Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8950834_HISTORICAL FILE_19960403
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 015083Lt DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS D ] HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE \g0140iO3 YYYYMMDD State of North Carolina Department of Environment, LT. FAA Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor p E H N F1 Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director April 3, 1996 Mr. G. Wayne Kinser. President Peppertree Resorts, LTD Post Office Box 6319 Asheville, North Carolina 28816 Subject: Permit No. SW8 950834 Peppertree Villas III High Density Stormwater Project Carteret County Dear Mr. Kinser: The Wilmington Regional Office received the Stormwater Application for Peppertree Villas III on August 28, 1995, with final information on March 13, 1996. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 950834 dated April 3, 1996, to Peppertree Resorts, LTD. This permit shall be effective from the date of issuance until April 3, 2006, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, / " 6/r- Dave Adkins Regional Water Quality Supervisor DA/arl: S:\WQS\STORMWAT\PERMIT\950834.APR cc: Joseph Rose, P.E. Garry Yeomans, Carteret County Inspections Linda Lewis �W it mington-Reg final -Office Central Files �S P.O. Rox 49535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 950834 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT STATE STORMWATER MAtNAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Peppertree Resorts, L7D Peppertree Villas III Carteret County construction, operation and maintenance of an Infiltration System including a pond and underground commercial chambers in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stonnwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Environmental Management and considered a part of this permit. This permit shall be effective from the date of issuance until April 3, 2006 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 11 State Stormwater Management Systems Permit No. SW8 950834 DIVISION OF ENVIRONMENTAL MANAGEMENT Project Name: Permit Number: Location: Applicant: Mailing Address Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Seasonal High Water Table Elevation: Expected permeability of soil: PROJECT DATA Peppertree Villas III 950834 Carteret County Mr. G. Wayne Kinser. President Peppertree Resorts, LTD Post Office Box 6319 Asheville, North Carolina 28816 August 28, 1995 Bogue Sound "SA" 3.8 MSL 100 gpd/sf (.07 gpm/sf) Maximum Bottom Elevation for Infiltrators: 5.8 MSL Area Impervious Volume Volume Infiltrators Drawdown Required Provided Provided Time -1 Il W 00 rea_1=(Bldgs_28_&=29) 44-, I9 sf �3 2 gal 264,550 gal 130 25.8 his fArea 2_(Blags-26-&_27) MZS .1-}�i5 sf gal 264,550 gal 130 25.8 hrs Area 3 (Parking east of 27 & 28) 12,420 sf ✓ gal 264,550 gal 130 25.8 hrs Area 4 (South Parking Lot) 3040 34-,OM sf , 3 gal 732,600 gal 360 25.8 hrs Area 5 1 s g3�tt33,34, Drive)3..g12327531 sf 6 U00'a �5 gal 140,654 gal N/A 117 hrs Area ing Lot) 2500 .7 8, sf gal 162,800 gal 80 25.8 hrs [Are'a_7_(Bldgs-30,_31); IGZA$ ",.��,,� 8 P6 sf 51374°� gal 183,150 gal 90 25.8 hrs Total impervious surfaces US-,191 sf IZCnZ041 Each infiltrator has a volume of 122 gallons, a surrounding stone volume of 23 gallons, and an infiltration area of 18.75 square feet. The recommended infiltration rate is 100 gpd/sf, or .07 gallons/minute/square foot. For the 25-year, 24-hour storm of 8", the expected infiltration rate per unit is 1890 gallons. Therefore, the total storage and infiltration capacity for each unit is 2,035 gallons per 24 hours. The use of the 25 year, 24 hour design storm precludes the requirment for a bypass. R] State Stormwater Management Systems Permit No. SWS 950834 4. The tract will be limited to the amount of built -upon area indicated in the supporting calculations and per approved plans, and the permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowine and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal from the system, including catch basins and piping. 4 In State Stormwater Management Systems Permit No. SW8 950834 3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. M. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. R State Stormwater Management Systems Permit No. SW8 §50834 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 3rd day of April, 1996. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ia, C V S iv t— V7--Q t-D_ A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission Permit Number SW8 950834 11 State Stormwater Management Systems Permit No. SW8 950834 Peppertree Villas III Stonnwater Project No. 950834 Carteret County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date 7 DIVISION OF ENVIRONMENTAL AGE? NORTH CAROLINA STOR:IIWATER MANAGEMENT PERMI'j ..: PLICATION I. GENERAL INFORMATION 1. Project Name Peppertree Villas III 2. Location, directions to project (include County, Address, State Road) Attach map 715 West Fort Macon Road, SR 58, Atlantic Beach, NC Peppertree Resorts, LTD. 3. Owner's Name C. Wayne Kinser, President Pilo 4. Owner's Mailing Address: One Vance Gap Road, P.O. Box 6319 City Asheville State NC 5. Nearest Receiving Stream Bogue Sound Class Carteret Count 704-251-8991 Zip 28816 SA 6.Projectdescription Nine (9) Buildings for 78 Unit True Sharing Re!;idents, Driveways, Parking and Pools I1. PERMIT INFORMATION (Project submitted I. PermitNo. (To befilledinbyDBkr) SW8 950834 Fee Enclosed$ 0.00 prior to 9-01-95) 2. Permit Type New X Renewal Modification (existing Permit. No.'?) 3. Project Type: _Low Density _Detention X Infiltration Other:_ Redevelop _General _Dir Cert 4. Other State/Federal Permits/Approvals Required (cheek appropriate blanks) CAMA Major X Sedimentation/Erosion Control X 404 Permit_ x al l._ohcnined M. BUILT UPON AREA (Please see N04C 211.1005 thm .1007for applicable density limits) Classification Allowable Impervious Area Total Project Area Draina a Drainaee Basin Basin SA 398,954 BreAdnwn of Impervious Area (Please indicate below the design imp^n°iom+ area) Buildings 43,538 Streets Packing/SW74,175 so. rt. Proposed Impervious Area 124,403 Other 6,690 Sq. Ft. % Impervious Area 31.18 Totals 124,403 Sq. Ft. IV. SfORMWATER TREATMENT (Describe how the r qff will be (reared) All stormwater runoff of impervious surfaces shall be infiltrated. No off site surface flow. V. DEED RESTRICTIONS AND PROTECTIVE: COVENXNTS Deed restrictions and protective covenants are required to be recorded for all Imv density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific iwms that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protect ice covenants for this project shall include all the items required by die permit, that the covenants will be binding on all parties and persons claiming under them, that they will ntn with the land, that the covenant cannot b:: chanted or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION 1, C. Wayne Kinser _ certify that die information included on this permit (Pkwr prba or type name rkarly) -- application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. I elf rize the / w named person or firm to submit stormwater plans on my itcitalf. f President September O ner/Authorized Agent Signature and Title n:te VII. AUTHORIZATION (musraEcouo E7FD) (Rose and Associates, P.A) - Personorfirmname _Peppertree Resorts, LTD; Mr. C. Wayne Kinser Mailing Address P. 0. Box 6319 (P.O. Box 3396) City Asheville Slate NC zip 28816 Phone 704/251-899L (New Bern) (NC) (28564) (919/633-0327) Please submit form to the Regional Office that serves the area that the projoA is located, as indicated on Attachment B. cc: ApplicanUWiRO//Central Files tresobm1� 3-13- 4 ry wl rew'51'61S Office use only TG'RN V, E C E I V E JAN 2 51996 D PROJ# WM S34 1V,0 IU)19(a�7-T7770, D MAR 13 1996 56t) 8 95a �3¢ STORIMNVATER Division of Environmental Management Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 SE AND C.QSSOCIATES, P. A. Engineers — Planners — Surveyors March 11, 1996 Attention: Ms. Linda Lewis, Environmental Engineer Reference: Peppertree Resorts Ltd. Villas III Stormwater Project No. SW8 950834 PRL-9501.771 Dear Ms. Lewis: Reference is made to your letter dated February 15, 1996 regarding additional information as follows: 1. The enclosed print outlines elevations 6.0' and 12.0' with the dimensions of 40' and 62.5' shown. 2. Revisions have been made to Stormwater Plan, Stormwater Detail Plans and Engineering Calculations to provide for the additional infiltration units due to the water storage capacity elimination in the bottom four (4) inches of gravel. We surveyed the ground elevation at the hand augered hole to determine seasonal high water table elevation: Ground elevation 5.8 feet USGS Seasonal high water 3.8 feet USGS 3. Section VII Authorization is the power to contract for spending which rests with Mr. Wayne Kinser or Mr. Ken Crume at the Asheville office of Peppertree Resorts Ltd. I have included my name and signature for design only. 1610 Hwy. 70 East Post Office Box 124e New Bern, North Carolina 28568-+248 (919) 633-4300 3396 'A3396 .Division of Environmental Management March 11, 1996 Page Two If you should have any questions or comments, please feel free to call. Bids are being received on March 13th and the owner wants to award contracts for the sewer, water and stormwater April 1st. Sincerely, 7 OW Jose h W. Rose, Civil -PE ,RLS, President Encl. CC; Dave Boegemann AUTHORITY. Permission. People v, Howard, 31 Cal.App. 35g, 160 P. 697, 701. Control over, juris- diction. State v. Home Brewing Co. of Indian- apolis, 182 In,1. 75, 105 N.E. 909, 916. Often synon- ymous with power. State v. District Court of Eighth Judicial Dist. in and for Natrona County. 33 Wyo. 231, 238 P. 545, 548. The power delegated by a principal to his agent. Clark v. Griffin, 9'i N.J.Law, 508, 113 A. 234, 235. The lawful delega- tion of power by one person to another. Rucks - Brandt Const. Co. v. Price, 165 Oki. 178, 23 P.2d 690, 692. Power of agent to affect legal relations of principal by acts done in accordance with prin- cipal's manifestations of consent to agent. In n: Fitzpatrick's Estate, Sur., 17 N.Y.S.2d 280, 288. r•. t 0 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary February 15, 1996 Mr. Joe Rose, P.E. Rose and Associates Post Office Box 3396 New Bern, North Carolina 28564-3396 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950834 Peppertree Carteret County Dear Mr. Rose: The Wilmington Regional Office received a Stormwater Management Permit Application for Peppertree on January 25, 1996. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please delineate the proposed 6.6 and 11.6 contours for the low area to serve buildings 32, 33, and 34. The calculations indicate that 40' and 62.5' diameter circles will be provided, however, that is not shown on the plan. 2. Please have the locations for each set of infiltrators flagged so that the Regional Soil Scientist can field verify soil infiltration rate assumption and Seasonal High Water Table elevation. 3. Section VII of the permit application, Authorization, must provide the name and address of the engineer/designer that is designing the project, ie., Rose and Associates. Mr. Kinser has already signed as the owner, and cannot sign again as the person authorized to submit stormwater plans to DEM. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Rose February 15, 1996 Stormwater Project No. SW8 950834 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 15, 1996, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950834.FEB cc: Linda Lewis Central Files K V. V1. VU DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all Inw density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be hindimi on all parties and persons claiming under them, that they will nm with the land, that the covenant cannot b: chanted or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. OWNER'S CERTIFICATION 1, C Wayne Kinser certify that the informatir•n included on this permit (Mme pdw or type carte erearry) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. named person or firm to submit stormwater plans on my behalf. President Agent Signature YMORiZATION (MUST BE COUPLA7W) Person or firm name _ Peppertree Resorts, LTD; Mr. C Member 25, 1995 O.ae- Kinser Mailing Address P. 0. Box 6319 _ City Asheville State 7C Zip 28816 Phone 704/251-899L Please submit form to the Regional Office that serves the area that the projo.:t is lor.ated, as indicated on Attachment B. cc: Applicant/WiRO//Central Files Office use only 71 E C E I V E JAN 2 5 1996 Lei PROJ N 5w 89' z/V /q 41, L D21VE gx-r G1�141111_1 &ZG_ aN . �N diQa�MENT.9-L ,�iNcl�ukLl2 5AJCE 4- Lai li v!z f5ui1-01 yDu S'I�fDGrLD f�/i(% A Y �L.Q.� Tlc�_����ASE /=C�Z F'lzEE Ty CA44 TN/ s ,O /CE7 , 9J � - G 33- o32'z, HAIWe Yvu ZE1ZY Muc/d , PO8ox 3396 1Fw 3E r2m A-�—n �8;s64 D/ U C l EEC E I V E �Fi x ?, Do -/jD �� JAN 25 1996 c % " " _ l c'c- �i�� n = wn r— �Q-��. ,� ,5�F% r 4-0 G. .42 j o Q J b 5. 2- 7/ x _ 0 y O-7 11 •�� <_ I ! 7 i %F,Z N- J,-, 1-7 HOSE AND CQSSOCIATES, P.A. CA jtl ME�V5�� Er..', Engineers — Planners — Surveyors p F f, 2 7 IL4npjJl IIII December 21, 1995 1995 !J ........................... Division of Environmental Management Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Attention: Ms. Linda Lewis, Environmental Engineer Reference: Stormwater Project No. SW8 950834 Peppertree Resorts Ltd., Atlantic Beach Carteret County PRL-9501.771 Dear Ms. Lewis: 9 E C E 0 V L DEC 2 1 1"S DAM •.ROT This is to confirm our phone conversation this date, regarding an extension of time to make our impervious area totals all be consistent. Additional revisions are under consideration, such as; omit elevator, remove some of the concrete sidewalks, add another building for pool equipment, laundry, rest rooms and other conveniences. All of these revisions should be resolved within the next thirty (30) days, on or before January 26, 1996. Thank you very much for your cooperation and understanding. Sincerely, Josep W. Rose, Civil-PE,RLS, President JWR:rr cc: David Boegemann Peter Sherratt Post Office Box 1248 New Bern, North Carolina 28569 1246 1919) 633-4300 3396 I/- 33f6 C7 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary November 27, 1995 Mr. Joe Rose, P.E. Rose Engineering Post Office Box 3396 New Bern, North Carolina 28564 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950834 Peppertree Villas III Carteret County Dear Mr. Rose: The Wilmington Regional Office received previously requested information for Peppertree Villas III on November 7, 1995. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The impervious area totals are different on the application form and in two places in the calculations. a. The application form lists 79,001 square feet of proposed impervious. b. The overall calculations (page 2 of 12, 11-7-95) show a total impervious of 102,601 square feet. C. Pages 4, 5 and 6 of 12 calculate the individual impervious areas for each infiltration area on the plans. This total comes up to be 97,795 square feet. Please clarify. Consistency is necessary. Please revise the calculations or the submittal form, as necessary. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal opportunity Affirmative Action Employer Mr. Rose November 27, 1995 Stormwater Permit No. SW8 950834 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 27, 1995, or the application will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950834.NOV cc: Linda Lewis Central Files 2 DIVISION OF ENVIRONMENTAL MANAGEMENT NORTH CAROLINA STORMWATER MANAGEMENT PERMIT APPLICATION 1. GENERAL INFORMATION 1. Project Name Peppertree Villas III 2. Location, directions to project (include County, Address, State Road) Attach map. Carteret County 715 West Fort Macon Road SR 58 Atlantic Beach NC Peppertree Resorts, LTD. 3.0wner'sName C. Wayne Kinser, President Phone 704/251-8991 4. owner's Mail ing Address: One Vance Gap Road; P. 0. Box 6319 City Asheville State NC Zip 28816 S. Nearest Receiving Stream Bogue Sound —Class SA 6.Projectdescription Seven (7) Buildings for 69 Unit True Sharing Residents, Driveways, Parking and Pools II. PERMIT INFORMATION (p7jed 5u6m,+644 7 cc prlor la ct—I—yS) 1.PermitNo.(robefilledinbyDEM) �iGt1 c(506 J4 Fee Enclosed S 0� 2.Permit Type New X Renewal Modification (existing Permit No.?) 3. Project Type: _Low Density _Detention X Infiltration Other:_ Redevelop _General _Dir Cert 4. Other State/Federal Permits/Approvals Required (Cheek opproprl reU Iles) CAMA Major X Sedimentation/Erosion Control X 404 Permit X all obtained III. BUILT UPON AREA (Please tee NGC 2N.1005 thm .)OQ77jor applie.,hle dewiy limit,) Drainaee Drainage Breakdown of Impervious Area Ra5in Basin (Please buScae below the &sign imperviow area) Classification SA Buildings 34,239 Sq. Ft. Allowable Impervious Area Total Project Area 372,639 Parking/SW 58,785 Sq.Ft. Proposed Impervious Area 79,001 Other 5,977 Sq.Ft. % Impervious Area 26.57 Totals 99,001 Sq.Ft. IV. STORMWATER TREATMENT Pt erlbe now the mmoff %ill be treated) All stormwater runoff of impervious surfaces shall be infiltrated. No off site surface flow. V. VI. VII cc: DEED RESTRICTIONS AND PROTECTIVE COVENXNTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all pasties and persons claiming under them, that they will nm with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. OWNER'S CERTUICATION I, C. Wayne Kinser certify that 0te information included on this permit (Plewe print or type nave clearly) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. 1 adttlbrize thQ*w named person or firm to submit stormwater plans on my behalf. Agent Signature ZATION (MUST BE commEm:o) ptember 25, 1995 Date Person or firm name Peppertree Resorts, LTD; Mr. C. Wayne Kinser Mailing Address City Asheville P. 0. Box 6319 Slate NC Zip 28816 Phone 704/251-8991 Please submit form to die Regional Office that serves the area that the project is located, as indicated on Attachment B. Applicant/NiRO//Central Files r 'Office use only -� IS C IS U U IS DDSEP 2 9 1995 5� 8 95Og34- l HOSE AND vQSSOCIATES, P.A. Engineers — Planners — Surveyors November 3, 1995 Division of Environmental Management Water Quality Section 127 Cardinal Drive Wilmington, NC 28405-3845 Attention: Ms. Linda Lewis, Environmental Engineer Reference: Peppertree Villas III Carteret County Stormwater Project No. SW8 950834 PRL-9501.771 Dear Ms. Lewis: STORRIWATER R LSDD NOV 0 7 IW5 D&m PROJ # Sw8 950854- Reference is made to your letter dated October 16, 1995 regarding eight (8) additional information items. The following is our reply to those items: Item 1 - Infiltrator dimensions and radius: As the chamber manu- facturer changes the unit configuration changes. The client has elected to use Infiltrator Systems Inc., 1-800-221- 4436. Our original calculations and dimensions have been enclosed, Sheets 1 through 4. As previously stated no storm water can run off this site and the infiltration rate is far greater than required. It is not possible to provide exact dimensions for this chamber. Using the 118 gallon calculated amount does not change the project design or environment effects, we didn't include the pipe line storage and several other factors that would be a plus. At an added expense, the best way to prove our 122 gallons is to fill a unit with water, that has been piped through a certified meter. This is how the manufacturer confirmed their calculations and the 122 gallons. Item 2 - Existing entrance road runoff. Please note "Site Plan" entrance road elevations as follows: 9.0 at W. Fort Macon Raod 8.0 at 155' south of W. Fort Macon 6.0 at 230' south of W. Fort Macon 6.0 at 370' south of W. Fort Macon 1610 Hwy. 70 East Post Office Box 1248 New Bern, North Carolina 2856 (919) 633-4300 3391 �/ Division of Environmental Management November 3, 1995 Page Two also note on the "Stormwater" plan the north and south parking lots have proposed elevations of 8.5 feet. As previously stated all existing project stormwater infiltrates into the sand and shows no sign of washing or sand disturbance caused by stormwater. We have not accounted for this area as noted on Page 2 of 10 "Stormwater Analysis" under Project Area. This area does not drain to the system. Item 3 - Refer to the enclosed certified Sheets I of 2 and 2 of 2. Item 4 - Label sediment tanks on detail Sheet 6 of 8. Completed. Item 5 - Thirty-five (35) gallons storage in stone. Refer to the attached sheet titled "Stone Water Storage." Item 6 - The Town of Atlantic Beach has permitted us to construct this construction access gravel road, 10 feet wide, for the construction of Buildings 26, 27, 28 and 29, after which it must be removed. We have obtained a DOT permit for a temporary approach good for one year, this can be extended another year, but it is only temporary. This is a temporary road and this area must be planted with trees to replace those removed in the building and driveway areas, per our permit with the town. Item 7 - Drawdown calculations have been sealed per Item 3. Item 8 - The proposed well 400 feet away from the infiltration system was in the direction of the total subsurface system flow as per ECS's reports, and would have provided more accurate subsurface water levels and sampling. We have moved the north well to the landscaped island southeast of Building 28. The second well is located just north of the south property line, south of the infiltration pond and in the direction of the subsurface water flow for this area. Please feel free to call this office if you have any questions. Sincerely, � J eph W. ose, Civil-PE,RLS, President Encl. cc: Wayne Kisner i ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633.4300 D W JOB l-'EPPE977Z,�E VJ --LA5- 11� SHEET NO. � OF I CALCULATED BY ` , Ld R. CHECKED BY / DATE / SCALE , OT r y^� �CA E zg, vAUU.-f Ml,=IR', Q. M 01411. a:+ _ ir,� ���� r--� aril ` ;,� , :,, .. �t�? :.. , ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633.4300 IW4M:I MI J Ilm. calm, Mm 01411 JOB /,--tPPk2 i i2EEr IViLLffS SHEET NO. II� OF CALCULATED BY v w DATE �— CHECKED BY DATE ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 Jr�/cre41'of(� Q114MB Ib] TI l NOiis I..., G. W Mll JIB %, p P'F / / iE�J6 y/ 4-L A.9 U-! SHEET N0, OF 4 CALCULATED BY ' ` /6 DATE b /~J CHECKED BY DATE_ JOB P ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF NEW BERN, NORTH CAROLINA 28560-1248 CALCULATED BY n DATE (919) 633-4300 CHECKED BY DATE ------------ - -- . ......... . ....... . lka� . ... .. .. .. ... ....... . ... .. .. ... ... .. . ............ .......... . .......... ....... . ... ...... . . ....... .......... ... .. . ... ... . ........ ------ Did 461(jic, .. .......... L7 r ike 44sjE? .. ................ I ... ............ I .. . ......... ... .. .. .7, T.......... K . . .......... ...... . ..... . .. ...... .... ........ . ..... ... ..... ........ . ........ . . ... ...... ... ... ....... .......... ............ ......... . . ............ . . . ... . . ...... ......... . ...... - ----- ... .. .. . .... . ........ ....... ......... . . ..... ....... ..... ............ .. . . . . ..... .... .. .... - - ........... ............ . ...... .. . ..... ...... . . ..... ..... . ..... ............. ........ .. ........ . . . . ........... . ........ .. . .. .... ...... ........ ... .......... . . ........... ............. ..... ... . .......... ..... ........ . ............... ... .. ............ -------- ...... ...... . . ..... . .... ............. ........ .. .. - ---------- .. ... .......... t ------ ---- - --- - .. . ........ . . ..... - . ........ .............. ... .. .. ..... .......... .......... .. . ....... . .. .. . .. ..... . . .. .. . ...... .. .. ... .. ... ....... . .. ------------- ------- . ........ ... . ...... ....... .. ... ... .. .. .. ... ... .... ...... . .. .. ..... . ...... . .................. ..... . ..... . ............ ........ . . ...... ... . . . ......... ... .. . ....... ..... ............. .. .. ...... ........ ................ .... . .. .. .. ------- . ..... . ..... . . ......... - . .... . ... .......... . .. . ... . ... ... ...... . .... . ......... ..... . ......... . . .......... ........ . ..... .............. - - ...... . . ........ . . ............. ......... . ..... . . . . . . ................ ....... ... . . . .......... - - ------ - . .. .. . .. .. ... . ........ .... . ..... ... . .. ... - . . ......... ..... ...... ............ . .... . ....... - ......... . .......... ........... . .......... .. . .... ........ . ........ --p ............. . ...... . .... . . . ...... ....... . . ....... .... ........ . . ....... . . ...... ......... . . . ....... - . . ............ . ... . ..... ........... . .......... - . ...... -... ........ .. .. - ROSE AND ASSOCIATES, P.A. JOB 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF NEW BERN, NORTH CAROLINA 28560-1248 CALCULATED BY DATE (919) 633-4300 CHECKED BY DATE WA V� X. 7 7 ,I Al��eeltli'l �111141'c t q /7) � mj =N�lig lz. Gl� wn 0 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary October 16, 1995 Mr. Joseph Rose, P.E. Rose and Associates, P.A. Post Office Box 3396 New Bern, North Carolina 28564-3396 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950834 Peppertree Carteret County Dear Mr. Rose: The Wilmington Regional Office received previously requested information for Peppertree on September 29, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. Please provide the information requested for the infiltrators. It is your responsibility to ensure that this Office has all the necessary documentation to review a project. Exact interior dimensions and radii are needed to verify the interior storage, which you calculate as 2.23 cubic feet per linear foot. 2. A portion of the existing entrance road will runoff into the north and south parking lots. Have you accounted for this offsite runoff in the storage calculations? The rules require that all off -site areas which drain to the system must be included in the design calculations. If the off -site areas can be routed around the system, they do not have to be included. 3. Your response to this Office's request to provide calculations to show that the runoff from the 25 yr-24 hr storm event is stored in the system was unsatisfactory. You state that the infiltration rate is high enough to provide storage for this storm, and you even give an example calculation. Please repeat the calculation for each area, seal the pages, and submit. The red -lined calculations were not sealed. 4. Please label the sediment tanks, A & B, on the detail sheet 6 of 8. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Rose October 16, 1995 Stormwater Project No. SW8 950834 5. How did you arrive at 35 gallons of storage in the stone? 6. Please verify for me that the road shown leading from Fort Macon Road to the backs of the buildings 27 and 29 is only a temporary construction road and is not a permanent impervious surface. 7. Please make the dmwdown calculations a part of the calculations, sealed. 8. I would like to see one observation well more centrally located within the infiltration zones, such as in one of the landscaped islands, and another located near the natural low area you plan to use for infiltration. The presence of buildings and parking lot will influence the water table elevation, therefore, my request to relocate the well from it's present proposed location of approximately 400 feet away from the furtherest infiltration area, is justified. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 16, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, 4-c�o 4x� Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950834.00T cc: Linda Lewis Central Files 1rJ 0 SCc�B 95U�34 fv-I�-qS �I, Z Presvl'o�¢ in Form a h'�., or, in F I irzfor. Si- i s c�oyr 1 L I 1)� Bleed re5pons,' 6 I' k -Icy OrvVi C� 2=I,(�� ! h �� m 2 �'oY�A enact ;lAr - Q Y d�m�n5�o�s — �- --- — --csw — ec,— s u /la e 3. 6 (Fs; le//o�uvm ex,s l�n� 5u�'ff2ces� be.11/ali� s ? aCCC✓prlFe�v izr iJ7 C2ICS ? re <2Xspn e�h�nce ood — nor nal crown Sech'on h, h m ;he m,�ol7e - lersf '/t of fhe • rO�- tag Horn w�b Proj ect, P l'lvsf— ro vrde—sFrX Imac¢ fh e� C?.nnot a% rc:>U ¢c l Br-oune� +he 5v50�e . 5. 1 --bow %�esrxnse fo r� �e57 filaf� ZS cJr Z4 h� S iD rrrr even /1 J e S1. O. Z/ i S U,Il G le Zy". yoLt d,'cL FZr a 25yr G hr S1-orm cwh,-,A 25 Sta/ed in_rn.�_Ie+�er� f o/oe s hof p�vve �i7LL2f #C i'-'n Or ZS�r sfUrm Con! be S/or2d. Xo✓ slag 6f -fhe_ in El /r eb b� r 2fe_ , s h , 5 h erlou5 )1 P �, v; o% _ ii s�� 2 kr i h e ZS -� 24=hr sly rm zn c� 10:4 Proy,, cl e i ex-2j pe c-2(c.u12,�-of%. P1e2se re eaf A1"5 c-Dlculah6.7 7h zzt� c Ll hecc)m.e. 2 1)7-f df fh� oriCl�2i c�/c�12%'ais. �, _Neeo� ib lz��ei seol;me�f f a�/c. /� $ f3 9j� elef�f 5{1 eef G of 8 . (vh,�h r' } w l7; ch 2 C� yt1i 7 How d id �c oa ;�rrl've 35 c� a.t to.,1S of s �a �c�z in h e D I wl V- - Iluw t-x a l/uv_ ar r 1 v e. c yrX> c>r perr umr- i ,II 11 .1 1". I I .! 1 { ♦ 1 'I � II ' �1♦. it ' II , II t 1 Ii I 1 i II 1 I I iI II it ' I ;I �j II {1 II / 9. i�___.. {'o zd5 4%Yom w /tirf ZCah Cbi5kochb,) oi/r-O;�,lce are ohly_ —ee � �e 02o %2 Oral on l Y I I Q25e m-6ke Aje &^ow(ao/yJil coIcs, 2 O"ic -- -- f%e calcul2ho�si_�� .. sezlecl. vr� 2 s.eP� �f e L—pz- e of PzPell-. LI,II T Vvvu/cl l�%e la See tie ol75GY'Vz�'v� I,uel� lo,oied Genfrzl(y i Me ProPoSec) in 2rQ2s such 05 In0 one of ++e I-.?t,e15c2Pe (5)�1sy_ ,e.r -7�e Pr(02-5eh+ l ocq b-oh i S {.)o fir �v z- —I— �vm +ham ih�l_1r2hot,_�}re25 -J �ccur2Tel rQP ed fh eu-f�,- t2bl� +here_. Th_e_�resQ•,ce o f / w� ��r s h are25 will it f/u ence s w Zf f 2h/e e%v z/, � fh.e�-e fr-re Jus�'lies r.� _re vest Yeloc2te the c�b�-e,-v2ho, we// ore ce�t�z� __._ II - �I t- 25-95 MON 14:01 2 9196384499 P.03 HANCOCK W 2 `h •� _- E —R- -\•RANGE Cherry Point LHndrng .,win �• 'I Cherry Pt �` �< �• \•M<n RIP )ag C.'tYFE l� \` I �" � _b�_ 1 Great Is ^: Pfgl•al :�a '- SCAR •(ove l J a`,6.:•I / t Z ,.� SMdv View 1 III fYJ n Beach tl /,/(� `1 y' Z 1;R9; 1• RV 10''mia <.�V46 ey.[reel 0 'v1J= 't 3, \ ONECLIt�i ,:EMpI :L q O i`yr /A ui1 s 35S :.) .,1 Ct tBa�helnr .• FxnA .✓� Iy n l' sree,w / t %r y59 1 •v • p •6 • � Ox l.,°M Cn 1 °"•. 1 k Il i4 1\�W�I .�-q � atA�'';. Cn _��.:. now ARI) Cum. i 1 y{Jz .I dJ I l it r . �. `r lr • [l Cr,"il.`v. '`, rr, -'^`fll 1.1 Bla 6 oyl� r 1// i oveloc ak 9 .C-<:�' �s,n ^o �Ry> •.-ti I"a P° //. s• t r �' Ir a3i R as" 3 m., Elf Ci 1J Jf»A 1 PAa` �e ,� <� . �i • GO/ •y� r;IEnm, Re. �� N/GO A E e oc` 2sr - Cea[r tot sar»..C„n., GRP%tiET No e . e• 4'�F' I 1 . Her we c �'P >.e ----� - �,. Wi La. rlowe 1 u y) Jo ®4 e Ja 91..7 a o Core ii {1Y 93 911 a°e� Cree II Nub.. HK I e B7 U Air.- • i CIA Evil� a Rio is 1, d 93a 76. HoIIY C a Union c `'aJ- A1700 ` jin8 f ileu. .Poi I a of 1 1�E^s Gl o-;: 1,r 4 . 'yb N4 ) 1 re„eAa`` :amYyea C.nl o :Cem , `, F 11 e— , a I_ r'v "Alllra Gmry i a eM ao . t a?I al AQ ' a°,�e Mill i `-„� y; •. , lrY ( Y• lot a a 'D`n mp •0 a i a Creek aAl 012 02 9- . K. C B{I'PQ REM RASA 1`a•.e -ay E ydY� Penn Pt Rp 10.4 G, : •� rahlPoint 1plp Fr.;Ku89 'L a°° 71 - I----' 1/4Br-ea i0 •c. F.P y� a .. Wildw814 �' _ ✓ as s 8 14v11 a JIL� M Pein 1. `�....• /�'� H � IM;A n.p.l R AU I eV •� l� r Ia11 ,. x... �.r,., .. sr _ 7..p�p° / �..�r .4. n _.a .. 1 — t=. a - , . 11 11-iaz'`'•✓{,I� P44d&t /6, "� E I s `/�' r n °T L11 ol!.1 CITY Y. .Q._.._... _ erT L• MaR9He MISER 13,xQ Creek D a S,iR.PARE p r1 ts' •Sugar Loaf C^ ., aSEAYF HlPole _�oi S M°u.vIt a Lkf'`} To BGU �ifda ., r /foP Pol( woflas TATE P NJ e Fort Mama Salter Allen Reach 1 Path (� Will &UTpjtHIbliny Money Ielalid - --- - roe Is Pkth Rack Pt .. B A�Y�� p ilra� Beach o� r v\ p' T C• StlackletwA M \ oNStoµ' p E6COd .J G II�� �EAN + _ ANAS P 291995 � ATL SE 1: E M jPolyconic Proieci 1927 North American patulr� PROJ # 5a 8 cl �5 q-- ,,:�;, s:* � ,r., . � ,�,. .6T,ilmMi "SE AND ASSOCIATES, P.A. fII�ILII�I�'�1rliS r (7 fiFP 2 9 1995 Engineers — Planners — Surveyors ........................... September 27, 1995 NC EH&NR DEM Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Attention: Ms. Linda Lewis, Environmental Engineer BUJ E C E 0 V E II II Reference: Peppertree Resort Villas III IUj`l\` SEP 2 9 1"5 U Carteret County Stormwater Project No. SW8 950834 De M PRL-9301.771 'ROJ # 2a1 a50, 34-_ Dear Ms. Lewis: Reference is made to your letter dated September 19, 1995 regarding additional information which listed sixteen (16) items. The following is a reply to those items: Item 1 - $385.00 (325.00) check returned. Thank you. Item 2 - Permit Application is being mailed direct from Asheville, Peppertree. Item 3 - Operation and Maintenance Plan. I'm assuming you are referring to our Operation and Maintenance Schedule. Mr. Kinser's office is mailing a signed copy direct to your office. Item 4 - Refer to plan titled "Stormwater Plan" whereon I have high- lighted catch basins and collection piping for the four (4) northern buildings 26, 27, 28 and 29, also the 12" collection pipe for the three (3) buildings south of the secondary dune, buildings 30, 31 and 32. Sheet flow is for.the asphalt parking areas to drop inlet. Buildings will have gutters and down spouts connected to the 12" collection pipes as shown on "Stormwater Pipe Profile". Item 5 - Individual drainage areas outlined on the plan, one (1) copy attached. Item 6 - Print quality. New Bern doesn't have the same print copy ability you have in Wilmington at Copycat or Raleigh at Case Blue Print. Our printer is not that good, only with ink. After all the government changes, including those 1l the owners, have made, we will draw in ink for recordation. Item.6 - Dimensions. A copy has been made showing the dimensions as you requested. We control all field layout and due to recordation requirements, we have had to draw at a 1"=50' scale. Previous State personnel have used planimeters to check areas. 1610 Hwy. 70 East Post Office Box 1248 New Bern, North Carolina 28568-4248 1919) 633-4300 3396 '1-3396 NC EHOR September 27, 1995 Page Two Item 8 - 25 year, 24 hour, 8.5 inches compared to 10 year, 30 min., 3 inches or as shown on sheet 3 of 10 Stormwater Analysis 25 year, 6 hour, 5.71 inches. The infiltration rate is high enough, 100 gallons per square foot per 24 hours, that all three of these storm concentrations will not cause an off site flow. As stated no stormwater can flow or run off this property, it must infiltrate to the subsurface waters. Major storms may cause ponding around drop inlets and gutter overflow, but this is after the 3.0 inches and the present area has this same driveway pending. Example: South parking area 25 year 24 hour 8.5 inches 31,500 sq.ft. x 8.5 in. x 7.48 gal. = 166,897 gals. 12 ft. cu.ft. Infiltration: 5,850 sq.ft. x 100 gal./24 hrs. = 585,000 gals. or 6.85 hours for total infiltration. Refer to sheet 6 of 10 Stormwater Analysis for the 25 year, 6 hour, 5.71 inch concentration. Item 9 - Seasonal highwater. This item has been referred to the geologist, Mr. Roger Moore, with ECS Ltd., who will reply directly to you. Item 10- As demonstrated in Item 8 and Stormwater Analysis Report, it is within hours, not days, the total rainfall from impervious surfaces will be infiltrated through our system. North parking area: 11,340 sq.ft. x 825 x 7.48 = 60,083 gallons 60,083 - (24' x 91' x 4.17 in./hr./sq.ft.) = 6.6 hrs. South parking area: 31,500 sq.ft. x25 x 7.48 (45' x 130' x 4.17) = 6.85 hrs. Buildings 26 and 27: 10,824 sq.ft. x25 x 7.48 (36' x 52' x 4.17) = 7.35 hrs. Building 28 and 29: 10,824 sq.ft. x 125 x 7.48 - (36' x 65' x 4.17) = 5.88 hrs. South Buildings 30, 31, 32 and Asphalt Drive: 32,531 sq.ft. x 125 x 7.48 - (1256 sq.ft. x 4.17) = 32.91 hrs. Item 11- Infiltrator Fact Sheet. We have changed the chambers to Cultex Contactor 100 HD 12.5 inches high, 2.23 cu.ft./lin.ft. NC EH&NR September 27, 1995 Page Three storage, 36 inches width, 7.5 (7'-6") long, each unit comes with fixed end plates, 3/4" perforation diameter, storage capacity 125 per unit. Located in Brookfield, CT 203-775-4416. Item 12- Sediment/catch basin water infiltrated. We think it is important to collect sediments and gasoline or oils when necessary. This may come under "Alternative Design". Item 13- Geogrid Manufactured by: Huesker Inc. distributed by T. G. Collins, Charlotte, North Carolina 1-800-942-9418 Product is Fortrac 35/20-20 woven PVC coating, polyester polymer, 1322 lb./ft. long term design strength in sand for base reinforcement. Geotextile Manufactured by: same as Geogrid Product is Comtrac 60.006 woven polypropylene, 40-70 mm openings Mullen burst 600 psi, puncture 120 lbs. Item 14- Observation wells. We moved the north well 100 feet south and east. I'm not sure the reason for this move. The other well would have worked for the proposed two buildings and driveway to the north of building 29, not shown or town approved at this time. Item 15- Sediment tanks have been numbered. Item 16- Dry infiltration pond southwest of building 32, elevations red lined and dimension (radius) shown. They are all the same except one has two manholes and the 4 for driveways have drop inlet grating and manhole. It was necessary to pave this gravel road so as to provide containment (restrain) the stormwater and not have the gravel settlement fill the dry pond. One additional set of plans have been enclosed plus a red lined "Stormwater Plan" and the architects drawing for buildings 26, 27, 28 and 29. Buildings 30, 31 and 32 will have an overall roof size of 50' x 100', design has not been completed at this time. We have enclosed one (1) red lined Engineer's Report where revisions were made for the Cultec Chambers. Thank you very much and if you need to have a conference, please feel free to call and I will meet you at your office. Sincerely, os Civil-PE,RLS, President Encl. cc: Wayne Kinser 11i �WIN � H ��S � y II R , d September 26,1995 Division of Environmental Management Water Quality Section 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Attention: Ms. Linda Lewis SEP 2 9 1995 ........................... Enclosed is the completed and signed North Carolina Stormwater Management Permit Application for Peppertree Resorts, Ltd. and the Operation and Maintenance Schedule, for stormwater project number SW8-950834 as requested in your September 19, 1995 letter. If you need any additional information, please let me know. Very truly yours, C. Wa e ins r President Attachment E C E I W k DD SEP 2 9 1995 "ROJ s� 8 g5o834 P.O. BOX 6319, ASHEVILLE, NORTH CAROLINA 28816 704 / 884-8991 State of North Carolina Department of Environment, Health, and Natural Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Governor WATER QUALITY SECTION September 19, 1995 Mr. Joe Rose, P.E. Post Office Box 3396 New Bern, North Carolina 28564 Resources Jonathan B. Howes Secretary Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950834 Peppertree Resort Villas III Carteret County Dear Mr. Rose: The Wilmington Regional Office received a Stormwater Submittal for the Peppertree Resort Villas III on August H, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: LQya�' 1. The application was received prior to September 1, 1995, therefore, no fee is required. ( Check No. 094924, in the amount of $385.00 is returned via certified mail to Mr. Wayne Kinser. ✓ 2. A completed permit application form, attached. In the space for fee, please mark N/A. / 3. The Operation and Maintenance Plan must be signed by the owner, or his authorized representative. 4. The plans do not show any catch basins or other collection piping to direct the runoff to the infiltration areas. Is sheet flow the only method used to achieve collection? How are the western entrance drive, roof drains, and gravel road collected and routed to the infiltrators? 5. Please indicate the individual drainage areas to each set of infiltration chambers. Regardless of the fact that you may have provided enough infiltration based on the overall volume, each area must be evaluated separately to check that the required volume is provided, as you have done in your calculations. You may delineate the drainage areas on sheet 5 of 8 with a highlighter. Only one copy of the marked sheet is needed. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Rose September 19, 1995 Stormwater Project No. SW8 950834 6. The print quality of the drawings is very poor. The writing is faded while the background is dark, making it hard to read. 7. Please add the proposed dimensions for the buildings, parking areas, entrance drives, and sidewalks, including widths, lengths, etc. 8. The waiver of the required bypass for infiltration is dependent on being able to store and �,i infiltrate the runoff volume associated with the 25 yr-24 hr storm event, which produces G,Xe5Q, approximately 8.5" of rain in Carteret County. Your design shows use of a 10 yr storm event, and 3" of rain to determine volume. The rules address infiltration requirements in �� Section .1008(d) and SA water requirements in .1005(2)(b). You must either provide bypasses, or show that the volume associated with the 25 yr-24 hr storm can be stored. \-% 9. Is the water table elevation referred to in the engineer's report the SEASONAL high water Q� table? The infiltration areas must be able to meet the 2' separation requirement during wet Q(, times, when the water table is running higher than normal. - 10. Please provide calculations of the drawdown time for each set of infiltrators. j� \C, LZaQy �11. Please provide another copy of the fact sheets for the infiltrators. .- Nee rAU�Pnl /V CaIC. S�Ui 2 nn t2. From the sediment/catch basin tank details, it appears that the runoff which is stored in the Gh tank below the invert of the 12" manifold will not be infiltrated until the next storm event pushes it out. It is the intent of the stormwater rules that the entire volume be infiltrated ill r C`�Q2`S within 5 days. Please provide a design to accomplish complete infiltration. t y13. Please provide a detail of the Geogrid used to line the bottom of the chambers. to 0 14. Please relocate the observation well closer to the actual infiltration areas. P�7 15. Please specify on the plans the type of tank for each location; either a catch basin, or a plain one. Perhaps you could do as most other engineers do, and number each detail with a unique number that uses a sequential number and a sheet number. The detail number is then added to the plans at the locations of the infiltrators. 16. For nmoff in the low area by building 32, please draw in the 6.6 and 11.6 contours so that the areas may be verified. Was the asphalt drive included in the impervious area draining to this depression? dZ7 01 S-M 5f 401 9°'�5 2 C�ryifSlC /�9U� le) u4Cte', er e 2-r-40— Prov. Cqi Ur5 I6C,'Ifr Ore2i Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 19, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950834.SEP cc: Wayne Kinser, Peppertree Resorts CLinda-LewisN Central Files 3 }) DATE..-.�/C�.,... _.L 9J�^ ❑ URGENT ROSE AND ASSOCIATES, P.A (�SPStJ 77 El SOON AS POSSIBLE D ILE NO __ _. NO REPL Y NEEDED 1610 Hwy. 70 East P.O. Box 33 I ] NEW BERN, NORTH CAROL INA 28564- 60CT O 4.7 ATTENTION/�.S % QQ .EINLS TO (919) 633-4300 """"""""'"" /i�TE/z......(GCA:i/7j- OcJ SUBJECT/...._/.T�FE.� /'�'.U...t... Y/L[,5T S?-oTz�wq red vB.__4,s'DB34� ........ ............ MESSAGE .1.,<'4.N... T F,ev..-� �cs,c ra 2cUgrl v4 ... S'.E,.sv�.4c ,w4 c1, ............... DATE OF REPL Y ........._..................................... .................. ........--........ ..................._....................._..._..._..._......----..............................._....._._ _ .... SIGNED � Y� .\ re i. .. .. ..- _.. i�. Y. -1 • � . .. � '.� �. f ENGINEERING CONSULTING SERVICES, LTD. Geotechnical • Construction Materials • Environmental WILSON ENGINEERING DIVISION September 29, 1995 Rose And Associates PO Box 3396 New Bern, NC 28564 Attention: Mr. Joe Rose, P.E. Reference: Seasonal High Water Table Level for the Design of Storm Water Infiltration Galleries - Additional Buildings-Peppertree Resort, Atlantic Beach, NC ECS, Ltd. Project Number: W1287 Dear Mr. Rose, Upon further review of the large amount of groundwater elevation data which has been gathered over the past two years at the above referenced site, it appears that the seasonal high water table elevation for the:area of the new buildings and parking area is elevation + 3.5 mean sea level. This elevation is based on long term monitoring of groundwater elevations in temporary wells on the property and on the main Peppertree Resort property. Water levels ranged from elevation 3.1 to elevation 3.4 over the wettest portion of the calendar year, that is the late winter and early spring of both 1994 and 1995. Should you have any questions with regard to this determination of the seasonal high water table elevation please do not hesitate to contact us. Respectfully Submitted, Engineering Consulting Service, Ltd. James K. Connors, P.E. Professional Engineer �a�,c. �• Morrcz. Roger D. Moore, P.G. Professional Geologist/Branch:Manager., JKC/RDM/sd ECEIRVE OCT "u 4 1995 D: E rxoJ sw8 so834 P.O. Box 10434, Wilmington, North Carolina 28405 • (910) 270-3016 • FAX (910) 270-2866 Offices: Washington, DC; Baltimore, MD: Richmond, Norfolk, VA; Research Triangle Park, Wilmington, NC I Suu 8 75c)83-+ Ctie& # OR4g2q F- $ 38S ` rece,VeCc or A) M ChecL cvi'fl he refurYrneol. U Need col?�d den/ 0 /1ca�bl co/lecfeW4 o/o ,?d Shot,, hou-) rulx>4 cu ; / / he &l Rc fe d y la Ae un aief-9.r_v_u�rol finks/L i� I.Q/7 1 f� a b Z �s .1 ((�7.n(�.—��C 2 Ahy C2rci1 �j25ii)5 ,/�ec/iD�7 DiP:11� 15 s/ieef Flo(/w o/,/y m e f&,a( 10 co//ecf ? /— w / P� 7n G le 2r 0�7 ! _ ? b,7 5 of r hee .5 8 _4ow5_ 13M s��_ es �( 5 _ e e Z 2_ _� e ec pi/ier O /Need la 5hoc-, 4e 1f7 oli wwual ¢ro,h7 2 4v�e2S arrow �b etch sysfe.�.. Ie, h,5{7p0ij7 5 -Roto � fi/7e5. 0 I o f doi y 5 is V-P/ll . (:(JrJ� lili7 q / is/` {2 J b 2c% 7 5 U ��, (�/ 2/4 .y ; T �l ✓'YoL TU yroUU� re act. keecl ow/ ino,-, 5%0/75 of a// i.ry,�erwz,v.j 5Or{,2cc- 5 ie r—bu,loG��s,_�Ja. k,nq �ieas� ciVes s;�✓ecv2/ks. SGv e e� re re Ui�e�e fb �Pnsi is�_ $ Col%cllc�5fayn j lie noT heca5e of �naelo dro�l?aqz •F Cll,hes to DOT- 2�W, i� LF trl 4 Cl- 19-95 — hr_ 5 ,a�o - h 04` rhor �— — �" wh use 3" a 3U ? CPe�k ru�o� rzFe?� _ . &LZh&:- wales- f2ble- hoAec4 - in /•eo rf — cvz s i t fhe I �e25Una� high Z /(tie to he 5e-,f-e4qce 0.1 2 of ECS 'S 6-14-9s le��er r 4h,'O,l' t� isn f Colculab'cn5// o-F odr-aN down Pz,(, e0ch Pie., �rvV%ae_ CNM 2,-75iy/75 17.r I -he Or.&a/ 2-C`t ed i n i er-. ol 5 Fh 21Jt ocr v_,� �' l car m efr 5, 04 s o 3' w, ode bssej rn. 14�+he chibe, S oY � ire 2+r�hecl� hew c2ff Fhe� have- recf-.>" j�peS 5/7>r2 0-F runO 0-FF CCv}^ oc�f Si efe o F fh e _ Z rr arched ill ril 11 ra On Un1 5 I ct3 �om fhe 5eolr;�,e�.�/��,,I� e�efa,'ls�_i� z/opea�-s fhat iA e runoff slv,-eal ih fhe be tow f he In verf of 12" rhah;�old wall Hot he ihh'/%r�teo IIfhe I uAkf 46n Sfbrm nushe 5 J oul . 7J- Is m� �rolf. es / �n4ef 42n c�r h 2t he —en be- Le Oeta,l of Gct��r;� Ixffom o� Chomber;, I iJ -'4- li cs VI r -/ 9- 75 1 A)eed fa ec;rxl C.-, (p�'"S ak h re o C6 a� sreaere �l� �r II'II r�r�o_ la low Yi12 �. CUB 7oUi' 2nc✓ C017 foUr- _ SoVer, -{:,, aS 3H- fir,�e incIv, � ? lfow much o{L `�x,s/,:,y 2sphzlf f5 �ISo CUIIec{2c� I & 2ccouli eo Ao- cj 26 1 l 11 1 ENGINEER'S AND GEOLOGIST'S REPORTS STORMWATER FACILITIES FOR PEPPERTREE RESORTS LTD. VILLAS III (�`y� a?a ATER 1 ATLANTIC BEACH, NORTH CAROLINA `Np71pl + CAR �F ESS SEAL 6893 c1V? AUGUST 1995 PROJECT NO.: PRL-9301.771 AUG 2 8 M5 DEM R of ?s6834- OWNER: MR. WAYNE KINSER PEPPERTREE RESORTS LTD. P.O. BOX 6319 ASHEVILLE, NC 28816 704-254-8991 704-254-8073 - FAX ENGINEER: ROSE AND ASSOCIATES, P.A. P.O. BOX 3396 NEW BERN; NC 28564 919-633-0327 919-638-4499 - FAX . _ _ _ __ JOB �"-'�/� /C / /�•�� A /J VU-LRS =- ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF NEW BERN, NORTH CAROLINA 28560-1248 CALCULATED BY DATE �9S (919) 633-4300 CHECKED BY ROgLf NLt n2iJ3 l2. fuVm. um Ulill. DATE ,.S 7-17a,�FE 14;� ih/UAf ��l ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 SHEET NO. OF - /0 CALCULATED BY J601 DATE::4�9 '6 CHECKED BY DATE_ SCALE ,r Vri..l.. L/ ...... ............ .................. ........ 4f A. QR - .. . . /W- j,,Q;097 - ............... . . . ........ .. . . . ........... . .7 ............. . .. ... ... - - 6�i 7 ............ -A . ........... .. .......... t -3 z f ............. -Y . .. .... ............. . .... . ....... . .. . ......... . ........ . ........... .. . . . ......... ........ ...... . .... . troy ... .. ... .. ... ... ......... ........ ... 17. . .. . .. .. .. ....... ......... rA L 0- a e S ZZY ... ... .. ... .. ... .. .. . ....v 3 / .... .. . ... . . . .............. ...... ..... -A a c-7�,L . . .... ............ ...... ...... 71.0 .. ... ... .. ...... ...... . ..... .......... . ...... ................... . .. . .. . . ....... . ...... IZEA .. .. G . ... ... . . . .......... ....... .......... . . ....... tf .. . ........ ........... .. ..... ........... . ..... ............. . . ........... ...... .... ............ ............. ...... ..... ... 77o.T .... .. ... ... . ............. . .... ... ..... ...... ...... ... .. .. ... ... .. ... . .. . .. .. .. .. .. ... .... ....... . .. ....... . ... .. .. .. .. .. ............ ................ .... ..... . .... ..... . . ...... ... .. . ......... ............ ... ... .. .. .. . . ---- ------- ....... ....... ......... ............. ....... . .... . . . ....... V. 71 ........... . ....................... . ...... ... . ............. ......... . . ...... . ... . ........ .. ..... ..... .. ..... ... .. ... .. .... ...... . t �7 t&- L 99, o o,/ L9 .. . .. .. . .. .. .. .. . ... .. .. ... .. ... .. .. .. .. .. .. .. . ... . . .. .. .. . �L. 77.1 &7-/�:Jl�7 .... .. ..... .11--l! ........... . .. ......... ............ . ............ ... ............ 2L-,41. vlhs V . ......... ... .. - . 40, ..... ....... 1-.1-1-1. p m ir i�,j 41 7-. ):C, 2 -<2 7-- ROSE AND ASSOCIATES, P.A. JOB 1610 Hwy. 70 East P.O. BOX 1248 SHEET NO. OF NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 CALCULATED BY pA CHECKED BY DA 1 SCALE "9 e, 9 5,4, G 4 sr�F7" i�itvED /+2,�A UEr�7 4J i .. ... O7//3�95` _.. , ri [ n( 119, IJG__ OF f;..d%u G/9T/o/J X//Wu/�i to a A// U YNWJGi20 1 M e5 tr2., Gl en, Maa 01471. 1 ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 ME SHEET NO. CALCULATED BY CHECKED BY - SCALE 0 OF O DATE DATE B JOB ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF_ NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 CALCULATED BY DATE CHECKED BY DATE SCALE gii d.7' 7 /IiZ u G b IN/A �a._[coc)s.. a;l�Zo� ..._uJ/i7 x �fr a cJ„rS o 7 _: ...... ..... k1F!4�Te.�T210 L0A(--A61/rL/ ....:. 2l 00 S.R..F7 X.0,07 uS,7/.�.A. S �1,1=7 JOB ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. NEW BERN, NORTH CAROLINA 28560-1248 CALCULATED BY (919) 633-4300 CHECKED By - SCALE Ff;A 0 A!PA-e 7- OF 0; 07 X i,5 7/1 k'. 60.., . ... ........1.3- 71 . . .......... . ....... .. ........ ....... . . ........ .. . . ...... 2.7( 7—lq 11.6 U / 4 D f k) Gm S ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 NO mj 1m. Q. M. 01411, JOB P7F SHEET NO. .� OF to CALCULATED BY DATE 81/1/95 CHECKED BY DATE JOB ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF_ NEW BERN, NORTH CAROLINA 28560-1248 (919) 633.4300 CALCULATED BY DATE CHECKED BY DATE _ y 9975l »z -_ 5i = /YJFiJlJIuc", O, 0lIZ /- �_ly;= JOB ROSE AND ASSOCIATES, P.A. 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF_ NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 CALCULATED BY DATE CHECKED BY DATE SCALE Q. U/. UOO (>AL Q M//,J_-- '. /<_Jb,-)S ��_... ' /J _ rs X 71%?; .ice <? O = ?7a 41 C7A4 PXGp1Ll M41U Ip, 6mmn. mpg 01111. JOB ROSE AND ASSOCIATES, P.A. Q 1610 Hwy. 70 East P.O. Box 1248 SHEET NO. OF - NEW BERN, NORTH CAROLINA 28560-1248 (919) 633-4300 CALCULATED By DATE CHECKED BY DATE , I I I I -- ) 1 0 ENGINEERING CONSULTING SERVICES, LTD. p• ,.. .K..o Geotechnical a Construction Materials e Environmental m WILSON ENGINEERING DIVISION August 14, 1995 Rose and Associates PO Box 3396 New Bern, North Carolina 28564 Attention: Mr. Joe Rose, P.E. Reference: Field Permeability Testing for Stormwater Disposal at the Peppertree Resort Addition Atlantic Beach, Carteret County, North Carolina ECS, Ltd. Project Number: W 1287 Dear Mr. Rose, Engineering Consulting Services, Ltd. has completed the field permeability testing for the proposed Stormwater Disposal System for the above referenced project. This letter with the attachments provides the results of our testing as well as an explanation of field testing methodology, and the laboratory testing results upon which the estimated permeability of the near surface soils is based. PROJECT INFORMATION: The field permeability tests performed for this phase of the project were to provide an estimate of the permeability of the soil strata at the proposed disposal depth for the stormwater disposal system for the additional parking and roadway areas for the Peppertree Resort Villas, Atlantic Beach, North Carolina. We understand based on the drawings faxed to us, that stormwater from the parking and roadway areas on the north side of the project will be routed to drop inlets and collection basins and then routed to an infiltration system to release the stormwater to the watertable aquifer. The existing ground surface elevations in the area of the proposed infiltration systems range from approximately 6.0 to 6'/2 feet above mean sea level. Proposed elevation for the base of the infiltration system is approximately elevation 5.5 or approximately 2 feet above mean high water table. In order to apply for a stormwater disposal permit, the permeability of the subsurface soils in the proposed area is required. The selected method for this particular area was an in -situ permeability test in a shallow hand auger boring at the approximate depth of the influent water disposal. P.O. Box 10434, Wilmington, North Carolina 28405 • (910) 270-3016 • FAX (910) 270-2866 FIELD TESTING: In order to perform the field permeability tests, shallow hand auger borings were advanced to the proposed base of the storm water disposal system at a depth of approximately 1.75 to 2.25 feet below existing site grade. Four locations were selected for field permeability testing and are shown on the boring location diagram. Additional hand auger borings were also performed in the proposed infiltration area in order to determine the depth to the watertable. Hand auger equipment was used to advance the borehole to the test depth and a sample of the subgrade soil encountered was retrieved and returned to the ECS, Ltd. laboratory. Upon reaching the required depth, a 2 inch steel pipe was driven into the soil a depth of approximately 6 inches and a clear plastic 1 inch diameter tube was installed with a water tight seal to the top of the 2 inch steel pipe. Clean on site water was introduced into the test apparatus by means of a funnel on the top of the plastic tube. The tube was filled to a predetermined height above the ground surface and then water was allowed to infiltrate into the subsurface soils to a predetermined lower height. The time required for the water to infiltrate over this predetermined length was measured for three consecutive test periods and the results were the average of the three tests. The vertical permeability of the soil was then calculated using the methodology described in Lamb and Whitman, 1951, page 284 and 285 method E. The results of are summarized in table 1. The calculated average was 495 gpd/ftz. Because the soils were not saturated during the test however, this value should only be considered an estimate. Upon completion of the field testing the boreholes were properly backfilled with on site material and thoroughly tamped in place. At all test r l� 2� locations the surfical water table aquifer was encountered at a depth of approximately 3�.5 to 4.0 feet below existing site grade. However, it is likely that this level will fluctuate -C ihd depending on the season of the year, recent rainfall levels, and tidal influences. opxI 3 t1�P,d- 5 LABORATORY TESTING: The recovered soil samples from the hand auger borings at the stormwater disposal depth were tested in the ECS, Ltd. laboratory for grain size in accordance with ASTM D-422. Based on the results of the grain size analyses, a grain size curve was established for each soil sample and an estimate of the permeability of the soil was calculated using Hazens method. This method uses the diameter of the grains at 10% finer on the grain size curve, to calculate estimated soil permeability in accordance with the following formula: K=A(D,o)Z where A=1 when K is to be determined in centimeters per second and DjO is in millimeters. The estimated permeability of the soil determined using Hazens method is shown in the attached table. The average permeability determined using this method z was approximately 215 gpd!ft. The Blain size analysis data and grain size carves arc attached for reference as well as the locations of the shallow hand auger borings on the site plan. Based on the results of the field permeability testing and the calculations using Hazens method we would recommend a value of K of 100 gpd/ft2 for design purposes. Should you have any questions with regard to the information submitted in this report please do not hesitate to contact us. Respectfully Submitted, Engineering Consulting Services, Ltd. gle" .D. /nwz., Roger D. Moore P.G. Professional Geologist/Branch Man Benjamin V. Wilson P.E. Principle Engineer/North Carolina Operations Manager Attachments: Sieve Analyses Table 1 & 2 RDM/BV W:sd TABLE 1 PEPPERTREE RESORT - INFILTRATION TESTING ATLANTIC BEACH, NORTH CAROLINA ECS, LTD PROJECT NUMBER: W1287 Values of K obtained using Hazen's Method and from Field Permeability Testing C =% DIO K = A(D 10)2 - Hazen's Method D60 = Soil Diameter (mm) where 60% of the soil weight is finer D10 = Soil Diameter (mm) where 10% of the soil weight is finer A = 1 when K in cm/s and DIO is mm Restrictions: 0.1< D10 <0.3mm Cu<5.0 TABLE 2 PEPPERTREE RESORT ATLANTIC BEACH, NORTH CAROLINA ECS, LTD. PROJECT NUMBER: W1287 �� "�,3;�+AMI,!Ll��.;j��:�,€,r��,�1,Y„RO(13VD,Ei•EY�tTt©E�„���.�WA`i'Et�EVEi�ELEVA°T'IQNS BASED ON ELEVATIONS OF EXISTING MANHOLE COVER NEXT TO SALES OFFICE MANHOLE COVER = 6.43 BASED ON ELEVATIONS OF EXISTING MANHOLE COVER NEXT TO SALES OFFICE MANHOLE COVER = 6.43 ENGINEERING .CONSULTING SERVICES, LTD. . P.O. Box 10434 Wlndngtoo. NC 28405 (910) 270-3016 FAX (910) 270-2966 SIEVE ANALYSIS PROJECT NAME: Peppertree DATE: 8-10-95 PROJECT NUMBER: W 1287 SAMPLE NUMBER: B2 SAMPLE DESCRIPTION: Tannish gray fine to medium sand, trace of silt CLASSIFICATION: SP COMPUTED BY: Kris Stamm Sieve Openings US Standard Sieve Size or Number weight Retained in grams Percent Retained Percent Finer by Weight Millimeters Partial Total 2.00 Number 10 0 0 0 100 0.84 Number 20 Pinches 0.42 Number 40 4.8 3.2 3.2 96.8 0.297 Number 60 47.0 31.3 34.5 65.5 0.149 Number 100 87.0 58.0 92.5 7.5 0.074 Number 200 9.6 6.4 98.9 1.1 Total Weight in Grams DRY WEIGHT BEFORE WASH 1150.0 DRY WEIGHT AFTER WASH 149.4 PERCENT PASSING # 200 SIEVE 1.1 •ENGINEERING .CONSULTING . SERVICES, LTD. P.O. Box 10434 Wilmington, NC 29405 (910) 270-3M FAX (910) 270-29" SIEVE ANALYSIS PROJECT NAME: Peppertree DATE: 8-10-95 PROJECT NUMBER- W1287 SAMPLENUMBER: B8 SAMPLE DESCRIPTION: Tannish gray fine to medium sand, trace of silt CLASSIFICATION: SP COMPUTED BY: Kris Stamm Sieve Openings US Standard Sieve Size or Number weight Retained in grams Percent Retained Percent Finer by Weight inches Millimeters Partial Total 0.079 2.00 Number 10 0 0 0 100 0.033 0.84 Number 20 0.0165 0.42 Number 40 5.6 3.7 3.7 1 96.3 0.0117 0.297 Number 60 44.7 29.8 33.5 66.5 0.0059 0.149 Number 100 86.1 57.4 90.9 9.1 0.0029 0.074 Number 200 12.1 8.1 99.0 1.0 Total Weight in Grams DRY WEIGHT BEFORE WASH 150.0 DRY WEIGHT AFTER WASH 148.5 PERCENT PASSING # 200 SIEVE 1_0 ENGINEERING .CONSULTING SERVICES,LTD. .. P.O. Doc 10474 . w1nd69t o, NC 28405 (910) 270-3016 FAX (9101 270-28" 6Y1WWAIM Y[. I PROJECT NAME: Peppertree DATE: 8-10-95 PROJECT NUMBER: W 1287 SAMPLE NUMBER: B4 SAMPLE DESCRIPTION: Tannish gray fine to medium sand CLASSIFICATION: SP COMPUTED BY: Kris Stamm Sieve Openings US Standard Sieve Size or Number weight Retained in grams Percent Retained Percent Finer by Weight inches Millimeters Partial Total 0.079 2.00 Number 10 0 0 0 100 0.033 0.84 Number 20 0.0165 0.42 Number 40 3.0 2.0 2.0 98.0 0.0117 0.297 Number 60 45.5 30.3 32.3 1 67.7 0.0059 0.149 Number 100 91.1 60.7 93.0 7.0 0.0029 0.074 Number 200 9.5 6.3 99.3 .7 Total Weight I in Grams DRY WEIGHT BEFORE WASH 150.0 DRY WEIGHT AFTER WASH 149.1 PERCENT PASSING # 200 SIEVE 2 ENGINEERING CONSULTING SERVICES, LTD. P.O. Box 10474 W1mia6ton. NC 28405 (9I0) T7030I6 FAX (910) 270-2866 SIEVE ANALYSIS PROJECT NAME: Peppertree DATE: 8-10-95 PROJECT NUMBER: W 1287 SAMPLE NUMBER: B6 SAMPLE DESCRIPTION: Tannish gray fine to medium sand, trace of silt CLASSIFICATION: SP COMPUTED BY: Kris Stamm Sieve Openings US Standard Sieve Size or Number weight Retained in grams Percent Retained Percent Finer by Weight inches Millimeters Partial Total 0.079 2.00 Number 10 0 0 0 100 0.033 0.84 Number 20 0.0165 0.42 Number 40 3.5 2.3 2.3 97-7 0.0117 0.297 Number 60 40.5 27.0 29.3 70.7 0.0059 0.149 Number 100 90.7 60.5 89.8 10.2 0.0029 0.074 Number 200 12.5 8.3 98.1 1.9 Total Weight in Grams DRY WEIGHT BEFORE WASH 150.0 DRY WEIGHT AFTER WASH 147.2 PERCENT PASSING # 200 SIEVE 19 ®' IJO fl nl' =. OEVELOPA6ENr f. s�JK6Ef A REA I Z\ SITE 9.M AC L G Co CP ME MOM n So REIFuS6 q ! 8-7 B-6 B s FIGURE 1 INFILTRATION TEST LOCATIONS IPEPPERTREE RESORTS ENGINEERING ,�-- —--- ; - CONSULTI` C; ! ! S, L't i) iKJS S-15-95 1'=65' V'J12S7 ....... ..... .. Job C Cal ons by: Date Y2-`�, /97-5" page alculations by*. I Checked by. e Date. hecked by: fM / 2f) /Q 5 15: 57 TX/RX N0.0110 r. 002 Job Name Calculations by: Chocked by. te: T ��1 Page 2 te: TOiML P.W nn') J U AJ E Ic? g q- 7EPo g of 012 k1 i ._�t_;�rf1 ✓ D/L �£ 5� /�1 ✓Ti I -- - - ' I � ;7-2E Sri 23 R-17 4 B-22 �620 .0 B-21 va.10, 93 1 F— P-1 p-jo :-P6 Bl B2 B15 2 OOB-23 Z B113 0 OB8 'B9 BI * B10 5 m El + PWI B27 .26 O "�•® Jm'vfA% LM O Boring Location Peppertrep,,R, Atlantic p3aci sy RPM Q/94 cmc� BY HAND AUGER PROFILE LOG HlkND AUGER No. I�_� JOB NO. W 0882 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach, NC ENGINEER WEATHER clear 700 DATE 4-4-94 GROUND ELEV. DEPTH TO WATER 4.0' DEPTH HORIZON SOIL DESCRIPTIONSA NO DAP REMARK 0 Tannish gray fine to medium SAND, trace of silt (SP) i 2 d 1 3 —� i i 4. —I 5 6 "l 8 Gray fine to medium SAND, trace of silt with shell fragments (SP) BORING TEININATED AT 8.75 FEET 9 10 REMARKS: 14000 THUNDERBOLT PUCE PROPORTIONS ABBREV. EXCAVATION SUITE R USED F - FINE EFFORT t9SUD TRACE (tr.) 5-127. M - MEDIUM E - EASY CHANTTLLY, VA. 22021 WITH (w/) 12-29% C - COARSE V - VERY M — MODERATE 703/471-8400 ma ADD TO NAME 30-50% GR. - GRAY D - DIFFICULT FAX/B34-0527 BN. - BROWN GROUNDWATER (SANDY) YEL. - YELLOW HAND AUGER PROFILE LOG HAND AUGER NO. B-3 JOB NO.w'1082 JOB NAME AND LOCATION _ Peppertree Resorts Atlantic Beach, NC ENGINEER WEATHER clear 700 DATE . 4-4-94 GROUND ELEV. DEPTH TO WATER 4.0' DEP'Cii HORI20N DES)CRIPTiON SAMPLE DCP REOK ,SOIL N Whitish gray fine to mediw^. SAND, trace of silt (SP) 1 —7 I 2 3 I I h I 5— 6 7- 8- 9 10- BORING TERMINATED AT 10.0 ITT RPA'ARKS: C i 14000 THUNDERBOLT PL1cE PROPORTIONS ABBREV. EXCAVATION SUITE R CHANTILIY. VA. nVrD 22021' USED TRACE (tr.) 5-12� F - FINE M - MEDIUM C COARSE I EFFORT E — EASY 7na/47!-8400 WITH (•.•:/) 12-297 — v - VERY M — MODERATE ADD TO NAME 30-50% GR. - GRAY I D — DIFFICULT FAx/e34-3527 BN. -BROWN vet. _ veL oW GROUNDWATER TOTMa HAND AUGR PROFILE LOG IIAND AUGER NO. B-17 JOB NO. W1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach NC ENGINEER WEATHER Sunny 750 DATE 5-4-94 GROUND ELEV. —_ DEPTH TO WATER 3.8' HORIZONI SOIL, DESCRIPTION Sp NO. MPLEDEPTH DC P REO. 0 Tannish gray fine SAND, trace of silt (Sp) 1 � II 2 I 3 —� t Gray fine to mediLun SAND, trace of silt (SP) 4 J BORING TERMINATED AT 4.0 FEEi 5 6 7 8 9 �{ 10 —I REMARKS: =- PROPORTIONS "'REV. EXCAVATION 14000 THUNDERBOLT PLACE USED F -- FINE EFFORT AML SURER TRACE (tr.) 5-12% ?.1 — MEDIUM E — EASY NSCfiANTIII.Y. VA. ��® 22021 WITH (w/) 12-29% C — COARSE V — VERY M — MODERATE Toa/aT>-eaoo ADD TO NAME 30-50% GR. — GRAY BN. - DROWN D — DIFFICULT FAR/034-5527 — —I (SANDY) YEL — YELLOW i GROUNDWATER HAND AUGER PROFILE LOG [-LAND AUGER NO. R---ta JOB N0. W1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic BeachNC ENGINEER WEATHER Sunny 750 DATE 5-4-94 GROUND ELEV. -- _-- DEPTH TO WATER _ 3.50 -- DEPTH HORIZON SOIL DESCRIPTION SAMPLE DCP KEMARK NO. 0 Tannish gray fine SAND, trace of silt (SP) 1 � II 2 —j i 3 --� fine SAND, trace of silt (SP) i Gray to medilun 4 J BORING TERMINATED AT 4.0 FEET 5- 6- 9 10 � I 0 REMARKS: PROPORTIONS ABBREV. EXCAVATION 14000 THUNDERBOLT PLACE USED F - FINE EFFORT sorre R TRACE (tr.) 5-12% IUM E - FASY CHANTIILY, VA. 22021 WITH (wj) 12-29% C - COARSE V - VERY M - MODERATE 703/471-8400 ADD TO NAME 30-50% GR- - GRAY D _ DIFFICULT l FAX/034-5527 BN. - DROWN GROUNDWATER _,�� (SANDY) � YEL. - YELLOW I II ND AUGER PROFILE LOG HAND AUGER NO. B-19 JOB NO. W1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach, NC ENGINEER WEATHER sunny 750 DATE 5-4-94 GROUND ELEV. DEPTH TO WATER 3.51 DEPTH FIORIZON SOIL DESCRIPTION S"No`� DCP RENOO. 0 1 Tannish gray fine SAND, trace of silt (Sp) 2- 3— Greenish gray fine to medium SAND, trace of silt (SP) 4 BORING TERMINATED. AT 4.0 FEET 5 6 8 i 9 10 R,,'D5ARK5: 14000 THUNDER90LT PUCE PROPORTIONS ABBREV. EXCAVATION y SUITE R CHANfIILY, VA. 22021 USED TRACE (tr.) 5-12% F - FINE M - MEDIUM C - COARSE EFFORT E - EASY p�+p a lfa0 i,� Tos/aT1-eaao W171H (iv/) 12-29% V - VERY M - MODERATE c g FAX/1134-5527 ADD TO NAME 30-50% GR. - GRAY BN. - BROWN D - DIFFICULT GROUNDWATER 4_ (SANDY? YEL. - YE!!,U OW HAND AUGER PROFILE LOG HAND AUGER NO. B-20 JOB NO. W1082 JOB NAME AND LOCATION Peppertree Resorts ENGINEER _ GROUND ELEV DEPTH iri0n1"LGNI 0 1 2 9 WEATHER Sunny 750 DATE 5-4-94 DEPTH TO WATER 3.8' SOIL DESCRIPTION i ANo DCP Gray fine SAND, trace of silt (SP) Brownish gray fine -to medium SAND, trace of silt (SP-SM) 4 Gray fine to medium SAND (SP) I BORING TERMINATED AT 4.0 FEE' 5 0 7 X E 10 REMAP.KS: a 14000 THUNDERBOLT PLACE PROPORTIONS ABBREV. EXCAVATION 00 SUITE R CHANTII.LY, VA. 22021 USED TRACE (tr.) 5-127. F - M — FINE MEDIUM EFFORT E — EASY LT® WITH (w/) 12-29% V - VERY M — MODERATE 703/471-➢400 eAx/e3a-ssn ADD TO NAME 30-50% GR. BN. - GRAY - BROWN D — DIFFICULT (SANDY) YEL. — YELLOW GROUNDWATER 4��c HAND AUGER PROFILE LOG HAND AUGER NO. B-21 JOB NOW1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach, NC ENGINEER WEATHER sunny 750 DATE 5-4-94 GROUND ELEV: DEPTH TO WATER 3.75- DEPTH HORIZON SOIL DESCRIPTION bA NO, DCP REMARK 0 Tan fine SAND, trace of silt (SP-SM) 1 2 3 Gray fine to medium SAND, trace of silt (SP) 4 BORING TERMINATED AT 4.0 FEET 5 6 7 8- 9 10 REMARKS: ® 14000 THUNDERBOLT PLACE PROPORTIONS ABBREV. EXCAVATION USED F — FINE EFFORT Ta Et;TRACE SUITE R (tr.) 5-12% M - MEDIUM F. - EASY LT® CIIAIIT LLY. VA. 22021 ViITH (w/`) 12-29% C - COARSE V — vERY M - MODERATE 703/471-8400 ADD TO NAME 30-50% I(SANDY) OR. - GRAY D - DIFFICULT FAR/834-5527 FIN. — BROwN 'iELLOw Q GROUNDWATER= YEL. — wr�xnc HAND AUGER PROFILE LOG HAND AUGER NO. B-22 JOB PJO. W1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach, NC ENGINEER WEATHER sunny 750 DATE 5-4-94 GROUND ELEV. DEPTH TO WATER 3.75' DEPTH �HORIZONI ,JOIL DESCRIPTION SA NO � DCP i6NO v. 0 —} - Tannish gray fine SAND, trace of silt (sp) I 2 I 3 Tannish gray fine to medium SAND, trace of silt (SP) 4- — BORING TERMINATED AT 4.0 FEET 5 6 7— 8 9- REMARKS: 14000 THUNDERBOLT PLACE PROPORTIONS ABBREV. EXCAVATION USED F - FINE. EFFORT ,�(J'�' SUITE R TRACE (tr.) 5-12% M - MEDIUM E - EASY . H N J LT® CRANTIll.Y, VA. 22021 WITH (w/) 12-29% C - COAREE V - VERY bi — MODERATE = 703/471-0400 ADD TO NAME 30-50% GR. - GRAY D - DIFFICULT _� �� FAX/1334-5527 BYFi. GROUNDWATER 2_ (SANDY) -HyFLLnw I-IAND AUGER PROFILE LOG HAND AUGER NO. B-23 JOB NO. W1082 JOB NAME AND LOCATION Peppertree Resorts Atlantic Beach NC ENGINEER WEATHER Sunny 750 DATE 5-4-94 GROUND ELEV. DEPTH TO WATER 3.0' DEPTH HORIZON SOIL DESCRIPTION SAMPLE DCPREMARK .0 i 1 Gray fine SAND, trace of silt (Sp) 2 —� i 3 i Tannish gray fine to medium SAND, trace of silt (Sp) 4= BORING TERMINATED AT 4.0 FEET 5 6 7 9 10 REMARK;: 9 —�— 14000 THUNDERBOLT PLACE PROPORTIONS ABBREV. EXCAVATION SUITE R E, CHA77TILLY, VA. 22021 OWD USED TRACE (tr.) 5-12% F - FINE M - MEDIUM C EFFORT E — EASY 03 „1_5; WITH (w/) 12-29% — COAR$c V - VERYA. M — MODERATE ° FAX/894-5527 ADD TO NAME 30-50% GR. - BROWN D — DIFFICULT CROUNDWATER Q (SANDY) YEL. - YENow 1 HAND AUGER PROFILE LOG H^.ND AUGER NO. B-24 JOB N0. W1082 JOB NAME AND LOCATION Peooertree Resorts Atlantic Beach, NC ENGINEER WEATHER sunny 750 DATE 5-4-94 GROUND ELEV. DEPTH TO WATER _ 3.25' DEPTHHORIZON SOIL DESCRIPTION SAMPLE DAP REMARK -- tin, 1 _I I Grayish tan fine SAND, trace of silt (Sp) 2 —� 3 I I 4 J i Gray fine to medium SAND, trace of silt (Sp) PARING TERMINATED AT 4.0 FEET 5 6 t 8 9 10— REMARKS. ® 14000 THUNDERBOLT PLACE PROPORTIONS ABBREV. EXCAVATION SUITE R USED F - FINE EFFORT 6T®OHANTILLY. VA. 22021 TRACE (tr.) 5- 12% WITH M - C - MEDIUM COARSE E _ EASY 703/471-8400 (w/) 12-29% V - VERY M — MODERATE FAX/834-5527 ADD TO NAME 30-50% CR. B? j- - GRAY - BROWN I T D _ DIFFICULT (SANDY) _ YEL. - YELLOW, GROUNDWATER - Peppertree Resort B-2 log t (min) -3.00 -2.00 -1.00 0.00 1.00 1.00 0.67 H/H0 0.33 IMME « h �o « « 0 o« 2.00 momwj 0.67 H/ HO -1.65 -0.65 0.35 1.35 2.35 3.35 log Tt/rc2 o - Data + - Type Curve Slug Test: alpha = -7.0 SOLUTION Transmissivity = 9.570E+0002 gpd/ft Aquifer Thick. = 4.000E+0001 ft Hydraulic Cond.= 2.392E+0001 gpd/sq ft Storativity = 1.000E-0007 0.33 0.00 L Peppertree Resort B-3 log t (min) -3.00 -2.00 -1.00 0.00 1.00 1.00 0.67 H/H0 0.33 0.00 M 2.00 --� 1.00 0.67 H/HO 0.33 0.00 -2.42 -1.42 -0.42 0.58 1.58 2.58 log Tt/rc2 o - Data + - Type Curve Slug Test: alpha = -2.0 SOLUTION Transmissivity = 1.625E+0002 gpd/ft Aquifer Thick. = 4.000E+0001 ft Hydraulic Cond.= 4.063E+0000 gpd/sq ft Storativity = 1.016E-0002 Data for Slug Injection/withdrawal Test Well Name: B=2 Date of Test: 5-4-94 Aquifer Thickness (b): 40.000 ft Change in Vol.of Water = 0.267 cu ft Effective Radius of Well = 0.063 ft Radius of Casing(rc) over Water Level Decline = 0.063 ft Entry Time(t) Head H H/HO No. (min) (ft) (ft) 1 -1.000 5.760 2 0.000 3.900 1.860 1.000 3 0.250 5.170 0.590 0.317 4 0.500 5.650 0.110 0.059 5 0.750 5.720 0.040 0.022 6 1.250 5.740 0.020 0.011 7 .1.500 5.750 0.010 0.005 8 1.750 5.750 0.010 0.005 Data for Slug Injection/withdrawal Test W ll N ne• B-3 Date of Test: 5-3-94 e a i Aquifer Thickness (b): 40.000 ft Change in Vol -of Water = 0.267 cu ft Effective Radius of Well = 0.063 ft Radius of Casing(rc) over Water Level Decline = 0.063 ft Entry No. 1 2 3 4 5 6 7 8 9 10 11 12 1.3 14 Time (min) -1.000 0.000 0.250 0.500 0.750 1.000 1.250 1.500 1.750 2.000 2.250 2.500 2.750 3.000 Head (ft) 9.350 7.800 8.660 8.880 9.090 9.140 9.190 9.220 9.230 9.250 9.270 9.280 9.290 9.300 H (ft) ************ 1.550 0.690 0.470 0.260 0.210 0.160 0.130 0.120 0.100 0.080 0.070 0.060 0.050 H/HO 1.000 0.445 0.303 0.168 0.135 0.103 0.084 0.077 0.065 0.052 0.045 0.039 0.032 PEPPERTREE RESORT ECS, LTD. PROJECT NUMBER: W1082 Location: Atlantic Beach, NC Date: 4-25-94 Boring #: B-2 Sample #: 1 Tested By: Eris J. Stamm Initial Sample Wt.: 150.0 Sample Description: Tan fine to medium SAND, trace of silt (SP) Remarks: EST Perm. = 2.89 x 10-2 cm/sec Depth 0.0' to 4.5' GRAIN SIZE ANALYSIS ....SIEVE -if SIEVE WT.'OF :PERCENT CUMULATIVE CUMULATIVE... SOIL: RETAINED PERCENT.';• PERCENT (mm) RETAINED RETAINED` FINER (q) iy # 4 4.75 -0- -0- -0- 100 # 10 2.00 -0- -0- -0- 100 # 16 1.18 -0- -0- -0- 100 if 30 .600 1.6 1.1 1.1 98.9 # 40 .425 4.0 2.7 3.8 96.2 # 50 .300 24.5 16.3 20.1 79.9 # 60 .250 37.1 24.7 44.8 55.2 #100 .150 73.5 49.0 93.8 6.2 #200 .075 8.8 5.9 x ENGINEERING CONSULTING SERVICES, LTD. ;u Geotechnical o Construction Materials a Environmental WILSON ENGINEERING DIVISION August 23, 1994 Rose and Associates - Post Office Box 3396 New Bern, North Carolina 28564 Attention: Mr. Joe Rose Reference: Infiltration Testing for the Disposal of Effluent Water from the Groundwater Loweri System P`eppertree el o t—Villas Atlantic Beach, North Carolina ECS, Ltd. Project Number: W1142 Dear Mr. Rose: Engineering Consulting Services, Ltd. has completed the infiltration testing for the proposed effluent disposal area for the above referenced project. This letter with the attachments provides the results of our testing as well as an explanation of the field testing methodology and the laboratory testing results upon which the estimated permeability is based. Project Information The infiltration tests performed for this phase of the project were to provide an estimate of permeability of the soils at the proposes: disposal depth for the groundwater lowering system for the nitrification field at the Peppertree Resort Villas. We understand that the effluent water from the groundwater lowering system is proposed to be piped to the new building area and disposed of in a trench adjacent to the parking area to the .west of the new P.O. Box 10434, Wilmington, North Carolina 28405 a (910) 270-3016 o FAX (910) 270-2866 Offlnpc- Wachinomn n('- Raltimorf%. Mt): Rirhmnnei Nnrfnik VA- Rrsearr.h Triangle Park. Wilmington. NC ECS, Ltd. Project Humber: W1142 - 2 - Infiltraton TesO no - Peppsctree Resort Villas building. Ground surface elevations in the area of the proposed trench range from 11 to approximately 13 feet above mean sea level. The proposed elevation for the base of the disposal trench is approximately 5.5 feet above mean sea level. In order to apply for a permit for disposal of this effluent water, an accurate infiltration rate for the subsurface soils is required for the design of the disposal trench. A double -ring infiltrometer test was considered for providing the necessary data on the infiltration rate of the subsurface soils, however given the location and cost, this method was determined to be unacceptable. The selected method for this particular site was an in -situ infiltrometer test in a shallow hand auger boring at the approximate depth of effluent water disposal. Field Testing Procedures In order to perform the field permeability tests, shallow hand auger borings were advanced to the proposed base of the effluent disposal trench at a depth of approximately 6.5 feet below existing site grade. Three locations were selected for field permeability testing and are shown on the test boring location diagram. Hand auger equipment was used to advance the borehole to the test depth and a sample of the subgrade soil was retrieved and returned to the ECS, Ltd. laboratory. Upon reaching the required depth, a 2 inch diameter steel pipe was driven into the soil, a depth of approximately 6 inches and a clear plastic '_ irl,h tube was mounted with a water tight seal to the top of the 2 inch steel pipe. water was introduced into the test apparatus by means of a funnel at the top of the plastic tube. The tube was filled to a predetermined height atiove ground surface and then the water was allowed to infiltrate into the subsurface soils to a predetermined lower height. The time u ECS, Ltd. Project Number: W7142 - 3 - Infiltraton Testing - Peppertree Resort Villas required for the water to infiltrate over this predetermined length was measured for 3 consecutive test periods and the result was the average of the three tests. The vertical permeability of the soil was then calculated using the methodology described in Lambe and Whitman 1951, page 284 and 285 Method E. Results are summarized in Table 1. The calculated average -was 985-gpd/ft2. Since the soils were not saturated during the test, this value can only be considered an estimate. Upon completion of the field testing, hand auger boring B-3 was advanced to the water table in order to determine the depth of unsaturated soils between the base of the trench and the top of the water table elevation. The surficial water table aquifer was encountered at a depth of approximately 12.8 feet below existing site. grade. However it is likely that this level will fluctuate depending on the time of year, recent rainfall levels and tidal influences. Laboratory Testing The recovered soil samples from hand auger borings B-1 through B-3 at the effluent disposal depth were tested in the ECS, Ltd. laboratory for grain size in accordance with ASTM D-422. -Based on the results of the grain size analysis, a grain size curve was established for each soil sample and an estimate of the permeability of the soil was calculated using Hazen's Method. This method uses the diameter of tho grains at 10$ firer on the grain size curve to calculate an estimated soil permeability in accordance with the following formula: K = A(DIO)where A is equal to 1 when K is to be determined in centimeters per second and DIo is in millimeters. The estimated permeability of the soil determined using Hazen's Method is shown in the attached table. The average of the permeability estimates ECS, Ltd. Project Nu.ber: '11142 _ - 4 - Infiltraton Testing - Peppertree Resort Villas using this method was approximately 600 gpd/ft2. The grain size analysis data and grain size curves are attached for reference as well as the locations of the shallow hand auger borings. Based on the results from field testing and Hazen's Method, we recommend a K of 700 gpd/ft2 for design purposes. Should you have any question with regard to the information submitted in this report, please do not hesitate to contact US. Respectfully submitted, Engineering Consulting Services, Ltd. -0. �Y7we-P,- Ro r D. Moore, P.G. Professional Geologist/Branch Manager P 771a"' Ron B. Manilla, P.E. Project Engineer RDM/RBM:lyc CARO<iy< SEAL H07 It 06% :t - 5 - ECS, Ltd. Project Number: W1142 Infiltraton Testing - Peppertree Resort Villas ATTACHMENTS: INFILTRATION TESTING RESULTS GRAIN SIZE ANALYSES FIGURE 1 - HAND AUGER BORING LOCATION DIAGRAM PEPPERTREE RESORT - INFILTRATION TESTING ECS, LTD. PROJECT NUMBER: W1142 Values of K obtained using Hazen's Method and from Field Permeability Testing amp qx,! Boring, pia j) 'X' gp, dY ft) sq, b-fit D Ptif . . ..... .... F,leId T eti .. ....... ... . ... ... . . . ....... . .. RigAd q.ft S-1 B-1, 6.5' 0.170 0.295 1.74 2. 89X,0-2 612.8 674.3 S-2 B-2, 6.5' 0.171 0.297 1.74 2.92x10-' 619.2 1513.7 S-3 B-3, 6.5' 0.163 0.300 1.84 2.66x10-2 564.1 767.7 Average 598.0 985.0 Cu = V�60 Dio K = A(D 10)2 - Hazen's Method D60 = Soil Diameter (mm) where 60% of the soil weight is finer D io = Soil Diameter (mm) where 10% of the soil weight is finer A = I when K in cm/s and D10 is mm Restrictions: 0. 1 < D10 < 0.3 mm Cu < 5.0 GRAIN SIZE ANALYSIS Project Name: Peppertree Resort - Infiltration Testing Job Number: W1142 Date: 8-11-94 Computed by: Kris J. Stamm Sample Number: S-1 Classification: SP Sample Description: Tan fine to medium SAND SIEVE # SIEVE PVT, OF SOIL PERCENT CUMULATIVE CUMULATIVE OPENINGS RETAINED RETAINED PERCENT PERCENT (mm) (cp i2ETAINED FINER # 10 2.00 -0- -0- -0- 100 # 40 0.425 5.7 3.0 3.0 97.0 # 60 0.250 80.0 41.5 44.5 55.5 #100 0.150 97.8 50.7 95.2 4.8 #200 0.075 8.5 4.4 99.6 0.4 Dry Weight Before Wash: 193.0 Dry Weight After Wash: 192.0 Percent Passing #200 Sieve: 0.4 GRAIN SIZE ANALYSIS Project Name: Peppertree Resort - Infiltration Testing Job Number: W1 142 Date: 8-11-94 Computed by: Kris J. Stamm Sample Number: S-2 Classification: SP Sample Description: Tan fine SAND SIEVE 4 SIEVE WT. OF SOIL. :�PERCENT : :CUMULATIVE: -.:CUMULATIVE OPENINGS.,:::: RETAINED RETAINED PERCENT PERCENT. RETAINED # 10 2.00 -0- -0- -0- 100 #40 0.425 1.7 0.9 0.9 99.1 # 60 80.0 41.3 42.2 57.8 #100 0.150 Lt0.250 101.7 52.6 94.9 5.2 4200 00 5 0.075 9.7 5.0 99.8 0.2 Dry Weight Before Wash: 193.8 Dry Weight After Wash: 193.1 Percent Passing #200 Sieve: 0.2 0 5"LA/ Gr.NPt Figure 1 Hand Auger Boring Location Diagram J r---- Peppertree Resort Villas -Atlantic Beach, N.C. ENGINEERING CONSULTING CONSUETING RDM 8� 23-94 1"= 50' W1142 GRAIN SIZE. ANALYSIS Project Name: Peppertree Resort - Infiltration Testing Job Number: W 1142 Date. 8-11-94 Computed by: Kris r ctm - Sample Number: S-3 Classification: SP Sample Description: Tan fine SAND SIEVE # : SIEVE WT, OF. SOIL PERCENT CUMULATIVE CUMULATIVE :> OPENINGS RETAINED RETAINED PERCENT PERCEI4'T ' (mm) (c)) RETAINED FINER # 10 2.00 -0- -0- -0- 100 940 0.425 1.6 0.8 0.8 99.2 # 60 0.250 68.6 35.0 35.8 64.2 4100 0.150 112.7 57.5 93.3 6.7 #200 0.075 12.3 6.3 99.6 0.4 Dry Weight Before Wash: 196.0 Dry Weight After Wash: 195.2 Percent Passing 4200 Sieve: 0.4 LTJ' ENGINEERING CONSULTING SERVICES, LTD. Geotechnical e Construction Materials • Environmental WILSON ENGINEERING DIVISION Rose and Associates 1610 Flighway 70 East Post Office Box 3396 New Bern, North Carolina 28564-3396 Attention: Mr. Joe Rose December 8, 199 L� v J n l Reference: Groundwater Flow Direction for Surficial Aquifer Beneath the S V Proposed Buildings 26 - 29 31 L Peppertree Resort Villas, Atlantic Beach, North Carolina j ECS, Ltd. Project Number- W1082 Dear Mr. Rose: Please find attached diagrams showing the approximate groundwater contours for the surficial aquifer at the above reference sites on various dates over the past four to six weeks. Our report has been prepared in response to your request in the letter dated October 17, 1994, item number 3. In order to complete the groundwater flow direction calculations, three (3) shallow piezometers were installed to depths of approximately 10 to 13 feet below existing site grade at the locations shown on the diagrams. The piezometers were installed using hand auger apparatus and consisted of 1 1/2 inch 0.01C slot screen pipe with a slip cap and pointed plug end. Water levels were checked periodically by means of an electronic water level sensing device. The elevation of the top of each of the piezometer casings was surveyed using the reference from the existing asphalt parking lot. In general, the groundwater Eow direction appears to range froru appfoximately southwest to southeast with the shift in direction occurring apparently due to seasonal change in the overall regional groundwater elevation. As the regional_ groundwater elevation decreased, the flow tended to be more directly toward the ocean and toward the 17 N P.O. Box 10434, Wilmington, North Carolina 28405 • (910) 270-3016 o FAX (910) 270-2866 eAn. VA. A=o —W, T.i. ,I, V—L- W, southeast. During wetter periods of the year, the apparent flow direction tends to follow a more. southwesterly flow direction generally, following a subdued outline of the existing ground contours. Should you have any question with regard to the information transmitted in this letter, please do not hesitate to contact us. Respectfully submitted, . ENGINEERING CONSULTING SERVICES, LTD. Roger D. Moore, P.G. Professional Geologist/Branch Manager amesno; P.E. Project Engineer RDM/JKC:Iyc cc: Mr. Wayne Kinser - Peppertree Resort 0 GROUNDWATER RIB E LEVAMNS 10-20-94 E so too ra � ah Mile Owv,A i.w Val wn �aa vxro Mm v} Wi'h FJf f,Q 5`b 7.b [/,MnI Cs�wlRp N�lvl W iPO.IE[i/CLIENT Peppertree Resort !atlantic (Peach, MC WU er I K13 J12234 scue t_50' c�cnEo it /✓novEo er w-102 PROPOSED BUQLDINGS 26 27 29 eoo At I � of c ON 415 I (4.174 PZ�k2 J 1 OPOSED ASPHALT SUR AC� 1 4.10 ' y (a.oe)--�--i Pz 19 0 SO 100 (4.09) PZ it REv Dn IE (Lkw 5n1546C55 PzJ. S9 Sbt�3 irpl.My fvWlp KM.1. LN roo.FClrctFln Peppertree ]Resort Atlantic Beach, NC 7 Mn'n er U1 u]LH scuE 1• . 50' RDUF UFL[ED �r unavEv e. w-1082 N PROPOSED BUELDINGS / 26 </ 27 28 29 ono u ♦TEE / 12 \ 1 I 11�R POSED ASPHALT SURFAC 1 ( / 13.74) I \ / 050 100 P (3. WE Pam. as P..q.n P } P� 1bn Coda D: o'i Mn,Sn Z PaW g, ex» sY.n� RO;Cl/CIENI Peppestaee Resort Atlantic Beach, NC Q°vRQ UJIlDWA'Ii'IER IEILlEVATHONS 10-31-94 PROPOSED BUILDINGS 0 SO 100 ® PA 8. M6 pwaJ� i,m} Pal yen Cn.w DIOD Cv1o. 9n SUVb pda* 9k 5`bPb KEY C✓r>AI IwYr IN RoACiRIEM Peppertree Resort Atlantic Beach, MSC pnw er ua �.vs. xwE r . So• —_ --- iamev[o er w-IOC2 ENGINEERING CONSULTING SERVICES, LTD. n Geotechnical • Constriction Materials o Environmental 1 M7,1US45N ENGINEERING DIVISION Rose and Associates h aR l i 4 P.Q. Bnt :396 New Berne, NC 28564 Attention: Mr. Joe Rose RE: Groundwater flow direction for the surfical aquifer at several locations at the PcpperTrec Resort Villas, Atlantic Beach, NC ECS, Ltd. project number W1242 Dear Mr. Rose: Please find attached, diagrams showing the approximate groundwater contours for the surfical aquifer at two locations at the Peppertree Resort Villas Property Atlantic Beach, NC. This information has been prepared in response to your request in March 1994 and as listed in our proposal. In order to complete the groundwater flow direction calculations four sets of three shallow piezometers were installed to depths ranging from 8 to 17 feet below existing site grade at the locations shown on the contour diagrams. The peizometers were installed using hand auger apparatus and consisted of 1'/4 in. 0.010 slot screen with a pointed plug end and slip cap. Water levels in the piezometers were checked immediately upon completion of the installation procedures and were periodically checked at several outer visits to the site. The elevation of the top of each of the piezometer casings were surveyed using the reference from the existing asphalt parking lot adjacent to buildings 15 and 16. In general the groundwater flow direction within the surfical aquifer beneath buildings 15 and 16 and the surrounding area appears to be moving toward the north and east. The periodic measurements made several days later show contours which are consistent with a general flattening of the surfical aquifer as the water lc rels have decreased due to dryer weather and a gradual drop in the seasonal high water table. Should you have any questions wit,h. regard to 4,�c information transmitted in this letter please do not hesitate to contact us. Respectfully Subr_ti cd, Engineering Consulting Services, Ltd. Roger D. Moore P.G. Professional GcologisvBranch Manager Jifnes K. Cormors P.E. Project Engineer P.O. Box 10434, Wilmington., North Carolina 28405 9 (910; 270-3016 9 FAX (910) 270-2866 -(3.4�9) -- P9 � P-t (156) (3.55) ra at \ 3.55 3.6 GROUNDWATER ELEVATIONS 3-28-9 i p 35 70 Fer.- • r� ,."',ti Iaf 1pJv i [.M+.N :wump B. na.l 1n lylq, rtn 5`o-: KOhC1ICl(F' GROUNDWATER CONT. Peppertrec Resort i i Atlantic Beach, NC gnBL er B,B s0 ,f r cVC 1 ntiBDKD BI � W-ISQ P-8 (3.40) P-9"""""" 0 (3.V91 P-1 3.41 (3.48)_._---� �. \\ P-2 f 521 ---TT3.45 3.5 3.4 GROUNDWATER ELEVATIONS 3-31-9 U l5 70 I 1 I [M.�N fn✓sq a.. a._�a - -� NOR C„CE(x, I GROUNDWATER CONT.' Peppertrcc Resort Atlantic Beach, NC W.I.Y ]1 {I5 -10] SC.tE UIiE r . to'�____� u�um e. JI umvto EE w.Eiai H W Y 58 FNI-RANCE To P -Pr'ER i REE P l o--- 3. P11 i3.34) 3.4- 0A izFl GROUNDWATER CONT. Peppertree Resort Atlantic Beach, NC GROUNDWATER ELEVATIONS 3-28-9 _ A111010 c, I W-1242 HWY 58 P10 3. 2 p rf (3.27) 3.2 5"� 3 (3.32) .3 GROUNDWATER ELEVATIONS 3-31-9 0 35 10 Gl',OUNDWATER CONT, Peppertree Resort Atlantic Beach, NC m" F- P1EZOv11;'I'ER 1' I P2 I'3 P4 PS P6 P7 P8 P9 LRSl11 l PIO f2-A I PH P12 11h:i'1'l,R] ltF:l: RESORT lVI - A.N ITC WF.ACII, NC, GROI'N5NN;ATLk' ELEVATIONS ECS, LTD. PROJECT{1 W1242 TOP OF CASING ELEVATION 21.14 21.42 22.45 11.59 14.04 10.17 11.49 11.47 18.41 6.40 6.42 6.69 STATIC WATER ELEVATION 17.58 17.81 18.90 S.0S 10.52 6.67 8.00 7.98 14.90 3.18 3.03 3.35 GROUNDWATER ELEVATION 3.56 3.61 3.55 3.54 3.52 3.50 3.49 3.49 3.51 3.22 3.39 3.34 'o AT AUG 2 8 1995 NARRATIVE D R 95b$34 Ra�oJ �� PROJECT DESCRIPTION The purpose of the project is to provide parking, stormwater infiltration systems and sewage piped to existing treatment system. SITE DESCRIPTION Sites are relatively flat with high secondary dune to the north and south of the proposed buildings. There is no evidence of significant erosion under the present use of the properties. Along the south property line a few myrtle shrubs and several larger myrtle trees are present. On the north side and the remaining properties are over 100 oaks and cedar trees. These are to be replaced in areas not proposed for development in accordance with the Town of Atlantic Beach's approval. ADJACENT PROPERTIES SOILS Property along the south property line has been subdivided into residental lots and most of the lots have resident homes, property to the west is a Food Lion shopping center, north side is W. Fort Macon Road and east side is Peppertree's existing development, Villas I and II. Soils in the project area are Duneland-Newhan complex, primary Duneland. Duckston fine sand is presently covered by Duneland sand. CONSTRUCTION SCHEDULE Receive Bids October 1995 Preconstruction Conference October 1995 Start Construction October 1995 Complete Project December 1997 All erosion and sediment control practices will be inspected weekly and after rainfall events. Needed repairs will be made immediately. i Estimated time before stabilization, three (3) months. CONSTRUCTION ITEMS Temporary block and gravel drop inlet protection structures around drop inlets. Three (3) temporary gravel construction entrance. Silt fence along the south side of property. MAINTENANCE PLAN 1. All erosion and sediment control practices shall be checked for stability and operation following every runoff producing rainfall but in no case less than once every week. 2. Sediment shall be removed from the sediment traps when sediment storage capacity has reached fifty (50) percent. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. 3. Sediment shall be removed from behind the sediment fence when it becomes about 0.5 feet deep at the fence. The sediment fence shall be repaired as necessary to maintain a barrier. 4. All seeded areas will be fertilized, reseeded as necessary,. and mulched according to specifications to maintain a vigorous, dense vegetative cover. CONSTRUCTION SEQUENCE Temporary road shall be constructed from existing paved developed area and Fort Macon Road. Elevator foundation and shaft. Building #28 piling and structure. Stormwater infiltration system. Driveway and all impervious pavement. Building #26, #27 and #29 piling foundation. Building #29 Building #26 Building #27 Building #30, elevator and tunnel. Building #31 Building #32 NATURE AND PURPOSE OF THE CONSTRUCTION ACTIVITIES The four (4) north end three (3) story buildings, asphalt pavement, utilities including stormwater and pools will be constructed first. The buildings will be constructed on piling seven (7) to eight (8) feet off proposed ground level. The units will be sold as time sharing and the association will provide all maintenance. All sewage will be treated in the existing treatment system under a DEM permitted facility. The three (3) larger three (3) story buildings located on the south end of the property along with the tunnel and elevator construction will follow the north end facilities and may be started early in 1997. Sedimentation and erosion control sequence shall consist of the following: Areas north of the secondary dune, all stormwater will be retained on -site during construction and after site has been developed. Gravel approach will be constructed at one location, 18' wide and 50' long, for limited construction equipment to enter and exit site, this will be located east of the south parking area and north of the secondary dune. It is proposed to construct a temporary approach and driveway 12' wide into building- #27 and #29. This driveway will be constructed of stone only and use temporarily for construction access. No stormwater ditches exist in this area. The area will be restored to its original condition, except the trees. No erosion and sedimentation is expected, only around the drop inlets located in the parking lots and special efforts will be taken to protect these areas. The drop inlets will.extend two (2) inches above the stone base and we will construct silt fences around these drop inlets until the asphalt has been installed. Area south of the secondary dune will have a dry pond constructed to provide temporary stormwater collection area during construction and cleaned out during and after development for permanent stormwater infiltration. Presently water drains into this area from an existing house and a portion of the street to the south. No visible indications of restricted infiltration. Geologist reports infiltraiton good in this area. Silt fence, 350 feet will be constructed south of the asphalt drive the first thing, before the asphalt driveway. Construction equipment will enter the project from Ocean Ridge Road. These buildings will also be constructed on a piling foundation. Very limited erosion and sedimentation facilities will be necessary, because the sands will provide natural infiltration of stormwater. MORMW TER STORM DRAINAGE SPECIFICATIONS rHDIaiDI1M DECEIuL 0 AUC 2 8 1995 DEM Work under this section includes all storm drainage systems including all drainage structures, pipe cleanout, and other appurtenances. All structures shall be built in accordance with local authorities specifications. PRODUCTS Catch Basin Frame and Grate: Shall conform to Neenah Foundation Co. #R-3�3+9-A or Vulcan Foundary V-5650 25" x 35" or larger. Pipe: Shall be PVC Pressure Class gaskets, Hancor Hi-Q high capacity 1-800-682-2236 or approved equal. EXECUTION 200, SDR 21 elastomeric smooth interior pipe, Tren�chin and Bedding for Pipe: Where pipe is to be laid below the ground =e, a trench shall be excavated to the required depth. When the foundation material is of poor supporting value, the pipe shall, if practicable, be relocated in firm material. 1,hen this is impractical, the foundation shall be reinforced by one of the following methods as designed by the Engineer or by special details as shown in the plans. 1. By replacing the unsuitable material with a layer of local material of sand. 2. By replacing the poor material with a layer of #5 stone. The pipe shall be laid true to Line and grade on,a bed which is uniformly firm throughout its entire length and carefully shaped to fit the outside of the pipe. SD-1 Installation of Pipe: Each pipe shall be carefully inspect immediately before it is laid, and defective pipe shall be rejected. Bell -and -spigot joint type pipe shall be bedded to the established grade line, placing the bell end upstream. The spigot end of the second pipe shall be cleaned. Pipe lines shall be laid to the grades and alignment indicated on the drawings. Backf�illin : After the bedding using #5 stone has been prepared and the pipe installed, selected #5 stone material shall be placed alongside the pipe in layers. Care shall be taken to insure thorough compaction of the fill under the haunches of the pipe. Each layer shall be thoroughly compacted by hand tamping with heavy iron tampers, the tamping face area of which shall not exceed twenty-five (25) square inches. The method of filling and compacting shall be continued until the fill has reached an elevation of two (2) inches over the pipe. Alignment and Grade: All pipe shall be laid and maintained to the required lines and grades. No deviation shall be made from the required line or grade except with the written consent of the Engineer. Excavation and Preparation of Trench: The trench shall be dug the required a_n7 depth shown on the Contract drawings and only so far in advance of pipelaying as the Engineer shall permit. The trench shall be braced when necessary so that workmen may work therein safely and efficiently. The trench width at the ground surface may vary with, and depend upon, its depth and the nature of the ground encountered. Pipe Joints: When pipelaying is not in progress, the open enc�f installed pipe shall be sealed by approved means to prevent entrance of trench water into the line. Backfill shall be placed on the pipe to prevent floating. Any pipe that has floated shall be removed from the trench and relaid as directed by the Engineer. No pipe shall be laid in wet trench conditions that preclude proper bedding, or on a frozen trench bottom, or when, in the opinln n of the Engineer, the trench conditions or the weather are unsuitable for proper installation. Drop Inlets, Manholes and Concrete Tanks to Retain Solids: Shall be constructed in aaccorcTance with t —ee applicable requirements of the local. authorities except that details of construction shown on drawings shall govern. SD- 2 A. Concrete - Concrete and reinforced concrete shall conform to the applicable requirements of specification "Concrete". All manholes shall be precast type. B. Frame and Gratings - Frame and gratings shall conform to the requirements of the local authority and in accordance with the details on the drawings. Hancor storm drain pipes shall be connected with Hi-Q standard coupling bands, 90' elbows, 45' elbows, 22.5° elbows and tees. Soil over the Hi-Q shall not be less than one (1) foot. All delivered pipe shall be inspected, all damaged pipe cannot be accepted, and must be returned by shipper. CONCRETE SOLID COLLECTION TANKS Precast concrete tank to be manufactured by Stay -Right Tank Company, or 'approved equal. Concrete shall have a minimum strength of 4,000 p.s.i. in twenty-eight (28) days, H-20 loading. Cement shall be ASTM C-150, Type 1. Reinforcing steel shall conform to ASTM A-615 and all joint sealant shall be "Ramnek" strips manufactured by K. T. Snyder Company, or approved equal. Tanks shall be excavated to the depths indicated on the plans, to provide gravity flow for the stormwater from its source. Tanks shall be placed on a bed of six (6) inch minimum crushed stone and carefully backfilled with soil and tamped. No large stones or clods shall be used as backfill. Backfill shall be compacted to ninety (90) percent of maximum density. Tank joints and all penetrations shall be coated inside and outside with grout and/or Thoroseal. CONCRETE TANKS LEAKAGE TEST Tanks shall be filled with water twenty-four (24) hours prior to following test procedure: Refill. tank cn day of the test accurate :Pater depth measurements shall be taken, recording time and date. Twenty-four (24) hours later accurate water depth measurements shall be again recorded. If the water SD- 3 level has dropped more than 1/2 inch the water will be removed and the interior of the tank rechecked for leaks. Depending upon the crack or area of the leak, Sika.Corporation, Old North Manufacturing Co., Inc. of Lenoir, N.C. products shall be used to correct the condition. The Engineer shall observe this test. SD-4 INSTALLATION OF STORMWATER CHAMBER SINGLE LAYER SYSTEM GENERAL Work under this section includes the chamber system for storage, distribution and infiltration of the stormwater runoff from impervious surfaces. MATERIALS AND EQUIPMENT High capacity H-20 bridge loading infiltrator chambers as manufactured by Infiltrator Systems Inc., 4 Business Park Road, Old Saybrook, CT 06475, 1-800-221-4436 or Cultec Inc., Brookfield, CT 06804, 1-800-428-5832, Units; Contactor #100. ° High capacity end plates. 2" - 22" washed rounded stone. Non -woven geotextile fabric Mirafi 140-N, Amoco 45/53 or approved equal. Geogrid Tensar Bx 1100, Mirafi MX1 or approved equal. ° Cordless drill. Self -drilling S.S.#6 12" to 2" dry wall type screws. Excavator. Bulldozer, not to exceed ground pressure of 1,100 lbs. per square foot. Plate compactor and/or a walk -behind vibratory roller which will not exceed dynamic force of 10,000 lbs. ° Level or one man laser type level. SPECIAL INSTRUCTIONS. Contact Buried Cable Locating Service 1-800-632-4949 prior to construction. Contact Infiltrator Systems Inc., 1-800-221-4436 at least one (1) week prior to start of installation. Check all infiltrator chambers for shipping damage at time materials are received and prior to installation. For large beds that cannot be filled from the sides, use a light -tracked vehicle such as a Caterpillar D-3. Ground pressure of track shall not exceed 1,100 lbs. per square foot. Be sure to maintain six (6) inch minimum of compacted cover beneath the tracks at all times. ISC-1 Compacted fill over geotextile shall be local sand materials or a well graded soil containing an even distribution of approximately ten (10%) percent fines, ranging from silt through sand to gravel. INSTALLATION SPECIFICATIONS Excavate and level designated areas as staked by the Surveyor, for grades and areas. Flood the excavated areas with water for a minimum period of eight (8) hours. Water to be obtained from a nearby fire -hydrant. This flooding should simulate two (2) inches of water over the area. Install the geogrid, Tensar or Mirafi, in accordance with the manufacturers instruction and/or as follows: Place geogrid in position and roll over the prepared - grade. Material shall be overlapped two (2) feet, pin overlaps and ends to provide anchorage. Overlap end geogrids in the direction fill will be spread. Pin grid with plastic ties, wire or hog rings five (5) to twenty (20) foot spacing as necessary to secure the overlaps. Pull geogrid tight by hand to take up all slack. Four (4) inch layer of 2" to 2z" rounded stone shall be spread over geogrid by hand, where the backhoe and/or front end loaders can not reach. Compact the stone with vibratory roller or plate compactor to achieve a flat surface and proper compaction. To ensure maximum stone compaction, compact twice, the second pass being perpendicular to the first. For this reason, the Contractor must have a plate compactor. Cut hole in closed end plate for appropriately -sized distribution pipe, according to plan. Screw end plates into "inlet end" (without interlocks) of first infiltrator chamber. End plates are required only at the beginning and end of each row of chambers. End plates are reversible to fit either end of chamber. (Upper steps fit into "Inlet End" and lower step in downstream end (with interlocks). A cordless drill and,self-drilling screws work well for all connections. Use the four (4) starter holes around perimeter of flange. Place first infiltrator chamber in the inlet end of excavation with interlocks downstream. Place rows of infiltrator chambers next to each other to fit desired bed area as per plan detail drawing. Do not overlap the "feet" of the chamber onto adjacent chambers. Place catch basin and other sedimentation structures as required by drawing. Run distribution pipe to rows of chambers as per design requirements. Run distribution pipe through inlet opening in endplate. Pipe does not run the length of the system. Fit infiltrator chambers together, fully engaging interlocks to fit desired bed area. Interlock chambers by holding at 45' angle. Place "Inlet End" on end of previous chamber. Lower chamber, fully interlocking units. To keep joints from disengaging during construction, joints must be screwed together at the two (2) top locations, similar to end plates. Fill area to a minimum of 3" - 6" over top of chambers with stone per plan. For the large bed that cannot be filled from the sides, use a light -tracked vehicle such as a Caterpillar D-3. (Tracked vehicle size must not exceed D-5. Ground pressure of track not to exceed 1,100 lbs. per ft'). Be sure to maintain six (6) inch minimum of compacted cover beneath tracks at all times. Compact stone with walk -behind plate compactor or vibratory roller, not to exceed dynamic force of 10,000 pounds. ISC-3 Cover entire installation area with geotextile fabric by taking it from perimeter and laying it onto area, making sure that it overlaps onto itself by two (2) feet. Backfill in six (6) inch lifts over top of chambers with well -graded soil. Avoid large rocks and organic matter such as roots, stumps, etc. in the backfill material. A well -graded soil contains an even distribution of approximately ten (10) percent fines, ranging from silt through sand to gravel. COMPACTED FILL OVER GEOTEXTILE Compact all lifts to ninety-five (95) percent maximum density at optimum moisture content as determined by Standard Proctor Test ASTM D-698. Use vibratory roller with maximum gross vehicle weight of 12,000 lbs., and a maximum dynamic force of 20,000 lbs. Backfill shall be in one six (6) inch layer. Refer to asphalt specifications. ISC-4 SCOPE ASPHALT PAVING Furnish all labor, materials, and equipment necessary for fine grading and compaction of subgrade, placing and compaction of aggregate base course, and placing and compacting bituminous paving as specified herein and as shown on the drawings. MATERIALS A. Subgrade material shall be from approved stockpiles located near the project site where fill is required or existing subgrade is unacceptable. B. Aggregate Base shall be ABC crusher run compacted to a thickness of six (6) inches. C. Tack Coat shall be RC-250 applied at a rate of 0.1 gallons maximum to existing pavements and structures, and at a rate of 0.03 to 0.1 gallons per square yard to existing pavements receiving resurfacing. D. Bituminous Concrete Paving shall be Type I-2. Thickness shall be a minimum of two (2) inches. EXECUTION A. Subgrade preparation shall be in accordance with the specifications for the Stormwater Chamber section of these specifications and graded as shown on the drawings. Fine grade subgrade to final specified elevations and slope. Compact subgrade to ninety- five (95) percent maximum density at optimum moisture content as determined by Standard Proctor Test ASTM D-698. B. Aggregate base course shall be applied on properly prepared subgrade. C. Castings, gutter edges and all other surfaces which the pavement will rest against shall be tack coated. Prior to resurfacing existing pavement, the existing F.1viawl pavement shall be tack coated and be allowed sufficient time to "break" prior to the resurfacing. Extreme care shall be taken when applying to prevent tack coat from getting on exposed gutter areas or any other exposed surfaces. D. Bituminous concrete surface course shall be applied on properly prepared primed base course. E. To insure that these specifications are met the subgrade, aggregate base, and pavement are subject to testing for compaction, thickness, design mix, and other related tests. AP - 04 GENERAL precaution throughout the life of the p r:_icct to prevent the eroding Of Soii ar-^ .::iC Sil[ind' Of IiCr_-r: , 5ti'c_rMs, lakes, r.=se_-- voirs, other :cater impoundments, ground surface, or other property. Excavated materials shall not be deposited, nor shall earth dikes or other temporary earth structures be constructed in streams or so near to such water that they will he carried into any stream or impoundment by stream flow or surface runoff. As an exception to the above, confined earth materials will be permitted when approved in writing by the Engineer or as shown on plans. Frequent fording of live streams with construction equipment chill not be permitted. unless otherwise approved in writing by the Engineer, mechanized equipment, shall not be operated in live streams except as may be necessary to construct channel changes and to construct or remove temporary or permanent structures. COORDINATION OF GRADING OPERATIOi:S All clearing and grubbing, excavation, borrow, embankment, ditch construction, and other grading operatings shall be so coordinated and performed as to cause a minimum of soil erosion. Grading operations shall be so scheduled and performed that permanent erosion control structures and features can follow immediately thereafter if project conditions permit. The Contractor may be required to perform temporary erosion control Treasures between successive construction stages. All land -disturbing activities undertaken on a tract comprising of more than one (1) acre, if more than one (1) continuous acre is uncovered, a ground cover suffi- cient to restrain erosion must be planted or otherwise provided within thirty (30) working days on that portion of the tract upon which further active construction is being undertaken. ES-1 Failure or. the pare. of thy- Contractor to perform the required erosion cont!'ol measures will be just cause for the Engineer to direct the suspension of operations. The suspension will be effective until such time as the Contractor has satisfactorily performed the required erosion control work. The Contractor shall perform excavation, borrow, and ctr.banki-,:c .t operations iu sucl: a manner that cut and fill. slopes will be completed to final slopes and grade in a continuous operation. The operation or removing excavation material from any cut and the placement of embankment in any fill shall be a continuous operation to completion unless otherwise permitted by the Engineer. If grading operations are suspended for any reason whatsoever, partially completed cut and fill slopes shall be brought to the required slope, and the work of seeding and mulching or other required erosion control operations shall be performed. During construction and until final acceptance, the Contractor shall maintain the work by shaping to provide for the drainage of surface run-off along and throughout the length of the project by constructing temporary ditches, and by using any other methods necessary to maintain the work covered by this article so that the work will not contribute to excessive soil erosion. WATER AND AIR POLLUTION The Contractor shall exercise every reasonable precaution throughout the life of the project to prevent pollution of rivers, streams, and water impoundments. Pollutants such as - chemicals, fuels, lubricants, bitumens, raw sewage, and other harmful waste shall not be discharged into or alongside of rivers, streams, or impoundments, or into natural or man-made channels leading thereto. The Contractor shall comply with all State or local Air Pollution Regulations throughout the life of the project. DUST CONTROL The Contractor shall control dust throughout the life of the project within the project area and at all other ES-2 areas affected by the construction of the project, including but not specifically limited to, unpaved secondary roads, haul roads, access roads, disposal sites, borrow and material pits and production sites. Dust control shall not be considered effective where the amount of dust creates a potential or actual unsafe condition, public nuisance, or c:onditiun endangering the value, utility, or appearance of any property. APPLICATION OF SPECIFICATIONS The provisions of this article shall apply to all con- struction operations. Further references and detailed requirements concerning erosion, siltation, and pollu- tion prevention and control are given in the plans and special provisions as supplements to the general requirements of this article. ES-3 I'ILTE; "ABRIC rCGR iE`PORAR� SILT FENCE BURLAP Burlap shall weigh at least 6.7 ounces per square yard, and s :a11 have a .::inimum wic:i_h of ti:irty-six (36) inches. S'iNTHETIC FABRICS The filter fabric shall be composed of strong rot -proof synthetic fibers formed into a fabric of either the woven or nonwoven type. Either type of fabric shall be free of any treatment or coating which might significantly alter its physical properties after installation. The fabric shall contain stabilizers and/or inhibitors to make the filaments resistant to deterioration resulting from exposure to sunlight or heat. The fabric shall be a pervious sheet of synthetic fibers oriented into a stable network sn that the fibers retain their relative position with respect to each other. The edges of the fabric shall be finished to prevent the outer yarn from pulling away from the fabric. The fabric shall be free of defects or flaws which significantly affect its physical and/or filtering properties. The fabric shall have a minimum width of thirty-six (36) inches. Sheets of fabric may be sewn or bonded together. No deviation from any physical requirements will be permitted due to the presence of the seam. During all periods of shipment and storage, the fabric shall be wrapped in a heavy duty protective covering which will protect the cloth from sunlight, mud, dust, dirt, and debris. The fabric shall not be exposed to temperatures greater than 140 degrees F. The fabric shall meet the following physical requirements: PHYSICAL TEST REQUIREMENTS PROPERTY METHOD CLASS A CLASS B Tensile AST14 D1682 Grab 50 lb.min. 100 lb.min. SLrengt:: Test i%�thod using 1 inch square jaws and a travel rate of 12 inches per minute. FFT-1 PHYSICAL TEST REQUIREMENTS PROPERTY METHOD CLASS A CLASS B Grab ASTM D1682 Grab 15% min. 25% max. Elongation Test Method using 1 inch square jaws and a travel rate of 12 inches per minute. Puncture ASTM D751 Tension 60 lb.min. 60 lb.min. Strength Testing Machine with ring clamp; steel ball replaced with a 5/16 inch diameter solid steel cylinder with a hemispherical tip centered within the ring clamp. EOS Corps of Engineers No. 100 No. 100 Sieve, (Equivalent Guide Specifications Sieve, min.; min.; No. 40 Opening Size) CW 02215 Nov. 1977 No. 40 Sieve, max. Sieve, max. Ultra Violet ASTM D1682 Grab 40 lb.min. 80 lb.min. Stability Test Method using 1 inch square jaws and a travel rate of 12 inches per minute. Tests to be made after 500 hours exposure on xenon arc weatherometer as detailed in ASTM G 26. Bursting ASTM D751 Diaphragm 100 psi min. 180 psi min. Strength Bursting Tester. FFT-2 SEEDING AND MULCHING Seeding and mulching is to be performed according to North Carolina State, Department of Transportation requirements, Section 880, :with the following special provisions: Seeding and mulching shall be done on all earth areas disturbed by construction or as designated by the Engineer. No seeding and mulching work shall be done between June 15 and August 15 unless otherwise approved by the Engineer. In order to prevent excessive soil erosion and siltation by establishing a grass cover as soon as possible, the Contractor shall complete grading to the proper cross section and perform seeding and mulching or within 30 days thereof, as the grading progresses unless the Engineer approved a specific permissible length of delay due to circumstances beyond the control of the Contractor. Superficial scratching of the slope surface will not be sufficient seed bed preparation. On 2:1 or 1-1/2:1 slopes, a seed bed preparation will be required approaching the degree of preparation required on flatter areas as far as depth is concerned although the same degree of smoothness of seed bed will not be required. The kind of seed, the rate of application of seed, fertilizer and limestone, and the seasonal limitations shall be as follows: All rates are in pounds per 1,000 square feet. 6 lbs. - Fescue 2 lbs. - Grain Type Rye 23 lbs. - Fertilizer (12-4-8) 120 lbs. - Limestone Limestone shall contain not less than 85 percent of calcium and magnesium carbonates and shall conform to the following mini!-num screening standards. One SM-1 hundri:d [: i'Z Ci: it !_ (1U!i ro) mtisL p&s5 Li'. ": OL:£h L.S. Standard 10 mesh scr,on, ::d Purttl po-ccnt. (;O o) must uass through U.S. Sta^:da_ds 1G; ;-:esh screcr_ EoLLLpment to be uSed for the, application, covering, and ..-L:.CL and :Cl2d 3ha l ht.. approved b.1 the Ea,ineer before used on the project. !ii•iiliCatlC:? ..: Se.'d :in C: .._rt1��"7.e' _._ wt.er suspension or by air blast r.:c'_hods will not be permitted on slopes flatter than 2:1. Should a hydraulic seeder be used for application of seed and fertilizer, the seed shall not remain in water containing fertilizer for more than thirty (30) minutes prior to application. Mulching - Mulch shall be spread uniformly over the area by hard or by means of appropriate mechanical spreaders or blowers to obtain an application satisfactory to the Engineer. It is the intent of this specification that satisfactory applications shall allow some sunlight to penetrate and air to circulate, but also partially shade the ground, reduce erosion, and conserve soil moisture. Care shall be exercised to prevent displacement of soil or seed or other damage to the seeded area during mulching operations. No seeded areas shall be allowed to remain for more than twenty-four (24) hours without mulching having been completed. The Contractor will be required to take sufficient precautions to prevent mulch entering catch.basins or pipe lines through displacement by wind, water or other causes. The Contractor shall apply a sufficient amount of asphalt to insure that the mulch is properly held in place. In the application of fertilizer in seeding operations, or in the application of asphalt materials during mulching operations, adequate precautions shall be taken to prevent damage to traffic, traffic signs, curb and gutter, or any other concrete or metal structures. Such structures shall be adequately covered or application methods changed so as to avoid damage. [;There any damage occurs as a result of the Contractor's failure to take adequate precautions, the Contractor will be required to repair such damage including any cleaning that may be necessary before final acceptance of the :fork Jill be Lade. Once an a'.:c:; haS oe. n S EilEu and mulched, the Contractor is requirec tc; take adequate urecau'_ions to insure that all future cor:struction operations do not damage these areas. No payment c:i11 be made for repairs of any kind that are c;;a to negligence of the Contractor. Fertilizer shall be the standard commercial product of a na 1Y�!�. "E _'t 1112�r S[1d11 be Cte l-vereo 1:: bags bearing the manu_`acturer's name, the chemical analysis of the product, and its weight. If not used immediately after delivery, fertilizer shall be stored in a manner that will not allow it to harden or destroy its effectiveness. Seed shall be certified seed or equivalent based on North Carolina Seed Improvement Association requirements for certification.. If the seed is not grown in the state :where it is to be used, it shall meet the certification requirements of the Seed Improvement Association for the state in which it is grown. All seed shall be furnished in sealed standard containers. Seed which has become wet, moldy, or otherwise damaged prior to seeding, will not be acceptable. Mulch shall be any of the materials noted below: Grain straw or dry hav: Mulch materials which contain an excessive quantity of matured seed of noxious weed or other species which would hinder the establishment of desirable vegetation will not be acceptable. Any mulch material which is in an advanced stage of decomposition as to smother or retard growth of grass will not be acceptable. Asphaltic adhesive: Asphaltic material to anchor straw mulch shall be thin enough to be bloom from spray equipment. It shall be SS-1 emulsion or RS liquid asphalt 1 or 2. Seed: Furnish duplicate signed copies of a statement from the vender, certifying that each container of seed is fully labeled in accordance with the Seed Improvement Association requirements for certification. finis certification shall appear on, or with, all copies of iri'JOiCBS for the Deed. Each lot Cf eed ?4 _ be S`—bi act to sampling and testing at the discretion of the Engineer. Sampling and testing will be in accordance with the latest regulation under the Federal Seed Act. SM-3 ertili%cr and I.il.:e: Furnish dl:pliCL?te cupic-s of invoices for all fertilizer a,id ;.imp used on the project. Invoices fur ferui.iizer st:a1.L show the anaLysis and the quantity furnished. Invoices for lime shall show the percentage of magnesi._:i oxice and quantity furnished. Upon completion i5i: ti:... pi ll'.0 i., a i.iiitii Check of i:l.`.: tc�l:ai quani-hies of fertilizer and lime used will be made against the _otal area seeded and Jif t!-.e _ates C?,: appliCati .. naV_ not been met, additional quantities of these materials shall be applied to make up the application specified. Prior to or during grading and tillage operations, the ground surface sham be cleared of stumps, stones, roots, cable, wire, grade stakes, and other materials that might hinder proper grading, tillage, seeding, or subsequent maintenance operations. Grades on the area to be treated shall be maintained in a true and even condition. Maintenance shall include any necessary repairs to previously graded areas. All graded areas shall be thoroughly tilled to a depth of at least four (4) inches by plowing, disking, harrowing, or other approved methods until the condition of the soil is acceptable. On sites where soil conditions are such that high clay content and excessive compaction cause difficulty in getting clods and lumps effectively pulverized, the Contractor shall use the rotary tillage machinery, until the mixing of the soil is acceptable and no clods or clumps remain larger than 1-1/2 inches in diameter. A firm and compact seedbed is required, and after being graded, the seedbed shall be lightly compacted with a land roller, such as a cultipacker, before and after seeding. All tillage operations shall be as near on the contour as is practical but in no instance up and dorm the slope. Timestoae may b- applied to the area prior to the preparation of the seedbed, but in all cases, it shall be applied before seeding and thoroughly incorporated into the entire depth of the prepared seedbed. The incorporation of the lime may form a part of the tillage operation specified above. The fertilize_ S171all be Co:rpo_C.ted into the upper three (3) or four (4) inches of prepared seedbed. This can be done just prior to the last tillage operation or just prior to seeding, but in no case, will it be applied SM-4 more than. Three (3) days before seeding or before the lime is applied. Distribution by means of an approved seed drill equipped to sow seed and distribute fertilizer at the same time will be acceptable. 1-.Then hydroseeding equipment is used for planting operation, fertilizer shall be applied simultaneously with seed using the above rate of application. When condi.ri.ons are such, by reason of draught, high winds, excessive moisture, or other factors that satisfactory results are not likely to be obtained, the work shall be stopped, and resumed only when conditions are favorable. If inspection during seeding operation, or after there is a show of green, indicates that strips wider than the space between the rows planted have been left, or other areas skipped, additional seed shall be soUm on these areas. Straw or hay mulch shall be anchored in place by uniformly spraying the straw with the hereinbefore specified asphalt material at the rate of 0.10 gallon per square yard. The area shall be protected against foot and vehicular traffic by erecting adequate barricades immediately after seeding is completed, and by placing warning signs of an approved type. The Contractor shall be responsible for the proper care of the seeded area during the period when the vegetation is being established. In the event of an erosive rain before an adequate stand of vegetation is established, damaged areas shall be repaired, limed, fertilized, seeded, and mulched wholly at the Contractor's expense. If upon substantial completion of the finish grading, the seeding or landscaping cannot be completed during the specified periods, then the seeding and landscaping shall be accomplished during the next seeding period specified. Only an amount considered sufficient by the Engineer to cover payment for this work will be withheld from the progress payments. The beneficial occupancy of the facility shall not be delayed by the postponement of the seeding and landscaping. SM-5 s DOSE AND v4SSOCIATES, P.A. - -1 �I' U Engineers — Planners — Surveyors AUG ? 8 1995L�August 24, 1995 STO YTER Division of Environmental Management E C E pp 127 Cardinal Drive Extension IIIluuulnnnJ"`((('jjj E IS L5 U LS UD Wilmington, NC 28405 AUG 2 8 W95 Attention: Ms. Linda Lewis, Stormwater DEM Reference: Peppertree Resorts Ltd., Atlantic Beach FROJ Villas III Stormwater Facilities PRL-9301.771 Dear Ms. Lewis: Please find the following enclosed documents for the above referenced facility: 1. Three (3) sets of plans. 2. Three (3) Engineer's and Geologist's Reports. a "___ �;) --'- - - 4. Check for $325.00. 5. Three (3) copies of Operations and Maintenance Manual. 6. Three (3) copies of the Deed Restrictions. 7. Three (3) copies of Corps of Engineer's letter regarding wetlands. Please note, and in accordance with our previous conversations, all stormwater must be infiltrated on site including the State's DOT roadway. It is not possible, with the present highway system and site elevations to provide any off -site surface drainage system. At the present, Peppertree's development to the east of proposed development, all stormwater and 30,000 GPD wastewater treatment plant effluent has been surface (stormwater) and subsurface (wastewater plant effluent) applied and samples obtained from test wells indicated no limit violations. The above limits are for wastewater subsurface systems. Our plans have included infiltration systems for the entire design rainfall. The design rainfall in this case includes all storm intensities. It is possible that extreme rainfalls of six (6) inches in six (6) hours may pool on the driveway for a short period of time. This occurs once in four or five years in the existing low areas of the present development. +64"IY7 -A-Eest Post Office Box 1246 New Bern, North Carolina 28569 1248 1919) 633-439A 3396 339E 0327 Division of Environmental Management August 24, 1995 Page Two The system design conforms the following: 30 feet from surface water - over 300 feet. 50 feet from Class SA water - over 500 feet. 100 feet from water supply wells - two Town of Atlantic Beach wells are located over 200 feet on adjacent properties. One north of the entrance to Peppertree on the north side of West Fort Macon Road and another south of the major dune and west of Peppertree's proposed development property. 2' above seasonal high water table - the Geologist's Report shows USGS elevations of less than 3.4, we have used 3.7 feet. Our Engineer's Report has included the stormwater from the pool's concrete decks, our plans have not. A lot of consideration was given to this area and could be accomplished with concrete trenches and cast iron gratings along.the outer limits of the concrete decks. This requires.more impervious surfaces and provides a wetted trench surface that is very difficult to clean and could create an environmental condition harmful to children. We think our two existing pools have the best environmental systems, where the stormwater drains evenly off the concrete decks to the surrounding sand and/or grass areas. We felt this may come under the area of an allow exemption for some activities that "cause minimal impact to surface waters." As stated in DEM's Report of Proceedings, page S-9 "In the permit review process, it is helpful to work with the applicants early on in their application process to ensure that all appropriate information is being put together to avoid the need for various project revisions." We.would appreciate your comments and assistance to.accomplish the environmental requirements in the most cost effective manner. Thank you. Sincerly, Joseph W. Rose, Civil-PE,RLS, President JWR:rr Encl. cc: Wayne Kinser Bradley Bennett PEPPERTREE RESORTS, LTD. August 21, 1995 North Carolina Department of Environment, Health and Natural Resources Raleigh, NC Dear North Carolina Department of EH&NR: AUG ? R 1995 ...................... Please consider this as authorization for Joe Rose, of Rose and Associates, to sign applications on behalf of Peppertree Atlantic Beach Associates. if you have any questions or concerns regarding this, please do not hesitate to give me a call. Thank you. Very truly yours, nl E C E g V. IS Dnl I'Jn(U AUG 2 8 1995 U DEm �oJ 5w895o839- P.O. 60X 6319, ASHEVILLE, NORTH CAROLINA 28816 704 / 584-8991 %sIs form must be completed bhethe pro,iectoSubamittal informatioll. INSTRUCTIONS TO NC PROFESSIONAL ENGLNEERt and included m a part of The elassiricat�on of she dounslo;e surface waters (the surface Haler, tbat any overflow imm the lad;ity would flow toward) in which Lbls spray irrigation S�'St..::1 wall be conswcit4 tnust be determined by the appropriate DE.'r1 regional office. Therefore, you ar. rcquired. prior to submittal of the application paekege, to 1ubmit this form6 with items 1 through 7 completed to the appropriatt Division of Environmental Management Regio Water Quality Supervisor (see page 8 of 8). Al. a tnininuat, you must include an 8.5" by 110 copy Of lbe portion of wall minute USGS opOgraphle Map wt ch slows Abe laation Of this Spr=_y irriga1jor systew and the dowoslope surface wall in which they will be [Ocated. Identify the closest dowoslope surface waters on the anacbed map copy. Once tbi regional office has cOmPltted toe classification, reincorporate this completed page and the topographic map into the eomplote appilution (crm and submit the applieatloa package. Applicant (specify na.^:e Of the muniapality. corperallon, individual, etc.): Pnonertree Resorts Lt, 2. Name 6c coe�ptc:e address of engiaee;ing tIrrr: Telepbone outnber: ( 919 ) a and Associates, Y.A. New Bero. NC 28564 633-03 3, Project nano: ` `yr` 4. Name of closest dowr,slope surface wavers: Gro ree Resorts Ltd. indwattr flows to Bo P.O._ Boa 3396 , 5. County(ies) wberc the spray irrigation system and surface waters art located: Carteret _ 6, Map n=c Lad date: U, Sa COa&t and GeodQt" Survey 1949 7. NC Professional Engir.w's Seal. Signature, end Dace: 69 93 • T, TOS REGIONAL WA 7/ 0/9'r SUPERVISOR L i lk MIMI 4UG 2 8 1995 D E M PROJ Please provide me with the classiflc2don of the watersbed wbere these sewers will be coastruetad. at idenuried on the atWbcd map segrsent: Name of surface waters: •-poop PC eACIFA X � dez q7N Classification (as established by the En+Ironaie:ital Management Curadsslon): &!�&_ Proposed classification, if applicable: Signature of regional orAre personnel (All anacbments must *x signed) .FORM: SIDS 06194 Page 6 of 8 Data: .. in: ....