebay. On the Wet Detention Basin Summary page of the calculations, the provided surface area appears to be associated with both the main pool and forebay. Please identify the surface area provided only in the main pool at the permanent pool elevation to demonstrate that the minimum requirements have been met. McAdams Response: Your comment is noted. Calculations have been modified so that the provided surface area is only associated with the main pool. Minimum requirements have now been met. 9. 15A NCAC 02H.1053(2): The average depth calculation appears to use Equation 2 on page 8 of Chapter C-3. However, Equation 2 includes the CRC-14010 Ms. Christine Hall UNCW Parking Improvements May 30, 2017 Page 4 of 5 vegetated shelf and requires the full permanent pool volume and surface area to be used to determine the average depth. If it desired to exclude the submerged potion of the vegetated shelf from the average depth calculation, Equation 3 on page 8 in Chapter C-3 should be used. Please reconsider the average depth calculation. McAdams Response: The average depth calculation has been modified in accordance with your comment and Equation 3. 10. 15A NCAC 02H.1053(3): The operation and maintenance agreement indicates the sediment removal elevation in the forebay has been set at 19.5, however the calculations appear to indicate it has been set at an elevation of 20. Please confirm the sediment removal elevation of the forebay is presented consistently and accurately. McAdams Response: The operation and maintenance agreement and calculations are now consistently indicating the sediment removal elevation. 11. 15A NCAC 02H.1053(5) and Chapter A-4 of the NC Design Manual: The forebay section of Chapter A-4 on page 10 recommends that the forebay weir can be set as low as (but not exceed) 1 foot. Plan sheet SW-1 appears to suggest that the forebay weir will be set 2 feet below the permanent pool surface. Please reconsider the elevation of the weir and demonstrate that flow of water through the weir will be at a nonerosive velocity. McAdams Response: The forebay weir has been modified to 1 foot below the permanent pool surface. The crest of the weir is considered to be the top of the riprap. Calculations are provided demonstrating that the flow of water through the weir will be at a nonerosive velocity. 12. 15A NCAC 02H.1053(7): The outlet structure detail on plan sheet SW-2 appears to indicate that the next available outlet is set at 25.30 ft while the identified temporary pool elevation is set at 25.11 ft. The hydraulics of any additional capacities should be considered when calculating the drawdown rate. Please reconsider the drawdown of the minimum required storage based on the entire provided head. McAdams Response: Hydraulics of the additional capacity is now considered in the drawdown rate calculation to include the entire CRC-14010 a1� VEI&IaP" MAY 31 ?�'•I Ms. Christine Hall UNCW Parking Improvements May 30, 2017 Page 5 of 5 provided head. Additionally, the temporary pool elevation is now set to 25.30 ft. 13. 15A NCAC 02H.1053(8): Please demonstrate that the pond discharge from the 1-year, 24-hour storm minimizes hydrologic impacts to the receiving channel and nearby stream. McAdams Response: The pond discharge from the 1-year, 24-hour storm minimizes hydrologic impacts to the receiving channel and nearby stream. See provided calculations. 14. Due to the potentially minor nature of these comments, the express additional information review fee has been waived. McAdams Response: Thank you. Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at (919) 361-5000. Sincerely, THE JOHN R. McADAMS COMPANY, INC. James Caldwell, PE Assistant Director, Water Resources & Infrastructure JWC/am CRC- 14010 J WADAMS LETTER OF TRANSMITTAL To: Ms. Christine Hall Date: 127 North Cardinal Drive Wilmington, North Carolina 28405 (919)796-7215 Re: UNC Wilmington Parking Lot Improvements Phase 1 I am sending you the following item(s): May 30, 2017 FEDERALEXPRESS Job No.: UNW-16050 COPIES DATE NO. DESCRIPTION 2 Construction Drawing Sets 1 SIA These are transmitted as checked below: ® As requested ® For approval ❑ For review and comment Copy to: Raleigh -Durham 2905 Meridian Parkway Durham, North Carolina 27713 (919)361-5000 s P__ I V I_— ❑ For your use MAY 3 1 2017 ❑ BY: n Signed: (111 CqA George LS, PE Project Manager, Institutional Charlotte 3436 Toringdon Way, Suite 110 Charlotte, North Carolina 28277 (704)527-0800 Designing Tomorrow's Infrastructure & Communities McAdamsCo.com STORMWATER MANAGEMENT PLAN UNC WILMINGTON PARKING IMPROVEMENTS - PHASE I U N W-16050 WILMINGTON, NORTH CAROLINA DATE: MAY 2017 PREPARED FOR: UNC WILMINGTON 601 S. COLLEGE ROAD WILMINGTON NORTH CAROLINA 28403 'J ECADVE MAY 3 12017 Raleigh/Durham o 2905 Meridian Parkway o Durham, NC 27713 Charlotte o 3436 Toringdon Way o Suite 110 o Charlotte, NC 28277 MCAdamSCo.Com Designing Tomorrow's Infrastructure & Communities E 11 UNC WILMINGTON PARKING IMPROVEMENTS - PHASE 1 WILMINGTON, NORTH CAROLINA STORMWATER MANAGEMENT PLAN PROJECT NUMBER: DESIGNED BY: DATE: UNW-16050 JAMES CADLWELL, PE DANIEL PERRY, El REBECCA STUBBS, El HEATHER DEW,EI JUNE 21 v�• 111)/1i�1 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 NC Lic. # C-0293 ok '�� 12 2011 UNCW — PARKING IMPROVEMENTS, PHASE l ioll Stormwater Management Calculations General Description Located on the main campus of the University of North Carolina at Wilmington, along Walton Drive, immediately adjacent to Wagoner Hall, is the proposed phase I parking improvement project. In order to meet demand, UNCW is proposing to install 243 new parking spaces, broken into two lots. Lot I will add 87 new spaces along with a drop off location, while Lot I will consist of 156 spaces. With the addition of this new impervious, a renovation of the existing stormwater pond is proposed to fix the forebay dam, expand for new impervious and an assumed additional future impervious allocation, and meet the current 2017 minimum design criteria (MDC) standards. As a result, a high -density permit modification of SW8 970128 is proposed. The current permit modification includes the addition of the new impervious, renovation and upgrade to current MDC, and the cleanup of Built Upon Area (BUA) and the drainage area into the pond. New drainage area maps, BUA maps, supplement, and permit boundary maps have been included in this submittal to clarify information in this permit. Previously this permit had been approved with multiple overlapping permit boundaries from neighboring permits. This submittal has attempted to rectify these overlaps to extent possible, with impervious from adjacent permits labeled as "offsite" when draining into the pond. On the attached BUA exhibit, measured impervious from each of these areas has been delineated along with the applicable rules the impervious should be covered under. Adjacent permit BUA information was determined using previously approved permit information, including, calculations, construction drawings, and drainage area maps obtained by ®1 McAdams during the master permit setup process. Previous modifications included the School of Nursing Regional Energy Plant (approved May 5, 2009), Seahawk Crossing addition of untreated area (approved December 18, 2008), Honors and International Housing addition (approved March 7, 2005) and the original permit submittal (approved May 13, 1997). The proposed project is located within the Cape Fear River Basin, with stormwater runoff from the proposed development draining to an UT to Bradley Creek. According to the N.C. Division of Water Quality BasinWide Information Management System (BIMS), Bradley Creek is classified as SC; HQW (Not within 575' of ORW) at this location and the proposed development has been designed in accordance with the most recent rule adoption of 2017. Hydrologic impacts to the receiving channel are minimized and non -erosive for the 1-year, 24-hour storm. Calculation MethodoloQy • Rainfall data for the Wilmington, NC region is from NOAA Atlas 14. This data describes a depth -duration -frequency (DDF) table describing rainfall depth versus time for varying return periods in the Wilmington, NC area. These rainfall depths are input into the meteorological model within PondPack for peak Bow rate calculations.'Please reference the rainfall data section within this report for additional information. Using maps from the NRCS Web Soil Survey, the on- and off -site soils were determined to be from hydrologic soil group (HSG) `A' soils, `B' soils and `D' soils. Since the method chosen to compute both pre- and post -development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Number (SCS CN). For this analysis, the HSGs for the site consisted of `A', ' B', and ' D'. Within the site boundary, an approximate proportion of each soil group was determined using NRCS Soil Survey Maps. Once an approximate proportion was determined, a composite SCS CN was computed for each cover condition. • Land cover conditions for the site were taken from a recent aerial mapping survey prepared by Avioimage Inc and combined with ground truth survey prepared by McAdams. e The times of concentration are calculated using the SCS TR-55 Segmental Approach. The Te flow paths are divided into three segments: overland flow, concentrated flow, and channel flow. The travel time is then computed for each segment, from which the overall time of concentration is determined by taking the sum of each segmental time. • PondPack Version V8i, by Bentley Systems, Inc., was used in determining the pre- & post -development peak flow rates for the 10-, 25- and 100-year storm events, as well as routing calculations for the proposed stormwater management facility. • For 100- year storm routing calculations, a "worst case condition" was modeled in order to insure the proposed BMPs would safely pass the 100-year storm event. The assumption used in this scenario is as follows: o The starting water surface elevation in each facility, just prior to the 100-year storm event, is at the secondary spillway elevation. This scenario could occur as a result of a clogged water quality siphon or a rainfall event that lingers for several days. This could also occur as a result of several rainfall events in a series, before the siphon has an opportunity to draw down the storage pool. ® o For the facility a constant tailwater was used for modeling and estimated to be near crown. Discussion of Proposed Erosion Control Proposed erosion and sediment control onsite consists largely of silt fence, silt fence outlets, and inlet protection. Where stockpiles exist two rows of silt fence will be provided. The majority of the site is lower than the surrounding terrain and drains into an existing storm network. Silt fence outlets are to be installed in low spots and as the engineer instructs throughout the project, in accordance with the details and project specification manual, to prevent fence failure. Conclusion If the development on this tract is built as proposed within this report, then the applicable requirements will be met with the proposed stormwater management facility. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: 1. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. S W 8 970128 IJN W-16050 • ATTACTCMENT A Drainage Area/Impervious Breakdown Basin Information Drainage Area to Pond Drainage Area BYPASS Drainage Area TOTAL Receiving Stream Name LIT Bradley Creek UT Bradley Creek UT Bradley Creek Stream Class SC; HQW SC; HQW SC; FIQW Stream Index Number 18-87-24-4-(1) 18-87-24-4-(1) 18-87-24-4-(1) Total Drainage Area (sf) 1,480,1 14 49,626 1,529,740 On -site Drainage Area (sf) 1,186,970 49,626 1,236,596 Off -site Drainage Area (sf) 293,144 0 293,144 Total Proposed Impervious Area (sf) 778,802 15,129 793,931 Onsite Proposed Impervious Area 669,464 15,129 684,593 Total % Impervious Area 52.62% 30.49% 51,90% Onsite % Impervious Area 56.40% 30.49% 55.36% Impervious Surface Area Drainage Area to Pond Drainage Area BYPASS Drainage Area TOTAL On -site Buildings/Lots (st) 0 0 0 On -site Streets (st) 0 0 0 On -site Parking (sf) 78,715 2,410 81,125 On -site Sidewalks (so 9,823 6,941 16,764 1988-2008 410,231 3,688 413,919 008-2017 63,951 I 454 64,405 SW8021218 0 0 0 SW8 061204 I 19,786 0 19,786 SW8 080406 12,242 0 12,242 SW8 020404 41,857 0 41,857 SW8 980427 1,814 0 1,814 Future 85,000 0 85,000 Off site (sf) 1988-2008 29,446 0 29,446 Off -site (sf) 2008-2017 4,193 0 4,193 Existing Pre-1988 BUA (sf) 21,744 1,636 23,380 Total(st)l 778,802 15,129 793,931 M 6/8/2017 IAktacnmc*l - 9 0 l• LJ Point Number Easting DTI N/ICAL)AMS Northing Point Number 1 2344152.9020' 173792.2305' 2 2344147.6147' 173821.0716' 1 3 2344142.3013' 173832.0890' 4 2344136.3975' 173847.4345' 1 5- 2344107.2410' 173867.3621' 6 2344098.1100' 173881.2600' 7 2344090.3466' 173901.2642' 8 1 2344085.6117' 173906.2896' 9 2344060.1285' 173923.6366' 1 10 2344086.9550' 173990.0799' 11 2344117.1683' 174025.8100' 12 2344149.9607' 174050.4897' 13 1 2344180.9108' 174075.1692' 14 123442.11.8609' 174105.0055.0058' 1 15 12344226.9680' 174120.1082' 16 2344237,0999' 174122.1342' 1 17 12344232.5837' 174137.5552' 18 2344230.8708' 1 174146.0553' 19 2344235.1629' 174196,8599' 20 12344243.2050' 174234.2500' 21 2344244.9436' 1174275.7175' 22 2344241.3016' 1174292.9297' 23 2344233.4000' Ij 174308.2900' 24 2344234.6832' 174328.5620' 25 2344233.9370' 174330.5981' 26 2344230.4720' 174340.2169' 27 2344230.4720' 1174345.2752' 28 2344233.0741' 1174351.6341' 1 29 2344234.6200' 174360.2500' 30 2344230.0900' 174374.3500' 31 2344224.6977' 174389.9831' 32 12344216.7704' 1174403.3307' 33 2344205.7140' 174421.6836' 34 2344191.3197' 174430.2343' 35 2344178.3860' 174438.3680' 36 2344151.2660' 174451.0899' 37 2344127.8268' 174465.9608' 38 2344112.3894' 174469.2977' 39 2344097.1197' 174475.3941' 40 2344080.8020' 174480.3104' 41 12344067.8700' 174499.3800. 42 2344062.3800' 174509.5600' Easting Northing 43 12344055.7665' 174518.5237' 44 12344053.5313' 1174520.3115: 45 12344045.9670' 174526.0696 46 2344041.5735' 174528.3197' 47 2344038.0600' 174528.7989' 48 12344034.0606' 1174517.0082' 49 12344018.6980' 174465.9557' 50 12344003.0560' 174424.8483' 51 2343988.5598' 1174385.9622' 52 2343982.7662' 174376.4091' 12343976.9727' 174370.9088' _53_ 54 2343969,4412' 174366.5665' 55 2343960.4610' 174363.9611' 56 2343949.1639' 174361.9347' 57 2343934.1832' 1174361.5310' 58 2343912.0884' 174363.3829' 59 2343901.8251' 1174363.5254' 60 2343894.4130' 174363.2405' 61 2343882.2711' 174361.8058' 62 2343871.2950' 1 174362.3756' 63 2343861.0316' 174364.7974' 64 2343817.7594' 174376.6494' 65 12343784.0150' 174387.5855' 66 2343749.1302' 1 174400.5733' 67 2343727.9258' 1174409.6876' 68 2343719.9457' 1 174414.7005' 69 2343714.4736' 1174419.4855' 70 12343711.0030' 174425.5004' 71 2343687.0623' 1174458.5396' 72 2343682.9582' 1174466.0589' 73 2343680.6782' 1 174474.0339' 74 2343677.9421' 174481.5532' 75 2343673.6100' 174487.7053' 76 2343668.5940' 174492.9460, 77 2343664.2619' 174495.6803' 78 2343660.8490' 174497.1179' 79 2343662.5834' 1174499.2365' 80 2343664.8470' 1174500.6159' 81 2343678.5860' 174506.5918' 82 2343697.3730' 174516.1909' 83 2343704.6520' 174521.9086' 84 2343704.7953' 174525.1385' Aikocv\mtot e> !• Point Number Easting O lM(--A [)f\ NIS Northing Point Number Easting Northing 85 12343708.5100' 174529.0300' 86 12343707.6896' 174545.7563' 87 12343713.4952' 174546.0411' 88 2343728.2677' 174544.7272' 89 2343734.5964' 174553.6659' 90 _ 12343743.7410' 174567.7592' 91 12343761.0553' 174595.6734. 92 _ 2343777.1408' 1174624.6307' 1 93 2343795.6609' 1174658.4903' 94 12343810.4344' 1174683.6485' JIj 95 2343828.9510' 174716.1544' 96 2343855.1831' 174761.5607' 97 12343866.5417' 174781.3209' 1 98 2343870.5080' 1174787.706977 99 2343871.6097' 174792.0010' 100 2343871.5000' 174793.7626' 1 101 12343870.2876' 1174795.5243' 1 102 12343868.3045' 174797.6163' 103 12343865.5501' 174799.2678' I 104 12343861.5838' 1174800.8093' 1 1 105 12343858.9670' 1174800.7159' 1 106 12343854.4374' 174797.7488' 107 12343848.9113' 174794.1290' 1 108 12343851.2384' 174792.5253' 109 12343825.8848' 174749.8060' 1 110 111 12343918.2750' 2343814.3091' 1174739.7697' 1 174736.1363' 112 2343810.4530' 174734.5949' 1 113 12343805.6053' 174734.2646' 114 2343802.5204' 174733.1635' 1 115 12343796.1300' 1174729.0897' 116 2343791.9436' 174723.0340' 117 2343788.1976' 174719.6207' 118 2343785.1127' 1174717.3086' 1 119 120 2343780.5568' 1174717.4648' 2343783.7330' 1 174723.0773' 121 2343777.3414' 174727.0511' 122 2343776.5191' 174732.7231' 123 2343775.5143' 174745.1862' 124 2343773.5311' 174753.1137' 125 2343771.2180' 174759.499T 126 2343768.2427' 174763.9038' 127 12343765.2680' 1174767.4271; 128 12343740.1695' 174783.9703' 129 12343725.2500' i 174792.3600' 130 12343715.0650' 174799.9523' 131 2343707.8800' 174802.1400' 132 2343704.1717' 174796.8818' 133 2343698.0267' 1174791.5781' 134 12343692.9118' 174778.1174' 135 12343684.2260' 174767.6480' 136 12343679.6400' 174769.8600' 137 12343674.2200' 174774.4200' 138 12343668.6799' 1174777.3463' 139 12343667.0094' 174779.7823' 140 12343667.0090' 174781.7672' 141 12343666.7836' 1174784.2483' 142 2343671.2200' 174793.5508' 143 12343679.8794' 1174908.1111' 144 2343683.5836' 174821.6216' 145 12343680.8350' 1174833.8467' 146 2343676.1613' 174843.1873' 147 12343669.0139' 1174851.9785' 148 12343660.3545' 1174858.7092' 149 12343648.7490' 1174865.6191' 1 150 12343638.1420' 1174868.3309" -12343628.7677' 174868.8239' 152 12343620.1338' 174867.5913' 1 153 12343609.7731' 174861.4282' 154 2343603.1127' 174854.7721' 155 12343596.6990' 174848.3625' 156 12343592.9987' 174841.7064' 157 2343587.3250' 174838.7481' 158 t23435 I174837.0224' F 159 2343577.2110' 174838.9946' 160 2343574.7440' 174841.9529' 161 2343S73.5107' 174848.8555' 162 12343581.4397' 174869.2491' 163 2343580.9500' 174874.3300' 164 2343574.4975' 174879.1779' 165 12343571.6100' 174883.4145' 166 2343566.0259' 174889.6014' 167 2343553.5227' 174899.4277" 168 2343537.4653' 174910.9908' AAH OCV%MeXlt 'S U • Point Number Easting Northing 169 2343523.8696' 174918.8761' 170 171 12343504.4470' 12343501.0482' 174928.7024' 1174928.9450' 172 2343498.8631' 1174928.5811' 173 2343497.4064' 174927.8532' 174 2343495.3428' 174926.3975' 175 12343490.2980' 1174922.2729' i 176 12343485.8744' 1174922.2729' 177 12343480.1690' 1174923.6073' F777i78 r2343475.3134' 1174926.2761' 179 2343464.3882' 1174934.1614' ( 180 2343453.3270' 174945.1045' 181 _ 2343446.0367' 174950.4979' 182 2343429.1835' 174962.4200' 183 2343420.9462' 174966.2994' 184 2343414.8581' 174968.2939' 18S 2343409.3670' 174968.4832' 186 2343404.4432' 174968.3885' 187 2343398.3836' 174967.7262' 188 2343392.0155' 174967.7262' 189 2343391.9400' 174967.6900' 190 2343391.9130' 174967.8323' 191 2343388.0634' 174968.2939' 192 2343383.8974' 174970.2809' 193 2343379.5421' 174973.8765' 194 2343376.9857' 174979.3644' 195 2343373.3880' 174988.3533' 196 2343369.9368' 174994.7688' 197 12343366.3021' 174999.9145' 198 12343362.3646' 175002.9414' 199 12343361.0273' 175003.5905' 200 2343324.7110' 174944.6018' 201 2343291.6660' 174905.6141' 202 I2343240.9420' 174841.8354' 203 2343191.5633' 174774.1175' 204 2343169.3280' 174728.1591' 205 2343226.1490' 174702.7773' 206 2343270.6235' 174696.2895' 207 2343341.5525' 174685.1766' 208 2343377.5691 174664.3179' 209 2343428.6486' 174615.7799' 210 12343452.5210' 1174586.2447' Point Number Easting Northing 211 2343491.3377' 174558.4072' 212 2343526.6292' 1174547.2127' 213 2343579.5267' 1174543.5452' 214 2343623,3446' 174557.7911' 215 2343640.3760' 174570.8144' _ 216 2343649.3276' 174586.5192' 217 2343666.0554' 174577.0275' 218 2343683.1158' 174567.0749' 219 2343696.7422' 174559.4402' 220 2343706.6650' J174554.0653'_l 221 2343668.8269' 1174527.9393' 222 2343592.2450' 174S00.3518' 223 2343543.2769' 174467.7367' 224 2343502.0716' 174455.8677' 225 2343467.8960' 174473.2005' 226 2343449.3709' 174483.1491" 227 2343430.0407' 1174494.1517' 228 2_343412.8023' 174504.0533' 229 2343391.7112' 1174515.979W 230 2343370.8250' 174527.5764' 231 12343353.7276' (174537.3640' 232 2343344.8199' 174542.3962' 233 2343329.3035' 1174551.1424' 234 2343308.6364' 1174562.7100' 235 2343290.9300' 174571.6937' 236 2343268.6260' 174584.6732' 237 12343247.5728' 174596.5227' 238 2343226.4306' 174608.7042' 239 2343200.1456' 1174623.7206' 240 2343177.9350' 174635.5932' 241 2343159.3172' 174646.4578' 242 2343138.4170' 1174658.5123' 243 2343114.8760' 174671.7678' 244 12343099.6056' 174679.7915' 245 2343092.6640' 174683.9713' 246 12343077.8583' 174691.6704' 247 2343063.3540' 174667.5121' 248 2343064.3779' 174665.5080' 249 I2343065.1849' (174663.4781' 250 2343066.7800' (174659.7592' 1 251 12343068.0038' 174655.9034' 252 2343068.8468' 174651,9465' Akra(,invv w+ 9 0 Point Number Easting Northing Point Number Easting Northing 253 2343069.4743' 174646.3899' 1 254 2343068.9305' 1174639.6498' 255 12343067.3150' 174634.2472' 1 256 2343065.7756' 174630.5629' 257 2343005.1322' 174523.4706' 258 2342913.8669' 174360.4308' 259 2342836.8510' 174403.8654' 260 12342829.3690' 174390.7071. 261 12343014.2800' 174285.5600' 262 2343069.6774' 1742S2.7011' 263 2343085.2269' 1174279.6936' 264 2343088.0934' 174278.0423' 265 2343105.6250' 1174308.4753' 266 2343146.4864' 174284.9363' 267 12343140.3800' 1174274.3361' 268 2343232.9769' 1174220.9943. 269 2343260.5996' 174268.9451' 270 �2343275.6760' 174260.2602' 271 2343281.2852' 1174269.9974' 1 272 2343313.9376' 174251.1874' 273 2343308.5584' 174241.8496' 274 12343323.8456' 1174233.0432' 275 2343296.4130' 174185.4233' 276 2343353.0972' 1 174152.7697' 277 12343326.9112' 174107.3131' 278 12343313.3010' 174115.1535' 279 2343287.3340' 174070.0770' 280 12343246.0250' 174093.8738' 281 2343218.9S02' 174046.8745' 282 2343204.4576' 174055.2232' 283 2343224.3800' 174014.6800' 284 2343233.1094' 174004.1762' 285 12343230.0000' 173980,0000' 286 12343270.0000' 173960.0000' 287 2343275.4233' 173954.0895' 288 2343277.4011' 173944.5625' 289 2343006.3994' 173989.5735' 290 2343007.5590' 173994.2154' 291 2343010.4079' 174000.0036' 292 2343013.4378' 1 174007.6138' 293 2342994.7340' 174010.4272' 294 �2342985.7032' 173993.0798' 295 12342973.8870' 173994.9734' 296 12342970.2590' 1174011.6521' 297 2342840.0042' 17408S.0702' 298 12342834.2540' 174098.1693' 299 2342818.3721' 174097.2632' 300 2342799.2480' 174108.0426' 301 12342796.9357' 1174123.3831' 302 2342832.6022' 174153.9293' 303 12342835.4231' 174198.7409' 304 2342844.2657' 174223.3112' 305 12342863.2010' 174266.2284' 306 12342877.8900' 1174281.0600' 307 12342892.2413' 174302.6059' 308 12342880.1109' 174317.7990' 309 12342855.0470' 174340.8701' 310 12342863.5090' 174355.7648' 311 12342849.5982' 174363.6696' 312 12342834.0882' 174336,3982' 313 2342817.8971' 174332.7115' F 314 12342813.5305' 1174323.5842' 1 1 315 12342808.2260' 1174316.6142' 1 1 316 12342802.5049' 174307.7375' 317 2342801.6713' 174297.7959' 318 2342788.9255' 174281.8343' 319 2342789.9155' 1174275.4492' 320 12342790.74S0' 1174268.3318' 321 2342792.3809' 174263.0637' 322 2342763.0854' 174211.5530' 1 323 2342753.9430' 174202.8866' 324 12342735.6049' 1174181.8581' 1 325 174152.2170' 326 �2342729.3390' 2342693.2999' 1174088.8484' 327 2342689.5586' 174078.4139' 328 2342680.5258' 174063.2464' 329 12342629.7156' 173980.6856' 330 2342606.7970' 173990.2969' 331 2342569.6438' 1173916. 3641' 332 2342584.6149' 173895.0804' 333 2342563.9481' 173857.6205' 334 2342553.7374' 173823.7300' 335 I2342585.6790' 173806.0183' 336 2342617.4042' 1 173794.8483' U E Point Number Easting Northing Point Number 337 12342653.7316' 1173791.1313' 338 2342678.8053' 173784.2909' 1 339 12343002.3074' 173853.8186' f 340 12343013.0210' 1173865.4546, 341 2342987.7866' 1173881.741977 342 12343007.6593' 1173956.7181' 343 2343282.7312' 1173912.9502' 344 12343283.9574' 173907.5317' 345 12343275.6220' 1173905.6455' 346 2343255.9200' 173899.5500' 347 2343207.0708' 173874.1940' 348 _ 2343196.2100' _ 173861.7500' 349 2343171.9600' 1 173831.0500' 350 2343200.3470' 173821.5105' 351 12343221.2177' 173728.4216' 352 12343222.5043' 173720.4394' 353 2343237.4200' 173652.5900' 354 2343247.9537' 173641.1512' 355 12343270.3400' 1173618.2700' 356 12343297.5277' 1173605.8036' 357 2343302.4625' 173604.5257' _ 358 12343309.6900' 173597.9100' 359 12343316.0000' 173588.1500' 360 12343320.2100' 1173572.1600' 361 2343324.4411' 173556.8100' 362 2343335.6862' 173552.4597: 363 2343343.1221' 173551.4925 364 2343350.8397' 173550.2390' 365 2343355.3770' 173546.3476' 366 2343370.2000' 173530.1400' 367 12343375.8577' 1173523.2890, 368 2343392.0556' 173526.8124' 369 2343393.6649' 173523.8819' 370 2343395.0220' 173518.3465' 371 12343394.7266' 173518.2689' 372 2343397.2266' 173507.4693' 373 2343425.4716' 173514.4099' 374 12343422.9167' 173525.6085' 375 2343422.4800' 173525.4876' 376 2343420.8307' 173531.9797' 377 2343427.7294' 173537.2426' 378 2343434.3833' 173534.4600' Easting Northing 379 2343435.4221' 1173529.9923 380 2343437.4370' 1173519,5274: 381 382 2343463.4853' 2343485.4206' 1173525.1484' 1173529.9624' 1 393 2343515.9923' 1173536.7265' 384 2343536.2518' 1173541.4925' 385 12343562.0500' �173546.9875' 386 F2343589.4131' 173553.2532' 387 12343591.5477' 173559.2026' 1 388 2343591.3761' 173561.5875' 1 389 2343591.9800' 1173568.0500' 390 2343598.1470' 173573.6550' 391 2343608.2529' 173575.9774' 1 392 2343611.2416' 1173573.5781' 393 12343614.3645' 173558.6242' 394 2343703.5733' 1173578.5420' 395 12343718.0900' 1173581.7113' 396 12343736.8737' !173585.8486' 397 2343764.4300' 1173592.1057' 398 2343759.7262' 1173609.4088'_ 399 2343768.7218' 1 173611.5817' 400 2343779.9450' 1173614.0284' 1 401 2343774.3757' 1173641.1484' 402 2343768.0380' 1173639.8846' 403 2343767.5500' 173641.8500' 1 404 12343769.7362' 1173652.6153' 405 12343769.7250' 1173652.9323' 406 2343778.9071' 1173669.0361' 407 2343801.9800' 1173655.8800' 408 2343813.8841' 173648.3397' 409 12343824.0745' 173628.9946' 1 410 12343865.2620' 1173605.8521' 411 2344007.5692' 1173614.7043' 412 12344046.4013' 1173631.1500' 413 2344131.5289' 1173708.7367' 414 12342987.5503' 1174760.7076' 415 416 12342984.4680' 2342980.3602' _ 1174760.9173' 174761.6143' II- 417 12342975.8464' 174762.5932, 418 419 12342971.4326' 12342969.7686' 1174763.9542' tl 174764.6276' 420 2342966.4220' f174764.7413' 1�}1- OAVIA M+ - 9 i® Point Number Easting Northing 421 �2342967.0492' 1174765.7410' 422 1 2342961.3610' 174768.7590' 1 423 2342953.6153' 1174773.6368' 424 2342946.1216' 174778.9606' 1 425 2342930.3880' 174790.2281' 426 �2342912.0579' 174803.7866' 427 2342891.9607' 174818.2130' 428 2342873.2264' 1174832.0045' 429 2342849.0293' 174849.5808' 430 12342828.7920' 174863.8823' 431 2342806.4980' 174880.3616' 432 2342783.8609' 174896.7910' 1 433 2342773.4976' 174904.3734' 434 2342764.4756' 174882.2702' 435 12342763.5100' 174878.0740' 436 2342768.6853' 174874.3149' 437 2342748.4811' 1174840.4672, 438 2342750.4600' 174830.4900' 439 2342745.3600' 174812.9100' 440 12342746.6070' 174791.4420' 441 12342752.9348' 1174779.5587' 442 2342758.6920' 174756.4900' 443 12342768.8170' 174750.9322' 444 2342791.6652' 174738.0754' 445 2342793.2300' 174737.2100' 446 12342818.4330' 174723.3195' 447 2342844.5785' 174708.4121' 448 2342874.0142' 174691.2920' 449 12342872.7273' 174685.2528' 450 2342869.4360' 174678.1731' 451 2342869.1366' 1174674.8825' 452 2342869.1366' 174672.1902' 453 2342871.3217' 1174663.0427' 454 2342866.6431' 174656.5351' 455 2342865.1470' 174653.6434' 456 12342862.2505' 1174641.7545' 457 2342860.5100' 174634.7736. 458 2342859.8723' 174630.9481' 459 2342860.9883' 174628.5571' 460 2342863.8580' 1 174625.8474' 461 2342868.8009' 1174622.3407' 462 2342872.3087' 174619.3121' Point Number Easting Northing 463 2342880.1213' 1174617.5588' 464 2342886.8178' 174616.1242' 465 2342890.1660' 174615.9648' 466 2342900.3193' 174607.8837' 467 468 2342907.8375' I2342911.6499' 174601.0087' 174597.4647' 469 2342918.8326' 1174594.9125' 470 2342921.5050' 1174592.5785' 471 2342928.4366' 174586.1218' 472 2342939.0579' 174583.4748' 473 2342942.7647' 174590.3269' 474 12342941.6427' 1174590.9469' 475 12342959.8230' 1174622.1967' 476 2342972.5275' 174642.9719' 1 477 12342982.0732' 1174660.1582' 478 12342987.3478' 1174669.5568' r 479 12342988.1879' 174671.0538" j 480 2342990.5310' 1 174674.3947' 481 12342993.1847' 174677.4935' 482 12342996.1256' 174680.3214' 1 483 12342999.3265' 174682.8513' 1 484 12343002.7563' 1174685.0612' 1 485 2343005.3550' 174686.4442' 486 2343008.5411' 1174687.9121' 487 12343011.8720' 174689.0141' 488 2343015.3059' 174689.7341' 1 489 2343018.7987' 174690.0651' 490 2343022.3070' 174690.0011' 491 2343025.7844' 174689.5441' 492 2343026.9314' 1174689.3051" 493 2343032.4612' 174688.2451' 494 2343037.9030' 1 174686.8002' 495 2343043.2300' 174684.9783' 496 2343046.9456' 1174683.2633' 497 2343050.2805' 174681.2754' 498 2343052.5796' 174679.5665' 499 2343064.4237' 174699.6446' 500 2343061.7810' 174701.4716' 501 2343056.5232' 174705.5864' 502 2343051.5174' 174710.0053' 503 2343050.3945' 1174711.0712' 504 2343046.2476' 174716.0950' AiAochvv%w+ 6 E Point Number Easting Northing Paint Number Easting Northing 505 2343041.2650' 174723.1563' • 11 A MISCELLANEOUS SITE 1 INFORMATION GEOTECHNICAL REPORT 2 (FROM OTHERS) PREVIOUS STATE STORMWATER 3 PERMITS STORMWATER MANAGEMENT 4 FACILITY DESIGN CALCULATIONS STORMWATER MANAGEMENT FACILITY DESIGN CALCULATIONS 5 - FUTURE IMPERVIOUS � S 411tjar i UNC WILMINGTON SITE AERIAL MAP o 125 250 soo Feet PROJECT #: UNW-16050 I inch = 2�0 teet WILMINGTON. NORTH CAROLINA n LJ u 11 ,.q .. p t M ••t fs..p b, ,,,: ��. 5 r 'r.. x oaf �� � XZ �•*" 4 ; �'�' •a� t"�:° Q�a' ,y � ' p 2 !'X pm�arr +L ra tX s�sg n i t�' S p �°irag.+�Yl _ .+" 'rJz g� IL a«t p'tr# �� .p - + ff 9k.+r stl # + +•; €'} , ,. .�* P b t AI11" µ" J L) ' #°' 'i r t .:x:, ry ' * c+ „# *#,. } g'. fir• ,gip s Y '� d 7i = mv, 17 4 . .. Q Z H f'p* 7..'A a :. � 5 '- ,• a # x Y �np .#p t'� #`._ d C •, Q' it Z t at �. y,. h � Y # �X�y at b �T ...#.5� _ •r��. a ���". � �p„, O W 4 k. .� �.,W/ryy 1 x°' ' s,. i b t, �ii"■�{��� \/ i O Z CL Z v , b t F O . e.. K` " •.y s e A W f 4n ki" v.5. p!'xt4¢� r e , * X pYL ��. 5 tl f f ! l i S,p ,•n4 In q 4 tt -LL a i w • i � % 13'33"N 34 1315' N • 0 3 Hydrologic Soil Group —New Hanover County, North Carolina 3 (SW8 97012B) k F I.GRL JYHi) Z.YFNO JifIIYI ]Jtiil,1 Y.5J10 !x Map Eok: 1:3,860 d pv,tei on A larbscape (1.'><d.5 '^ N 0 41 , W 210 300 An,ap prule:Uon: Nob MoTatur Corder cxydrote;: WCSgA Edge tics'. UN 7m MWGSiA t NI I -A Natural Resources Web Soil Survey -111111110 Conservation Service National Cooperative Soil Survey • 0 Hydrologic Soil Group —New Hanover County, North Carolina (SW8 970128) Area of Interest (AOII Area of Interest (AOI) Solis Soil Rating Polygons O A u ND B u R/D LJ C IEJ C/D D Not rated or not available Soil Rating Lines ..r A C C/D ... D . Not rated or not available Soil Rating Points 0 A ® ND B BID 13 C p CfD ® D 13 Not rated or not available Water Features Streams and Canals Transportation Reds >.4r Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1 15,800. "Warning: Sal Map may not be valid at this scale Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale Please rely on the bar scale on each map sheet for map measurements. Source of Map. Natural Resources Conservation Service Web Soil Survey URL: Coordinate System. Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area. New Hanover County, North Carolina Survey Area Data Version 17, Sep 20, 2016 Soil map units are labeled (as space allows) for map scales 1 50,000 or larger. Dates) aerial images were photographed. Data not available. The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. I sm Natural Resources Web Soil Survey 5/11/2017 -IIIIIIff Conservation Service National Cooperative Soil Survey Page 2 of 4 11 Hydrologic Soil Group —New Hanover County, North Carolina Hydrologic Soil Group S W 8 970128 Hydrologic Soil Group— Summary by Map Unit — 01, New Hanover County, North Carolina (NC129) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Be Baymeade fine sand, 1 to 6 percent slopes I A 18.01 63 9016 Le Leon sand A/D 3.51 12 5 Ly Lynn Haven fine sand I AID 2 5 I 8.9% Se Seagate fine sand B I 3.21 11.2 Subtotals for #1 27.1 j 96.6 Totals for Area of Interest I 28.11 100.0 Hydrologic Soil Group —Summary by Map Unit —#2, New Hanover County, North Carolina (NC129) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Be Baymeade fine sand, 1 to 6 percent slopes A I 1 0 Subtotals for #2 1.01 3.4% Totals for Area of Interest 28.1 100.0 USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5111/2017 Page 3 of 4 11 is 40 Hydrologic Soil Group —New Hanover County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff., None Specified Tie -break Rule: Higher USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey SW8 970128 5/11/2017 Page 4 of 4 NC DENR- DIVISON OF WATER RESOURCES .0311 CAPE FEAR RIVER BASIN 2B 0300 Name of Stream Description Class Class Date Index No. Channel From Rich Inlet to Intracoastal SA;ORW 01/01/90 18-87-16 Waterway Cedar Snag Creek From Green Channel to Intracoastal SA;ORW 01/01/90 18-87-17 Waterway Butler Creek From Nixon Channel to Intracoastal SA,ORW 01/01/90 18-87-18 Waterway Futch Creek From source to Intracoastal SA;HQW 08/09/81 18-87-19 Waterway Nixon Channel From Rich Inlet to Intracoastal SA;ORW 01/01/90 18-87-20 Waterway Middle Sound Entire Sound SA,ORW 01/01/90 18-87-21 Pages Creek From source to Intracoastal SA;HQW 08/09/81 18-87-22 Waterway Howe Creek From source to Intracoastal SA;ORW 01/01/90 18-87-23 Waterway Intracoastal Waterway From the western mouth of Howe SA;HQW O8/09/81 18-87-(23.5) Creek to the southwest mouth of Shinn Creek, exclusive of the Wrightsville Beach Recreational Area Wrightsville Recreational Area In any waters within a line beginning SB:# 10/01/87 18-87-24 (including Lees Cut, Motts at a point on the mainland along the Channel and portions of Banks Intracoastal Waterway 1400 feet (Channel)) north of the U.S. Hwy. 74-76 bridge extending directly across the waterway to the northern edge of ® Lees Cut, thence along the northern edge of Lees Cut to the end of the Cut, crossing the Cut in a northeasterly direction to a point on Wrightsville Beach 1900 feet northeast of the U.S Hwy. 74 bridge, thence along the western shoreline of Wrightsville Beach to a point 4000 feet southwest of the U.S. Hwy. 76 bridge, thence in a northwesterly direction across Banks Channel and mud flats to a point on the eastern side of the Intracoastal Waterway across from the southern edge of Bradley Creek, thence along the eastern side of the waterway to a point 1750 feet northeast of Channel Marker #128, thence directly across the waterway in a easterly direction to Money Point and along the western edge of the Intracoastal Waterway in a northeasterly direction to the point of beginning. Lees Cut Entire Cut SB:# 10/01/87 18-87-24-1 Channel Entire Channel SB:# 10/01/87 18-87-24-2 Channel Entire channel south of the SA;HQW 10/01/87 18-87-24-3 Wrightsville Recreational Area Bradley Cre_e_k - _ From source to U S. Hwys. 17, 74 & _ SC,HQW.# 0.8_ /01/9.0 18-8.7-24-4-(1), 76 bridge` 50 12/22/2016 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Wilmington North Carolina. USA' Latitude: 34.2227°, Longitude:-77.8652° L Elevation: 35.37 ft•' }`�r1\��''./,n 'ii source' ESRI Maps ,Uj ® -source USGS POINT PRECIPITATION FREQUENCY ESTIMATES L_J G M Bonnm, D. Marlin, B. Lin, T. Pan ybok, M Yekta, and D. Riley NOAA, National Mather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 j Average recurrence interval (years) Duration 1 2 5 10 25 50 100 ���� 200 500 1000 0.524 T 0622-IF 0.728 IF 0.811 IF 0.916 IFO.995 IF1.08 11.16 1 26 1 35 5-min (0.489-0.565) (0.580-0670) (0678-0783) (0752-0872) (0846-0982) (0914-107) (0.984-116) (105-124) (1.13-1.36) (1.20-145) 0.837 0.995 1.17 1.30 1.46 1.58 1.71 1.83 1.99 2.12 10-min F� (0.782-0.902) (0.928-1.07) (1.09-1.25) 1 (1.20-1.39) 1 (135-1.56) (146-1.70) (156-184) (167-197) (1.79-2.15) (t89-229) 1.-1 1.-1 1.64 1.85 2.01 2.-2 2.-2 2.51 266-1 .-2 15-min C T7-1 (0.977-113) (1.17-135) (137-159) (1.52-1.76) (171-1.98) (1.84-2.15) (1.98-232) (210-249) (2.26-2.71J (2.37-287) 1.43 1.73 2.10 2.36 2.74 3.02 3.31 3.60 4.00 4.31 30-min (134-1.54) 1 (1.61-186) 1 (195-225) 1 (2.21-256) 1 (2.53-2.94) (2.78-324) (303-355) (327-3.87) (3.59-4.31) (3.84-466) 1.79 2.17 2.69 3.10-IF-3 .65 4.09 4.56 5.as 5.73 6.29 60Krlin (167-193) (202-2.33) (250-2.89) (287-3.33) (337-3.91) (3.76-439) (4.17-489) (459-543) (5.16-6.18) (5.61-6.79) 2'11 2.57 3 28-IF 3.87 4.72 5.45 1 6.24 1 7.111 8.39 1 9.50 2-hr (1 95-2 31) 1 (2 37-2.81) 1 (3 02-3 58) 1 (3 55-4.22) 1 (4.31-5.14) (4 95-5 93) (5 64-6 79) (6.38-7.72) (7.45-9.13) (8.36-10 4) 2.25 2.74 3.51 4.-4 5.'16 6.-6 6.98 8.-8 9.-1 111 3-hr (208-2.47) (253-3.00) (3.23-3.84) (3.82-456) (4.70-562) (545-656) (6.27-7.59) (717-873) (850-105) (963-121) -280-IF-3-41IF-4-37IF-52-0IF 6.46 1 7.55 1 8.79 1 0.2 1 2.3 1 4.1 6-hr (2 59-3 08) 1 (3 15.3.75) 1 (4024.79) 1 (4 77-5.70) 1 (5,88-7.04) (6 83-8 24) (7 89-9 57) (9.03-11.1) (10.8-13 4) (12 3-15 4) 3.28 3.99 5.15 6.17 7.70 9.07 10.6 12.4 15.1 17.5 12-hr E� (3.00-3.63) 1 (3 65-4A1) 1 (4 70-5.68) 1 (5 60-6.79) 1 (6 94-8 46) (8.12-9 94) (9.43-11e) (10 9-13 5) (13.1-16 5) (14 9-19.1) 3.88 4.70 6.09 73-IF 9.18 1 0.9 1 12.8 1 4.9 1 8.3 1 21.3 24-hr (3.53-4 32) 1 (4 29-5 25) 1 (5 54-6 78) 1 (6 63-8.12) 1 18 25-10 2) (9 66-12 0) (11.2-14.2) (12 9-16 6) (15.5-20.5) (17 8-23.9) 4.60 5.56 7.13 8.51 10.fi 12.4 14.5 16.9 20.5 23.7 2day (421-5.09) (509-615) (6.51-7.90) ( 773-9.42) ( 9.54-117) ( 111-13.8) (12.8-16.2) (14.7-189)( 17.4-230) ( 198-26a) 4.90 5.91 7.53 8.94 11.0 12.9 15.0 17.3 20.8 23.9 3day E�il (449-541) 1 (542-653) 1 (689-8.33) 1 (814-988) 1 (997-122) (11.5-143) (132-166) (151-193) (17.8-23.4) (20.1-27.1) 5.20 6 6IF 7.94 9.37 11.5 13.3 15.4 17.7 21.1 24.2 4day ( 477-573) (5691 ) (T26-8.76) (854-10.3) (10.4-127) ( 12.0-148) (137-171) ( 155-19.7)( 18.2-237) ( 205-27.3) 5.96 7.19 9.05 10.6 12.9 14.8 16.9 19.1 22.5 25.3 7day (5,526.51) 1 (6.65-7.84) 1 (8.35-9a6) 1 (9.74-11.5) 1 (118-140) (134-16.1) (15.2-18.4) (17.0-21o) (19.7-24.9) (218-28.2) 6 75-IF 8.07 10.0 11.6 IF14.0 IF16.0 IF18.1 20.4 1 23.8 1 26.6 today (625731) 1 (7.49-877) 1 (9.25-109) 1 (107-12.6) 1 (12.8-15.2) 1 (145-17.4) (163-19.7) I (182-22.3) (20.9-262) (23 1-295) 9.01 10.7 13.1 15.0 78-IF 200-IF 22.5 IF25.0 28.7 3 7 20day (8.41-9.69) 1 (10.0-11.6) 1 (122-14.1) 1 (14.0-16.1) 1 (16.5-191) 1 (18.4-21.6) (205-24.3) (227-27.2) (25.6-314) (27.9-35.0) -IjF-3-jF-15-8jF-7-91F-20-9j 23.3 1 25.7 1 28.3 1 31.8 1 34.6 30day (104118) 1 (12.4-140) 1 (148-168) 1 (168-19.1) 1 (19.5-223) 1 (21.6-249) (237-27.6) (25.9-30.4) (28.8-344) (31.0-37.7) 13.8 16.3 19.4 21.8 25.2 27.9 1 30.7 1 33.5 1 37.4 1 40.4 45day (13.0-14.7) 1 (15.4-17.4) 1 (182-206) 1 (20.5-23.2) 1 (23.6-268) (26.0-297) (284-32.7) (308-35.9) (34.0-403) (36.5-43.9) 16.6 19.5 22.8 25.5 29.0 31.8 34.5 37.3 41.0 43.8 60day (t57-17.6) (185-207) I (2t6-24.2) (241-27.0) ( 3-o8) (29.8-338) (32.2-36.8) (34.6-39.9) (37.7-44.0) (40.0-473) 1 Precipitation frequency RF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information Back to Too http /lhdsc.ms.noaa.gov/hdsc/pfds/pfds_printpage.html9lat=34.2227&lon=-77.8652&data=depth&units=english&series=pds 114 0 Center Wei,bled Star. CampaWtiun - Dated on NOAA Ads, 14 Results Copy input data from NOAA Alas 14 I) [lave NOAA Aias 14 results in Imunet Cxplmet Window 2) Copy from ARI ofime year m 1000 year, 60 day pr e.paatmn value. Do nn1 melude column headings, "I"will be in upper left of selection, 1000-yr, 60-Jay result in lower right ofselection 3) Paste with seat l mg pot nl at ARI of I year (lilst cell to the Alt column, cell Alt) Cannot poste special to preserve fount, Nutria, Is via nmero In next step 4) Place cursor on AR of 1 year (cell A] 2), and press C rRL+1 for Journal - make sure that Al2 is the only cell selected before running the honest macro 5) Copy results of output data (helow mat fall input) into Pondl'uck AID 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 31) 45 60 (years) min min min min min min hours hours hours hours hours days days days days days days days 1 052 084 1 05 1 43 1.79 2 11 2 25 2 80 3 28 3 88 4 60 5.20 596 675 901 1105 13 80 1657 2 067 099 I75 171 917 75'1 7'Id 'till 100 d]n C5o I Ito Nn7 to la It td i"I in" 78 in 981 130 164 238 3In 387 417 520 6.17 731 851 937 to59 1163 is01 1793 2191 2549 Output Data to Export to I'm dl'ack, 5 minute intervals 'Time 'rime Iyear 2year 5year 10 year 25 year 50 year 100year 500year 5 0.083 0004 0005 0007 0008 0010 0012 0015 0022 10 0167 0008 0010 0,013 0016 0021 0025 0030 0045 T 30 0 500 0 025 0 030 0 039 0 048 0 062 0 075 0 090 0 135 35 0583 0029 0035 0046 0055 0072 0087 0105 0157 60 1 000 0 050 0 059 0 078 0 095 0 123 0 149 0 179 0 269 65 1 083 0 054 0 064 0 085 0 103 0.134 0 162 0.194 0292 0 071 0 084 0 90 1 500 0 075 0 099 0 118 0 143 0 185 0 224 0 269 0 404 95 1.583 0 079 0 094 0,124 0 150 0 195 0.236 0 284 0A26 120 2,000 0too 0118 0157 0190 0247 0298 0358 0538 125 2 083 0 104 0 123 0 163 0 198 0 257 0 311 0 373 0 561 Oalpm D.C. la Egmn m P.rull'ark 5 minule mler,al, 'Time 'lime )year 2year 5year 10 year 25 year 50 year I00yeur 500)enr (min) (hour,) (inin) (min( (min) (min) (mia) (min) (min) (min) 130 2 167 0 108 0 128 0 170 0 206 0 267 0 323 0 388 0 583 135 2 250 0 113 0 133 0 176 0 214 0 278 0.336 0 403 0 606 140 2 333 0 117 0 138 0 183 0 222 0 288 0.348 0 419 0 628 215 3583 0179 0212 0281 0340 0442 0535 0642 0965 220 3667 0183 0217 0287 0348 0452 0547 0657 0987 225 3 750 0 188 0 222 0 294 0 356 0 462 0 559 0 672 1 009 230 3 833 0 192 0.227 0 300 0 364 0 473 0.572 0,687 1.032 235 3 917 0.196 0 232 0 307 0 372 0 483 0 584 0 702 1 054 240 4 000 0200 0 237 0 313 0 380 0 493 0 597 0 717 1 077 245 4 083 0204 0 242 0 320 0 388 0 504 0 609 0 732 1 099 250 4.167 0208 0 247 0 326 0 396 0 514 0 622 0 747 1 122 255 4250 0212 0251 0333 0404 0524 0634 0761 1144 260 4 333 0 217 0 256 0 339 0 412 0 534 0 646 0 776 1 166 205 4417 0221 0261 0346 0420 0545 0659 0791 1 IN 270 4 500 0 225 0 266 0 352 0 428 0 555 0 671 0 806 1 211 275 4 583 0 229 0 271 0 359 0 435 0 565 0 684 0.821 1 234 280 4 667 0 233 0 276 0 366 0 443 0 576 0 696 0 836 1.256 305 5 083 0 254 0 301 0 398 0 483 0 627 0 758 0 911 1368 310 5167 0258 0306 0405 0491 0637 0771 0926 1391 335 5 583 0 279 0 330 0 437 0 530 0 689 0 833 1 000 1 503 �tlRl=101P1•I1RIII�IXL}�IEYO=1}1/1�1)EII=II:V}�piF�NH 365 6083 0307 0363 0481 0583 0.757 0916 1100 1654 370 6 167 0 313 0,371 0.492 0 597 0 774 0 937 1 126 1 693 • Cl Output Hatt In Export to PondPack. 5 minute imenalr 'Time 'Time I year 2 year 5 year 10 year 25 year 50 year 100 year 500 year (min) (hours) (min) (min) (min) (min) (min) (mm) (min) (min) 620 10 333 0 784 0 943 1 242 1 513 1 918 2 335 2 799 4 170 695 11583 I127 1,367 1834 2267 2965 3616 4367 6643 ECllfil 720 12 000 2 159 2 609 3 343 3 971) 4 950 5,809 6.787 9 601 770 12 833 2 942 3 568 4 587 5.462 6 772 7 928 9.220 12 902 775 12,917 2 968 3 602 4 636 5 526 6 961 8 042 9 360 13 123 800 13 333 3 042 3 692 4 762 5 690 7 097 8 345 9,747 13 772 805 13.417 3 053 3 706 4 781 5 715 7 133 8 393 9 808 13 878 810 13 500 3 065 3.720 4 800 5 740 7 170 8 440 9 870 13 985 815 13 583 3 080 3 739 4 824 5 769 7206 8 483 9.920 14 058 820 13 667 3 096 3 757 4 848 5 797 7 242 8 525 9 971 14 130 825 13 750 3 HI I 3 776 4 872 5 826 7 278 8 568 10 021 14 203 830 13 833 3 126 3 794 4 896 5 854 7 314 8 610 10 071 14 275 955 14 250 3 203 3 888 5 015 5 mot 7.495 8 823 10.323 14 638 860 14333 3218 3900 5039 6026 7,531 8865 10373 14710 Output Dam to Export to Pond Pack, 5 minute imereab 'Time 'lime Iyear 2year 5year 10 year 25 year 50 year 100yenr 500year (min) (hours) (min) (min) (min) (min) (min) (min) (min) (min) 865 14 417 3 233 3 925 5 063 6 055 7 567 8 908 10,423 14 783 �iL1�G1[M1�ERIts�[0:ffffff]D:f:t�pE�aQ��iT11�Y�iD)•Li:YYI 975 16 250 3 440 4 176 5 393 6 457 8 078 9 522 11 154 15 871 1000 16667 3473 4216 5447 6524 8164 9627 11281 16065 1025 17 093 3 507 4 256 5.501 6 592 8.251 9.733 11 407 16 259 1030 17 167 3 513 4 264 5 512 6 605 8 268 9 754 11 432 16.298 1035 17250 3520 4273 5523 6,619 8285 9775 11458 16336 1060 17 667 3 553 4 313 5 577 6 686 8 371 9 881 1 1584 16 530 1085 18 083 3 584 4 350 5 627 6 748 8 450 9 977 11700 16 707 417 2 Output Data to Export to Pondl'm,k 5 minute intenals 'Time 'I ime 1 year 2 year 5 year 10 year 25 year 50 year 100 year 500 year (min) (haurs) (min) (min) (min) (min) (min) (min) (min) (min) 1120 18 067 3 613 4 384 5.672 6 803 8 522 10 064 11 804 16 864 1125 18750 3619 4389 5079 6811 8533 10077 11819 16887 1165 19.417 3 651 4 429 5.731 6 875 8 615 10 176 11 939 17 066 1170 19 500 3 655 4 434 5738 6 883 8 625 10 189 11 954 17 089 1175 19, 583 3 659 4 439 5 744 6 890 8 635 10 201 11 969 17 I I I 1180 19,667 3 663 4 444 5 751 6 898 8 646 10 214 11 984 17 134 1185 19 750 3 668 4 449 5 757 6 906 8 656 10 226 11 9" 17 156 1190 19833 3672 4453 5.764 6914 8666 10238 12013 17178 1205 20,1183 3 684 4 468 5.783 6 938 8 697 10 276 12 058 17.246 1210 20 167 3 688 4 473 5 790 6 946 8 707 10 288 12 073 17 268 1215 20.250 3.693 4.478 5.796 6 954 8.718 10 301 12 088 17 291 1245 20750 3718 4508 5835 7001 8.779 10,375 12178 17.425 1250 20,833 3.722 4,513 5.842 7,009 8,789 10388 12193 17.448 1255 20,917 3726 4.518 5.848 7017 8.800 10,400 12208 17470 1260 21 000 3 730 4 523 5 855 7 025 8 810 10 413 12 223 17 493 1265 21 083 3 734 4 527 5 862 7 033 8 820 10 425 12 237 17 515 1270 21167 3738 4532 5, 868 7041 8831 10.437 12.252 17537 1290 21.500 3 755 4 552 5,894 7 073 8 872 10.487 12 312 17627 1295 21 583 3759 4 557 5 901 7 080 8 882 10 500 12 327 17 650 1320 22 000 3 780 4 582 5.933 7 120 8 933 10, 562 12 402 17 762 1325 22.083 3 784 4 587 5940 7 128 8 944 10 574 12 417 17 784 OOE 81 09L ZI 09801 081'6 01£L M09 OOLC 088E 000 t2 Ott] 8i 881 81 S89 ZI 86L OI 6ZI'6 OLZ'L LSO SL9t 658'E E85'EZ Sltl 86081 9Z9Z1 StL01 SE06 6EZL ILO9 959t EtBE OSZ£Z 56EI I t6 LI IZS ZI 19901 9106 CSIL 9865 IZ9t E18'E L99'ZZ 09CI 616L1 905'ZI 61,901 5006 5LIL 6L6S 9191, 608E E85ZZ SSCI (mw) (Um) (mm) Imm) (Pw) (olm) (mw) (ulm) (unay) M.) Jna.S 00S JPa4 (IQI JPa505 J.ix j'L JPa.56I JPat J.axr JPd51 aull". alul 1. quuaull amulm 5'13udpuod of Podxg of P1u(l Indlnp 2340000 FEET 2350000 FEET 180000 FEET 77'52'30"VV 77'52'0"W 77'51'30"W 77*51'0"W 180000 FEET D, g Av, ",a :�fq v; 0 f c W4 Ig�, �k 4 �Vr �k low P Ob, A, I 1WV I FW� 2�1 ! I A "�4 "T I v,_� _Z Irv, r 1111 V "R Q, 1A, IVSgt­ C �,, 7"Ar IV M VN g %704 r/ P� 34'14'0"N 4 34'14'0"N 7�; 'W' 2 A I U, N All ­44 - fr-0 I&V46 ki,_ "N T, -47, 4C) vi,4 FT A* , XM 'Ii"R 40 , Im "V V 15 NIQ 'W _�R m A A2 t 010 'r, r,c,g,:; ­ i Xv f 71- J 'A v, II, :fc ap-, IN pl, WWWN TTCWI� k, ix 2111 � ­1 ". 401 A ",I ­ A-� IWA, IZV A2, 34'13'30"N 1�7 1 .0, N 34'13'30"N - 4 N 'Al Ft "Al T w, 5, L"? 2. 71 R A. V'' Ic, 1k W IS A h� Yr I- , -1 _ - 11.1 1 fA A '0 IN tv AI -,f :P7 6� �Ile 2 ION, iFl IF W If �J, �,U 'c- J P Ile 6 Q* fm 'v W "1 46, k 414 ON a 7, �, At" 14M v711 vw-, A& 9 E RAI _Pine Needie6 34'13'0"N 34'13'0"N ,8M f, 4w� Ar Xc vx?, K .8 2 K ;viv 7 zr ­J ®r _I* C 04 M A Q13 v" 0 K 1, .0- 777c V PT r A P� T r 3_� n Rkil ir�nqhfsvif, ft 2"1, 0 A X Y^1 Ie, -, 1,- -4 , I, A, 170000 FEET 170000 FEET rIk Ave�S,, , - VIX, lk a 77'52'30"W 77'52'0.lw 77'51'30"W 77'51'0"W 2340000 FEET 2350000 FEET This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodiplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION SEE FIS REPORTFORZONE DESCRIPTIONSAND INDEXMAP 1 i E I f: 4� A NOTES TO USERS SCALE For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in ge r".]I please call the FEMA Map Information eXchange at 1-877-FEMA-MAP (1-877-336-2627) or visit IN _M A Map Service Center website at http://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program welasite at hftp://www.ncfloodmaps.com or contact the FEMA Map Service Center. Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 Without Base Flood Elevation (BFE) Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as 0 250 500 1,000 the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. Feet SPECIAL FLOOD With BFIE or Depth n?1i)-A_F, For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. Meters Regulatory Floodway To determine if flood insurance is available in the community, contact your insurance agent or call the National 0 75 150 300 HAZARD AREAS Flood Insurance Program at 1-800-638-6620. 0 2% Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square Mile Future conditions 1% Annual ('III- 'I Chance Flood Hazard Z - I OTHER AREAS OF Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes Zf­,­_� , OTHER lftk, Areas Determined to be Outside the AREAS 0.2% Annual Chance Floodplain Z,_�', iex ------------- Channel, Culvert, or Storm Sewer Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUCTURES Non -accredited Levee, Dike, or Floodwall BM5510 X North Carolina Geodetic Survey bench mark BM551i National Geodetic Survey bench mark BM5510 <8> Contractor Est. NCFMP Survey bench mark .2— ��Jr8- cross Sections with 1% Annual Chance Water Surface Elevation (BFE) - - - - - coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature OTHER Limit of Study FEATURES Jurisdiction Boundary Base map information shown on this FIRM was provided in digital format by the North Carolina Floodpain Mapping Program (NCFMP). The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures, For more information on flood insurance, interested parties should visit the FEMA Website at http://�.fema.gov/business/nfip/index.shtm. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. i If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicates the levee system does not comply with Section 65.10 requirements, FEMAwill revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Welosite at http://w�.fema.gov/business/nfip/index.shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LIMWA). The LMWA represents the approximate landward limit of the 1.5-foot breaking wave. The effects of wave hazards between the VE ZoneandtheL!MWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) wilibe similar to, but less severe than those in the VE Zone. Limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE This map may include approximate boundaries of the CBRS for informational purposes only. Flood insurance is not available within CBRS areas for structures that are newly built or substantially improved on or after the clate(s) indicated on the map. For more information see hftp://w�.fws.gov/habitatconseNation/GOastal- barnerthtml, the FIS Report, or call the U.S. Fish and Wildlife Service Customer Service Center at 1-800-344-WILD� CBRS Area 7 .1 Otherwise Protected Area PANEL LOCATOR NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM E NATIONAL FLOOD INSURANCE PROGRAM CC =NORTH CAROLINA UM PANEL3147 N tER ORV, CC COMMUNITY CID PANEL SUFFIX WILMINGTON, CITY OF 370171 3147 1 WO 0 0 cc ECEIVE cc Z B Y.- MAPNUMBER 3720314700.1 MAP REVISED 04/03/06 ril L • U GEOTECHNICAL REPORT (FROM OTHERS) UNCW - PARKING IMPROVEMENTS PHASE 1 UN W-16050 ® REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS LOTS 1AAND 1B - WAGONER WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA ® ' TM PREPARED FOR: MR. CORY GEORGE, PE, PLS MCADAMS 2905 MERIDIAN PARKWAY DURHAM. NORTH CAROLINA27713 ECS SOUTHEAST, LLP PROJECT NO.: 22.25091 FEBRUARY 27, 2017 r 1 ECS SOUTHEAST, LLP "Setting the Standard for Service' ®----=zl. Geotechnical • Construction Materials • Environmental • Facilities NCRe,,,te,adEn,,,eenn,F„mF.1078 NC Registered Geao,as F„m C-406 SC 3252 February 27, 2017 Mr. Cory George, PE PLS McAdams 2905 Meridian Parkway Durham, North Carolina 27713 Re: Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1B - Wagoner Wilmington, New Hanover County, North Carolina ECS Project No.: 22.25091 Dear Mr. George: As authorized by your acceptance of our proposal number 22.21193 Rev.1, dated November 15, 2016, ECS Southeast, LLP (ECS) has completed a subsurface exploration for the subject project. This report presents the results of the field exploration and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project ® and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS SOUTHEAST, LLP ate, cu.?.,. Annemarie Crumrine, E.I. Staff Professional 6714 Netherlands Drive, Wilmington, NC 28405 [�;4�� Winslow E. Goins, P.E. Principal Engineer NC PE License No. 033751 T.910-686-9114 • F:910-686-9666 • www.ecs[imited.com ECS Capitol Services, PLLC • ECS Florida, LLC • ECS Mid-Atiantic, LLC • ECS Midwest, LLC • ECS Southeast. LLP • ECS Texas, LLP ® REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS LOTS 1A AND 1 B - WAGONER WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA PREPARED FOR: MR. CORY GEORGE, PE, PLS MCADAMS 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 PREPARED BY: ECS SOUTHEAST, LLP 6714 NETHERLANDS DRIVE WILMINGTON, NORTH CAROLINA 28405 ECS SOUTHEAST, LLP PROJECT NO.: 22.24591 FIRM NO. F-1078 WINSLOW E. GOINS. P.E. NC LICENSE NO. 033751 FEBRUARY 27, 2017 El ® TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...................................................................................................... 1 3.0 EXPLORATION PROCEDURES.......................................................................................... 3 3.1 Subsurface Exploration Procedures................................................................................ 3 3.1.1 Cone Penetration Test............................................................................................ 3 3.1.2 Kessler Dynamic Cone Penetrometer Tests............................................................ 3 4.0 EXPLORATION RESULTS..................................................................................................4 4.1 Site Conditions................................................................................................................4 4.2 Regional Geology............................................................................................................ 4 4.3 Soil Conditions................................................................................................................ 4 4.4 Groundwater Conditions.................................................................................................. 5 4.5 Seasonal High Water Table and Infiltration Testing........................................................ 5 5.0 ANALYSIS AND RECOMMENDATIONS............................................................................. 6 ® 5.1 Subgrade Preparation.....................................................................................................6 5.2 Engineered Fill Placement............................................................................................... 7 5.3 Pavement Design Considerations.................................................................................. 8 5.4 Site Drainage.................................................................................................................. 9 5.5 Construction Considerations........................................................................................... 9 6.0 CLOSING...........................................................................................................................11 APPENDICES APPENDIX A -FIGURES APPENDIX B-CPT SOUNDING LOGS APPENDIX C- KESSLER DCP RESULTS APPENDIX D-SEASONAL HIGH WATER TABLE AND INFILTRATION TESTING RESULTS APPENDIX E-GENERAL CONDITIONS El Report of Subsurface Exploration and Geotechnical Engineenng Analysis Lots 1A and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No * 22.25091 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located near Wagoner Hall, off of Walton Drive, on the UNCW campus in Wilmington, Hew Hanover County, North Carolina. At the time of our exploration, the site consisted of open and lightly wooded areas. The site is relatively level with typical elevations ranging from 33 to 37 feet. ECS understands that the proposed project consists of two new parking lots. ECS has been requested to evaluate the existing subgrade and provide a pavement design section for the proposed parking lots. Additional project information including project traffic loading was not available at the time this proposal was prepared. Beneath the surface materials to depths of about 5 feet, the test soundings (S-1 through S-5) consisted of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and soft to stiff, sandy and clayey silts, silty clay, and lean clay (ML, CL-ML, CL). From depths of 5 to a termination depth of about 10 feet, the soundings encountered intermittent layers of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and stiff to very stiff, sandy silts (MIL). In summary, a light duty flexible pavement section may consist of 2 inches of surface course asphalt overlying at 6 inches of compacted graded aggregate base. A heavy duty flexible pavement section may consist of 3 inches of surface course asphalt overlying at least 6 inches ® of compacted graded aggregate base. For a rigid pavement section, 5 inches of concrete with a design flexural strength of 450 psi overlying 4 inches of compacted graded aggregate. The base material should be compacted to 98 percent of the modified Proctor (ASTM D 1557) maximum dry density. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. 1 Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No. 22.25091 2.0 PROJECT OVERVIEW 2.1 Project Information ECS' understanding of the proposed construction is based upon information provided by Mr. Cory George, PE, PLS of McAdams. The proposed site is located near Wagoner Hall, off of Walton Drive, on the UNCW campus in Wilmington, Hew Hanover County, North Carolina. At the time of our exploration, the site consisted of open and lightly wooded areas. The site is relatively level with typical elevations ranging from 33 to 37 feet. ECS understands that the proposed project consists of two new parking lots. ECS has been requested to evaluate the existing subgrade and provide a pavement design section for the proposed parking lots. Additional project information including project traffic loading was not available at the time this proposal was prepared. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of the following: Five Cone Penetration Test (CPT) soundings, in the proposed pavement areas, • Five field Kessler dynamic cone penetrometer (DCP) tests, ® Two hand auger borings, and • Engineering analyses of the Feld and laboratory findings with respect to the provided project information. 1 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives as follows: • Performing a site reconnaissance to evaluate the existing site conditions, • Performing five test sounding to explore the subsurface soil and groundwater conditions, and • Performing five Kessler DCP tests to correlate a CBR to provide pavement recommendations, • Performing hand auger borings to estimate the seasonal high water table and perform infiltration tests, and • Analyzing the field data to develop appropriate geotechnical engineering design and construction recommendations. 2 Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No.22 25091 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Cone Penetration Test Five electronic cone penetration test (CPT) soundings (S-1 through S-5) were performed during our field exploration. The CPT soundings were performed in general conformance with ASTM D 5778 with a track mounted rig. An ECS representative staked the CPT sounding locations using existing site features and a hand held GPS device. Approximate locations of the CPT soundings are indicated on the Exploration Location Diagram in Appendix A of this report. The cone used In the soundings has a tip area of 10 Cm2 and a sleeve area of 150 cm2. The CPT soundings recorded tip resistance and sleeve friction measurements to assist in determining pertinent index and engineering properties of the site soils. The ratio of the sleeve friction to tip resistance is then used to aid in assessing the soil types through which the tip is advanced. The results of the CPT soundings and seismic testing are presented in Appendix B. 3.1.2 Kessler Dynamic Cone Penetrometer Tests Five Kessler DCPs were performed at the boring locations in the proposed parking lot. The Kessler DCP is used to estimate the strength characteristics of soils. The Kessler DCP was driven continuously through approximately the upper 2 feet below the existing ground surface. ® The Kessler DCP is driven into the soil by dropping a Dual -Mass 17.6 lb Hammer from a height of 22.6 in. The depth of cone penetration is measured at selected penetration or hammer drop intervals and the soil shear strength is reported in terms of Kessler DCP index. The Kessler DCP index is based on the average penetration depth resulting from one blow of the 17.6 lb hammer. The Kessler DCP index can be correlated to CBR and modulus of rigidity. The individual results of the Kessler DCP tests are presented in Appendix C. Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B - Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No.. 22 25091 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located near Wagoner Hall, off of Walton Drive, on the UNCW campus in Wilmington, Hew Hanover County, North Carolina. At the time of our exploration, the site consisted of open and lightly wooded areas. The site is relatively level with typical elevations ranging from 33 to 37 feet. 4.2 Regional Geology The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. ® 4.3 Soil Conditions Approximately 2 inches of organic topsoil was encountered at the sounding locations, S-1 trough S-5. The depths of the surface material should be considered approximate. CPT Sounding: Beneath the surface materials to depths of about 5 feet, the test soundings (S-1 through S-5) consisted of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and soft to stiff, sandy and clayey silts, silty clay, and lean clay (ML, CL-ML, CL). The equivalent corrected standard penetration test resistances (N*-values) in these soils generally ranged from 4 to 34 blows per foot (bpf). From depths of 5 to a termination depth of about 10 feet, the soundings encountered intermittent layers of loose to dense, silty, slightly silty, and clean sands (SM, SP-SM, SP) and stiff to very stiff, sandy silts (ML) with N*-values ranging from 10 to 36 bpf. The descriptions provided in this section are a general summary of the subsurface conditions encountered within the CPT test sounding. The CPT Sounding Log in Appendix B contains detailed information recorded at the sounding location. The findings from the Kessler DCP tests are shown in Appendix C. 4 Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and I - Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No.: 22.25091 4.4 Groundwater Conditions Porewater pressure measurements were made at the sounding location during exploration. The apparent groundwater depth was observed to range from approximately 7.0 to 10.0 feet below the existing grade in the CPT soundings. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. 4.5 Seasonal High Water Table and Infiltration Testing The results of the seasonal high water table and infiltration testing are shown in the report included in Appendix D of this report. A Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots to and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ECS Project No . 22 25091 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this exploration and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subgrade Preparation The first step in preparing the site for the proposed construction should be to remove vegetation, rootmat, topsoil, deleterious materials, and other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. Due to the presence of near surface loose sands near soundings S-1, S-2, and S-3, in -place densification of the surface soils in the pavement areas should be performed during site grading activities prior to fill placement and/or roadway construction. After proper clearing, stripping, grubbing, further evaluation of the site soil and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be evaluated by an experienced geotechnical engineer to identify localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, proofrolling using a heavy vibratory smooth drum roller, having a weight of at least 10 tons, is suggested to be used at this time to aid in identifying localized soft or unsuitable material which should be removed. The proofrolling will also help density the upper exposed subgrade soils. Soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrades. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by ECS personnel. These observations should be performed by an experienced geotechnical engineer or qualified person to ensure that unsuitable materials have been removed and that the prepared subgrade meets project requirements for support of the proposed construction and/or fills. M Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No : 22 25091 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. Fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, less than 35 percent fines passing the #200 sieve, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 35 and 9, respectively. We also recommend that fills within structural areas have a standard Proctor (ASTM D 698) maximum dry density of at least 100 pounds per cubic foot (pcf). Materials that should not be used as engineered fill include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. The existing, sands should be suitable for re -use as structural fill. Moisture conditioning should be anticipated for the soils to achieve the optimum moisture content for fill placement. Existing soils containing significant amounts of organic matter will not be adequate for re -use as engineered fill. As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be adequate for re -use as engineered fill. Natural fine- grained soils classified as clays or silts (CL, ML) should generally not be considered for use as ® engineered fill, but may be evaluated by the geotechnical engineer to determine their suitability at the contractor's request. Prior to the commencement of fill operations and/or utilization of off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 98 percent of the soil's standard Proctor (ASTM D 698) maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. r Report of Subsurface Exploration and Geotechnical Engmeenng Analysis Lots to and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No 22 25091 Grade controls should also be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by qualified ECS personnel to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,500-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other remedial activities in order to achieve the required compaction. Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. Wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 6.3 Pavement Design Considerations ® For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement' sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. u Based on our past experience with similar facilities and subsurface conditions, we present the following design pavement sections provided the recommendations contained in this report are strictly followed. We have developed the asphalt or concrete pavement sections recommended below using NCDOT guidelines based on a design CBR value of 8 and an anticipated design life of 20 years. Actual traffic conditions were not provided to ECS. However, based on our experience for light duty traffic for similar projects, a light duty flexible pavement section may consist of 2 inches of surface SF9.5 mix overlying at least 6 inches of compacted ABC stone in the roadway areas. . Similarly, a heavy duty flexible pavement section may consist of 3 inches of surface SF9.5 mix overlying at least 6 inches of compacted graded aggregate base in the roadway areas. The base material should be compacted to 98 percent of the modified Proctor (ASTM D 1557) maximum dry density. ♦3 Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B -Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No : 22.25091 For a rigid pavement section, we recommend 5 inches of concrete with a design flexural strength of 450 psi overlying 4 inches of compacted ABC stone in the roadway areas. . Joint spacing should be between 10 to 15 feet. Regardless of the section and type of construction utilized, saturation of the subgrade materials and pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. 6.4 Site Drainage ECS recommends that landscaped areas adjacent to the pavements be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the paved areas. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 5.5 Construction Considerations It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed pavements areas without significantly interrupting its flow. Other practices would involve crowning and sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. E Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B - Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No. 22.25091 The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. E 10 Report of Subsurface Exploration and Geotechnical Engineering Analysis Lots 1A and 1 B - Wagoner Wilmington, New Hanover County, North Carolina ® ECS Project No.: 22.25091 6.0 CLOSING Is Our geotechnical analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our analysis have been based on interpolation of subsurface data between the soundings and borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 11 1 n LJ n LJ APPENDIX B CPT SOUNDING LOGS • n U n U 0 0 REFERENCE NOTES FOR CONE PENETRATION TEST (CPT) SOUNDINGS In the CPT sounding procedure (ASTM-D-5778), an electronically instrumented cone penetrometer is hydraulically advanced through soil to measure point resistance (q,), pore water pressure M), and sleeve friction (fj. These values are recorded continuously as the cone is pushed to the desired depth. CPT data is corrected for depth and used to estimate soil classifications and intrinsic soil parameters such as angle of internal friction, preconsolidation pressure, and undrained shear strength. The graphs below represent one of the accepted methods of CPT soil behavior classification (Robertson, 1990). y L \ 3 U ro � \ m ♦s a o \ \ U o U ♦ \ )Z Friction Ratio, F, (%) 1. Sensitive, Fine Grained 2. Organic Soils-Peats 3. Clays: Clay to Silty Clay 4. Clayey Silt to Silty Clay 5. Silty Sand to Sandy Silt C C-� 08 ? Pore Pressure Ratio, Bq 6. Clean Sands to Silty Sands 7. Gravelly Sand to Sand 8. Very Stiff Sand to Clayey Sand 9. Very Stiff Fine Grained The following table presents a correlation of corrected cone tip resistance (q°) to soil consistency or relative density: SAND SILT/CLAY Corrected Cone Tip Resistance ° tsf Relative Density Corrected Cone Tip Resistance tsf Relative Density <20 Very Loose <5 Very Soft 20-40 Loose 5-10 Soft 40-120 Medium Dense 10-15 15-30 Medium Stiff Stiff 120-200 Dense 30-45 Very Stiff >200 Very Dense 45 60 _ >60 I Hard Very Hard 0 0 Lots 1 A 0 1 B- Wagoner Operator Cory Robeson Cone Number DDG1352 Project Number 22-25091 _ Date and Time 2/76/2017 72:33:35 PM 12M: 1 Water Table 9.2 ft CPT DATA a p,,. Tip Resistance Local Friction Pore Pressure SPT N" Of TSF 20010 Fs TSF 1-2 Pw PSI 1 0 60% Hammer 0�0 . 1 !._i Tom.. I.T. _�._. _ _ T_ — _ (�_ ;,._�. I—T_e 2 4 6 8 10 1 - sensitive fine grained :.. 2 - organic material ■ 3 - clay ■ 4 - silty clay to clay ae 5 - clayey silt to silty clay 0 6 - sandy silt to clayey silt a 7 - silty sand to sandy sill 8 - sand to silty sand 9- sand location Wilmingto•. Sounding Number S-01 County New Hanover I o REMARKS J Q W =d O 00 F N 10 - gravelly sand to sand 11 - very stiff tine grained (") ■ 12 - sand to clayey sand (') Lots 1 A to 1 B- Wagoner Operator Cory Robison Cone Number DDG1352 Location Wilmington N.C. Project Number 22.25091 Date and Time 2116/201712:20:59 PM Sounding Number S-02 .■ Water Table 9.67 fl County New Hanover cc CPT DATA 0 U.]REMARKS oTip Resistance 0 Ot TSF 7010 Local Friction Pore Pressure SPT N' F1 s TSF 1 -1 Pw PSI 1 0 60 % Hm Hammer a 16 0 LU m >- I p _ __.I�.. ). 21 4',, 6 8 i 10', 12.. 1.... _.. i 1 - sensitive tine grained ■ 4 - silty clay to clay ■ 7 - silty sand to sandy silt N 10 - gravelly sand to sand a. 2 - organic material ■ 5 - clayey slit to silty clay 8 - sand to silty sand r 11 - very stiff tine grained (') ■ 3 - clay 0 6 - sandy silt to clayey silt -; 9 - sand 0 12 - sand to clayey sand (') Lots 1 A 40 1 B- Wagoner Operator Cory Robison Cone Number DDG7352 Project Number 22-25091 Date and Time 21161201712:D8:55 PM Water Table 1 _. _ 10.0 ft — CPT DATA TSF 1601 0_ _ FS TSF 1 I-1 _ �. J �— Pw PSI i Resistance Local orePressure Of 2 4 6 8 10 121 1 - sensitive fine grained --- 2 - organic material ■ 3 - clay Location Wilmington . Sounding Number 5-03 County New Hanover O J Q W x a SPT N' W 1- 60% Hammer 30 U) m ~ -__[ 1.— ■ 4 - silty clay to clay ■ 7 - silty sand to sandy slit o 10 - gravelly sand to sand ■ 6 - clayey silt to silty clay 8 - sand to silty sand v 11 - very stiff fine grained (') ■ 6 - sandy silt to clayey silt = 9 - sand 0 12 - sand to clayey sand (") REMARKS 9 N 4 6 8 10 Lots 1 A 0 1 B- Wagoner • Operator Cory Robison _ Cone Number DDG1352 _ Location _ Wilmington_ N.C. Project Number 22.25091 Date and Time 2/16I2017 11:50:36 AM Sounding Number S-04 Water Table 7.0 if County New Hanover Ir CPT DATA o REMARKS Tip Resistance Of TSF 100 a._..I I. T— I_.- _i. 1 - sensitive fine grained v 2 - organic material N 3 - clay Local Friction 0 Fs TSF Pore Pre 1.1 Pw ■ 4 - silty clay to clay ■ 5 - clayey silt to silty clay ■ 6 - sandy silt to clayey silt I i i ■ 7 - silty sand to sandy silt 8 - sand to silty sand 9- sand N 10 - gravelly sand to sand n 11 - very stiff fine grained (') 11112 - sand to clayey sand (') Lots 1 A to 1 B- Wagoner Operator Cory Robison_ _ _ Cone Number DDG1352 Location Wilmington N.C. _ Project Number 22.25091 Date and Time 2/16/2017 11:35.52 AM Sounding Number 5-05 Water Table 7.2 it - County New Hanover CPT DATA REMARKS a = d LU E Tip Resistance Pore Pressure SPT N' 0 m ~ 0 Of TSF 20010 Fs TSF 1;-2 Pw PSI 1 0 60% Hammer 35 4 6 C-1 10 1 - sensitive fine grained s 2 - organic material ■ 3 - clay Local Friction ■ 4 - silty clay to clay ■ 5 - clayey silt to silty clay ■ 6 - sandy silt to clayey silt --1 - I _ I ■ 7 - silty sand to sandy silt R 10 - gravelly sand to sand 8 - sand to silty sand � 11 - very stiff fine grained (') 9 - sand ■ 12 - sand to clayey sand (') 10 APPENDIX C KESSLER DCP RESULTS 0 0 n LJ • DCP TEST DATA Project: Lots 1A and 1B - Wagoner Date: 14-Feb-17 Location: S-1 Soil Type(s): Sandy and Clayey Silt Ha _ _ 5.0 iTyr, a+ G� e lm a BO( 'umnu_�usev � All Ofh Pr SV t15 No. of Cumulative Type of Blows Penetration Hammer (m m) 0 0 5 292 1 3 :... 592 _.. 1 1 696 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 i 1 i i / / i i i / i 1 7 1 0.1 0 5 10 15 c 20 a w 25 30 35 40 C Nit 1.0 10.0 100.0 0 127 254 381 E E 508 H a w 635 762 889 1016 0.1 1.0 10.0 100.0 BEARING (APV I11.psf 0 2000 4000 6000 8000 10000 12000 0 5 10 1s c_ x !— 20 a w ❑ 25 30 35 40 Bases on approximate iMenelatlonahipa of CBR and Bearing values (Design of Concrete Airport Pavemant, Penland Cement Aesaclation, page 8, 1955) 0 14 28 42 56 69 BEARING CAPACITY, psi 0 127 254 381 E E 508 F a w 635 ❑ 762 889 1016 83 r1 U • DCP TEST DATA Project: Lots 1A and 1B - Wagoner Date: 14-Feb-17 Location: S-2 Soil Type(s): Silty Sand, Sandy and Clayey Silt ._ Ha _ _.. 5ne Tvqe c1h � cn G t so, J a 8a[h rt ...... usen J NI UtherSjls No. of Cumulative Type of Blows Penetration Hammer 0.1 1.0 (mm) 0 0 0 1 5 251 1 5 5 _.... 437 1 _.. 4 645 1 10 1 1 15 1 c 2 F 20 w 1 p 25 1 30 35 1 1 ..___.. —.. _... __. 40 CRR 10.0 100.0 1 0.1 1.0 10.0 1 REARING (:ti'M II N. pst 1 0 2000 4000 6000 8000 0 i t 5 1 1 10 i 15 1 20 a 1 w 25 1 30 1 35 1 40 0 127 254 381 E E 508 F a w 0 63s 762 889 1016 100.0 10000 12000 0 127 254 381 E E 508 r a w 635 762 889 1016 1 0 14 28 42 56 69 83 1....... BEARING CAPACITY, psi t Based on approximate ioterrelattooships of CBR arM Searing values (Design of Concrete Airport Pavemer4, Portland Cemerrt Association, page e, 1955) E • • DCP TEST DATA Project: Lots 1A and 1B - Wagoner _ Date: 14-Feb-17 Location: S-3 Soil Typil Silty Sand, Sandy Silt ea __. Sni rvoe �� t0 bt Oi CL Son �amntrs uuK: i> All othe'SOils No. of Cumulative Type of Blows Penetration Hammer (m m) 0 0 1 5 323 1 5 668 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 t 1 1 1 1 1 1 1 1 1 1 0.1 0 5 10 15 c 20 a w 0 25 30 35 40 BR 1.0 1.0 10.0 100.0 0 127 254 381 E E 508 3 n w 635 762 889 1016 0.1 1.0 10.0 100.0 BF kRING (:kil ll N, psf 0 2000 4000 6000 8000 fill 12000 0 5 10 15 c x a zo w 0 25 30 35 40 Based on approximate intemelaeonsbip9 of CBR and Bearing values (Design of Concrete Airport Pavement, Poell Cament Association, page 8, 1956) 0 14 28 42 56 69 BEARING CAPACITY, psi 0 127 254 381 E E 508 F o. w 635 0 762 889 1016 83 0 0 0 • DCP TEST DATA Project: Lots to and 18 - Wagoner Date: 14-Feb-17 Location: S-4 Soil Type(s): Clean and Silty Sand '- eta Snl Tv m r a o a son r.x�,mers �.eo OO All aNcrs0,i No. of Cumulative Type of Blows Penetration Hammer 0.1 1.0 (mm) 0 0 _ _5 .. __ 0 _.. 1 - 130 1— 5 5 188 1 5 257 1 70 _. 5 315 —. 5 381 _ 5 _ 457 _ _. 1 15 5 541 1 C 5 622 1 _. _ _ _.. F 20 4 691 1 11 w 1 Cl25 1 1 30 36 i 1 40 f RR 10.0 100.0 1 0.1 1.0 10.0 RE.\RItiG C:\V.4('I Il, pxf 1 1 0 2000 4000 6000 8000 0 1 1 5 10 1 15 G 1 20 w 25 1 30 35 40 0 UT 254 381 E E 508 F a w 635 Cl 762 889 1016 100.0 10000 12000 0 127 254 381 E E Sae w w 635 ❑ 762 889 1016 _1 _ 0 14 28 42 56 69 83 1 BEARING CAPACITY, psi i Based on approximate INerrelationshlps of c8R and Bearing values (Design or Concrete Almon PavemeM, Portland Cement Aasociauoo, page 5, 1955) 0 0 • 1r u DCP TEST DATA Project: Lots 1A and 18 - Wagoner Date: 14-Feb-17 Location: S-5 Soil Type(sj: Clean and Silty Sand, Clayey Silt - ea e So Rvpe CL ` b mme f uzea �� All Omer ..5 No. of Cumulative Type of Blows Penetration Hammer 0.1 1.0 "ml 0 0 --5.. .__. 0 _-. 1 lea 1- 5 5 246 5 297 10 5 348 5 386 1 5 417 1 15 5 442 1 C 5 465 1 .-- -_ -- f 20 5 490 1 Q. 5 513 1 _ _ p 5 - --536 -. -- 1 25 5 566 1 5 589 1 30 5 617 5 645 35 5 678 1 1 1 -- 40 CRK 10.0 100.0 0 127 254 381 E E 508 2 a W 635 762 889 1016 1 0.1 1.0 10.0 RP 1RItiG ( 1Pa(ill. psf t 1.. 0 2000 4000 6000 8000 10000 1 1 5 10 15 1 F 20 a 1 w 25 30 1 35 t 40 1 0 1 Base4 on approximate IMerrelatiarettips of CBR and Bearing values (Design of Concrete Airport Pavement, Portland Cement Ass wfflon, page 6. 1955) 14 28 42 56 69 BEARING CAPACITY, psi 100.0 12000 0 127 264 381 E E 508 3f a w 635 0 762 889 016 83 n LJ r1 L.J n U E SEASONAL HIGH WATER TABLE AND INFILTRATION TESTING E n u 0 0 ECS SOUTHEAST, LLP -Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities VC^' ys:e ec Eng rear rg Fnm F. 1078 tie R,,mwm n Oeo'oc,.v, Fnm C- 00 SC Re,swe d Fnm 3230 February 22, 2017 Mr. Cory George, P.E. McAdams 2905 Meridian Parkway Durham, North Carolina 27713 Reference: Report of Seasonal High Water Table Estimation and Infiltration Testing UNCW Lots 1A and 1B - Wagoner Wilmington, New Hanover County, North Carolina ECS Project No. 22.25091 Dear Mr. George: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the stormwater best management practice (BMP) area(s) off of Seahawk Village Loop on the campus of UNCW in Wilmington, New Hanover County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On February 21, 2017, ECS conducted an exploration of the subsurface soil and groundwater ® conditions at two requested locations shown on the attached Boring Location Plan (Figure 1). ECS located the boring locations using a site plan provided by McAdams. The purpose of this exploration was to obtain subsurface information of the in situ soils for the stormwater BMP area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater B-1 6 inches 30 inches B-2 24 inches 42 inches 11 ECS has conducted two infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted and calculated up to 30 minute intervals. If an exact hydraulic conductivity is necessary for these locations, then ECS recommends collecting samples by advancing Shelby tubes and performing laboratory permeability testing. ECS Capitol Services, PLLC • ECS Florida, LLC • ECS Mid -Atlantic, LLC • ECS Midwest, LLC • ECS Southeast, LLP • ECS Texas. LLP w .ecslimited.com Report of SHWT Estimation and Infiltration Testing UNCW Lots 1 A and 1 B - Wagoner Wilmington, New Hanover County, North Carolina ECS Project No. 22.25091 isFebruary 22, 2017 Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour B-1 Black silty SAND w/roots 10 inches 0.022 B-2 Black silty SAND 10 inches 0.073 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us. Respectfully, ECS SOUTHEAST, LLP K. Brooks Wall Project Manager bwall@ecslimited. com 910-686-9114 Attachments: Figure 1 - Boring Location Plan Infiltration Testing Form ASFE Document W. Brandon Fulton, PSC, PWS, LSS Environmental Department Manager bfulton@ecsli mited. com 704-525-5152 Infiltration Testing Form ® UNCW Lots 1A and 1 B - Wagoner Wilmington, New Hanover County, North Carolina ECS Project No. 22.25091 February 21, 2017 Location Depth USCS B-1 0-44" S M 44"-50" SP Soil Description Black silty SAND w/roots Gray fine SAND Seasonal High Water Table was estimated to be at 6 inches below the existing grade elevation. Groundwater was encountered at 30 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.022 per hour Location Depth USCS B-2 0-14" SM 14"-50" SP Soil Description Black silty SAND w/roots Gray fine SAND ® Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 42 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.073 per hour E ® General Conditions The Analysis, conclusions, and recommendations submitted in this report are based on the exploration previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings and soundings were located at the requested locations selected by the client where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring or sounding may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re -analysis of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either express or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. ® Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil exploration work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil explorations will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further exploration as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. E Geolechnical Engineering RePOPI ,, Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engineer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geo- technical engineering report is unique, prepared solelyfor the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you - should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Geotechnical Engineering Report Is Based on A Unique Set of Project -Specific Factors Geotechnical engineers consider a number of unique, project -specific factors when establishing the scope of a study. Typical factors include. the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities Unless the geotechnical engi- neer who conducted the study specifically indicates otherwise, do not rely an a geotechnical engineering report that was. • not prepared for you, • not prepared for your project, • not prepared for the specific site explored, or • completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect: • the function of the proposed structure, as when it's changed from a parking garage to an office building, or from alight industrial plant to a refrigerated warehouse, • elevation, configuration, location, orientation, or weight of the proposed structure, • composition of the design team, or • project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their impact Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed Subsurface Conditions Can Change A geotechnical engineering report is based an conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering report whose adequacy may have been affected by: the passage of time: by man-made events, such as construction on or adjacent to the site; or by natu- ral events, such as floods, earthquakes, or groundwater fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable A minor amount of additional testing or analysis could prevent major problems. Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review held and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site Actual subsurface conditions may differ -sometimes significantly from those indi- cated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report's Recommendations Are Not Final Do not overrely on the construction recommendations included in your re- port. Those recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion Geotechnical engineer can finalize their recommendations only by observing actual subsurface conditions revealed during construction The geotechnical engi- neer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation, A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineer- ing reports has resulted in costly problems Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report Also retain your geotechnical engineer to review pertinent elements of the design team's plans and specifications Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruclion conferences, and by providing construction observation. Do Not Redraw the Engineer's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con- tractors the complete geotechnical engineering report, butpreface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct ad- ditional study to obtain the specific types of information they need or prefer. Aprebidconference can also bevaluable Be sure contractors have sufficient timeto perform additional study Only then might you he in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unantici- pated conditions. Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reloads, Sometimes labeled "limitations' many of these provisions indicate where geotechnical engineers' responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly Geoenvironmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a geoenviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually re- late any geoenvironmental findings, conclusions, or recommendations, e.g., about the likelihood of encountering underground storage tanks or regulated contaminants Unanticipated environmental problems have led to numerous project failures It you have not yet obtained your own geoenvironmental in- formation, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared for someone else. Obtain Professional Assistance To Deal with Maid Diverse strategies can be applied during building design, construction, op- eration, and maintenance to prevent significant amounts of mold from grow- ing on indoor surfaces To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated Into a comprehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a number of mold prevention strategies focus on keeping building surfaces dry While groundwater, wa- ter infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in -this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; none of the services performed in connectron with the geotechnical engineerk study were designed or conducted for the purpose of mold prevention. Proper implementation of Me recommendations conveyed in this report will not of itself he sufficient to prevent mold from growing in or an the struc- ture involved. Rely an Your ASFE-Member Geotechnical Engineer For Additional Assistance Membership in ASFE/ihe Best People on Earth exposes geotechnical engi- neers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project Confer with your ASF6member geotechnical engineer for more information. A® E t!r Brsl PrrP lr sv Frr tE 8811 Galesville Road/Suite G106, Silver Spring, MD 20910 Telephone.'301/565-2733 Facsimile:301/589-2017 e-mail: info®asfe.org www.asfe.org ® Copyrigdt2004hyA5FF, Inc Duplication. reproduction, or copying of this document, inwhole or in part, by any means whatscever, is onctly prohrdned, except with ASFE's specific written permission Excerpting, quahog or otherwise extracting wording from this document Is permitted only with the express written permission ofASFE and only for purposes o/scholarly research or book review Only members olASFEmay use this document as a comolement to or as an element of a geolechmcal engineering report. Any other firm, individual, or other entity that so uses this document without being anASFEmember could be committing negligent or intentional (fraudulent) mrsreoresentahon IIGER06045 OM S C] PREVIOUS STATE STORMWA TER PERMITS UNCW -PARKING IMPROVEMENTS PHASE 1 UN W-16050 CJ • STORMWATER CALCULATIONS UNCW PRIVATIZED HOUSING, HONORS HOUSING AND INTERNATIONAL HOUSING, REGIONAL ENERGY PLANT - PHASE II & PHASE III Wilmington, North Carolina For UNC Wilmington 601 South College Road Wilmington, NC 28403 (910)962-3067 f ff'f1: i:ilfl\�'. NiA� '1 1 '�009 February 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) 40 NKT Project No. 06179-1 Date Design NORRIS, KUS KE &TUNSTALL CONSULTING ENGINEERS. INC. Check Job G - Wilmington, NC ,9 Brunswick County, NC Ot Y —v. % .� . 1.- /c-� v:_a�•-�"''.'. ��'�t;J-'� r�.'�: f' �� /_i ;r��•:r 1.. L��i_i' '.%•�?l'i,�'�r';: T��� �',�7�✓c-: i7,= I.1 i'.. l71U�'�_- r f'%%� .. .>j.i "-:✓c-:' .fli. .''-`�ri 61. �•''%_J_�t j =•'� �` U-- � / date Design A/.:- NORRIS, KUSKE &TU NSTALL Yiiifi `� � ✓; � �'o CONSULTING ENGINEERS, INC i Check Job Wilmington, NC I Sheet Brunswick County, NC .. _.- ,.< .i. ._ -.. .1 / __ �., �'/���• ,ter._"o:f : __ yts' . � ..� �_ v;,'G/ °°, r✓� � /` =7 7 -i% Lim _. � - ! 1✓. 's.-. � q i Lj i / WET DETENTION POND ANALYSIS Note:'User input boxes are shaded in blue FILE NAME: S:IWQSISTORMWATERIEXCELSPREADSHEETSIPONDI970128.apr09.WKt PROJECT# SW8970128.apr09 . REVIEWERS. Pusey �pROJECT NAME UNWCPrivatized Housing - Hpnors & Int'I. . DATE' 05-May-09 ® Regional Energy Plant - Phase 2 & 3 Receiving Stream: Bradley Creek Class: Sc Drainage Basin: Cape Fear - Index No. - Site Area Total 30.77 acres Drainage Area 1225256.00 square feet DA Area Acres 28 13 oHHora na I I I S916 00> square feet DA Area Acres:- - - 2,64 IM Buildings or Lots 105086.60 square feet Streets 8100,00 square feet Parking :.178600.00 :square feet Sidewalks 87123 00 - square feet Other onsite 606.00 square feet Offsite .22498.60 square feet New offsite 42216.01) square feet TOTAL 444223.00 square feet onal C Net Change in BUA 1 00 3206.00 sf 098 0.98 0.98 096 098 from previous modification Rational Cc= 048 SURFACE AREA CALCULATION Overall s=NewDA`?'€'- % IMPERVIOUS 33 14%:, 36,64% SA/DA Ratio 1,76% Avg. Des. Depth Req. PP SA F7723552' TSS, 85 or 90. 90 VOLUME CALCULATION Rational ?* I na I na Within 112 mile SR? : n I= - =- - n Runoff Depth 1.00 Pre/ Rv = 0.050 . �ost/ Rv = 0.343 yr 24hr Pre/ Vol. 18889 cf 1yr 24hr Post/ Vol 129558 of Req Volume 35016 5829 {Perm. Pool Volume= Req Forebay Volume= Provided Forebay Volume= 243177.00 cf 48635.4 jcf 58631. cf 24.1% 3/4 HP AREAS Elevation Area Inc. Vol. Ace. Vol. Bottom, clean 20:00 2893200 ? 090 Permanent Pool, PP 26.00 52127 00 243177 00 243177 00 Any elevation btwn PP & TP 27.00 --` 61641.00'- 56884.00 300061.00 Reported Temporary Pool, TP 27.40 " .61641.00 24656.40 324717.40 Storage met @elev 26.70 msl Vol. Prov at TPE F 81540 cf (+1- 5%) J �e- ks'( SHWT= fmsl OI<. ORIFICE CALCULATION Avg Head = Flow Q2, cfs Flow Q5, cfs No of Orifices Diameter, inches Runoff Cc 1 yr 24 hr depth Rainfall intensity tyr 24hr Peak Q Orifice flow < peak Drawdown = 0.43 ft 0 236 cfs 0.095 cfs Q2 Area = Q5 Area = Orifice Area weir�H, in C= 3.298333333 from NOAA chart FILTER FOR 85% TSS POND 1084 sq. inches 4.34 sq. inches 7.07 sq inches 0 154 cfs x OL,in L'' -0.085 Find Q peak for the 10 year storm: Time of Concentration minutes - from Consultant calculations NC®ENR North Carolina Department of Environment and Natural Resources ® Division of Water Quality Overly Eaves Perdue Coleen H. Sullins Governor Director May 5, 2009 Mr. Charles Maimone, Vice Chancellor UNC-Wilmington 601 College Road Wilmington, NC 28403 Subject: Stormwater Permit No. SW8 970128 Modification UNC-W Honors, International, & Privatized Housing Regional Energy Plant— Phase 2 & 3 High Density Project New Hanover County Dear Mr. Maimone: Dee Freeman Secretary The Wilmington Regional Office received and accepted a complete modified Stormwater Management Permit Application for UNCW Honors, International, & Privatized Housing, Regional Energy Plant — Phase 2 & 3 on March 18, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 970128 MOD, dated May 5, 2009, for the construction of the subject project. This permit supercedes all previously issued stormwater permits, and shall be effective from ttte ® date of issuance until March 7, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirement in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P-O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please conta Steve Pusey, or me at (910) 796-7215. Sincerely, aCott Stormwater Supervisor Division of Water Quality GDS/sgp: S:\WQS\STORMWATER\PERMIT\970128mod.apr09 cc: John Tunstall, PE — Norris, Kuske, & Tunstall Consulting Engineers Tony Roberts, New Hanover County Building Inspections City of Wilmington Development Services ® Steve Pusey Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone 910-796-72151 FAX: 910-350-20041 Customer service: 1-877-623-6748 Internet vvv w ncmmterquality Ong NorthCarotina Naturally State 5tormwater management Systems Permit No. SW8 970128 Modification STATE OF NORTH CAROLINA ® DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Charles Maimone and UNC-W UNC-W Honors, International, & Privatized Housing - Regional Energy Plant - Ph. 2 & 3 Cahill Drive, UNCW Campus, Wilmington, New Hanover County FOR THE construction, operation, and maintenance of a wet detention pond in compliance with the provisions of Session Laws 2006-246, 2008-211, and 15A NCAC 2H .1000 ® (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 7, 2015, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 444,223 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located per the approved plan. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. ® 6. This modification adds 3,206 square feet of built -upon area to this pond by adding a building and changing pavement and sidewalk sections as needed for the Regional Energy Plant. Page 2 of 7 atate 6tormwater management 6ystems Permit No. SW8 970128 Modification 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: ® a. Design storm, inches: 1" 1.5" Total b. Drainage Area, 9cres: 28A4 2.64 30.78 Onsite, ft : 1,202,757 0 1,202,757 Offsite, ft2: 22,498 115,216 137,714 C. Total Impervious Surface, ft2: 397,793 46,430 444,223 Onsite buildings, ft : 102,036 3,050 105,086 Onsite streets, ft2. 8,100 0 8,100 Onsite parking, ft2: 178,600 0 178,600 Onsite sidewalks, ft2: 85,953 1,170 87,123 Other onsite, ft2: 606 0 606 (future) Existing Offsite, ft2: 22,498 42,210 64,708 d. Pond Depth, feet: 6.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, fmsl: 26.0 g. Permanent Pool Surface Areq, ft2: 52,127 h. Permitted Storage Volume, ft : 79,638 i. Temporary Storage Elevation, fmsl: 27.4 j. Controlling Orifice: 3" O pipe k. Permitted Forebay Volume, W: 58,631 I. Receiving Stream/River Basin: Bradley Creek / Cape Fear M. Stream Index Number: CPF24 18-87-24-4-(1) n. Classification of Water Body: "SC HOW #" II. SCHEDULE OF COMPLIANCE ® 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. q. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. ® 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans, specifications, and other support data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 970128 Modification 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: ® a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 3/4 horsepower. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any ® modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee ® shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 estate 'stormwater Management Systems Permit No. SW8 970128 Modification III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In ® the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form signed by both parties, and supportina documentation as listed nn page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The ® filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion .and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 10. The permittee shall submit a renewal application and fee at least 180 days prior to the expiration date of this permit. Permit modified and reissued this the 5th day of May 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION El lY�l � q (or Colee H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 araie brormwaier management aystems Permit No. SW8 970128 Modification UNC-W Honors, International, & Privatized Housing — Regional Energy Plant Stormwater Permit No. SW8 970128 Mod. ® New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 970128 Modification Certification Requirements: ® 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections 1 Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Permit Number -//- O SoS.O° # 77G )o, State of North Carolina \'O# f.t lxL 61 Department of Environment and Natural Resources IV1 Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATI T-QR}� This form may be photocopiers for use as an original � �i 1 MA k f t 200q L GENERAL INFORMATION t ��, I. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Charles A. Mainione Vice Chancellor Business Affairs 3. Mailing Address for person listed in item 2 above 601 South College Road City:Wilmington State:NC Zip:28403 Phone: (910 1 962-3067 Fax: (910 ) 962-3550 I- ma it: ma i rnonec@iLncw.edu ® 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): UNCW Privatized Housing, Flonors Housing and International HousinK Regional Ener;;y Plant - Phase II & 5. Location of Project (street address): 601 South College Road City:Wilmington County:New Hanover Zip:28403 6. Directions to project (from nearest major intersection): From Randall Drive & College Road, head eastward on Randall. Turn right onto Reynolds Drive. Turn left onto Cahill Drive. The Energy Plant site is located at the termination of Cahill Drive behind Wagoner Drive. 7. Latitude:340 13' 19.35" N Longitude:770 51' 44" W _ of project 8. Contact person who can answer questions about the project: Name[ohn S. l'unstall. P.E. Telephone Number: (910 ) 343-9653 Smail:itiinstall@nktetig.com If. PERMIT INFORMATION: ® 1. Specify whether project is (check one): New ❑Renewal ®Modification Form SWU-t01 Version 09.25.08 Page t of 0 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberSW8 970128 Modification _ and its issue date (if known)December 19, 2008 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SNIP []Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major RISedimentation,/Erosion Contrel .e i I—,1 nc.n 1 ncr . "., n,it ❑.v. , ,.,5 Industrial jtormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how storm water will betreated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. TheWoposed permit revision is a result of additional built upon at a (BUA) from UNCW School of Nursing_ l�ional F,nergy Plant that naturally drains to the existing UNCW Privatized I -fouling Phase I pond Tire Phase I pond has sufficient surface area and volume to treat the additional BUA & DA from the Regional Enc� Plant._ 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 30.78 acres 4. Total Coastal Wetlands Area: 0 acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**:30.78 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA):33.14 % 7. How many drainage areas does the project have? 1 8 Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density proiects, complete the tahlr with ­­ r,,. _ a Basin Information - Drainage Area 1 - . ...--. ....... �«. Drainage Area 2 Receiving Stream Name UT to Bradley Creek Stream Class & Index No. SC; I-IQW Total Drainage Area (so 1,340,472 SF On -site Drainage Area (so 1,202,757 SF Off -site Drainage Area (so 137,715 SF Existing Impervious* Area (so 441,017 SF Proposed Impervious*Area (so 3,206 SF % Impervious* Area (total) 33.14% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 102,036 SF + 3,050 SF = 105,086 SF On -site Streets (so 8,100 SF On -site Parking (so 179,614 - 5,620 SF + 4,606 SF = 178,600 SF On -site Sidewalks (so 851953 SF+ 1,170 SF = 87,123 SF Other on -site (so 606 SF (Future 4/23/08 Mod.) Off -site (sf) 22,498 (Existing) + 42,210 (Proposed) = 64,708 SF Total (so: 444,223 SP impervious area is aehned as the built upon area including, but not lindted to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Norm SWU-101 Version 09.25.08 Page 2 of 4 `*Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BLIA). 11 E l 9. How was the off -site impervious area listed above derived?Existing design plans for UNCW Privatized Housing, Phases 1. II and IB as measured in CAD). Projects in Union County: Contact the DVVQ Central Office staff to check to see if you project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.ne.us/su/bmp forms.htm - deed restrictions. Form DRPC-I High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Fomi DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming tinder them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http:/ih2o.enr.state.nc.us/su/bmp forms htni. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Fort SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filler Form SW401-Penneable Pavement Form SW401-Cistern Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of 4 V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the ® interactive online map at http:/lh2o.cni-state.nc uS/su/MSi ma so hum) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) • Original of the applicable Supplemen orm(s) and O&M agreement(s) for each BMP • Permit application processing fee o $505 Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soils report • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm - Legend - (North arrow - Scale als - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures ® - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (mdividual or firm):lohn S. Tunstall P E /Norris. Kuske & Tunstall Consultfn -n ineers. Inc Mailing Address:902 Market Street City:Wilmingtton State:NC zip:28401 Phone: (910 ) 343-9653 — Fax: (910 ) 343-9604 l,'mail:ituiistaLi@nkteii.com VIIL APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Charles A. Maimone, Vice Chancellor Business Affairs certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A ® NCAC 2H .1000. Signature: �.-1j`�{'`w /�."�t.L %7(�"?'t,f` _ Date: Z _L Form SWU-101 Version09.25.08 Pagc4of4 Permit No (to be Pmvrrled by DWq) Aj NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be Tilled oul, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and submitted along with all of the required information I. PROJECT INFORMATION Project name UNCW Privatized Housing, Honors Housing and International Housing, Regional Energy Plant — Contact person John S Tunstall, P E Phone number 914343-9653 Date 1&Feb-09 Drainage area number II. DESIGN INFORMATION Site Characteristics _ Drainage area 1,340,472 R' Impervious area, post -development 444,223 Rz U`Il((}j •� JI' .}-�13�-_ %impervious 33,14 % Design rainfall depth 1 & 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided ®Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the tyr 24hr stone peak flow required? I-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr stoml Pre -development 1-yr, 24hr peak flow Post -development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pen. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided 40,886 it' AIG ti`0 \-rf" 1 .)I�.�f #\'A UE 1 I - TL(ta d� 79.638 g' `}, �o NOT fill out BOTH Non -SR and SR data. OK, volume provided is equal to or in excess of volume required NIA ft' NIA R' NIA R3 #VALUEI ft' NIA ft' NIA (Y or N) NIA in NIA (unitless) NIA (unitless) NIA inlhr NIA ff3lsec NIA tt'Isec #VALUE! h'Iser. 27.40 fa sl 2600 fmsl i. NIA fmsl NIA trust P' NIA final 21.00 trust 20.00 bast 1.00 It #REF! #REFI Do NOT fill out BOTH Non -SA and SA data. #VALUEI #VALUEI miAQ "s. ! 2009 Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the lop of the additional volume NIA fmsl Insufficient Must equal the temp. pool elev. previously entered. ® f`� r� fi {r \�i\��`� �91,(I.?11!1� �1�1"V�.. � �`✓! i1`t1 '�r�d � `'1 �)4,7. Farm SW401-vfel Delennon Basin-Rev.5 Parts I. & 11 Desgn summary, Pare I of 2 PermnNo _NWX i70(Z`d (vlop (10 be pmvbed by DWQ) II. DESIGN, INFORMATION Surface Areas ® Area, temporary pool Area REQUIRED, permanent pool NIA ft' 23,592 it' SAlDA ratio 1.76 (umtless) Area PROVIDED, permanent pool, Ape,,,,, �2-2.7.S1JL7 fit` + OK I, 4p Area, bodom of 1 Oft vegetated shelf, A,...,,, Nm, W Area, sediment cleanout, top elevation (bottom of pond), Aw pond NIA ft' Volumes Volume, temporary pool 79,638 R� #VALUE! Volume, permanent pool, V.r 243,176 it Volume, forebay (sum of forebays if more than one forehay) 58,631 rya Forebay, %of permanent pool volume 24.1% % Insufficient forebay volume. SAIDA Table Data Design TSS removal 90 Coastal SA/DA Table Used? Y (Y or N) MountainlP'edmont SA/DA Table Used? N (Y or N) SA/DA ratio 1.76 (unibess) Average depth (used in SA/DA table) Calculation option 1 used? (See Figure 10-2b) N/A (Y or N) Volume, permanent pool, V enm�+ NIA ft ' Insufficient Does not equal data previously entered. Area provided, permanent pool, A . p � NIA ` Insufficient Data does not equal data previously entered Average depth calculated NIA If #VALUE' Average depth used in SAIDA, d., (Round to nearest 0.511) N/A it #VALUE! Calculation option 2 used? (See Figure 10-2b) N/A (Y or N) Area provided, permanent pool, Awm� N/A ft` Insufficient. Data does not equal data previously entered. Area, bottom of 10ft vegetated shelf, A,,-., N/A It, OK Area, sediment cleanout, top elevation (bottom of pond), A.-pp„4 NIA it OK 'Depth' (distance b/w bottom of 10ft shelf and lop of sediment) NIA If #VALUE! Average depth calculated N/A it #VALUE' Average depth used in SA/DA, d., (Round to nearest 0.5ft) NIA ft #VALUE' Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice ('f-non-circular) Coefficient of discharge (Cg) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.„) Length of weir (L) Driving head(H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak Pow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & onfice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? ®Capures all runoff at ultimate buildout? Drain mechanism for maintenance or emergencies Form SW401 Wet Detention Basa.Rev.5 Y (Y or N) 3.00 in Y N/A in' 000 (umtless) 124 it N (Y or N) N/A (tintless) N/A (unitless) N/A it N/A it N/A Plsec Enter either diameter of orifice or area of non -circular orifice Do not enter both diameter and area for a circular orifice NIA ft3/sec 0.20 ft/sec 4 66 days OK, draws down in 2-5 days. 3 1 }. NIA :1 N/A If 3 1 k -- 1.5 :1 Y (Y or N) 0.6i i N (Y or N) Y (Y or N) Y (Y or N) #VALUE! #VALUE! #VALUE' OK OK OK OK OK OK Insufficient freeboard, minimum of 1-fit required OK OK OK Pans I & 11 Design summary, Page 2 of 2 Permit No. 5w8 976f2$M01 (to be provided by D Wq) C� E. III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan In�itijpl�s Sheet No. 4-0 0 4- 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing. Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. The supporting calculations. t t � I1�(l 8. A copy of the signed and notarized operation and maintenance (0&M) agreement 9. A copy of the deed restrictions (If required) rl 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin -Rev 5 Part III Required Iterns Checklist, Page t or t PennitNunrber, , (to be provided by DWQ) Drainage Area Number: 0 C� C'J Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. f, Tll This system (check one): does ® does not incorporate a vegetated filter at the outlet. a -v" This system (check one): r-: ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable grotmdcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide Lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of Ion _ approximately six inches Form SW401-Wet Detention Basin O&M-Rev.4 Page I of 4 2 E LJ Permit Number: S W e 170 121 rko O (to be provided w DWQ) Drainage Area Number: BMP element: The inlet device: pipe or swale Potential problem: The pipe is clogged. How I will remediate the problem: Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damn ed. Erosion is occurring in the sivale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the original design depth for sediment and remedy the problem if possible. Remove the sediment and sediment storage, dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to Weeds are present. prevent future erosion problems. Remove the weeds, preferably by hand. if pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices show that pruning is needed Prune according to best professional practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying- problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spra yin . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area._ and control the algal growth - Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of the basin surface. with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: 5'W g 11701 2g NAOD (to be provided by D1VQ) Drainage Area Number: E BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into ® accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. CI When the permanent pool depth reads 5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 21.0 I 1 ----------------- POREBAY BASIN DIAGRAM (fill in the blanks) Lft Min. Sediment Storage Permanent Pool Elevation 26.0 Pool Sediment Removal Elevation 21.0 volume Bottom Elevation 20.0 L 1-ft MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: Sw S aW )1 Za Mo0 (to be provided by DWQ) f acknowledge and agree by my signature below that I am responsible for the ® performance of the maintenance procedures listed above. i agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narrte:UNCW Privatized Housing, Honors Housing* and intematienal Housin� Regional Energy Plant- Phase 11 & Phase III BMP drainage area number: I Print name Charles A. Maimone Title: Vice Chancellor Business Affairs for UNC Wilmington Address:601 South College Road Wilmington NC 28403 Date: 1 - Z z/ -- 6% c Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president a Notary Public for the State of l l(,;lt/i County of �7t t� L. do hereby certify that kr personally appeared before me this y1� day of ?L_`7 and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal. a' �arFAse'�� SEAL My commission expires IJ ?� i ® v Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 n LJ r 1� STORMWATER MANAGEMENT FACILITY DESIGN CALCULATIONS U ® UNCW - PARKLNG IMPROVEMENTS PHASE I UN W-16050 UNC-W VARKING 1-01I'fl I STORMNVATER MANAGEMENT FACILITY D. PERRY. El UNW-16050 SSFxn.4how, AT 6t13/2017 (STA'CE-STORAGE-fIINCI'ION - A130VE NORMAL POOL *Temp pool elevation` Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume Nr/ S-S Fro (feet) (feet) (SF) (SF) (CF) (CF) (feet) 24.00 0.00 56.489 14.S0 0.50 5U,14 57867 28931 28933 0.50 25.00 1.00 60.642 59943 29972 58905 1.00 _M.00 100 63.482 62062 62062 120967 1.99 27.00 3.00 66.378 64930 64930 185897 3.06 28.00 4.00 69.3.31 67855 67855 253751 4.04 Storage vs. Stage 300000 250000 y = 59117Xl 0436 R' = 0 9999 LL 200000 i U 150000 m 0 n 100000 50000 0- 0 00 1.00 2.00 3.00 400 5.00 Stage (feet) K,= 5911i 6= 1.0436 JUN 13 2017 BY: UNC-NY PARKING 1-orl'll I STORMWATER MANAGEMENT FACILITY D. PERRY, 1_I UNW-16050 QQV,,, na„;„ /""d 611 3/2017 STAGE -STORAGE t: UNCTION i)1AIN Y001, Average Incremental Accumulated Estimated Contour Contour Contour Contour Stale Contour Stale Area Area Volume Volumc Nc/ S-S Fxn (feet) (feet) (SI-) (SF) (CF.) (CF) (feet) 16.00 -1.00 22.803 Sediment Storage I7.00 0.00 24.930 18.00 1.00 27.1 Is 26023 26023 26023 1.02 M.00 3.00 31.688 29402 58803 84826 2.91 22.00 5.00 36.577 34133 68265 153091 4.93 23.00 6.00 39.075 378_6 37826 190917 6.00 23.50 6.50 40.364 39720 19860 210776 6.56 24.00 7.00 42.669 41517 20758 231535 7.13 `surface area and eolume used fot am-,. depth calculation Storage vs. Stage 250000 200000 Y = 25591 xl 1211 R2 = 09994 U 150000 a m 0 100000 w 50000 0 0.00 2.00 4.00 6.00 8.00 Stage (feet) 6s = 25591 b = I.1211 rMIECEOV JUN 13 ?nn 6y:_---- UNC-%V PARKING LO'['I'll I STORN7WATGR MANAGI'MEN"I' FACILITY D. PERRY, El UMW-16050 SSF'n Forebrq, 6/13/2017 rS'1'ACE-57-OIL'�CEI�UNCPION=fOR.G13A1' . .Avertee Incremental Accumulated Estimated COntOnr Contour Contour Contour Stage Contour Sta2c Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SI-) (SF) (CF) (CF) (feet) 1800 -1.00 1.312 Sediment Storage 19.00 0.00 4.009 20.00 2.00 6.294 5152 5152 5152 1.95 21.00 3.00 8.417 7356 7 356 12507 3.08 22.00 4.00 9.835 9126 9126 21633 4.09 2:,.50 s.50 11.615 11324 5662 37719 5.45 24 00 6.00 12.608 12122 6061 43780 5.89 Storage vs. Stage 50000 45000 — - 1414.1X1935 40000 Y R' = 0.9974 35000 u 30000 - a 25000 `0 20000 15000 10000 5000 0 000 200 4.00 6.00 800 Stage (feet) Ks = 1414.1 b = 1.9360 JUN 13 2017 UNC-W PARKING LOT P11t STORNIWATER n1ANAGEMEN'I' FACILITY D. PERRY, El UNW-16050 Folumce C:ulculution 6/13/2017 TOTAL YOLUA1E OF FACILITY Volume of Main Pool belm� Normal Pool= 2317535 of Volume of Forebav below Normal Pool= 43.780 cf Total Volume Below Nonnal Pool = 275314 cf Total Volume Above Normal Pool= 253,751 of Total Volume of Facility = 529,066 cf FOREBAY PERCENTAGE OF PERMANENT POOL VOLUM Per ACOBO ,6finumun Design Critei ia. the loreMY volume should eyrnd approximolelt 15-20% of1he main pool volume Total Main Pool Volume = 231.535 of Provided Forebav Volume = 43.780 of Provided Forebav Volume %= 18.9% AVERAGE DEPTH OFMAIN POOL - Main Pool Volume at Nonnal Pool = 231.535 of Main Pool Area at Normal Pool = 42.669 sf Average Depth — 5.43 ft rPF �"fIsN 13 2417 BY:------- UNC-W PARKING 1,01 111 1 STORMWATER MANAGEMENT FACILITY D. PERRY, El UNAV-16050 Stnface Area Calculation 6/13/2017 p� ETDCTEI�T101V�B•\SI\`Sl'13111r�R1� —�'_��,,,i � �� Enter the drainage area e•haracteriuies => eR Total drainage area to pond = 33.98 acres Total impervious area to pond = 15.9.3 acres ' 00 Vote The husin must he sled to went ull i nperwous surface runoff etraming info the pond not ju i lhr impervious surface from on -site development. Drainage area = 33.98 acres ,n 46.9%: impervious Estimate the surface area required at pond normal pool elevation => Wet Detention Basins are based on an minimum average depth of 5.0 5.43 Lower Boundary => 40.0 1.83 Site % impen,ious => 46.9 2.19 1.98 Upper Boundary => 50.0 135 Therefore. SA/DA required= 19X Surface area required for main pool at normal pool = 29.254 = 0.67 Surface area provided for main pool at normal pool = 40.364 5.43 feet (Calculated) 6.0 1.39 1.69 1.83 ft2 acres ft' � 13 2011 N� >3v'. uNC-AA PARKING 1-0l•I'rl I STORAINVATER MANAGEMENT FACILITY D. PERRY, El U N W-160S 0 IFO F Calcululiun 6/ 1 3/2017 IDETERaI INATION OF WATER QUALITI' VOLUME Proposed Developmew (11) (R , )(A) 112 where_ WQ, = water quality volume (in acre-0) R, =0.0ST0.009(1) where 1 is percent impervious cover A = area in acres P = rainfall (in inches) Input dam: Total area. A = 20.08 acres Impervious area = 2.03 acres Impervious area = 88538 sf —a 7 `d 7 1,5 Percent impervious cover, 1 = 10.1 :b Rainfall. P = 1.50 inches Calculated values Rv= 0.14 WQV= 0.35 acre-ft 15423 el'. Previously Permilled 1988-2008 If'O v = (P)(R O(A)-1' where. \BQ\, water quality volume (in acre-fi) Rv = 0.05' 0.009(I) where I is percent impervious corer A = area in acres P = rainfall (in inches) Input data: Total area. A = 9.42 acres Imperviousarea = ° acres hnpervious area = 410,2317 ssf Percent impervious cover. I = 100.0 :o Rainfall, P = 1.00 inches Calculated vedues: R\— 0.95 VA'Qv = 0.75 acre-ff = 32477 cf. ` 1UN 13 24!7 gV:� UNC-tr PARK1Nc fur Pll I STORMNYA-I-E12 14ANACEIMEN-1- FACILITY 1). PERRY, El UNVA'-16050 1 VOF Calculution 6/I ;/2017 Previoush, Permitted 2008-2017 I I'O r = (11)(R r ) (d N12 tehere. WQ,= water quality volume (in acre-11) Rv = 0.05+0.0090) where 1 is percent impm ious cover A = area in acres P = rainfall (in inches) Input data: Total area. A = 1.47 acres Impervious area = 1.47 acres lmpervions ar 163.951 sf Percent impervious cover. I = 1000 % Rainfall. P = 1.50 inches Calculated values: R,.= 0.95 \\'QX = 0.17 acre-ft 7594 cf. Other Permits 1988-2008 (1 " Treated) Ilb"O r. = (PICK r•)(A),12 where. \VQ,= water quality volume (in acre-ft) Rv, 0.05+0.009(1) where I is Percent impervious cover A = area in acres P = rainfall (in inches) Input datu: Total area. A = 1.46 acres Impervious area= 1.46 acres 1I11 Impervious area= 63.457 s --a 117$(,t 411957 t 1V Percent impervious cover. I = 100.0 4u Rainfall. P = 1.00 inches Calculated values: R, = 0.95 WQ, = 0.12 acre-ft 5024 cf. = = JU" 13 2011 UNC-W PARKING LOTPII I STORNINVATER NIANAGEN9 ENT FACILIT)" o. PERRY. El U N W -16050 I FO F Colculnlitm 61I ?12017 Other Permits 2008-2017 (1.5 " Trenled) II'O i. __ (P)(R , )(d) 11 where. \VQ,.= water quality voti ire (in acre-fi) R, = 0.05 - 0.(109(I) where I is percent impervious cover A = area in acres P=rainftll (in inches) Input data: Total area. A = 0.28 acres Impervious area= 0.28 acres hnpmr ions area = Percent impervious cover. I = 100.0 "41 Rainfall. P= 1.50 inches Calcuhdect values: R, = 0.95 VA,Q%.= 003 acre-ft )454 cf. Of tWte 1988-2008 WO, = (l')(R t )(1) V ) where_ NVQ, = water quality volume (in acre-ttt) R\ = 0.05+0.009(f) where I is percent impervious cover A = area in acres P = rainfall (in inches) lnput darn: Total area. A = 0.68 acres Imperious area = 0 acres Impervious area= 29.446 sf Percent impervious cover, I = 100.0 gt Rain Fall, P= 1.00 inches Calculated vuhies: R\.= 0.95 WQ\— 0.05 acre-ft = 2331 cf. UNC-%% PwihENa l.o'r rlt 1 S-rOR11Ni'ATER MANAGEMENT EACILI-rY D. PERRY. [l U AV-16050 IFOVC(llculotmn 6/13/2017 Of fcite 2008-2017 WO, = (P)rR,.)(4)'l2 where. \A'Q,.= water quality volume (in acre-fi) R� — 0.05r0.009(1) where I is percent impervious cover .A = area in acres P = rainfall (in inches) Input rlatu: Total area. A = 0.10 acres Impervious area = 0.10 acres Impervious area = 4.193 sf Percent impervious cover. I = I(10. °o Rainfall. P= 1.501 inches Calculated shies: R, = 0.95 \\'Q\ = 0.01 acre-ft 498 cf. Evisting Pre-1988 If Or = (1 JfR, WA) Il2 where. \\'Q,. = water quality' volume (in acre-ft) R, = 0.05+0.009(1) where I is percent impervious cover A = area in acres P=rainfall (in inches) Input data: Total area. A = MO acres Imperviows area = 0.50 acres Impervious area= 4 sfsf Percent impervious cover, I = 100.0 °o Rainfall.P= 1.50 inches Calculated vuhtes: R, = 0.95 WQ� = 0.06 acre-fi _ ?58' cf. JUH 13 Z017 UNC-vv' PARKING 1-of Pl1 l STOkM\YATER 1lANAGEMENT FACILITY D. PERRY. El U N AA'- 16O50 610l' Cnlculal tun 6/ 1 312017 ' -- -- ----- VVQ» 07388 cf. Stage / Storage Pam Ks- 59219 b= 1.043 Zo = 24.00 Total R'Qv = 67388 ef. Calctduted ratites: Depth of A1'Qv in Basin = 1.13 ft = 13.58 inches Elevation- 25.13 fl UNICAV I'ARKINO LOI II l STORMN'VA'llER MANAGEMENT FACILITY D. PERRY. El UNW-16050 TVQV Dratrdou'n Culcula/ion 6/13/2017 DRAWDOWN SIPHON DESIGN D orifice = n orifices = Ks= b= Cd siphon = Normal Pool Elevation= Volume r i? Normal Pool = Orifice Invert = WSEL at Water Qual it} Volume' _ 5 inch 1 59117 1.0436 0.60 24.00 feet 0 cf 2400 feet 25.30 feet NSEL (feel) Vol. Stored (cf) Siphon Floe (cfs) Avg. Flow (cfs) Incr. Vol. (ct) Incr. Time (sec) 25.30 77736 0.685 25.18 70417 0.647 0.666 7319 10990 25.06 63130 0.607 0.627 7287 11625 24.95 55878 0.564 0.585 72s2 12394 24.83 48666 0.517 0.540 7213 13353 24.71 41497 0.465 0.491 7168 14596 24.59 34381 0.408 0.436 7117 16305 24.48 27326 0.340 0.374 7055 18876 24.36 20346 0.241 0290 6979 24029 24.24 13468 0.133 0.187 6879 36781 14.12 6739 0.049 0.091 6729 73804 Drawdown Time = 2.69 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth). the result would be: Average driving head on orifice = 0.364 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.136 sf Q = 0.3960 cfs Dr wdown Time = Volume / Flowrate,/ 86400 (sec/dap) Drawdown Time = 2.27 days �JUN 13 2017 BY:_----- LMW PARKING IMPROVEMEN'f5-PHASE I STORNIWATER MANACENIENT FACILITY" UNW-16050 Anti -Flotation Block Calculations ® \ RISER diVTI-FLOT.4TIONCALCUE4TION Input Data —> Safety Factor: Concrete: Riser: Openings: Safety factor to use = Concrete unit weight = Inside height of Riser = Inside length of our = Inside width of riser = Wall thickness of riser = Base thickness of riser = Base length of riser - Base width of riser = Total Orifice Area = OD of harrel exiting manhole = 511C of drain pipe (if present) _ Trish Rack: Bottom Length = Buttom Width = fop Length = ®) Top Width= Height = Trash Rack water d6piacement = Concrete Present in Riser Structure =_> Total amount ofconcrete' Base of Riser = Riser Walls = Adjust for openings' Opening fur Onfices = Opening for barrel = Opening for drain pipe = Total Concrete present, adjusted for openings = Weight of concrete present = 11 1.15 (recommend I IS or higher) 142.0 PCF 130 feet 4.00 feet 400 feet 6 00 inches 600 mches 5.00 feet 5.00 feet 0.087 SF 30.00 inches 8.0 inches 7 00 feet 7.00 fort 1.00 feet 1,00 feet 200 feet 38.00 CF 1150 CF 11.70 CF 0 04 CF 2.45 CF 0 17 CF 21.527 CF 3,057 IN Note: NC Products lisp unit wL of manhole concrete at 142 PCP H. DEW, El 5/11/2017 i uNW PARKING IMPROVEMENTS PHASF I STORMWATER YIANACEb1ENT FACILITY UNW-16050 AnrrFlotution Block Calculations ®Amount of water displaced by Riser Structure => 1 Displacement by co Displacement by open air i Displacement by t ee Total water displaced by nsedbarrel stru Weight of water dig Calculate tiye of base for riser assembly ==> ncretc= 21 53 CF n riser= 2080 CF It rack = 38 00 CF cmre= 80.33 CF placed= 5,012 lbs ®' nk Length = 8,00 feet Width= 8.00 feet Thickness = 15 inches Concrete Present = 80.00 CF Cheek validity of base as designed => Total Water Displaced= 147.83 CF Total Concrete Present = 89 03 CF Total Water Displaced= 9,224 lbs Total Concrete Present = 12.642 lbs Acrualsafetyfactor— 137 OK Results of design => Bare length = 8.00 feet Base width = 8.00 feet Base Thickness= 15.00 inches CY of concrete total in base= 2.96 CY Concrete unit weight in added base= 142.0 PCF if. D6 W, El 5l11/2017 u 1: E UNW PARKING IMPROVEMENTS - PHASE I STORMWATER MANAGEMENT FACILITY UNW-16050 Anti -Flotation Block Calculations II. CALCULATION FOR RISER ANTI -FLOTATION STEEL Input Data Anti -Floatation Block Length = 8.0 feet Anti -Floatation Block Width = 8 0 feet Anti -Floatation Block Thickness = is inches A,,,,i to Ate, Ratio = 0.0020 (recommend 0 0018 or higher) Cross -Section Calculations— Cross -Section Area" = 10.00 SF Minimum Steel Area Required = 0 020 SF 2.88 SI -Note Assumes a "square"x-sec (L and W same) Rebar Calculations => Bar Size 4 5 6 7 8 Diameter(inchcs) 0500 0625 0.750 0.875 1,000 X-Sec Area (SI)j 0.196 1 0.307 0A42 0,601 0 785 1 Minimum Number of Banj 15 1 10 1 7 1 5 4 Spacing Calculations — Minimum Offset of Rehar them outside of block = 6.0 inches Vertical Clearance brtwcen Rebar Mats = 9.0 inches Maximum Length of Rebar = 7.0 feet Maximum height of Reba Mats = 0.3 feet Number of mats — 2 Bar Size 4 5 6 7 8 Number of Bars each Direction 4 3 2 2 1 Horizontal Spacing (inches O.C.) 28.00 42.00 84.00 84.00 #DIV/01 Total Number of Ban 16 12 8 8 4 "Total Cross -Sectional Area (SI) 3.14 3.68 3.53 4.81 114 H DEW, FI 5/112017 UNC-W PARKING LOT IMPROVEMENTS PHI HYDROLOGIC CALCULATIONS H. DEW, El UNW-16050 Drainage Area to SCM 6/9/2017 I. RATIONAL C VALUES ® TypcolSurf:Icc RationalCValue Impervious I 0.95 _ Wooded __ 0.20 Grassed 0.30 - 11. POST -DEVELOPMENT A. Watershed Breakdown Contributing Surface Area Rational C Value I Area [acres] Impervious Area 0.95 15.89 Wooded Area 0.20 3.58 Grassed Area I 0.30 14.51 Total area = 33.98 acres Weighted "C" Value= 0.59 C*A Value= 20.16 acres i = 1.50 in/hr C *A * i = 30.49 cfs ®%Impervious= 46.8% 1 11 ® Forebay Berm Riprap Weir Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.078 Channel Slope 0.00100 ft/ft Left Side Slope 300 ft/ft (H-V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 10.00 ft Discharge 30.49 ft-Is Results Normal Depth 2.25 ft Flow Area 37.70 ft- Wetted Perimeter 24.23 ft Hydraulic Radius 1.56 ft Top Width 23.50 ft Critical Depth 0.62 ft Critical Slope 0AI132 ft/ft I Velocity 0.81 ft(s ® Velocity Head 0.01 ft Specific Energy 2.26 ft Froude Number 0.11 Flow Type Subcnbcal GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 It Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 2.25 It Critical Depth 0.62 ft Channel Slope 0.00100 ft/ft Bentley Systems, Inc. Bentley FlowMaster Val (SELECTserl" 1) [08.11.01.031 ® 6/912017 9:17:00 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA •1-203-765-1666 Page 1 of 2 ®_ Forebay Berm Riprap Weir GVF Output Data Critical Slope 0.11132 ft/ft J Bentley Systems, Inc. Bentley FlowMaster V81(SELECTseries 1) [08A1.01.03] ® 6/9/2017 9:17:00 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 I ®) •1 Ek Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) SUB-1 Post- 1 Year 1 3.471 742.000 28.93 SUB-2 Post- 1 Year 1 0:3 721.000 6.52 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) POA I Post- 1 Year 1 1.4171 904.0001 3.76 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Wet Pond Post- 1 Year 1 3.789 742.000 3031 (N/A) (N/A) (IN) Wet Pond Post- 1 Year 1 1.41J 904.000 3.76 25.77 2.437 (OUT) UNW-16050 Bentley PondPack V& [08, 11,01,561 D Perry. El 6/9I2017 2 L3 lyr 24hr Downstream Project Description Fnction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.078 Channel Slope 000100 Rift Left Side Slope 2.00 Rift (H'V) Right Side Slope 2.00 Rift (H.V) Bottom Width 7.50 ft Discharge 3.76 ft-Is Results Normal Depth 0.86 ft Flow Area 7.92 ft' Wetted Perimeter 11.34 R Hydraulic Radius 0.70 R Top Width 10.94 R Critical Depth 0.19 R Critical Slope 0.15771 ft/ft Velocity OA7 ft/s Velocty Head 0.00 ft Specific Energy 0.86 It Froude Number 0.10 Flow Type Subcribcal GVF Input Data Downstream Depth 0.00 R Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 000 ft Profile Description Profile Headloss 0.00 R Downstream Velocity Infinity f /s Upstream Velocity Infinity ftts Normal Depth 0.86 R Critical Depth 0.19 ft Channel Slope 000100 ft/ft Bentley Systems, Inc. Bentley FlawMaster V8i (SELECTseries 1) [08.11 01 03] 619/2017 9:28:22 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA ♦1-203-755-1666 Page 1 of 2 iyr 24hr Downstream i GVF Output Data Cnti al Slope 0 15771 iVtt 13 J Bentley Systems, Inc. Bentley FlowMaster V81 (SELECTserles 1) (08.11.01.031 ® 6/9/2017 9:28:22 AM 27 Siemons Company Drive Suite 20D W Watertown, CT 06795 USA-1.203-755.1666 Page 2 of 2 111 1l '1( A 13,E i1�i 5 ® Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ac-ft) SUB-1 Post- 10 Year 10 10.565 741.000 82.30 SUB-2 Post- 10 Year 10 0.801 721.000 13.55 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ac-ft) POA Post- to Year 101 8.953 1 762.0001 54.89 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/S) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Wet Pond Post- 10 Year 10 11.365 741.000 85.56 (N/A) (N/A) (IN) Wet Pond Post- 10 Year 10 8.953 762.000 54.69 26.97 4.219 (OUT) I IsUNW-16050 Bentley PonOPack Vat [08 11,01.56] D. Perry, El 6/9/2017 ® DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project UNCW PARKING IMPROVEMENTS - PHASEI Date 6/9/2017 Project No. IJNW-16050 Designer RAS Outlet ID SWMF Flow, Qio_r, 54.9 cfs Slope, S 1.00 % Pipe Diameter, Do 24 inches Pipe Diameter, Do 2.0 feet Number of pipes I Pipe separation 0 feet Manning's n 0.013 Fienre 8.06.6.1 25 211 15 = 10 5 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (rt) �—'—��a Zone 1 — I—�� Zone from graph above = I 2 Outlet pipe diameter 24 in. Outlet Ilowrate 54.9 cfs Outlet velocity 8.0 ft/sec Material = Class B Length = I2.0 ft. Width = 6.0 ft. Stone diameter = 6 in. Thickness = 22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x_D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 _ Class 1 13 _ _ 22 _ 8 x D(o) 3 x D(o) 4 Class 1 13 _ 22 _ _8 x D(o) 3 x D(o) 5 Class 11 23 27 10 x 1)(0) 3 x O(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 1. Calculations based on NY DOT method - 1 2. Outlet velocity based on full -flow velocity Rip Rap Outlet Protection Design6/9/2017 1-1 STORMWA TER MANAGEMENT FACILITY DESIGN CAL CULA TIONS - FUTURE IMPER VIOUS UNCW - PARKING IMPROVEMENTS PHASE 1 UNW-16050 UNCAV I'ARKING LOI' Pli I STOR11N\'ATER MANAGEMENT FACILITY D. PERRY. El UNW-16050 SSFxn Above F!' - Fulrtre 6/13/2017 (STA—GC-STORAGE FUNCTION — ABOVE \ORNIT1 POOL j A veraee Incremental Accumulated Estimated Contour Contour Contow Contour Stage Contow Stage Area Area Volume Volume NV/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 24.00 0.00 56.489 24.50 0.50 59_1-44 57867 28933 28933 0.50 2500 1.00 60.642 59943 19972 58905 1.00 *Tentp pool elevation" 25.30 130 61.206 60924 182,77 7:162 1 _19 26.00 2.00 63.482 62062 62062 120967 199 27.00 3.00 66.378 64930 64930 185897 3.00 28.00 4.00 69.331 67855 67855 253751 4.04 Storage vs. Stage 300000 250000 - y = 59117x' 036 R' = 0.9999 200000 LL U m 150000 A O w 100000 50000 0 0.00 1 00 200 300 4 00 500 Stage (feet) K,= 59117 b= 1.0436 1 - -�� E IVEP a i JUN 13 2017 BY. UNCAV PARKING 1_0I'll I t STORMWATER MANAGEMENT FACILITY D. PERRY, GI UN W-16050 SSF.cn klain Pool - Furure 6/13/2017 (STAGE -STORAGE PUNCTIOI\ MAU POOL A\erase Incremental Estimated Accumulated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (S1=) (SF) (CF) (Cl:) (feet) 17.00 0.00 14.930 Sediment Storage 18.00 1.00 27.115 26023 26023 260^_3 1.02 20.00 3.00 31688 29402 58803 84826 2.91 22.00 5.00 36577 34133 68265 153091 4.93 23.00 6.00 39.075 37826 37826 190917 6.00 23.50 6.50 40,364 39720 19860 210776 6.56 24.00 7.00 42.669 41517 20758 231535 7.13 `surface area and volume used for ave. depth calculation Storage vs. Stage 250000 200000 Y = 25591 x! 1211 R' = 0 9994 U 150000 m m 0 100000 y 50000 0 000 200 4.00 6.00 8.00 Stage (feet) Ks = 25i91 b= 1.1211 SUN 13 2�i1 ar:�— UN&W PARKING I.o'rPo11 STORD7WATER IAIANAGF..NIENT FACILII'N' D. PERRY. El UNW-16050 SS!•kn Forehuc - Flow 6/13/2017 iSTAGE-STORAGE (UNCTION - FOREBAY A�-ertee Ina-emenial Accumulated Estimatcd Contour Contour Contour Contour Stage Contour Stage Area ,Area Volume Volume �e/ S-S Fxn (feet) (feet) (SF) (SF) (CI') (CF) (feet) 1900 -1.00 1.312 Sediment Slot a�_e 19.00 0.00 4.009 20.00 2.00 6.294 5152 5152 5152 1.95 21 00 3 00 8 417 7356 7356 12507 3.08 22.00 4.00 9.835 9126 9126 21633 4.09 23.00 5.00 11.013 10424 10414 32057 5.01 23.50 5.50 11.635 11324 5662 37719 5.45 )4.00 6.00 12.608 Jill? 6061 43780 5.89 50000 45000 40000 35000 c 30000 25000 m `0 20000 w 15000 10000 5000 0 Storage vs. Stage y = 1414.1 x' 935 R' = 0 9974 1 000 200 4.00 8.00 800 Stage (feet) 6s = 1414.1 b = 1.9360 .1 JUN 13 2017 UNC-w PARKING Lo'l I'll I STORM WATER MANAGEMENT FACILITY UNN'-16050 Volume Culcularion - Future 1TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 231.53,5 of Volume of Forebav below Normal Pool= 43.780 cf Total Volume Below Nonnal Pool = 275,314 cf Total Volume Above Normal Pool= 253.751 cf Total volume of Facility = 529,066 cf Per ACDLO ,Llinimum Design Ci iterio, the forebgY volume should equal approsimolelj- 15-201, o0he main pool rohone Total Main Pool Volume = 231.535 of Provided Forebav Volume = 43.780 of Provided Forebav Volume `5u= 18.9% AVERAGE DEPTH OF MAIN POOL Main Pool Volume at Nonnal Pool = 231.535 cf Main Pool Area at Normal Pool = 42.669 sf A vei age Depth = 5.43 ft D. PERRY, Fl 6/13/2017 cEN! . JUN 13 2017 UNC-w PARKINO LOI' 'lI I STORtNIWATER MANAGED7EN'T FACILITY D. PERRY, 1.1 UN\1"-16050 Surfilce Area Calculevion - Future 6/I3/2017 l4 F DETENTION BASIN SUINUMARI - Enter the drainage area c•huracteri.stics _> Total drainage area to pond = 33.98 acres Total impervious area to pond = 17.88 acres Now The husin nual he sited to treat u[7 itnpervrmrs suriucc runof%'draining into due pond, not just the impervious suu jbe from ota-rile d We1Opment Drainage area= 33.98 acres a. 52.6% impervious Estimate the surface area required at pond normal pool elevation => Wet Detention Basins are based on an minimum average depth of = 5.43 feet (Calculated) 5.0 5.43 6.0 Low'et'Boundarv=> 50.0 2.35 L83 Site % impervious => 52.6 2.46 Z24 1.94 tipper Boundaq, => 60.0 2.78 2.26 Therefore. SA/D.A required Surface area required for stain pool at normal pool = 31168 ft2 = 0.76 acres Surface area provided for main pool at normal pool = 40,364 ft- NCDEQ Stormw5ter BMP Manual Table_ 2_ Coustal_SA/DA Table (Adapted from Driscoll, 1986) 3 4. 5' 6 7 8 0 0.78 0.61 0.44 , - . 0 0' 0, 20 :: _ 1.48 - 1.04 0.87 0.7 0.52 40 2 96 _ ° 6 1 33'-- 119. 0.96 0.78 - - 2 87 2 35 . 1 33" f31 '0:96 60 435 2.26 1°.7d 1.13 . - 70 _; 5 21 3 92 :-:� _2781F` 3 21 _'- 42:9T- -t9.83' .131- 80 -' -5.92- -1 51" ` - �.65 -°- - _ s_ 2.78 - :=.11 9- '1.57 . - - - _ _ _ 90 6 53_ _ _ 5.05-) _ 4 18% 396- ?:4 - I'74 ' 100 -' 7.13 5.92: . ` " 4.87:-' 3.83- - 2.78 1.83 JUG 13 2017 ' gY:-.. UnC-W PARKING Lon'll I sTORMWATER MANAGEMENT FACILITY UN'\V-I6050 IYDPCulcuhnion - Fwtwe jDE'PER:\11\AT10\ OF WA"I'ER QUALITI' VOLU,NIE Proposed Development 0'0 11 _ W)IR I )GUiI ) where \VQ,-=water quality volume tin acre -fit) R, = 0.05-0.009{I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area. A = Impervious area = Impervious area = Percent imper sous cover, I = Rainfall. P = Calculated values: R, _ \VQ1 Previously Permitted 1988-2008 110, = IP)(R r)(A)%12 where. 13.13 acres 2.03 acres 38 si' —�, 7?n15 4-1M3 11.2 °u 1.50 inches 0.15 0,34 acre-ft 14897 cf. \V0v = water quality volume (in acre-ft) R,. = 0.05-0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area. A = 9.42 acres Impervious area= 9.42 acres Impervious area = 410.231 s Percent impervious cover: I = 100.0 °ro Rainfall. P= 1.00 inches Calculated valuev R, = 0.95 N'Q, = 0 75 acre-ft 32477 cf. D. PERRY, [I 6/1 3/2017 SUN � g 2p11 uNC-vv1'ARKINGL0f1'llI STORiA1WATERDlANAGEIVIEN'CEACILITY UNW-16050 11'QV Ca/Culutiutt - Furure Previoush, Permitted 2008-2017 IPq1, =W)(R,)6W12 where. VVQ,-= water quality volume (in acre-ft) R, =0.05-0.009(1) where I is percent impervious cover A = area in acres P = rainfall (in inches) Grput data: Total area. A = 1.47 acres Impervious area = 1.47 acres Impervious area = 63.95I sf Percent impervious cover. I = 00.0 46 Rainfall. P = ISO inches Calculated values: R, = 0.95 WQv= 0.17 acre -It 7594 cf. Other Permits 1988-2008 (1 " Treated) II"Oi=(P)(H],)(A)%12 \s here. WQ, = water quality volume (in acre-ft) Rv= 0.05-0.0090) where I is percent impervious cover A = area in awes P = rainfall (in inches) Input datu: Total area. A Impervious area= Impervious area = Percent imperious cover. I = Rainfall. P= Calculated ralues: Rs = \VQ, _ 1.46 acres 1.46 acres 6_.457 sr —�, 19786 4 y1857 + 1-911 100.0 % 1.00 inches 0.95 0.12 acre-ft 5024 cf. D. PERK) . El 6/1 :/2017 �U� 13 2911 UNC-W PARKING I_01' 19I I STORNINYATER N1ANAGE111ENT FACILITY D. PERRY. Ef GT N W-16050 11'Q l% Culculu/ion - /• ul urn 6/ 13/2017 Other Permits 2008-2017 (1.5" Treatert) IF(), =(p)(Rt )GU'12 where. WQ, — water quality volume (in acre-fi) Rr =0.05T0.009(1) r+here I is percent impervious cover A — area in acres P = rainfall (in inches) Input data: Total area. rA = U-8 acres Impervious area = 0.28 acres Impervious area = 12;142 sf Percent impervious cover. I = 100.0 9^u Rainfall. P = 1.50 inches Calculated vahies: R,= OAS WQv= 0.03 acre-ft = 1454 cf. Ojfsite 1988-2008 ItO1 _(1�(Rt)GU72 where. \N Qv� water quality volume (in acre-ft) Rv = 0.05-0.001)(1) there I is percent impervious cover A = area in acres P = rainfall (in inches) Mpw data: Total area. A = 0.68 acres Impervious area = 0.68 acres Impervious area= 29.44G sf Percent impervious cover,) = 100.0 "6 Rainfall. P= 1.00 inches Calculated ralu es: R,= 0.95 \VQ� = 0.05 acre-ft ^_.331 cf. T t UNC-P' PARKING l.0'f I'll I STOIZ.N9 WATER 1l4ANACENIENT FACIL%TI' U. PERKY. EI U,N Vv -16050 l i'O P C�ticalulknv -Future 6/ 1 :/2017 Offvite 2008-2017 WO, . = (1' tl?i-)(4)11' where. \\'Q\, Nvater quality volume (in ane-fi) Rv= 0.05-0.009(1) where I is percent unpervious cover A = area in acres P = rainfall (in inches) Input Aura: Total area, A = 0.10 acres Impervious area= 0.10 acres Impervious area = 4.193 sf Percent impervious cover. I = 100.0 44, Rainfall. P = 1.50 inches Calculated slurs: Rv = 0.95 VA'Qv= 0.01 acre-fr 498 cf. Evisting Pre-1988 where. WQ,= water quality volume (in acre-ft) R,=0.05-0.009(1) where I is percent impervious cover A = area in acres 1' = rainfall (in inches) Input data: Total area. A = OA acres Impervious area = 0.50 acres Impervious area= 21.744 sf Percent impervious cover. I = 100. :u Rainfall. P= IA inches Calculated values: Rv= 0.95 WQ\. = 0.06 acre-ft = 2582 cf. IVA 13 2fl11 UNC-tc PARKIN6 utf I'll I STOI2�7WATER NIANACEMENT FACILITI' D. PERRY, El UNW-16050 It'nPCulcaludon -Future 6/1 ,,'2017 Future Impervious IPO,. = (P)(R, )(i)'1_' where WQ, = water quality volume (in acre-li) R,= 0.05.0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input da[a: Total area. A = 1 95 acres Impmiousarea = 5 acres Impervious area = S5.000 acre Percent impervious cover. I = 100.0 °41 Rainfall.P= 150 inches Calculated ratites: R, = 0.95 11'Qv— 0.23 acre-ft 10094 cf. ASSOCIATED DEPTH IN POND —� WQ,.= 76950 cf. Slage I Storuge Data: Ks= 59219 b - 1.043 Zo = 24.00 Total WQv = 76950 cf. Calculated ralaes: Depth of WQv in Basin = 1.29 ft 15.43 inches Elevation = 25.29 ft UNC-W PARKING LOTHI I STOR—NIN'ATEIZ MANAGEMENT FACILITI' D. PERRY -El UNW-16050 JJ 0I,' DrrnrdoTn Colcula/ion - Fature 6/13/2017 DRA VDOWN SIPHON DESIGN D orifice = k orifices = Ks = b= Cd siphon = Normal Pool Elevation = Volume (d N�onnal Pool = JOrifice Invert = WSEL at Water Quality Volume' = 5 inch 1 S9117 1.0436 0.60 24.00 feet 0 of 24.00 feet 2530 feet \VSEL (feet) Vol. Stored (Cr) Siphon Flow (cfs) Avf;. Floc (Cl's) Incr. Vol. (CI) Incr. Time (see) 2530 77736 0.685 25.18 70523 0.648 0.666 7214 10828 25.07 63340 0.608 0.628 7183 1144, 24.95 56191 0.565 0587 7149 12185 24.84 49080 0520 0.543 7111 13107 24.72 42012 0.469 0.494 7068 14295 24.61 34993 0.413 0.441 7019 15912 24.49 28034 0.347 0.380 6960 18309 24.,7 21146 0.255 0.301 6888 21881 24.26 14352 0.146 0.200 6794 33925 24.14 7695 0.060 0.103 6657 64812 Drawdown Time = 2.52 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.364 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.136 sf Q= 03960 efs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Dramdown Time = 2.27 days jo 13 2017 � J i• UNC-W PARKING LOT IMPROVEMEM'S PHI HYDROLOGIC CALCULATIONS UNW-16050 Drainage Arco to SCM- Future I. RATIONAL C VALUES Type of Surface I Rational C Value Impervious ' 0.95 _ Wooded 0.20 Grasseddrassed 1 0.30 D. POST -DEVELOPMENT A. Watershed Breakdown Contributing Surface I Rational C Value Area Iacresl Area Impervious Area 0.951 17.84 Wooded Area 0.20 3.58 Grassed Area I 0.30 12.56 Total area = 33.98 acres Weighted "C" Value = 0.63 C*A Value= 21A3 acres i = 1.50 in/hr C*A*i= 32.41 cfs % Impervious = 52.5% H. DEW, El 6/9/2017 ® Project Description Forebay Berm Riprap Weir - Future Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.078 Channel Slope 000100 fUR i Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 10.00 ft Discharge 32.41 ft /s Results Normal Depth 2.32 ft Flow Area 39.40 V Wetted Perimeter 24.69 ft Hydraulic Radius 160 ft Top Width 23.93 It Critical Depth 0,64 It Critical Slope 0A1013 ft/ft Velocity 0 ft/s I ® Velocity Head 01 001 ft Specific Energy 2.33 ft Froude Number 0.11 Flow Type Subcntical GVF Input Data Downstream Depth 000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity f fs Upstream Velocity Infinity fVs Normal Depth 232 ft Critical Depth 0.64 ft Channel Slope 0.00100 Wit Bentley Systems, Inc. Bentley FlowMaster Val (SELECTseries 11 (08.11.01.03) ® 6/1/1017 10:17:33 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-765-1666 Page 1 of 2 01 GVF Output Data Forebay Berm Riprap Weir - Future Critical Slope 0 11013 WIN: Bentley Systems, Inc. Bentley FlowMaster V61 (SELECTserles 1) (08.11.01.031 ®' 6I9t2017 10:17:33 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA .1-203-755-1666 Page 2 of 2 08� ® Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Event Volume (min) years) (ac-ft) 1 3.993 741.000 Peak Flow (ft3/s) SUB-2 I Post- 1 Year 1 0.318 721.0001 6.521 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/e) (years) (ac-ft) POA Post- 1 Year 11 1.9371 807.000 1 5.23 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Wet Pond Post- 1 Year 1 4.310 741.000 35.62 (N/A) (N/A) (IN) Wet Pond Post- 1 Year 1 1.937 807.000 5.23 25.79 2.474 (OUT) 1 ® UNW-16050 Bentley Pond Pack VBi 108 11 01 561 D Perry, El W912017 ® 1yr 24hr Downstream Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.078 Channel Slope 0.00100 ft/ft Left Side Slope 200 Wit (H:V) Right Side Slope 200 8/ft (H V) Bottom Width 7.50 It Discharge 5.23 ft-Is Results Normal Depth 1.04 it Flow Area 9.93 ft' jWetted Perimeter 12.14 it Hydraulic Radius 0.82 H Top Width 11.65 ft i Critical Depth 0.24 it Critical Slope 0 14773 tuft Velocity 0.53 ft/s ® Velocity Head 000 It Specific Energy 1.04 It Froude Number 0.10 Flow Type Subcritical GVF Input Data Downstream Depth 000 ft Length 0.00 it Number Of Steps 0 GVF Output Data Upstream Depth 0.00 it Profile Description Profile Headloss 0.00 1t Downstream Velocity Infinity ft/s Upstream Velocity Infinity Ills Normal Depth 1,04 ft Critical Depth 0.24 it Channel Slope 0.00100 ft/ft Bentley Systems, Inc. Bentley FlowMaster V81 (SELECTseries 1) [08.11.01.031 ® W12017 10:15:28 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA .1403-755-1666 Page 1 of 2 01 GVF Output Data 1yr 24hr Downstream Critical Slope 0.14773 " Bentley Systems, Inc. Bentley FlowMaster V8i (SELECTserles 1) [08.11 0/.03] ® 6/9/2017 10:15:28 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA *1-203.766.1666 Page 2 of 2 n Li U] 1 cA l)A N/t Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) SUB-2 Post- 10 Year 101 0.8011 721.0001 13.551 Node Summary Label Scenario Return Hydmgraph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) POA Post- 10 Year 1 101 9.8241 758.000 1 7765.121 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/5) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Wet Pond Post- 10 Year 10 12.238 741.000 92.52 (N/A) (N/A) (IN) Wet Pond Post- 10 Year 10 9.824 758.000 65.12 27.05 4,344 (OUT) I ® UNW-16050 Bentley PondPack V8i I08 11.01 561 D, Perry. El 6/9/2017 r] DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project UNCW PARKING IMPROVEMF.N'I'S-PI IASE I Date 6/9/2017 Project No. UNW-16050 Designer RAS Outlet ID SWMF- FUTURE Flow, Qle_r, 65.1 cfs Slope, S 1.00 % Pipe Diameter, D. 24 inches Pipe Diameter, Do 2.0 feet Number of pipes 1 Pipe separation 0 feet Manning's n 0.013 Fieure R.11(.b.l 25 20 N IS T = 10 > 5 zone I 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (R) %Ane l Zone from graph above = 2 Outlet pipe diameter 24 in. Length = 12.0 ft. Outlet tlowrate 65.1 cfs Width = 6.0 ft. Outlet velocity 8.0 ft/sec Slone diameter = 6 in. Material = Class B Thickness = 22 in. Zone Material Diameter Thickness Length I Width I Class A _ _ _ 3 _ _ _ 9 _ _ 4 x D(o) 3 x Ole) 2 Class U 6 22 6 x D(o) 3 x D(o) 3 Class 1 _ 13 _ 22 8 x D(o) 3 x D(o) _ 4 _ _ Cl ass 1 13 22 8 x D(o) 3 x 1)(0) 5 Class If 23 27 10 x D(o) 3 x D(o) 6 Class II 23 27 10 x D(o) 3 x D(o) 7 Special study required _ 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manua 2. Outlet velocity based on full -Flow velocity Rip Rap Outlet Protection Design - Puture6/9/2017 Energy. Mineral & Land Resources ENVIRONMENTAL QUALITY May 19, 2017 ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director Vice Chancellor for Business Affairs UNC Wilmington c/o Mark Morgan, Associate Vice Chancellor for Business Affairs -Facilities 601 S. College Rd. Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 970128 UNCW Wilmington New Hanover County Dear Mr. Morgan: The Wilmington Regional Office received and accepted a modified Express State Stormwater Management Permit Application for the subject project on May 12, 2017. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. 15A NCAC 0211.1042(2)(a)(i): Please confirm the project name desired to describe this project area listed in Section 1.1 of the application. Previously, this project name was "UNCNN' Honors, International, and Privatized Housing." The recently submitted application lists the project name as "Parking Lot Improvements Phase I." Recommendation: The project name should be descriptive of the entire areas the project encompasses. ✓2 15A NCAC 0211.1003(1) and .1042(2): a. Please confirm that the percent of impervious area draining to the pond presented in Attachment A, the supplement, and calculations are consistent with the intended design. For instance, Attachment A and the supplement identify this drainage area as having 58% impervious area while the calculations indicate it has 47%. b. Recommendation: Include a future allocation for contingencies and increased flexibility if future development is desired within the delineated drainage area. V 3. 15A NCAC 0214.1042(2)(g)(ii) Please provide dimensioned project or project phase boundary with bearings and distances. ✓4. 15A NCAC 021-1.1042(2)(g)(vii): Please provide the details of the Stormwater collection system, including the inverts of the piped collection system on plan sheet C-12 Or a citation of where this information can be located within the provided plan set. 5. 15A NCAC 0214.1042(h): Please provide a cross-section view of the wet pond that includes the sub -items of this section of the rule. 4�10 CA 6. 15A NCAC 021-1.1042(2)(h)(ii) and .1053(3): The forebay bottom eleva ion is set at 19 ft with a sediment accumulation elevation of either 19.5 ft or 20 ft (refer to Item . The invert of the forebay inlet appears to be set at an elevation of 19.17 ft, which would be located within this sediment removal elevation. Please confirm the intended design and ensure that any sediment accumulation will not impede the water from entering the system and that the system can still be operated and maintained as outlined in the signed operation and maintenance agreement. State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources N5lmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 9107%7215 State Stormwater Permit No. S W8 970128 Page 2 of 3 I' 1-7. 15A NCAC 021-I.1042(3)(b): Please provide the following information to support the intended design: Vii— Please adjust the number of decimals shown on the supplement to correctly display the intended design. For instance, the supplement indicates the bottom elevation of the vegetated shelf will be 24 ft, however the other application documents indicate this will be 23.5 ft.. ,Vlelevation b. Under the "compliance with the applicable stormwater program" section of the supplement, please identify the stormwater program that applies to this project. Based on the permitting history and proposed changes, this review assumed the built -upon area is subject to the 1995 rules, Session Law 2006-246, Session Law 2008-211, and the 2017 rules while the SCM is subject to the 2017 rules. Please identify the surface area at the temporary pool elevation in the calculations. ✓8. 15A NCAC 021-I.1053(1): Please note that the required surface area determined from the SA/DA ratio is only for the main pool and does not include the forebay. On the Wet Detention Basin Summary page of the calculations, the provided surface area appears to be associated with both the main pool and forebay. Please identify the surface area provided only in the main pool at the permanent pool elevation to demonstrate that the minimum requirements have been met. �7 9. 15A \CAC 021-1.1053(2): The average depth calculation appears to use Equation 2 on page 8 of Chapter C-3. However, Equation 2 includes the vegetated shelf and requires the full permanent pool volume and surface area to be used to determine the average depth. If it desired to exclude the submerged potion of the vegetated shelf from the average depth calculation, Equation 3 on page 8 in Chapter C-3 should be used. Please reconsider the average depth calculation 10. 15A NCAC 021-1.1053(3): The operation and maintenance agreement indicates the sediment removal elevation in the forebay has been set at 19.5, however the calculations appear to indicate it has been set at an elevation of 20. Please confirm the sediment removal elevation of the forebay is presented consistently and accurately. 1 1. 15A NCAC 021-I.1053(5) and Chapter A-4 of the NC Design Manual: The forebay section of Chapter A-4 on page 10 recommends that the forebay weir can be set as low as (but not exceed) 1 foot. Plan sheet SW-1 appears to suggest that the forebay weir will be set 2 feet below the permanent pool surface. Please reconsider the elevation of the weir and demonstrate that flow of water through the weir will be at a nonerosive velocity 12. 15A NCAC 02I-1.1053(7): The outlet structure detail on plan sheet SW-2 appears to indicate that the next available outlet is set at 25.30 ft while the identified temporary pool elevation is set at 25.11 ft. The hydraulics of any additional capacities should be considered when calculating the drawdown rate. Please reconsider the drawdown of the minimum required storage based on the entire provided head. !I3. 15A NCAC 02H.1053(8): Please demonstrate that the pond discharge from the 1-year, 24-hour storm minimizes hydrologic impacts to the receiving channel and nearby stream. 14. Due to the potentially minor nature of these comments, the express additional information review fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May 31, 2017, or the application will be returned as incomplete. If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review dale and will need to resubmit all of the required items at that time, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the email address or fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information, which shall be no later than 5 business days past the original due date. State of North Carolina I Environmental Quality I Energy. Mineral and land Resources Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, NC 2S405 910 796 7215 State Stormwater Permit No SW8 970128 Page 3 of 3 V The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation ofNCGS 143-215.1 and is subject to enforcement action pursuant to \CGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at christine_ha11@ncdenr.gov. S incerclx , WA Christine Hall Environmental Engineer GDS/canh: A\\Stormwater\Permits & Projects\1997\970128 1ID\2017 05 addinfo 970128 cc : Cory George, N4cAdams Galin Jamison, UNCW Wilmington Regional Office Stormwater File State of North Carolina I Envnonmemai Quality I Energy. Mineral and Land Resources v ilmingtun Regional Office 1127 Cardinal Drive Extension I Nilmington,NC 28405 910 796 7215 i Hall, Christine From: Hall, Christine Sent: Friday, May 19, 2017 4:59 PM To: George, Cory (george@mcadamsco.com), Galin Jamison (jaimsong@uncw.edu) Cc: Weaver, Cameron Subject: request for additional info - SW8 970128 Attachments: 2017 05 addinfo 970128.pdf Gentlemen, Attached is a pdf of the request for additional information for the subject project. Please let me know if you have any questions or concerns. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Nothing Compares... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. x0o w\ C5 . North Carolina Department of Environmental Quality Request for Express Permit Review Feroeeueeowr �II Remexer sut l a rime CoY= FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a?ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leengncdenr.gov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107; marcia.allocco(a)_ncdenrgov • Washington Region -Lyn Hardison 252-948-3842 or lyn.hardison cimcdenrgov • Wilmington Region -Cameron Weaver 910-795-7303orcameron.weaveK&ncdenr.gov NOTE Project application received after 12 noon will be stamped in the following work day Project Name UNC-W PARKING IMPROVEMENTS- PHASE 1 County NEW HANOVER Applicant: MARK MORGAN Company UNC-Wilmington Address: 601 S COLLEGE ROAD City. WILMINGTON, Stale NC Zip 28403- Phone 910-962-7743, Fax 910-962-7140, Email morganm@uncwedu Ph sical Location UNCW MAIN CAMPUS - ADJACENT TO WAGONER DINING HALL SW 8970128 SW_ SW _ NPDES NPDES wQ wQ _ E&S _ E&S _ Other Y Project Drains into BRADLEY CREEK waters - Water classification SC HQ W (DWR Surface Water Classifications Map) Project Located in WHITE OAK River Basin Is project draining to class ORW waters? NO, within % mile and draining to class SA waters NO. or within 1 mile and draining to class HOW waters? YES Engineer/Consultant CORY GEORGE PE PLS Company MCADAMS Address 2905 MERIDIAN PARKWAY City DURHAM, State NC Zip: 27713- Phone 919-361-5000, Fax 919-361-2269, Email eg orge@mcadamsco com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE S_ #_JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermitteni/Perennial Determination _ It of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear If or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac ❑ Bkhd & Bl Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ It Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑i MOD:Z Major ElMinor ❑ Plan Revision ❑ Redev. Exclusion SW 8970128 (PromdePevnd tt) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 8 acres to be disturbed (CK # & Amt (for DEQ use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts ® No ❑ YES _acre(s) Wetlands Delineation -has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No I of DEO use onlv Faa Snht for mnlfinla norm itc /Cher4 t1 1 Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA S I Variance (❑ Mai; ❑Min) S SW (❑ HE, ❑ LID, ❑ Gen) S 401: S LQS S Stream Deter,_ S NCDEQ EXPRESS March 2016 GNC-WV — Parking Improvements — Phase I NC DEQ Express Review Narrative General Deserintion The proposed parking improvements will consist of two parts, first an approximate 80 space expansion to the existing parking lot known as Lot EE, on the north side of Wagoner Dining Hall. Second, a new 150 ± space parking lot on the south side of Wagoner Dining Hall. "these new parking spaces will replace the existing spaces being lost by the new Allied Health Building, recently passed with the CONINEC7:NC Bond. As proposed we will drain both Tots into the existing regional stormwater pond (SNV8 970128). This pond, as designed, cannot accommodate the additional proposed impervious. Therefore, we will be proposing a major modification plan to the existing detention pond to allow for the additional capacity, to fix problems with the pond as it exists, and to bring up to current 2017 design criteria. The project is located within the White Oak River Basin, with stormwater runoff from the proposed project draining to Bradley Creek. According to the -N.C. Division of Water Quality BasinAVide Information Management System (BIMS), the waterway is classified as SC; I-IQW at this location. Discussion ofPr000sed Stormwater Management Stormwater onsite will be handled with the to be modified existing stormwater pond. Existing and proposed conveyances will be used to route runoff from the parking lots to the existing pond. The pond will be modified to meet current 2017 MDC criteria and expanded for current and future impervious. Discussion of Proposed Erosion Control Erosion control on each of the parking lot areas will be handled with silt fence, silt fence outlets, inlet protection, and sediment basin if disturbance requires. The existing pond will not be used for erosion control as other stabilized areas on campus will continue to drain to the pond. All erosion control measures will take place upstream of the pond, including the new conveyance which will be protected by inlet protection at the end of each days work. 3111/2017 Google Maps Got gle Maps UNC Wilmington Parking Improvements - Phase 1 i.. r ScahpvA l wdm90 QLot SS University of.,,` North,Carolina aci�e,�,•3� c` Wilmington•:�C` r 3 p^ � } t cohnw9 Sk villas u 'UNCW Studem U m � Reka Girid r � � , ' nP Q Rcrrmbon Contcr , '2 Lot F..FQ Pine ri.is L>{ �2a; o;. % Gougie "�mt;rce lik .a 5'a Y _� - .I ,. A.. ,r st tc VrvPI iF ,Z .'j r l �o 4U i �C1 4 JJD v. ,Ci Cau' fb. 4 F a !� c �n rTl V J a' 0- b. W;� Hn gnaoo�.FRct ,r; Map data @2017 Google 500 (t hops/Av google com/maps/@342231913,-77.8646322,16zohl=en Weaver, Cameron From: George, Cory <george@mcadamsco.com> Sent: Saturday, March 11, 2017 12:40 PM To: Weaver, Cameron Subject: UNCW Express Request Attachments: 2017-03-11 UNW-16050 - Express Narrative.pdf, 2017-03-11 UNW-16050 REQUEST FOR EXPRESS form FINAL.pdf, Vicinity Map.pdf, 2017-1-4 Illustrative Parking Layout 1A.pdf, 2017-1-4Illustrative Parking Layout 1B.pdf Cameron, Hope you are doing well. I have another express review I would like to get setup. We are requesting a combined erosion control and stormwater review for some proposed parking improvements. Please give me a call when you get a chance to review. Looks like you guys are scheduling near the end of April right now, so that should fit in our schedule. Thanks, Cory Cory George, PE, PLS I Project Manager, Institutional 2905 Meridian Parkway I Durham, NC 27713 Office. 919.361.5000 x 218 Direct: 919.287.0862 Mobile. 919.971 5619 McAdamsCo.com 1111 =J McADAMS Designing Tomorrow's Infrastructure & Communities Hall, Christine From: George, Cory <george@mcadamsco com> Sent: Monday, March 13, 2017 4:09 PM To: Hall, Christine Cc: Weaver, Cameron Subject: RE: UNCW parking improvements Right now, the goal is to design a new conveyance that gets water from 1B to big pond in the back. That makes the most sense to combine the stormwater. We have run a preliminary profile of the new conveyance that appears to miss all the gravity utilities, but we haven't completed the vacuum extraction on the handful of dry utilities (duct bank, gas etc) to prove it for sure. I know the exhibit shows a bmp associated with 113, but we are planning to use the existing pond for both lots, please ignore. Thanks! Cory From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Monday, March 13, 2017 3:50 PM To: George, Cory <george@mcadamsco.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: UNCW parking improvements Cory, Cameron brought me the express request for the subject project. One question — there is a "stormwater device" identified near Parking Lot 1B. The narrative doesn't mention a second device. Can you confirm? Thanks, Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall()ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 Nothing Compares. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties d I I I 1 I 11 if I U SI op1 , For DENR Use ONLY CReviewer IIA •�,FA North Carolina Department of Environment and ��/ a Natural Resources NCDENR Request for Express Permit Review Tim Confrrn FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville & Mooresville Regions - Alison Davidson 828-296-4698; alison.davidson(g)ncdenr.gov • Fayetteville, Raleigh or Winston-Salem Regions - David Lee 919-791-4203;david.leea(�ncdenr.gov • Washington Region - Lyn Hardison 252-948-3842; Iyn.hardison(@ncdenr.gov • Wilmington Region - Cameron Weaver 910-796-7303; cameron.weaveq@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: UNCW - LOT FF EXPANSION County: NEW HANOVER Applicant MARK MORGAN Company UNCW Address 601 SOUTH COLLEGE RD City WILMINGTON, State: NC Zip: 28403-_ Phone: 910-962-7743, Fax: 910-962-7140, Email MORGANM@UNCW EDU Physical Location:MAIN CAMPUS Project Drains into BRADLEY CREEK waters -Water classification SC HQ W (for classification see - SW _ SW NPDES _ NPDES WO _ WQ E&S _ E&S _ Other 1 hftp://portal.ncdenr.org/web/wq/ps/cs /classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within y: mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: CORY GEORGE Company: MCADAMS Address: 2905 MERIDIAN PARKWAY City. DURHAM, State: NC Zip: 27713- Phone 919-361-5000, Fax: 919-361-2269, Email: GEORGE@MCADAMSCO.COM PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $_ #_ JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY _®_Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: REC D APR 2 8 2016 SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ' ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _# Treatment Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _# Treatment Systems /❑ MOD ❑ Major ElMinor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit4) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed. ❑ Yes ® No Received from US ACOE ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit For DF.NR use onh Fee Solit for mul0ole oermits:(Check q 1 Total Fee Amount$ SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LDS $ Stream Deter,_ $ NCDENR EXPRESS January 2014 UNCW — Lot FF Expansion Stormwater Management Narrative General Description Located on Cahill Drive, adjacent to Wagoner Hall on the main campus of the University of North Carolina and Wilmington is the proposed project known as Lot FF Expansion. This project will consist of the addition of approximately 80 parking spaces directly adjacent to the existing Lot FF. The added parking will aide in the increased parking demand in the vicinity of Wagoner Dining Hall. This project will be located inside the drainage area and permit boundary of SW8 970128. We anticipate a major modification to this permit as a part of this project. The project is located within the White Oak River Basin, with stormwater runoff from the proposed project draining to the existing BMP from SW8 970128 ultimately draining to Bradley Creek. According to the N.C. Division of Water Quality BasinWide Information Management System (BIMS), the waterway is classified as SC; HQW at this location. Discussion of Proposed Stormwater Managemenl Stormwater on this site will drain to and be treated by the existing Stormwater BMP. Discussion of Proposed Erosion Control Erosion control on this site is anticipated to be silt fence and silt fence outlets. Any inlets, either existing or proposed will be protected with inlet protection along with other requirements necessary for compliance with an approved erosion control permit. N A UNCW - LOT FF EXPANSION 0 1,500 3,000 6,000 Feet 1 inch = 3,000 feet VICINITY MAP �I PROJECT #: FOR-16185 WILMINGTON, NORTH CAROLINA MCADAMS %: o cta FOR 2OI6 FOR NuTE FOR-161M Lot FF E a Lmd WM-E1.E , 4 26 2016 9:":� M, O r e, Cn reascr No. FOR-16185 Lot FF Ex ansion Site WUMhVbOa, North Carolina 11 �a�� MC "> AW ww�mo�anu OM ~':'' wo :7 FOR16185—E1 snLe: N.T.S. °"18t 2016-04-28 nova �o��� L �1'� � / d