Loading...
HomeMy WebLinkAboutSW8950317_HISTORICAL FILE_20141010STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 g5_031-\ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS NI HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 201 `4 \ U 1 U YYYYMMDD NC®ENR North Carol ina'Department of Environment and Pat McCrory Governor October 10, 2014 Mr. Daniel T. Waller. Sr. Vice President Onslow Memorial Hospital 241 New River Drive Jacksonville, NC 28540 Natural Resources Subject: Stormwater Permit No. SW8 950317 Modification 2 Parking -ER 8: Surgical Services Pavilion - Onslow Memorial Hospital High Density Project Onslow County Dear Mr. Waller: John E. Skvada, III Secretary The Wilmington Regional Office of -the Division of Energy, Mineral and Land Resources issued a Stormwater Management Permit Modification 2 for ER & Surgical Services Pavilion on April 5, 2012. This permit modified permit SW8 950317, issued on August 3, 2006, by revising the permit to increase the built -upon area (BUA) in the high density pocket of an overall 30% low density development; and by reducing the BUA in the low density section. However, this permit was a temporary approval pending a modification to expand the wet detention pond in the high density pocket (drainage area DA1) to handle the actual BUA (pre-88 + newer) plus any future expansion. Presently, for the pocket of high density, the pond is designed to handle runoff from 176,410 square feet of BUA. For the future modification the pond will need to be designed to handle 295,594 (pre-1988 + newer) square feet of BUA plus any future BUA expansion. Please reference the "BUA Summary" table in the permit for a summary of the BUA and project area. , In the permit letter, we stated that in order to validate the permit approval, and remain in compliance with the permit modification, the permittee must submit a new permit modification with revised plans showing future development to DWQ within 18 months. It has now been thirty (30) months since we issued the permit. However, in light of the letter received from David Newsom on your behalf, dated July 2, 2014, we are willing to give you an extension for one (1) year. Therefore, please provide an update by July 2, 2015. Please be reminded that the Director may modify, revoke and reissue or terminate the permit for cause. In addition, your current permit is effective from the date of issuance until August 3, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey at 910-796-7215. Smcerel / or Tracy Davis .E., Director Division of Energy, Mineral and Land Resources GDS/ sgp: \\\Stormwater\Permits & Projects\1995\950317 HD\2014 10 letter 950317 CC: David Newsom, PE - Crystal Coast Engineering, PA John Pierce, PLS - John L. Pierce & Associates, PA Danny Bryan, City of Jacksonville Wilmington Regional Office Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax. (910) 350-2004 JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING — LAND PLANNING — MAPPING P.O. BOX 1685 JACKSONVILLE, NC 28541 OFFICE: (910) 346-9800 FAX: (910) 346-1210 E-MAIL: bettvbnilnnc.com Or brianina ilonc.com TO: Mr. Steve Puse N.C. Department of Environment and Natural Resources — Department of Stormwater 127 Cardinal Drive Extension Wilmineton, NC 28405 Letter of Transmittal DATE July 9.2014 ATTENTION' Mr. Steve Pusev Re Onslow Memorial Hospital- Project No. S W8 950317 COPIES DATE NUMBER I DESCRIPTION 1 Letter from engineer in response to your e-mail dated 6/25/14 1 Previous letter related to project dated 4/4/12 1 Copy of the stormwater permit —"Modification 2" Crystal Coast Engineering, PA 205-3 Ward Road Swansboro, N.C. 28584 Tel: (910) 325-0006 Fax: (910) 325-0060 Email, crystalwasteng@bizec.v.com July 2, 2014 Mr. Steve G. Pusey DENR — DEMLR 127 Cardinal Drive Extension Wilmington, N.C. 28405 Re: Stormwater Project No. SW8 950317 Onslow Memorial Hospital Onslow County Dear Mr. Pusey In response to your email of June 25, 2014, we did indeed once again make contact with Onslow Memorial Hospital (Mr. Michael Holdren) with regard to current status of "proposed expansion project" as described in my previous letter to you of April 4, 2012. You will recall that the April 5, 2012 Permit Modification issued by your office was a "temporary approval' contingent upon expansion of an existing wet detention pond (DA1) "to handle pre-1988 + newer)" BUA. Mr. Holdren indicates that the "proposed expansion project' ("courtyard area between original "main" building and the more recently constructed ER & Surgical Pavilion) is current on "hold", pending resolution of budgetary issues. Mr. Holdren could provide no firm dates as to when, and if, these budgetary issues may be resolved. That being the case, we would request that your office grant the Permittee a temporary extension of 24 months. It is hoped that these budgetary issues can be resolved during that period, and we can then provide your office a more "concrete" assessment of the timeline for expansion of the existing pond. We are hopeful that this response addresses all concerns. questions or additional concerns, please feel free to contact me. Yours truly, David K. Nev CRYSTAL COAST ENGINEERING Should you have ECEIVE JUL 10 2014 BY: Pusey, Steven From: David Newsom <crystalcoasteng@bizec.rr.com> Sent: Wednesday, July 02, 2014 3:48 PM To: 'Betty Bullock', Pusey, Steven Subject: RE: Onslow Memorial Hospital permit SW8 950317 Attachments: Steve Pusey Onslow Memorial Hospital 2.pdf Steve, At present, Hospital really has no firm timeline for the future expansion. Hopefully, in a few months the construction schedule will be more definitive. See attached letter. Does this seem reasonable (24 month extension)? If so, I will sign and forward hard copy to your office. From: Betty Bullock[mailto:BettvBullock(alilonc.com] Sent: Wednesday, June 25, 2014 4:37 PM To: Dave Subject: FW: Onslow Memorial Hospital permit SW8 950317 Importance: High Please advise and HANDLE!!! From: Pusey, Steven[mailto:steven.pusey@ncdenr.aov) Sent: Wednesday, June 25, 2014 3:33 PM To: Betty Bullock Subject: Onslow Memorial Hospital permit SW8 950317 Importance: High Betty & John, On another subject, recent review shows that the subject permit is past due for a modification. The previous permit modification of April 5, 2012 stated that the permittee must submit a new permit modification with revised plans showing future development within 18 months. This means that a new modification was due on October 5, 2013. Please follow up with the hospital and let us know if they are in a position to go forward with this at the current time. Thanks, Steve Stet/e4g. ptrset Environmental Engineer NCDENR - Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 Ph (910) 796-7334 / Fax (910) 350-2004 http://portal.ncdenr.org/web/Ir/stormwater Pusey, Steven From: Pusey, Steven Sent: Wednesday, June 25, 2014 3:32 PM To: bettyb@jlpnc.com Subject: Onslow Memorial Hospital permit SW8 950317 Importance: High Betty & John, On another subject, recent review shows that the subject permit is past due for a modification. The previous permit modification of April 5, 2012 stated that the permittee must submit a new permit modification with revised plans showing future development within 18 months. This means that a new modification was due on October 5, 2013. Please follow up with the hospital and let us know if they are in a position to go forward with this at the current time. Thanks, Steve Stet/esc JC. Ptrset, Environmental Engineer NCDENR - Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 Ph (910) 796-7334 / Fax (910) 350-2004 http://Portal.ncdenr.org/web/Ir/stormwater Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.