Loading...
HomeMy WebLinkAboutSW8950814_HISTORICAL FILE_19951105STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8' 5AF) DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS Hp HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE MlIl 3I�U5 YYYYMMDD OWState of North -Carolina department of Environment, / o Health and Natural Resources Division of Environmental Management A41a �0IL James B. Hunt, Jr., Governor ®FE H Jonathan B. Howes; Secretary A. Preston Howard,,.'Jr., P.E., Director Mr. Stephen Miller Gulf Stream Development Group, Inc. 1009 North Lake Park Boulevard, Suite 4-A Carolina Beach, North Carolina 28428 November 6, 1995 Subject: Permit No. SW8=95081'4� Kure Beach Village Phase III High Density Stormwater Project New Hanover County Dear Mr. Miller: The Wilmington Regional Office received the Stormwater Application for Kure Beach Village Phase III on August 15, 1995, with final information on October 19, 1995. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 950814 dated November 6, 1995 to Gulf Stream Development Group, Inc. The project has been approved with the built -upon areas more particularly described on page 3 of this permit. This permit shall be effective from the date of issuance until November 6, 2005 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the Stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Dave Adkins Regional Water Quality Supervisor DA/arl: S:\WQS\STORMWAT\PERMIT\950814.NOV cc: Joseph Hill, P.E. Bill Hanna, Kure Beach Building Inspections Linda Lewis Wilmington—RegionOffice Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 950814 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Gulf Stream Development Group, Inc. Kure Beach Village Phase III New Hanover County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Environmental Management and considered a part of this permit. This permit shall be effective from the date of issuance until November 6, 2005 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. There is no off -site runoff into this Pond. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 'ra State Stormwater Management Systems Permit No. SW8 950814 DIVISION OF ENVIRONMENTAL MANAGEMENT Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth: Permanent Pool Elevation: Total Impervious Surfaces Allowed For Phase III: Green Area entering Pond Required Surface Area: Provided Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Controlling Orifice: PROJECT DATA The Keys @ Kure Beach 940217 New Hanover County Mr. Stephen Miller Gulf Stream Development Group, Inc. 1009 North Lake Park Boulevard, Suite 4-A Carolina Beach, North Carolina 28428 August 15, 1995 Atlantic Ocean ON WUI 4 feet 14.35 MSL For the total project: 580,220 square feet 42 units 03200 ftz= 134,400 Streets & Recreation= 67,730 531,000 square feet, total 226,940 square feet, Phase III 50,243 square feet 59,850 square feet 56,019 cubic feet 57,935 cubic feet 15.3 MSL 3" pipe R3 State Stormwater Management Systems Permit No. SWH 950814 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. Each of the lots in the subdivision will be limited to the amount of built -upon area indicated in the supporting calculations and per approved plans. 6. The permittee is responsible for verifying that the proposed home plans do not exceed the allowable built -upon area. Once the lot transfer is complete, the home plan may not be revised without approval from the permittee, and responsibility for meeting the built -upon area limit is transferred to the individual homeowner. 7. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 9.. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals. 4 State Stormwater Management Systems Permit No. SW8 950814 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Part I N2. The recorded statements must follow the form: a. "The allowable built -upon area per lot is 3,200 square feet, inclusive of that portion of the right- of-way between the lot line and the edge of pavement, structures, pavement, walkways of brick, stone, or slate, but not including open wood decking." b. "The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State." C. "Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State." 6. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, North Carolina, 28405, attention Water Quality Section. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. 5 State Stormwater Management Systems Permit No. SW8 950814 III. GENERAL CONDITIONS This permit is not transferable. Iu the event there is a desire for the facilities to change ownership, or. there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 6th day of November, 1995. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -� AX reston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission Permit Number SW8 950814 State Stormwater Management Systems Permit No. SW8 950814 Kure Beach Village Phase III Stormwater Project No. 950814 New Hanover County Engineer's Certification I, North Carolina, project, , as a duly registered Professional Engineer in the State of having been authorized to observe (periodically/weekly/full time) the construction of the for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 7 DENSITY PROTECT DATA Project Name DmSIr ' OF E`iVMONMENTAL MANAGED- iT Kure Beach Village — Phase III ENGINEERED Location (County, Towaship/Municipaliry, Address, State Road) Kure Beach Owner's Name Gulf Stream Development Group, Incorporated MailingAddress 1009 North Lake Park Blvd, Suite 4—A Carolina Beach. N.C. 28428 Phone Number 910-458-3979 Submittal Date 8/10/95 Brief Description (include map and appropriate drawings) a9 lit a11hd;00on with rlirh and niii't'a, Name of Water Body Receiving Stormwater Runoff U.T. Cape Fear River Classification of Water Body SC If SA waters,- engineered system, and distance is <0.5 miles, attach report of chloride sampling results Ni is mg(1 Stare/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Maior 404 Permit_ Other (Soecifv CALCULATION OF BUILT UPON AREA Sedimentation/Erosion Control X DEM/DHS Sewage Disposal X Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them separately below. Subwatershed Subwatershed Classification SC Built upon area 13. 32 AC Total Project Area 25.51 AC W Built upon Area Allowable B/U Area 30% (Total for Kure Beach Village — Ph III and The Keys of Kure Beach) Is the Project B/U Area S the Allowable B/U Area? Yes (If no, an engineered system is required.) Built upon area = (built upon area / total project area) = 100 Built upon area limits for projects to meet density: SA waters — 25 %, Other —30 % '• "Office use only STORMWATER COLLECTION SYSTEM Describe how the runoff will be treated Existing stormwater detention nnnrl Y,,,, of rc aUG 1 5 1995 nPAA BUFFER AREA Is the built upon area at least 30 feet from mean high water of all surface waters? Yes If no,.please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS By my signature below, I certify that the recorded deed restrictions and protective covenants for this project shall limit the allowable built -upon area per lot to 3,200 square feet inclusive of right -of --way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. CERTIFICATION I Stephen. Miller , certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the below named person or firm to submit stormwater plans on my behalf, and agree to abide by the deed restrent above. � Owner's Signature Date Provide authorized person or firm name and address below: Joseph S. Hill, Jr. and Associates 1602 Harbour Drive Wilmington, N.C. 28401 rg , pJ . A J C allotaryPublicfortheStateof Al J r 9 lJ A e c 1, l a FF �f�+ I� w do hereby certify that S +c P 1, <o h, l� : I I P. personally e� o this day of 4,A s) 19 5'�— , and acknowledges the due execution fqr g0mg ffllment. Witness my hand and official seal, G''L LI51. DIVISION OF ENVIRONMENTAL MArNIAGEAMNT SIGN -OFF Regional Office (S2 "v q5 Date Date In!ual Evaluating For ns/Plans Regional Water Quality Supervisor cc: Appiicant/WiRO/Bradley Beanett/Central Files DMSIr 'OF ENVIRONMENTAL MA-NAGEIM-4T DENSITY ENGINEERED X PROJECT DATA Project Name Kure Beach Village — Phase III Location (County, Township/Municipality, Address, State Road) Kure Beach Owner's Name Gulf Stream Development Group, Incorporated MailingAddress 1009 North Lake Park Blvd, Suite 4—A Carolina Beach, N.C. 28428 Phone Number 910-458-3979 Submittal Date 8/10/95 Brief Description (include map and appropriate drawings) 42 lot siihdivision with curb and gutter strppts Name of Water Body Receiving Stormwater Runoff U.T. Cape Fear River Classification of Water Body SC If SA waters, engineered system, and distance is <0.5 miles, attach report of chloride sampling results nl /4 mg/1 State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major 404 Permit Other (Specify) CALCULATION OF BUILT UPON AREA Sedimentation/Erosion Control X DEM/DHS Sewage Disposal T Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them separately below. Subwatershed Subwatershed Classification SC Built upon area * 13.32 AC Total Project Area 25.51 AC v % Built upon Area — I at )3 450$ly Allowable B/U Area 307 (DCnb�rae� ('Total for Kure Beach Village — Ph III and The Keys of Kure Bea Is the Project B/U Area S the Allowable B/U Area? Yes (If no, an engineered system is required:) % Built upon area = (built upon area / total project area) = 100 Built upon area limits for projects to meet density: SA waters - 25%, Otber —30% Office use,only STORMWATER COLLECTION SYSTFM Describe how the runoff will be treated Existing stormwater detention �� a s�ryGith,llt � k H U nUG t 5 1995 U D E IVI r zoJ # 15lxi:�_450�f.!¢= BUFFER AREA Is the built upon area at least 30 feet from mean high water of all surface waters? Yes If no, please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS By my signature below, I certify that the recorded deed restrictions and protective covenants for this project shall limit the allowable built -upon area per lot to 3,200 square feet inclusive of right-of-way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. CERTIFICATION I, Stephen Miller certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the below named -person or firm to submit stormwater plans on my behalf, agree to abide by the deed restri n tpment above. Owner's Signature Provide authorized person or firm name and address below: Joseph S. Hill, Jr 1602 Harbour Drive Wilmington, N.C. i and Associates 28401 Date and J,J oy� , a Notary Public for the SLate of � ) (9 6 Iq e 0 1, J'/+ a do hereby certify that S+e�1 eJ Yh, M: )IP� personally this I I day of /a, , s j , 19 S�_ , and acknowledges the due execution rument. Witness my hand and official seal, (,/-L 19 L DIVISION OF ENVIRONMENTAL MANAGEMENT SIGNOFF Regional Office (e Gov 9 S Date G� !9!i Date In ' ' ual Evaluating Forms/Plans Regional Water Quality Supervisor cc: Applicant/WiROBradley Bennett/Central Files JOSEPH S. HILL, JR AND ASSOCIATES CONSULTING ENGINEERS and PLANNERS IW2 HARBOUR DRIVE MU,UNGT N, NORTH CAROIINA TEIPPHONE 9M7"-15" is Octobe r Ms. Linda Lewis N.C.D.E.M. 127 Cardinal Drive Extension Wilmington, North Carolina 28405 MaINRAbDRESS M CE BOX SM-STf I WI N, NC 2W3.1155 1995 HEM EM U_DOCT 1 9 1995 D E M pRoj# sw8950?14- Subject: Additional Information Stormwater Management Project No. SW8 950814 Kure Beach Village — Phase III New Hanover County Dear Ms. Lewis: In response to your request for additional information regarding the subject project, we are submitting the following information: 1. Since the project is a revision to the previously permitted SW8 940217 (Keys at Kure Beach), please use the previously submitted plans and calculations for project No. SW8 950814 (Kure Beach — Phase III) as revisions to SW8 940217. 2. An Operation and Maintenance Plan is unnecessary for Kure Beach Village — Phase III since it was previously submitted for the Keys at Kure Beach. 3. A revised submittal form for The Keys at Kure Beach is enclosed. The first column of the calculations section shows Keys at Kure Beach built — upon area and the second column shows total built —upon area from both projects draining to the pond. A revised submittal form for Kure Beach Village — Phase III shows only built —upon information for that project. On the form for Kure Beach Village — Phase III, the description of stormwater treatment states that the previously permitted pond for The keys at Kure Beach (SW8 940217) will be used. 4. The drop inlets are located within the street pavement with the back of the inlets at the gutter line as stated in a note beside the drop inlet detail on sheet #5. 5. A note on the plan (sheet #1) states, "All runoff from the tennis court/recreation area must be directed to the stormwater pond. 6. The deed restriction will include the statement, "Drainage from all impervious surfaces and lots shall be routed to the stormwater detention pond by grading the front two—thirds of each lot to slope toward the Linda Lewis Kure Beach Village — Phase III October 4, 1995 Page 2 street, and/or using gutters on all structures to route flow to the street, and/or providing swales to route rear and side lot drainage to the street." (See deed restrictions section on Kure Beach Village — Phase III submittal form). 7. A cul—de—sac detail is added to the plans. 8. The orifice size of 3.25" is corrected on the riser detail. Enclosed are revised submittal forms for The Keys of Kure Beach (940217) and Kure Beach Village (950814). Included are two (2) complete sets of revised plans. Please contact me if you have any questions. JSH/pat Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES Joseph S. Hill, Jr., P.E. State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF ENVIRONMENTAL MANAGEMENT Jonathan B. Howes Governor WATER QUALITY SECTION Secretary September 6, 1995 Mr. Joseph Hill, P.E. Post Office Box 5592-Sta.1 Wilmington, North Carolina 28403-4155 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950814 Kure Beach Village, Phase III New Hanover County Dear Mr. Hill: The Wilmington Regional Office received a Stormwater Submittal for the Kure Beach Village, Phase III on August 15, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. The submitted project is actually a revision to the previously permitted SW8 940217, so revised plans and calculations must be submitted for 940217, showing the new design storage elevations and design of the new pond. With your permission, I can use sheets 2 and 5 of 5 of the submitted plans and the submitted calculations as revisions to 940217. 2. An Operation and Maintenance plan has already been signed for the pond and it's drainage piping. It is not necessary to do another. 3. A revised submittal form for 940217 must be done. The first column should contain the Keys at Kure Beach built -upon areas, and the second column can be used to show the total B/U area from both projects that will drain to the pond. Additionally, the 950814 submittal form should contain only the information about the current project. In the description of the stormwater treatment, say that the previously permitted pond for SW8 940217 will be used. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Hill September 6, 1995 Stormwater Project No. SW8 950814 4. It appears from the plans that the drop inlets are located outside of the curb line. I can only assume that the runoff will be captured by use of transitioning the curbing. Please provide a detail. 5. Please provide elevations for the Recreation Area, or note on the plans that all runoff must be directed to the pond. 6. Because the subdivision does not meet 30 % low density, this Office must be assured through the use of recorded deed restrictions that all impervious areas will be picked up by the pond, including all lot drainage. Options to ensure this include: a. Require that 2/3 rds of the lot be graded to the street, or directed to the pond. b. Require that gutters be used on all structures and directed to the pond. C. Provide swales to carry the rear and side lot drainage to the pond. 7. Please add a cul-de-sac detail to the plans. 8. I am unclear as to the orifice size. The revised calculations use 3.25", but the plan detail calls for 4". Please clarify. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 6, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950814.SEP cc: -L'inda:Lewis� Central Files Luce V;1/ Ph.7IL 9-�-q5 -- S�v 8 RSo 8 l 4 / 5 o7 (/ Poi sw a a q-0217. 21� lV eel 5540 Nee_ /s5jon �o (>5C? she.e4- Zor-S g SaF 5 �L � C2�cS �s s�hm, ff Zl Fes- 171*07-f7, vLot ,.y. , �y(f s %rem•-. ✓elv m �'.� %i�t n�eCe�� __ 0�1 es,Gl_65e Gt Qv217 cce4 co Iy ri r- n u✓n bier s rzv cori%J;ned K�s, r2eA,•`5e 2SOSA V rr, f D shokd oh �y h L)m ber s fzo- /t�l 15 q5 ;2c J"J R� 4 1 i Ir�z� L %IZec,-e I'Unoq WUS be- &1'ecfed rU S1Yz�e , se soixl.Vls,v-, odes not mee- 35 7u, fhe deed zfoo,o/2 a s6zk urn e -f col7cern71-7 fhe =ea c6`teL61L of runo �ar fhe iM_ 6c 2✓e�j mu5�— % coG��cl"ee�, � Doh o,75 �r-e 2) RQ vise IhZf �on,� Zl3 0 ��f %e V �rz�ee� � c f e b) IPe�v'�e �h2fc��f�i s he u5ecl on �'ucfvres ec ly Skeet G)-oy'c/e rg-.?Y- �y7 �Y2r//00cy� 7D al�. -33�c(S-3 /=2c/cf Z-� Scf a 7, q ¢ ac- Sh'4-30 57�I 1 Q 1I �I li Cul-de- sic ol�f�l err moo u3 o.,, �/>..s. l� U�clea- cy� or ice S,2e. Ur. yi�alle� 3", cz/cs S U,� �. ZS„r c)u+Iy4 d e+ � I � ,�I>,, sh y 4 . >` ,. 4 zq 0 CoS, (o Y u s - 4 Z �J 3M 13 ¢ 4DD ue co/7 s,, '5 I f it i) 'i JOSEPH S. HILL, JPLAND ASS CONSULTING ENGINEERS and P E 11R IZZIUUJJ� IW2 nARBODRIVE AUr. It i995 WI GTON, NORTH CAROUNA TE HONE910.7"-I5 MAn IMMDDRMC POSEDMMBO%5592 kl WaAMOTON, NC] 34153 August 1:5, 1995 Ms. Linda Lewis N. C. D. E.M. 127 Cardinal Drive Extension Wilmington, North Carolina 28405 AUG 1 5 1995 Subject: Kure Beach Village — Phase III DE M Stormwater Management Plan FROJ New Hanover County Dear Ms. Lewis: Enclosed are two (2) copies of the stormwater management plan for Kure Beach Village — Phase III. Also included are two (2) copies of calculations showing the percentage of built —upon surfaces, a (1) completed submittal form, and a (1) signed copy of the operation and maintenance plan. Since the built —upon area exceeds 30 percent of total project area, a detention pond will be used to treat runoff. An existing detention pond serving The Keys of Kure Beach will be also be used for stormwater management for Kure Beach Village — Phase III. Please review this plan as soon as possible. Copies have been sent to New Hanover County Engineering for review with regards to erosion control. Please do not hesitate to contact me if you have any questions or need additional information. Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES JSH/pat Jos h S. Hill, Jr., P.E. R IMIUA7 l ID/ E 6 E & W E h KURE BEACH VILLAGE — PHASE III AUG 1 5 1995 Stormwater Detention Pond Calculations ra�oJ sWFR i4 Stormwater runoff from the project will be retained in an existing wet detention pond serving The keys of Kure Beach (Stormwater Permit No. SW8 940217).Since runoff from Kure Beach Village — Phase III will be added to the runoff generated by The Keys of Kure Beach, modifications are necessary to make the pond capable of storing the combined runoff generated by 1 inch of rainfall from both projects. The pond area required to remove 90% of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina coastal regions. Runoff Calculations Impervious Surfaces: 42 units @ 3,200 Each = 134,400 Sq. Ft. Streets and cul—de—sac = 57,410 Sq. Ft. Tennis Court and Parking = 10,320 Sq. Ft. Keys of Kure Beach (see calculations for SW8 940217) = 378,090 Sq. Ft. Total Impervious Area = 580,220 Sq. Ft. = 13.32 AC. Pervious Surfaces (Grassed, Landscaped areas) = 226,940 Sq. Ft. Keys of Kure Beach (see calculations for SW8 940217) = 304,060 Sq. Ft. = 531,000 Sq. Ft. 12.19 Ac. �\ S. 580,220 x 0.083' Runoff = 48,159 CF (Impervious) �i ' w,,,,1533 ,00 x 0.083' Runoff x 0.2 (R.O. Coefficient) = 8,815 CF (Pervious) O� .., Oe;,,;,, Total Runoff (1" Rainfall) = 56,974 CF ,�;G�Essir)yT' 427,305 Gallons :a `EAL ' KBIII SW - Page 1 JF '• \ 7'// .. ' •v . . Detention Pond Calculations Pond surface area at storage pool elevation of 15.35' _ *62,118 Sq. Ft. Pond surface area @ permanent pool elevation of 14.35' = 59,850 Sq. Ft. v' Pond surface area (average) = 60,984 Sq. Ft. (*Not possible to measure difference between original permanent pool elevation of 14.95' and revised permanent pool elevation of 15.30' by planimeter.) 56,974 CF r 60,984 Sq. Ft. = 0.95' Storage Depth Required. Solids Settling Area Calculations Total watershed area = 25.51 AC. Impervious % = 13.32 AC -� 25.51 AC. = 52.2% Basin Depth = 4.0' SA/DA% required for 90% solids removal (see chart) = 4.5% 4.5% x 25.51 AC = 1.15 AC. Basin Surface area @ permanent pool elev. of 14.35' = 1.37 Ac. Basin is therefore adequate for 90% solids removal. s� SEAL KBIII SW — Page 2 SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT SOFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SA/DA - > 90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 32 90 50% 5.6 5.0 4.3 3.9 3:5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.04's 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 0 ORIFICE DISCHARGE RATE CALCULATIONS Use 3.25" diameter orifice for outlet. Calculate average discharge rate and time to lower orifice head from 0.95' to 0.85': 0.10' pond height x 60,984 Sq. ft. pond area x 7.48 gal/ft3 = 45,616 Gallon Storage Average head on orifice from 0.95' to 0.85' = 0.90' Average discharge rate @ 0.90' head: Q(GPM) = (449)c A 2gh Q(GPM) = Volume discharged in gallons per minute c = discharge coefficient = 0.6 A = orifice area in square feet g = gravity = 32.2 h = head above center of orifice _ Q(GPM) = (449)(.6)(.0576) (2)(32.2)(0.90) Q = 118 GPM Time required to lower pond 0.10' @ 0.90' average head: T = 45,616 Gal. o- 118 GPM = 387 minutes 118 GPM vs 387 minutes plotted on curve (See Discharge Curve). Discharge rate and time to lower head from 0.85' to 0.75': Q = III GPM T = 45,616 Gal. o- 111' GPM = 411 minutes 111 GPM vs 798 minutes plotted on curve. KBIII SW — Page 3 S. 4�w aR A�!29 :Q SEAL 898 r r. HS.N 8-14A- T Discharge rate and time to lower head from 0.75' to 0.65': Q = 104 GPM T = 45,616 Gal, o- 104 GPM = 439 minutes 104 GPM vs 1,237 minutes plotted on curve. Discharge rate and time to lower head from 0.65' to 0.55': Q = 96 GPM T = 45,616 Gal. o- 96 GPM = 475 minutes 96 GPM vs 1712 minutes plotted on curve. Discharge rate and time to lower head from 0.55' to 0.45': Q = 88 GPM T = 45,616 Gal. = 88 GPM = 518 minutes 88 GPM vs 2,230 minutes plotted on curve. Discharge rate and time to lower head from 0.45' to 0.35': Q = 79 GPM T = 45,616 Gal, s 79 GPM = 577 minutes 79 GPM vs 2,807 minutes plotted on curve. Discharge rate and time to lower head from 0.35' to 0.25': Q = 68 GPM T = 45,616 Gal. r 68 GPM = 670 minutes 68 GPM vs 3,477 minutes plotted on curve. Discharge rate and time to lower head from 0.25' to 0.15': Q = 56 GPM T = 45,616 Gal. o- 56 GPM = 814 minutes 56 GPM vs 4,291 minutes plotted on curve. KBIII SW — Page 4 aweESsio %�Lq: SEAL T: 'o' .FNG I h��� Discharge rate and time to lower head from 0.15' to 0.051: Q = 39 GPM T = 45,616 Gal. - 39 GPM = 930 minutes 39 GPM vs 5,222 minutes plotted on curve. Discharge rate and time to lower head from 0.10' to 0.00': Q = 28 GPM T = 45,616 Gal. - 28 GPM = 814 minutes 28 GPM vs 6,036 minutes plotted on curve. The outlet structure will discharge the total calculated runoff volume of 427,305 gallons in approximately 3.9 days (See Orifice Discharge Curve). KBIII SW — Page 5 K0RE B FACHVilLl AGE ' -PHA SE TH 240 STOR MW,%TEX P•-)P D DISCHARGE CURVe 200 fm RATE 112 GPM/387 MIN. J5 III GPM/740MlW 126 i 1G / 104GPM1 237MIN. ` q6 GPM1 1,712 M IN. BBGPM/2,230 MIt•l. 79 GPtl/2307 H!fi. c8 GPM 3,477MIPd. 90 L 6 GYM 4,2 91 M IN. / 2 3.a5 0 ORIFICE DISCHARGE CALCUt_AreDt?UN0FP OF Z}2 7, 305 fALLON$ I N 3.q DAYS 39 &PM/5"222.MIN. 29GPM/6,039MIN, l DAY I DAY 2 (6 I DAY 3 f DAY `t (I'T33J8 lC-) (122�go00) (96'000G•� ; 1j2000.) O 1000 2000 300C, 4of-, s-00 6000 7000 8000 g000 TIME (MINUTES) Engineering Land Planning Surveying July 21, 1997 Ms. Linda Lewis N.C. Department of Environment, Health, and Natural Resources Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Request for Additional Information - Analysis of 1-inch Storm on Keys Pond Kure Dunes, Phase IV, Stonnwater Project No. SW8 961234 New Hanover County, Dawson Engineering Project No. 9611 Dear Ms. Lewis: 3177 Wrightsville Avenue Wilmington, NC 28403 (910)762-4200 In response to your letter dated July 3, 1997, we have prepared the following calculations and analyses of the I - inch storm on the Keys pond and the impact of the proposed Kure Dunes Phase IV pond discharging into the Keys pond. The DWQ regulations require the treatment of the first 1-inch of runoff from impervious areas. The volume of l- inch runoff required for the Kure Dunes Phase IV project is 12,790 cubic feet and the volume of 1-inch runoff required for the Keys and Kure Beach Village projects is 48,153 cubic feet. These volumes were determined using the Schueler Method. The first attachment is a copy of the "KURE BEACH VILLAGE - PHASE Bi Stormwater Detention Pond Calculations" prepared by Mr. Joseph S. Hill, P.E. Mr. Hill uses a non -routing analysis to estimate that it will take 3.9 days for the pond at the Keys to release the required 1-inch of runoff volume (56,974 cubic feet) stored in the pond from Kure Beach Village and the Keys (see pages 1 and 5 of Mr. Hill's calculations). Based on field topography survey of the constructed pond and using the Schueler Method, our non -routing analysis estimates it will take 3.7 days to release the required 1-inch runoff volume (see attached "KEYS POND CALCULATIONS'). The effective storages were calculated from actual field survey data of the Keys pond. We are proposing to discharge the outflow of the proposed Kure Dunes Phase W pond into the existing pond serving Kure Beach Village and the Keys. To accurately model this situation, we have prepared manual hydrogmphs of storms producing one -inch of runoff for Kure Dunes Phase W, and Kure Beach Village and the Keys. The manual hydrographs produced are based on a quick 15 minute storm which is typical for our area. The Kure Dunes Phase IV 15-minute storm was developed to produced 12,790 cubic feet of runoff. The peak discharge was determined by dividing the volume (12,790 cubic feet) by 10 minutes to obtain 21.32 cfs. A manual hydrograpb was produced to have a peak discharge of 21.32 efs at 5 and 10 minutes and 0 cfs at 0 and 15 minutes. The same procedure was utilized for the Keys and Kure Beach Village projects. Based on Mr. Hill's calculations, the impervious area for the Keys and Kure Beach Village projects total 13.32 acres of the total drainage area of 25.51 acre, or 52.2 % impervious. Based on the Schueler Method, the volume of runoff required to be stored and released over a 2-5 day period is 48,153 cf. REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR THE KEYS -POND: (use Schueler Method) = 0.05 + 0.009,(1) = 0.05 + 0.009(52.2) = 0.52 = (1")(0.52)(1/12)(25.51)(43,560) = 48,153 CF A peak discharge rate for a 15 minute storm was determined by dividing the volume (48,153 cubic feet) by 10 minutes to obtain 80.26 cfs. A manual hydrograph was produced to have a peak discharge of 80.26 cfs at 5 and 10 minutes and 0 cfs at 0 and 15 minutes. In routing the storms, some assumptions were used: 1) The size of the orifice used was 3.25 inches (from Mr. Hill's calculations dated 8/14/97) 2) The crest elevation of the 36-inch riser is 16.9 (from survey data) 3) The orifice invert is elevation 14.40 (from survey data) Please see the schematic diagram of the hydrographs. Numbers I through 7 refer to hydrographs previously provided while hydrographs 8-12 and 13 & 14 are for the new calculations. The first set of hydrograph calculations (STORMWATER CALCULATIONS FOR ROUTING I -INCH RUNOFF FROM THE KEYS & KURE BEACH VILLAGE ONLY) refer to runoff from the 1-inch storm for Kure Beach Village and the Keys. In referring to the hydrographs, hydrograph No. 13 is the 1-inch storm hydrograph from Kure Beach Village and the Keys. Hydrograph No. 14 is the routed outflow hydrograph of the Key's pond which indicates a maximum total storage volume in the pond of 48,039 cubic feet with a peak outflow rate of 0.22 cfs and a peak stage elevation of 15.19 feet. The second set of hydrograph calculations (STORMWATER CALCULATIONS FOR ROUTING 1-INCH RUNOFF FROM KURE DUNES PHASE IV, THE KEYS & KURE BEACH VILLAGE) refer to runoff from the 1-inch storm for Kure Dunes Phase IV, Kure Beach Village, and the Keys. In referring to the hydrographs, hydrograph No. 8 is the 1-inch storm hydrograph for Kure Dunes Phase IV. Hydrograph No. 8 flows into No. 10, which is the Kure Dunes Phase IV pond (Reservoir No. 2). Hydrograph No. 9, which is the flow from the Keys and Kure Beach Village, is then combined with the outflow of hydrograph No. 10 to form hydrograph No. 11. Hydrograph No. 12 is the routed outflow hydrograph of the Key's pond wluch indicates a maximum total storage volume in the pond of 48,090 cubic feet with a peak outflow rate of 0.22 cfs and a peak stage elevation of 15.19 feet. The routing method analyses indicate there is only a 0.04 ft difference in maximum pond elevation, a 0.02 cfs difference in outflow at the end of 5 days and 51 cubic feet of extra storage volume in the Key's pond after the Kure Dunes pond is allowed to discharge into the Key's pond. Therefore the impact of discharging the Kure Dunes Phase IV pond outflow into the Keys pond will be insignificant. We hope this clarifies the effect the Kure Dunes Phase IV pond has on the Keys pond. If you need additional information please call. Very truly yours, DAWSON ENGINEERING Mark N. Hargrove, P.E. Enclosures: As noted above cc: Kure Beach Associates JOSEPH S. HILL, M AND ASSOCIATES CONSULTING ENGINEERS and PLANNERS bMu2(rl DAM IW2 NARUOUR DRIVE POST OFFICE aOx 5592 I MI NG N, NORM C OUNA WUMIR9 N, NC ]8tl 155 IELMONE 910-M-15" April 19, 1995 nW Ms. Linda Lewis E 6 E N.C.D. E.M. � UD 127 Cardinal Drive Extension Wilmington, North Carolina 28405 MAY 0 1 1995 Subject: Stormwater Project No. SW8 940217 DE M The Keys of Kure Beach QROJ ;¢ New Hanover County Revised Plans, Calculations, Submittal Form Dear Ms. Lewis: Enclosed are two (2) copies of the revised stormwater management plan for The Keys of Kure Beach. Also included are two (2) copies of revised calculations and a revised submittal form. As requested in your letter dated April 13, 1995, the following items are addressed: 1. The revised calculations are sealed. 2. The revised submittal form indicates the new impervious area numbers. 3. Permanent pool and storage pool areas and elevations are shown on the plans. Pond contours are revised. 4. The orifice calculation referencing 226,113 gallons of runoff volume has been corrected to show the new figure of 272,481 gallons. Please do not hesitate to contact me if you have any questions or need additional information. JSH/pat Sincerely, JOSEPH S. HILL, JR. and ASSOCIATES J , V4/ Jose S. Hill, Jr., P.E. THE KEYS OF KURE BEACH Stormwater Detention Pond Calculations (Revised — April 1995) Stormwater runoff from the project will be retained in a wet detention pond. This pond will store the runoff generated by 1 inch of rainfall. The stored runoff will be discharged over a period of 3.7 days. The pond area required to remove 90% of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina coastal regions. Runoff Calculations Impervious Surfaces: 92 units @ 1,760 Each = 161,920 Sq. Ft. Walks and Drives @ 800 Sq Ft/unit = 73,600 Sq. Ft. Streets = 135,750 Sq. Ft. Pool (including parking and walks) = 6,820 Sq. Ft. Total Impervious Area = 378,090 Sq. Ft. = 8.68 AC. Pervious Surfaces (Grassed, Landscaped areas) = 304,060 Sq. Ft. STORMWATER 6.98 Ac. C E .. V � UD 378,090 x 0.083' Runoff = 31,381 CF D MAY 0 t 1995 304,060 x 0.083' Runoff x 0.2 (R.O. Coefficient) = 5,047 CF DEM Total Runoff (1" Rainfall) = 36,428 CF pRoJS(u8 gq(>ZI"I — 272,481 Gallons Surface area of detention pond at storage pool (02,118 — 6,118 Sq. Ft. Surface area of detention pond at permanent pool = 59,850 Sq. Ft. Average surface area of detention pond = 60,984 CF 36,428 CF o- 60,984 Sq. Ft. = 0.6' Storage Depth Required elevation o elevat f Solids Settling Area Calculations Total watershed area = 15.66 AC. Impervious % = 8.68 AC r 15.66 AC. = 55.4% Basin Depth = 4.0' SA/DA% required for 90% solids removal (see chart) = 4.9% 4.9% x 15.66 AC = 0.76 AC. Basin Surface area @ permanent pool elev. of 14.35' = 1.37 Ac. Basin is therefore adequate for 90% TSS removal. CAR0, '••, :5 SEAL a -I -yc ORIFICE DISCHARGE RATE CALCULATIONS Use 3" diameter orifice for outlet. Calculate average discharge rate and time to lower orifice head from 0.60' to 0. 55' : 0.05' pond height x 60,984 Sq. ft. average pond surface area x 7.48 gal/ft3 = 22,808 Gallon Storage Average head on orifice from 0.60' to 0.55' = 0.575' Average discharge rate @ 0.575' head: Q(GPM) _ (449)c A V 2gh Q(GPM) = Volume discharged in gallons per minute c = discharge coefficient = 0.6 A = orifice area in square feet g = gravity = 32.2 h = head above center of orifice Q(GPM) _ (449)(.6)(.0491) (2)(32.2)(0.575) Q = 80 GPM Time required to lower pond 0.05' @ 0.575' average head: T = 22,808 Gal. o- 80 GPM = 285 minutes 80 minutes vs 285 minutes plotted on curve (See Discharge Curve). Discharge rate and time to lower head from 0.55' to 0.50': Q = 77 GPM T = 22,808 Gal. t- 77' GPM = 296 minutes 77 GPM vs 581 minutes plotted on curve. r;I S. gz--1-55 Discharge rate and time to lower head from 0.50' to 0.45': Q = 73 GPM T = 22,808 Gal, o- 73 GPM = 312 minutes 73 GPM vs 893 minutes plotted on curve. Discharge rate and time to lower head from 0.45' to 0.40': Q = 69 GPM T = 22,808 Gal, o- 69 GPM = 330 minutes 69 GPM vs 1223 minutes plotted on curve. Discharge rate and time to lower head from 0.40' to 0.35': Q = 65 GPM T = 22,808 Gal. r 65 GPM = 351 minutes 65 GPM vs 1,574 minutes plotted on curve. Discharge rate and time to lower head from 0.35' to 0.30': Q = 61 GPM T = 22,808 Gal. !- 61 GPM = 374 minutes 61 GPM vs 1,948 minutes plotted on curve. Discharge rate and time to lower head from 0.30' to 0.25': Q = 56 GPM T = 22,808 Gal. !- 56 GPM = 407 minutes 56 GPM vs 2,355 minutes plotted on curve. Discharge rate and time to lower head from 0.25' to Q = 50 GPM I CARo ',''� T = 22,808 Gal. o- 50 GPM = 456 minutes OF k, SSIG 50 GPM vs 2,811 minutes plotted on curve. Discharge rate and time to lower head from 0.20' to 0.15': Q=44 GPM T = 22,808 Gal. r 44 GPM = 518 minutes 44 GPM vs 3,329 minutes plotted on curve. Discharge rate and time to lower head from 0.15' to 0.10': Q = 37 GPM T = 22,808 Gal, r 37 GPM = 616 minutes 37 GPM vs 3,945 minutes plotted on curve. Discharge rate and time to lower head from 0.10' to 0.05': Q = 29 GPM T = 22,808 Gal, r 29 GPM = 786 minutes 29 GPM vs 4,731 minutes plotted on curve. Discharge rate and time to lower head from 0.05' to 0.001: Q = 17 GPM T = 22,808 Gal. o- 17 GPM = 1,342 minutes 17 GPM vs 6,072 minutes plotted on curve. The outlet structure will discharge the total calculated runoff volume of 272,481 gallons in approximately 3.7 days (See Orifice Discharge Curve). sILt�V �g ........... SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT S.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 7HE KEYS OF SA/DA - > 90% TSS REMOVAL KI)RE SEAC --� FOR WET DETENTION WITHOUT VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT14.OFT14.5FT SOFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% 1.3 1.0 -------- T .7 .6 .5 .4 .3 .2 .1 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 �- 50% 5.6 5.0 4.3�3.9 3.5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 1 20 .E R0 40 ORIFICE DISCNA,=>I'= CRrvI>!_G 31q j 80 G Pf9/20S tdlti. 73 GPMlgg3 MIN, 6q GPM 122 3 M1IJ, 660 PN11157`lml t'l, 3"0 ORIFICE WILL vA I s6 GP2,353-m!`1. Ir; 3.7 D/'<y5 b' y \fie G4yli-Fi•)f332gr=.11., _-� \ � y� I7GPhf/(3:i2Mtr,�, ri 20 — DAY I 110j B 00 G6, L DAY 2 85,000 GAL 2000 3000 DAY3 i DA i 1- n-DOD SOC•^. rftic (141fd U VE 5 ) f� 60oll- 7000 9v09 %J�i� State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr.,. Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager April 13, 1995 Mr. Joseph Hill, P.E. Joseph S. Hill and Associates Post Office Box 5592-Sta. 1 Wilmington, North Carolina 28403-4155 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 940217 The Keys at Kure Beach New Hanover County Dear Mr. Hill: The Wilmington Regional Office received the revised Stormwater Submittal for the The Keys at Kure Beach on April 4, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: /'1. North Carolina registered Professional Engineers seal on the calculations. 1/ 2. A revised submittal form, indicating the new impervious area numbers. 3. The calculations have been based on a "mean surface area" of 14.65.. You have not provided this Office with the new permanent pool or storage elevations and surface areas provided at those elevations. If the pond contours have not been revised since the last submittal, then the volume provided in the pond, 30,700 cubic feet is deficient. The pond is not designed to hold 36,428 cubic feet which you calculate as the required volume. Your outlet structure detail, however, indicates an orifice invert of 14.35 and a top of riser . at 14.95. If these are your new permanent pool and storage elevations, then please provide the surface areas at each elevation, revise your pond contours to show the 14.35 and 14.95 contours, and calculate the volume provided in the pond between those contours. 4. The orifice calculation is still referencing the old 226,113 gallons of runoff volume. Please revise to use the new figure of 272,481 gallons. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3945 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Hill April 13, 1995 Stormwater Project No. SW8 940217 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to May 13, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\940217.APR cc:wisr5' Central Files 2 5[A) �1PL 44 5ecl 4-/3- ?5 5/ti/-2�1.e 0/e1/z/CLO G (4huhzs S4 C�IrCCd 6U,-, rl r-vn e �z�-P/� ell✓ ? I-L—w—cc_Ci7 ee--rl m:ter. S-4 p PY9 Z OGIW76e. c2/cs . 2-72¢�l /v e e/ 0,-7 2 h?5 I%ee•�c��e�ll_a/e% buf Meyo%> �L Prc�LbleC/ (n-�Vl.e_�70�1� �JZlW2 �4 & (� �%/2S not ro u c�,n oar % , S r, (0 M. 35 `, iv� IC Yis— c 14, Cl S, — /uJv s� �rcM-C/ )4. 3S l9. c(S� cz)cc,/zle Vol b�hvee• fD See yc,� h �.e ��Oo�e�1 the. m�n� whim, I! �� I i► + i, I i � � �� i I;; � I I► I i ► I- � I I � I JOSEPH S. HILL, JIL AND ASSOCIATES CONSULTING ENGINEERS and PLANN IMIUNGADORM POST OFFICE BOX 5592-SD1.1 1 CXON, NORTHCDRIVE '� `��� WILNiNGTON, NOKIFI CAROUNA 9IIIA9NGfON, NC ]810NI55 IF."IIONE910.7WI5" APR 0 4 April 3, 1995 Mr. Rick Shiver Regional Hydrologist N.C.D.E.M. 127 Cardinal Drive Extension Wilmington, North Carolina 28403 Subject: The Keys of Kure Beach Stormwater Project No. SW8 940217 New Hanover County Dear Mr. Shiver: ....................M��� cCCt19 i��a�izfl'f11F} LG .....�.E_C.E APR 0 4 1995 U DEM 11Ro7 - 5ry 8 1OZO In response to your notice of violation dated March 3, 1995, we are submitting three (3) copies of the revised stormwater plan and calculations for The Keys of Kure Beach. This plan shows revised building dimensions (see typical drawings of 2—unit and 4—unit buildings at northwest project corner) and building locations. Changes to the outlet structure necessary to accommodate the revised building layout are shown on the detail sheet. The proposed "Plan of Action" is as follows: 1. Obtain approval of revised plans from N.C.D.E.M. 2. Perform necessary changes to detention pond outlet structure. 3. Obtain Engineer's certification. Please call if you have any questions. JSH/pat attachments Sincerely, JOSEPH S. HILL, JR, and ASSOCIATES S. 4ZLP Jose S. Hill, Jr., P.E. cc: Mr. Steve Miller, Gulfstream Developers Mr. Bill Hannah, Town of Kure Beach I el a..FMG� CAR4 STATE OF NORTH CAROLINA ANNUAL REPORT INCLUDE 10.00 FILING FEE PAYABLE 0 N.C. SECRETARY ��A. OF STATE. Afi r RUFUS L. EDMISTEN SECRETARY OF STATE ANNUAL REPORTS P.O. BOX 29525 RALEIGH NC 27626-0525 (919) 7h-4201 a REPQQT{�E'AATEJ 12-30-1994 95 03 1 0864 CORP ID- 0 3 1 4 2 2 3 i FILING No- A 0 0 2 STATE OF INC- HC � � W UlkNO012-1992 1. NAME OF CORPORATION, PRINCIPAL OFFICE ADDRESS ENTER PRINCIPAL OFFICE ADDRESS CHANGE HERE GULF STREAM DEVELOPERS, INC. A-4 PLEASURE ISLAND PLZ CAROLINA BEACH NC 28428 2. REGISTERED AGENT AND MAILING ADDRESS ROBERT WEINBACH 801 PAOLI COURT WILMINGTON NC 28409 3. STREET ADDRESS OF REGISTERED OFFICE $01 PAOLI COURT WILMINGTON NC 28409 COUNTY - NEW HANOVER 4. IF REGISTERED AGENT CHANGED, SIGNATURE OF NEW AGENT ENTER AGENT NAME AND MAILING ADDRESS CHANGE HERE - ENTER STREET ADDRESS CHANGE HERE - (SIONSTURE CONSTITUTES Cd1 W TO APFOINTWNTI S. FEDERAL EMPLOYER ID NUMBER ENTER FEDERAL ID NUMBER CHARGE HERE - 6. ENTER MANE, TIT® BUSINESS ADDRESS OF PRINCIPAL OFFICERS HERE - MAME-Robert Weinbach ADDR- 801 Paoli Court TITLE- President CITY_ Wilmington ST-NC ZIP- 28409 NAME- James Miller ADDR- 240 Hogan Court TITLE —Vice -President CITY- Wilmington ST- NC ZIP. 28409 MAME- Stephen Miller ADDR- 935 Radnor Drive TITLE- Secretary/Treasurer CITY- Wilmington ST-NC zip- 28409 NAME- ADDR- TITLE- (CITY- ST-. ZIP- ATTACH 2ND PAGE IF NECESSARY CITY- ST- 2IP- NAME -�/�'{r n /// )J� ADDR- r^���raU�QL(f7Lp'6�/IG CITY- ST- IIP- NAME'J / . �i/c p�"" 1. /� CITY- ST- ZIP- /6t% /j/, /dtic ,y f�u�%CaN�i AIi11 8. BRIEFLY DESCRIBE THE NATURE OF ITS BUSINESS OR ACTIVITIES Real Estate Sales & Development GULF STREAM OLV.UOPERS,_jNr�. 10. aIm c� 9. IF NONPROFIT, ARE THERE MEMBERS? IFSIGNED SY OFFICER OF CGRPOR TIGNI YES .�� TITLE-. TYPE OR PRINT INNS TIT - This form should be returned by the DUE DATE shown above with a check for 510.00 to: SECRETARY OF STATE, ANNUAL REPORT SECTION, POST OFFICE 29525, RALEIGH NC 27626-0525. CAR4 - r uavvs vi=A ="' Y 0 SETTLEJZS WI 0 :ate rrvci�E<r scncw ,urx o. rsrAz., FINAL PHASE 2-B u . THE KEYS .r KURE=BEACH V�IMUk�LU,UG - scae. r-so `O w�w.ms am no less ells MOKVBMSVAWB TM to Kk vet"a . bf _—_. ttw aftw rarmdbit • ._.._............ it,tMM ANY VERMM ow SIZE Odle pES1StEa OF areas a I 0 a CO NN •95me is dR 10 Yt ____._... Aewt rdmtuw No, Crony m td—.---- dy d fade Omen areas at Nma teaob NORTH GAROUNA NONWARRANTYDEED =m amp tw -__...._.. dvda !S._........___.___........__. a??!....... b amOetves ®AMN smr qaw DRn3APM. mc. A North Carollm Corporation s___ Ttit MM AT f®NN OUM A880CLTmN. INC.. A Norm mtrolim tot-vmflt Corvawt Ion c.ee b eape %ow w at r aaq. cane. eYn.. eea N -09ea•► % d.ww d MINA oa.et^ebn a aene.aM TM doyoabm mraabr ad Omaha m umd bntla daN brbde edd IMUM Ihdr halem aawwn, and aetpm. W 2 Wl bdm% aWdar, dv.L enmMM few[Wee x amw m tmekod bl tmbd. wnum m tut the Q mbr, for a tabeble amdda and by the O.edm the etdpt of abk► k bada tehwabdaad. W and by d. p.mmb deo peat barple w l and rm. mode the Greaten to rep dines d tbat sebie let w perrd d bad .bored b tM Ob d ... ......_. .. Tat¢RF.41.. QV#P.S...._... Twomip ff w .. .. . Camy. Noah fardtee.4 aave pertkelarlr dwt,%m m soft ALI of the eaves arms of that sabdivlslae heave m TU MM AT 1TItt DOW, m row partfcalmly deatribai In ExhSblt "e attatbed bmeto ad Incorporated by wfereooe. 400933 BM PACE 1965 oil? Tbsw ty bmmlnabw dawlmad m waoI hr G\vlaf W Wwa MOW" fu A atlp sb..W tb abw dwrf " or"-U is ncmkd t. 1L Dwk.. TO HAVE AND TO HOLD tb. ofu" 1.1 w plat of twd and RD ffWft n at0 WVMWaaa Lb*t4U b041ft ft gb* G� In � simPI& vwcrilwb►s" .AMY. �. bpook ft"Sk ft dw 0.4pnky d� 4 .......... ........... ...... . ............................. .... . ................ W:1:2�pmn�u&m S-Z*t"Y ---------------------------------------------- — ....... ........... I ............. --- ................. tr- ...... - . ....... ...... ............... ...... ....... ............ --------- - ------ EAL------ ------------------ ...... ... -, ---------- ------------ ----7 ---- -------------------- w .............. W.�� ................................................. ....... — ........... ...... ............ ...... APM-P�x A.!"I.ap.-rj!,.!nsw ...... . . ......... ............. . .......... . - - ---- ----------- .. ..... -------- ... ............................ . ..... ----- - ---- ---- --------- ................ ...... .......... ........ ------- ........... ...... . ................................ I ........ .. 14,W lianowr ........... /I ........ I ..... . ------------------- Imp p vq lit Pi