Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8950317_HISTORICAL FILE_20120405
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 q5 03 �1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2012oyv5 YYYYMMDD r� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director April 5, 2012 Mr. Daniel T. Waller, Sr. Vice President Onslow Memorial Hospital 241 New River Drive Jacksonville, NC 28540 Subject: Stormwater Permit No. SW8 950317 Modification 2 Parking - ER & Surgical Services Pavilion - Onslow Memorial Hospital High Density Project Onslow County Dear Mr. Waller: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for ER & Surgical Services Pavilion on March 19, 2012. This permit modifies permit SW8 950317, issued on August 3, 2006, by revising the permit to increase the built -upon area (BUA) in the high density pocket of an overall 30% low density development; and by reducing the BUA in the low density section. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. Therefore, we are forwarding Permit No. SW8 950317 Modification 2 dated April 5, 2012, for the construction, operation, and maintenance of the subject parking project. However, this permit represents a temporary approval pending a modification to expand the wet detention pond In the high density pocket (drainage area DA1) to handle the actual BUA (pre-88 + newer) plus any future expansion. Presently, for the pocket of high density, the pond is . designed to handle runoff from 176,410 square feet of BUA. For the future modification the pond will need to be designed to handle 295,594 (pre-1988 + newer) square feet of BUA plusany future BUA expansion. Please reference the "BUA Summary' table in the permit for a summary of the BUA and project area. In order to validate this permit approval, and remain in compliance with this permit modification, the permittee must submit a new permit modification with revised plans showing future development to DWQ within 18 months, as stated in the attached letter dated April 4, 2012 from David Newsom to DWQ. This means that, unless otherwise notified by the permittee of a new development schedule, a new permit modification must be received by DWQ by October 5, 2013, otherwise the permittee may be subject to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval Issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which grants an extra year for a total of four (4) years extension. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-7215 1 FAX: 910-350-20041 DENR Assistance 1-877-623-6748 Internet w .ncwaterqualiry org State Stormwater Management Systems Permit No. SW8 950317 IVIOD 2 Therefore, this permit shall now be effective from the date of issuance until August 3, 2020 (which includes the 4 year extension), and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NIC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey at (910) 796-7215. Si/cerely, ,- Charles Wakild, P.E., Director Division of Water Quality GDS/sgp: S:\WQS\STORMWATER\Permits & Projects\1995\ 950317 HD\ 2012 03 permit 950317 cc. David Newsom, PE — Crystal Coast Engineering, PA John Pierce, PLS - John L. Pierce & Associates, PA Danny Bryan, City of Jacksonville Wilmington Regional -Offices State Stormwater Management Systems Permit No. SW8 950317 MOD 2 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY SUBDIVISION DEVELOPMENT WITH POCKETS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Daniel T. Waller and Onslow Memorial Hospital Parking - ER & Surgical Services Pavilion - Onslow Memorial Hospital 317 Western Blvd., Jacksonville, Onslow County FOR THE construction, operation and maintenance of an overall 30% low density development with one (1) State Stormwater wet detention pond and one (1) City of Jacksonville wet detention pond to treat the higher density areas, in compliance with the provisions of Title 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit modifies Permit No. SW8 950317, issued on August 3, 2006, by revising the permit to increase the built -upon area (BUA) in the high density pocket of an overall 30% low density development; and by reducing the BUA in the low density section. This permit represents a temporary approval pending a modification in the future to expand the wet detention pond in the high density pocket (drainage area DA1) to handle the actual BUA (pre-88 + newer). In this permit, for the pocket of high density, the pond is designed to handle runoff from 176,410 square feet of BUA. In the future modification, the pond will need to be designed to handle 295,594 (pre-1988 + newer) square feet BUA plus future additional BUA. Please reference the 'BUA Summary" table on the next page for a summary of BUA and project area. In order to validate this permit approval, and remain in compliance with this permit modification, the permittee must submit a new permit modification with revised plans showing future development to DWQ within 18 months, as stated in the attached letter dated April 4, 2012 from David Newsom to DWQ. This means that, unless otherwise notified by the permittee of a new development schedule, a new permit modification must be received by DWQ by October 5, 2013, otherwise the permittee may be subject to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. Page 3 of 10 State Stormwater Management Systems Permit No. SW8 950317 MOD 2 BUA Summary SW8 950317 22-Mar-12 Onslow Memorial Hospital MOD 2 Total DA1 HD Pocket 1 (2006 DWQ) DA2 HD Pocket 2 (HD Jax) DA3 LD As -built in March 2012 with proposed improvements: Impervious (Pre-1988+"new") Bldg 211,135 84,329 9,824 116,982 parking / streets 437,512 182,504 90,195 164,813 Sidewalk 42,557 23,383 2,508 16,666 pre-88 BUA onsite * Incl. above Incl. above Incl. above incl. above pre-88 BUA offsite 5,378 5,378 0 0 Future 41,000 0 41,000 0 BUA Total (Pre1988+"new") 737,582 295,594 143,527 298,461 "New" BUA 469,935 277,349 92,303 100,283 Pre1988 BUA 267,647 18,245 51,224 198,178 Project Area (sf) 1,956,725 594,158 172,945 1,189,622 Project Area (acres) 44.92 13.64 3.97 27.31 ' Pre-88 BUA onsite is included in buildings, parking, streets, & sidewalk. This permit shall be effective from the date of issuance until August 3, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The overall tract built -upon area percentage for the project must be maintained at 30% per the requirements of Section .1005 of the stormwater rules. This stormwater system for the high density pocket (drainage area DA1) has been approved for"the management of stormwater runoff as described in Section 1.6 on page 5 of this permit. The stormwater control has been designed to handle the runoff from 176,410 square feet of impervious area that will result from the increase in BUA for the subject project. 3. The runoff from the design built -upon areas within drainage areas of the pockets of high density must be directed into the permitted stormwater control systems. 4. The stormwater s stems proposed to treat the runoff generated by the designated high density areas have been approved for the management of stormwater runoff as described in Section 1.6 on page 5 of this permit and in the City of Jacksonville permit. 5. The low density portions of this project will maintain a minimum 30 foot wide vegetated buffer between all impervious areas and surface waters. sf sf sf sf sf sf sf sf sf ac Page 4 of 10 State Stormwater Management Systems Permit No. SW8 950317 MOD 2 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, 9.cres: 13.64 Onsite, ft . 594,158 Offsite, ftz: None b. Increase in Impervious Surfaces, ftz: 176,410 OS Buildings, ftz: 69,313 OS Streets/ParkiPg, ftz: 98,864 OS Sidewalks, ft : 8,233 C. Design Storm, inches: 1.0 d. Pond Depth, feet: 4.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 27.5 g. Permanent Pool Surface Area, ftz: 21,884 h. Permitted Storage Volume, ft3: 24,966 i. Temporary Storage Elevation, FMSL: 32.6 j. Controlling Orifice: 2.0" 0 pipe (Marked, approved plans from TO to TO per Engineer, 8/3/2006) k. Permitted Forebay Volume, ft3: 10,175 I. Receiving Stream/River Basin: Scales Creek / White Oak M. Stream Index Number: 19-16-4 n. Classification of Water Body: "SC; HQW, NSW" il. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. ' 4. Within the low density portions of the permitted project, all roof drains shall terminate at least 30 feet from the mean high water mark of surface waters. 5. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 950317 MOD 2 e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 6. The Director may determine that other revisions to the project should require a modification to the permit. 7. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project must be recorded showing all such required easements, in accordance with the approved plans. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Unless otherwise shown, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 950317 MOD 2 15. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump in this pond is 1/6 hp. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the applicable documents as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party, constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 950317 MOD 2 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. At the time the permit is transferred to a new owner, the permittee shall forward the approved plans to the new owner. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. , Permit issued this the 5th day of April, 2012. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 950317 MOD 2 Page 8 of 10 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): ER & Sureical Services Pavilion - Onslow Memorial Hospital 2. Location of Project (street address): 317 Western Boulevard City:lacksonville County:Onslow Zip:NC 3. Directions to project (from nearest major intersection): From the intersection of US 17 and NC 24 in Jacksonville north approximately 2 4 miles to Western Blvd right on Western Blvd approximately 1.1 miles site on right 4- Latitude:34° 45' 46" N Longitude:77° 23' 07" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 950317 , its issue date (if known)August 3, 2006 , and the status of construction: ❑Not Started ❑Partially Completed* ® Completed' provide a designer's certification Specify the type of project (check one): ®Low Density ®High Density []brains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ❑Sedimentation/Erosion Control: 0.35 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: N0V 2 9 2011 Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Onslow Memorial Hospital Signing Official & Title:Damel T. Waller, Senior Vice President b. Contact information for person listed in item la above: Street Address:214 New River Dr. City:Jacksonville State:NC Zip:28540 Mailing Address (if applicable):same Phone: (910 ) 577-2345 Fax: (910 ) 577-2465 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 21a below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City: Phone: (_ _ )_ State: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Signing Official & b. Contact information for person listed in item 3a above: Mailing City: Stab Phone: ( ) Fax: 4. Local jurisdiction for building permits: City of Jacksonville Zip: Point of Contact:Danny Bryan Phone #: (910 ) 938-5200 RECEIVED NOV 2 9 2011 BY:�_ Form SWU-101 Version 07Jun2010 Page 2 of 7 IV. PROJECT INFORMATION In the space provided below, briefly summarize how the stormwater runoff will be treated. Current permit is a Low Density permit which includes a 'Pocket of High Density" as more fully described in permit SW8 950317 This project (Driveway/Parking Improvements Plan) spans both the Low Density and High Density "zones" of that permit. The portion of the project within the Low Density zone results in less impervious surface (4,630 sf BUA to be removed) . However, that portion of the project within the High Density zone results in a net increase of 3,660 sf of impervious surface (7,310 sf BUA to be added & 3,650 sf BUA to be removed) Calculations are attached which indicate that the existing wet detention pond serving this Pocket of High Density area is more than adequate to accommodate the marinal increase in BUA associated with this project. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: 1-1 Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW — 1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the 4. Total Property Area: 44.72 acres River basin. 5. Total Coastal Wetlands Area: -0- acres 6. Total Surface Water Area: -0- acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area'- 44.72 acres Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area between the area of streams and rivers, the area below the Normal High Water (NUM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area a used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = <30 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. NOV 2 9 2011 BY Form SWU-101 Version 07Iun2010 Page 3 of 7 +. Ull k-D. qcar LI n _ I ,Y D A(PIA Basin Information Drainage _Area _ Uramage Area _ Dralliage Area _ Drainage Area _ Receiving Stream Name Scales reek a ek Scales Creek Stream Class Stream Index um er - - - - - - Fotal Drainage Area s s s On -site Drainage Area s s s Off -site Dramage Area s s Proposed Impervious Area (sf) 295,594 sf 143,527 298,461 s Impervious Area (total) 49.67. ° 2b.1% MIm ervious Surface Area ramage rea - ramage rea _ ramage rea _ Drainage Area -site ur mgsLots s -site Streets s - - - - - - -site Parking s On -site Sidewalks s Other on -site s - uture s - - -site s - - - - - xtstmg s s s s ota s s St 296,461 s * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/zoeb/wq/ps/esu/classi cations *" Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from hU://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_ does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Pe TjCMA oradditional information and to schedule the required application meeting.) V R 0 9 2012 Form SWU-101 Version 07Jun2010 Page 4 of 7 oy:_ 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor v the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within h mile of the site boundary, include the tiff mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. Jr. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hn://www.secretga.state.nc.us/CoEporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/fo=s_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to -the -sale -of eny'IR.0 NOV 2 9 2011 Form SWU-101 Version 07Jun2010 Page 5 of 7 �, VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:David K. Newsom, PE Consulting Firm: Crystal Coast Engineering, PA Mailing Address:3817-3 Freedom Way City:Hubert State:NC Zip:28539 Phone: (910 ) 325-0006 Email: crystalcoastengQbizec.rr.com Fax: (910 ) 325-0060 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Leff Hudson , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) Daniel Waller with (print or type name of organization listed in Contact Information, item la) Onslmv Memorial Hospital to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of ' peI p to 5,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of r y'A (Wl./lu, County of (Q), 8 IA , —do hereby certify that S�-kA-YEc.I P-t.16.SOn personally appeared before me this 11 day of and acknowledge LIW due execution of the application for a stormwater permit. Witness my hand and official seal,o ;''p10TAgy:� n.............. .�' SEAL My commission expires A� �d & NOV 2 9 all Form SWU-101 Version 07Jun2010 Page 6 of 7 JC. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Daniel T. Waller certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storm); tt r gffles under;51 AXAC 2H .1000, SL 2006-246 (Ph. Ii — Post Construction) or SL 2008-211. Date: I, rA .0 \ L. S.a,v-L v S'c . a Notary Public for the State of PC— County of C%i�6� do hereby certify that an...�dl LADOl 2r personally appeared before me this f7 day of �I�,JQ„ 1}�, �nll , and acknow�he dye �ececu of the application for \<L��/ a stormwater permit. Witness my hand and official seal, �7— ```````O µ1CM4,p M < �n� 9 CA N� Z=. � 9 O MUM My commission expires �o.N. 15, ZO 13 Nov � 9 20i1 Form SWU-101 Version 07Jun2010 Page 7 of 7 04/04/2012 14:14 9103250060 CRYSTAL COAST ENG PAGE 01/03 205 Ward Rd. # 3 Swansbo , NC 285a4 Tel: (910) 325-0006 Fa (910)325.0080 I In � 7b: e V C. �S From: V i �7s Pages: Fom q� D -35o -any Date: Li co Rft bN lv� e ❑ Fw YayMeM 0 For ReMsw ❑ Fw your w Cl For ye11►1ecards ❑ 4s mquesfad 34/04✓2012 14:14 9103250060 CRYSTAL COAST ENG PAGE 02/03 J- C stal Coast Eln i 3817-3 Freedom Way Hubert, N.C. 28539 Tel: (910) 3254)oo0 Fait (glo) 325.0080 EmaA: Gy9tBJ0GWtM9@bae m.wm April 4, 2012 Mr. Steve G. Pusey N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 Re: Stormwater Project No. SW8 950317 Onslow Memorial Hospital Onslow County Dear Mr. Pusey In your email of 3/26/12 you requested "a secure date for when the permitttee can submit a plan of action with a schedule for submittal of a permit modification". In that regard, I met yesterday with Mr. Michael Holdren, Director of Facilities and Engineering Mgt. for Onslow Memorial Hospital. During that meeting, Mr. Holdren shared with me plans for a future building expansion project that when initiated, would trigger another Stormwater Permit Modification, and thus would also likely trigger enlargement of the existing Pond No.1 serving High Density Pocket No. 1. Specifically, the building expansion is proposed in the existing courtyard area between the original "main" building and the more recently constructed ER $ Surgical Pavilion. We have labeled this location "Future Project Area" on the Master Stormwater Plan (revised copy attached). You will note that this "Future Project Area" is indeed located within the designated drainage area for High Density Pocket 1, as was previously delineated by Mulkey Engineers & Consultants. Onslow Memorial Hospital understands and agrees that this future building expansion would trigger another stormwater permit modification. Furthermore Onslow Memorial Hospital recognizes that this building expansion would likely require enlargement of existing Pond 1 and intends to include funding for that expansion in the building project funding. The proposed building expansion project is currently In the preliminary planning and budgeting stages, and a detailed project timeline has not yet been developed. However, it is anticipated that design and permitting for this project would begin in the next 12 — 18 months. E;4/04/21112 14:14 y1UJZbU0bV UPY8IAL UUASI LNU HAct 0 Page 2 April4, 2012 We are hopeful that this response addresses all concerns and that the requested permit modification can be issued in the near future. Should you have questions or additional concerns, please feel free to contact me. fC Newsom, PE%� �� CRYSTAL COAST ENGINEERING y Pusey, Steven From: David Newsom [crystalcoasteng@bizec.rr.com] Sent: Wednesday, April 04, 2012 9:56 AM To: Pusey,Steven Subject: RE: Onslow Memorial Hospital Attachments: Steve Pusey Onslow Memorial Hospital.doc; Stormwater Master Plan.pdf You were correct ..... I failed to send it ....... waiting on a review of the letter by Mr. Holdren.... He since ok'd the letter ... so here it is.... I will sign and fax ASAP. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, April 04, 2012 9:41 AM To: David Newsom Cc: Scott, Georgette Subject: RE: Onslow Memorial Hospital Importance: High Just checking the status of this permit application. Can they give us a secure submittal date for when they can submit a plan of action with schedule? This is all we need. Please advise ASAP. Thanks, Steve From: David Newsom [mailto:crystalcoasteng(a@bizec.rr.com] Sent: Tuesday, March 27, 2012 8:07 AM To: Pusey, Steven Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Sounds reasonable.... Let me get with the Hospital.... and see if we can formulate a plan ..... and schedule of implementation. From: Pusey, Steven[mailto:steven.pusey@ncdenr.aovl Sent: Monday, March 26, 2012 2:32 PM To: David Newsom Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Importance: High David, OK, here's the deal. We can issue this permit as soon as we get a secure date for when the permittee can submit a plan of action with a schedule for submittal of a permit modification. We will add a line in the permit which reads as follows: In order to validate this permit approval, and remain in compliance with this permit modification, the permittee must submit a plan to DWQ by' (DATE) which includes a schedule for the submittal of a permit modification that includes revised plans for current and future development. We are holding the permit until we receive your response. Let me know if you have any questions. Regards, Steve Pusey From: David Newsom [mailto:crystalcoasteng(albizec.rr.com] Sent: Monday, March 19, 2012 10:19 AM To: Pusey, Steven Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Just let me know if I can help.... Will be glad when/if we can finish this one ....... It seems as if I have been "tortured" with a "slew" of these difficult ones of late...... Why can't I get any "easy" projects anymore? From: Pusey, Steven [mailto:steven.pusey(alncdenr.gov] Sent: Monday, March 19, 2012 10:10 AM To: David Newsom Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Thanks, David. I will get back with you ASAP after internal discussions here. Steve From: David Newsom [mailto:c[ystalcoasteng(a)bizec.rr.com] Sent: Monday, March 19, 2012 9:24 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital No, unfortunately I cannot explain other to say that the original BUA numbers (per 11/16/11) were premised on the original BUA figures from the 2006 Permit Modification. At the time of those calculations, I did NOT realize the unorthodox fashion that permit was written (i.e., was written on the basis of ADDITIONAL BUA as opposed to the customary format of TOTAL BUA). Therefore, we were, in a sense comparing "apples and oranges ....... the very reason for the most recent accounting of BUA (everything on the same basis). In short, the most recent calculations I prepared (copy attached) were prepared on the same format as that used in the Mulkey Calculations. If you will study those (Mulkey) calculations carefully, you will realize that the existing Pond 1 WAS NOT sized, at least in area, to accommodate all (TOTAL) BUA tributary to it (sized on the basis of ADDITIONAL BUA). A further study of those calculations reveals that the VOLUME (at least the required storage volume) was adequately sized based on TOTAL BUA. ' t In order to validate this permit approval, and remain in compliance with this permit modification, the permittee must submit a plan to DWQ by' (DATE) which includes a schedule for the submittal of a permit modification that includes revised plans for current and future development. We are holding the permit until we receive your response. Let me know if you have any questions. Regards, Steve Pusey From: David Newsom [mailto:crystalcoastengl7a bizec.rr.com] Sent: Monday, March 19, 2012 10:19 AM To: Pusey, Steven Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Just let me know if I can help.... Will be glad when/if we can finish this one ....... It seems as if I have been "tortured" with a "slew" of these difficult ones of late...... Why can't I get any "easy" projects anymore? From: Pusey, Steven [mailto:steven.puseyCo ncdenr.gov] Sent: Monday, March 19, 2012 10:10 AM To: David Newsom Cc: Scott, Georgette; Johnson, Kelly Subject: RE: Onslow Memorial Hospital Thanks, David. I will get back with you ASAP after internal discussions here. Steve From: David Newsom [mailto:crystalcoastengcd)bizec.rr.com] Sent: Monday, March 19, 2012 9:24 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital No, unfortunately I cannot explain other to say that the original BUA numbers (per 11/16/11) were premised on the original BUA figures from the 2006 Permit Modification. At the time of those calculations, I did NOT realize the unorthodox fashion that permit was written (i.e., was written on the basis of ADDITIONAL BUA as opposed to the customary format of TOTAL BUA). Therefore, we were, in a sense comparing "apples and oranges ...... the very reason for the most recent accounting of BUA (everything on the same basis). In short, the most recent calculations I prepared (copy attached) were prepared on the same format as that used in the Mulkey Calculations. If you will study those (Mulkey) calculations carefully, you will realize that the existing Pond 1 WAS NOT sized, at least in area, to accommodate all (TOTAL) BUA tributary to it (sized on the basis of ADDITIONAL BUA). A further study of those calculations reveals that the VOLUME (at least the required storage volume) was adequately sized based on TOTAL BUA. In short, it appears that the pond was not sized (at least in area) to serve any of the pre-existing (exempt) BUA tributary to it. Although I understand it is typical to "exempt' such Pre 88 BUA from Low Density permits, I did NOT think (until this situation anyway) is permissible to exclude such Pre 88 BUA from pond calculations, if said BUA is tributary to said pond (it is in this case). Although unorthodox (the only situation I am aware of) I can only presume that DWQ was aware and approved of this design rationale (i.e., "area" sized on ADDITIONAL / "volume" sized on TOTAL). Therefore, when evaluating the "adequacy" of the existing pond, I used the same design rationale. Please note, that even using that unorthodox design rationale, the existing pond DID NOT have capacity (at least in terms of area) to accommodate the additional BUA associated with this project (parking improvements). However, a subsequent Pond Asbuilt survey reveals that the existing Pond 1 was actually constructed LARGER (at least in area) than the design/permit conditions. That additional area is sufficient to accommodate the small amount of BUA associated with this project (parking improvements), USING THE SAME DESISN RATIONALE AS USED IN THE MULKEY CALCULATIONS (excluding pre-existing BUA). I think it could be argued, at least in consideration to TODAYS design requirements, that the existing Pond 1 is perhaps undersized (at least in area) for the TOTAL AMOUNT OF BUA (including Pre -Existing) tributary to it. I have made the Hospital aware of my opinions/findings in this regard, and informed them they should NOW beginning budgeting for expansion of this existing pond, as it is NOT, in my opinion, adequate to accommodate any more tributary BUA (at least beyond the small amount presently proposed). The hospital indicates that they are already in the planning/budgeting phase of another future parking improvements project which will likely be under design this summer. They indicate that they will indeed plan on enlarging the existing Pond 1 at that time. They also indicate that they currently have a serious lack of parking, and very much appreciate the DWQ's understanding, at that they are hopeful that this project (March 2012 Parking Improvements) can be approved as submitted with the understanding that the future parking project will include a pond enlargement. Sorry for being so long winded.... but as you know, this is NOT a simple issue. From: Pusey, Steven [mailto:steven.puseyCla ncdenr.gov] Sent: Thursday, March 15, 2012 11:02 AM To: David Newsom Cc: Pascal Pandosy Subject: Onslow Memorial Hospital Importance: High David, I ran the new numbers and it checks out. However, now we need to finalize the numbers for the pond. If I take the total BUA of 295,594 sf and subtract the previous allowed pre-88 BUA amount of 115,179 sf, I get 180,415 sf BUA to be treated in the pond. Previously, you calculated 173,431 sf BUA was to be treated in the pond (reference sealed calcs of 11/16/11). However, your recent calculations show an additional 6,639 sf on top of the original 169,771 sf BUA, yielding a total of 176,410 sf. So, the difference between 180,415 and 176,410 is 4,005 sf. Any idea where that difference comes from? We need your revised calculations (similar to the sealed calcs of 11/16/11) to alleviate this discrepancy. Furthermore, you will need to submit a revised Wet Detention Pond Supplement form and if the normal pool level needs to be raised, a new O&M Agreement. Regards, 205-3 Ward Road Swanslooro, NC 28584 Tel: (910) 325-0006 i Fax: (910) 325-0060 I To: Steve Pusey CC: Rs From: David K. Newsom Date: March 8, 2012 ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle Per your email of Y7112, we submit the following: • Master Stormwater Plan (3 copies) • BUA Supplement (3 copies) • BUA Summary Spreadsheet • Revised Sheet 4 of Application • Existing Pond Adequacy Calculations 'E C E I V - it', MAR 6 9 2012 ti,:— BUA Summary As of March 2012 (Prior to March 2012 Parking Improvements) Including March 2012 Improvements Pre 1988 High High Remaining High High Remaining Total Existing Existing Density Density Low Density Density Density Low Density BUA('I BUA"' Pocket 10) Pocket 214) Project Area Pocket 11'II Pocket 2 ") Project Area(e) BUA Type (sf) (sf) (sf) (sf) (sf) (sf) (sf) (sf) On -site Bldg 211,135 92,675 84,329 9,824 116,982 84,329 9,824 116,982 On -site Streets 0 0 0 0 0 0 0 0 On -site Parking 433,136 169,231 175,865 90,195 167,076 182,504 90,195 164,813 On -site Sidewalks 42,557 2,626 23,383 2,508 16,666 23,383 2,508 16,666 Other on -site 0 0 0 0 0 0 0 Future 0 0 0 41,000 0 0 41,000 0 Offsite 5,378 5,378 5,378 0 0 5,378 0 0 Existing BUA n/a n/a 0 incl. above 0 0 incl. above 0 Subtotal 692,206 269,910 288,955 143,527 300,724 295,594 143,527 298,461 Pre 88 BUA 269,910 n/a 18,245 51,2241 200,441 18,245 51,224 198,178 Total BUA NIC Pre 1 422,296 n/a 270,710 92,303 100,283 92,303 100,283 Drain/Project Area 1,956,725 1,956,725 594,158 172,945 1,189,622 594,158 172,945 1,189,622 % Impervious TOTAL a 35.4 n/a 48.6 83.0 25.3 49.8 83.0 25.1 % Impervious Nicvxte 21.6 n/a n/a n/a 8.4 n/a n/a 8.4 (')Based on as -built survey of ALL BUA. 1�)Based on Boney "Existing Site Plan of Feb. 1987) (;)Based upon As -built Survey - Not ADDITIONAL BUA as per permit 14)Based upon COJ SW Permit 09.05.003 (S)Percent BUA coverage on basis of TOTAL BUA (including Pre 1988 BUA) (6)Percent BUA coverage on basis of TOTAL BUA less exempt Pre 1988 BUA i'IHigh Density Pocket 1 including March 2012 Parking Improvements (Deduct 6,123 sf / Add 12,762 sf = Net Add 6,639 sf) (8)Low Density Project Area including March 2012 Parking Improvements (Deduct 2,263 sf (also 2,263 Pre 1988 BUA)) ECEIVE MAR 0 9 1012 �v: Crystal Coast Engineering, PA 205-3 Ward Road Swansboro, N.C. 28584 Business License #G2553 Tel: (910) 325-0006 Fax: (910) 325-0060 Email: crvstalwasteng@b¢ec.a.com Existing Pond Adequacy Calculations Pond No. 1 — Onslow Memorial Hospital 1. Confirm Adequacy of Existing Pond Surface Area Based on Mulkey Calculations dated 8/1/06, pond area was "sized for the increase" in BUA as follows (Italics indicate verbatim Calculation from Mulkey Calculations): The proposed project will add 169,771 SF or 3.90 ac of impervious area. The basin will be sized for this increase: 3.90 ac 113.64 ac = 0. 286 or 28. 6 % From Table 2.3, SAIDA ratios for 90% TSS and depth of X. SAIDA = 3.346 SA=(3.3461100) (13.64 ac) (43,560 st) = 19,881 sf (Design) Surface area of Perm. Pool = 19,930 sf, therefore, OK. This project (March 2012 Parking Improvements) is adding 6,639 sf of parking BUA, therefore, using the same design rationale as previously approved and permitted, the above Mulkey Calculations may be updated as follows: 6,639 sf = 0.15 ac The basin should be sized for the following increase: (3.90 ac + 0.15 ac) / 13.64 ac = 0.297 or 29.7% From Table 2.3, SA/DA ratios for 90% TSS and depth of 3.0: SA/DA = 3.46 SA=(3.46/100) (13.64 ac) (43,560 sf) = 20,594 sf "Asbuilt" Surface Area of Perm Pool = 21,884, therefore, OK. E C E d EP' MAR 0 9 2012 k3Y: ' F. .� ';�,_. � '�T:' -., � .. 1 r'; . J 'Ji ,l �� =1 • � J l 2. Confirm Adequacy of Temporary Pool Volume Based on Mulkey Calculations dated 8/1/06, pond temporary pool was "designed for the 1" storm" as follows (Italics indicate verbatim Calculation from Mulkey Calculations): Rv = 0.05 + 0.009(l) / = 6, 54113.63 = 0.48 Rv = a 482 (Rv) (1/12') (13.64 ac) (43560 so = 23,865 cf Volume of the Temp Pool = 24,966 cf OK This project (March 2012 Parking Improvements) is adding 6,639 sf of parking BUA, therefore, using the same design rationale as previously approved and permitted, the above Mulkey Calculations may be updated as follows: 1=(6.54ac+0.15ac) /13.63ac=0.491 Rv=0.492 (0.492) (1/12") (13.64 ac) (43,560 sf) = 24,348 cf Design Volume of Temp Pool = 24,966 cf, therefore OK. Pusey, Steven From: David Newsom [crystalcoasteng@btzec.rr.com] Sent: Wednesday, March 07, 2012 10:30 AM To: 'David Newsom'; Pusey, Steven Cc: Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 Attachments: BUA Summary2.xlsx, BUA Area Matrix - As of March 2012.pdf; BUA Areas - 2012 Parking Improvements.pdf; Onslow Memorial Master SW Plan.pdf Steve I am convinced that at this point it is nearly (if not completely) impossible to reconcile the 2006 BUA figures in the Mulkey Calculations and the 2006 Permit itself with the TOTAL BUA that actually now exists on the ground. The ONLY way I know to "reconcile' is to base ALL BUA measurements on the actual recent Asbuilt Survey. Note, the BUA numbers will NOTjive with the 2006 permit, for various reasons (that permit written on basis of ADDITIONAL BUA and the Existing BUA used in the calculations does not distinguish between pre and post 1988 BUA). I have revised the "accounting" so that now EVERYTHING is based on a constant, that being the recently completed AS - Built Survey which depicts ALL BUA on site, including that within both pockets of high density and the resulting Low Density Project area. Attached is a New BUA summary spreadsheet on that basis.... Also attached are the AutoCad "worksheets" where each BUA measurement for each category was measured/computed. Take a look at this, and see if this approach makes sense to you ..... I am convinced it is the ONLY way to reconcile "Permitted BUA" to the ACTUAL BUA on the ground.... which in reality is what I think we are concerned about. From: David Newsom [mailto:crystalcoasteng@bizec.rr.com] Sent: Wednesday, March 07, 2012 8:33 AM To: 'Pusey, Steven' Subject: RE: Onslow Memorial Hospital - SW8 950317 That is because DWQ wrote a permit in 2006 on the basis of ADDITIONAL built upon area .... and not on the customary basis of TOTAL built upon area. (i.e., "apples and oranges"). That 2006 permit indicates NO existing BUA, even though the calculations reflect 115,179 sf of existing BUA. Nor does the permit account for 5,378 of offsite BUA that is included in the Pond Calculations. Further complicating the situation is the fact that there is no breakdown for that existing 115,179 sf...some of that BUA was removed and replaced with new BUA....some was not.... The only way I know to fix this ..... is to go back and measure after the fact... based on the Asbuilt Survey ... the amount of TOTAL BUA for each category exist within High Density Pocket 1. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, March 06, 2012 6:29 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 r Pusey, Steven From: David Newsom [crystalcoasteng@bizec.rr.com] Sent: Wednesday, March 07, 2012 8:33 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 That is because DWQ wrote a permit in 2006 on the basis of ADDITIONAL built upon area .... and not on the customary basis of TOTAL built upon area. (i.e., "apples and oranges'). That 2006 permit indicates NO existing BUA, even though the calculations reflect 115,179 sf of existing BUA. Nor does the permit account for 5,378 of offsite BUA that is included in the Pond Calculations. Further complicating the situation is the fact that there is no breakdown for that existing 115,179 sf... some of that BUA was removed and replaced with new BUA .... some was not.... The only way I know to fix this ..... is to go back and measure after the fact... based on the Asbuilt Survey ... the amount of TOTAL BUA for each category exist within High Densitv Pocket 1. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, March 06, 2012 6:29 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 David, I reviewed your BUA summary spreadsheet and the numbers don't make sense. For example, the subtotal BUA adds up to more than the total existing BUA on the as -built survey. Why is this? You need to work with our spreadsheet or at least make sure that everything adds up correctly. We would like to write the permit as follows: Total Area = HD pocket 1 + HD pocket 2 + LD area (reference our spreadsheet). Please revise and resubmit. Thanks, Steve From: David Newsom[mailto:crystalcoasteng(albizec.rr.com] Sent: Monday, March 05, 2012 2:48 PM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Please disregard EVERYTHING submitted up to this point, and review the following, prior to our re -submittal. First, review the attached SW Master Plan. Based upon information obtained from your office, and provided by the Hospital, we have identified all PRE 1988 BUA, have added the Drainage Area Boundaries for both pockets of High Density, and have added the BUA for THIS PROJECT (i.e., March 2012 Parking Improvements). On the basis of the new Master SW Plan, we have prepared a totally new spreadsheet, which clearly identifies the BUA in the 3 drainage basins (High Density Pocket 1, High Density Pocket 2 and Remaining Low Density Project Area), both PRIOR TO this project, and INCLUDING THIS PROJECT. Pusey, Steven From: David Newsom [crystalcoasteng@bizec.rr.com) Sent: Monday, March 05, 2012 2:48 PM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Attachments: Onslow Memorial Master SW Plan.pdf; BUA Summary.xlsx, revised page 4 of 7 sw app.pdf Please disregard EVERYTHING submitted up to this point, and review the following, prior to our re -submittal. First, review the attached SW Master Plan. Based upon information obtained from your office, and provided by the Hospital, we have identified all PRE 1988 BUA, have added the Drainage Area Boundaries for both pockets of High Density, and have added the BUA for THIS PROJECT (i.e., March 2012 Parking Improvements). On the basis of the new Master SW Plan, we have prepared a totally new spreadsheet, which clearly identifies the BUA in the 3 drainage basins (High Density Pocket 1, High Density Pocket 2 and Remaining Low Density Project Area), both PRIOR TO this project, and INCLUDING THIS PROJECT. As you can see, the "magic number" is the % Impervious in the Remaining Low Density Area (exclusive of Pre 88 BUA). As you can see, that number is 22.3%. In accordance with DWQ policy, no credit has been provided for that Pre 88 BUA that was removed and subsequently replaced with new BUA. I have also revised Page 4 of the SW Application accordingly (also attached). If you are OK with ALL of the above, I am proceeding with additional calculations to demonstrate that Existing Pond No. 1 (High Density Pocket No. 1) can accommodate the additional 6,639 sf (yes, that number also has changed) associated with these parking improvements. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, February 28, 2012 8:30 AM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 OK. File is ready up at front desk. Steve From: David Newsom [mailto:crystalcoasteng(a)bizec.rr com] Sent: Tuesday, February 28, 2012 7:27 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 She will be there. Thanks From: Pusey, Steven [mailto:steven.puseyCalncdenr.gov] Sent: Monday, February 27, 2012 3:41 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 Ok. I'll set it up from 10 —11 am tomorrow morning. Tell them to try to be on time because someone else is coming in at 11 am. Steve From: David Newsom [mailto:crystalcoastenaCa)bizec.rr.com] Sent: Monday, February 27, 2012 3:27 PM To: Pusey, Steven Cc: Jeanie at CCE Subject: RE: Onslow Memorial Hospital - SW8 950317 Yes ... anytime after 10. From: Pusey, Steven [mailto:steven.pusey()a ncdenr.gov] Sent: Monday, February 27, 2012 3:01 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 Tomorrow looks good all day. What time do you want me to set the appointment for? Also, FYI, if they need to make copies of the drawings, they will have to go offsite to Allways Graphics, with supervision by a DWQ employee. Payment will be handled directly between your firm and Allways Graphics for these copies. Typically, supervision is handled by either Cameron Weaver or Janet Russell. Just ask for their assistance at the front desk. Steve From: David Newsom [mailto:crystalcoasteng(a)bizec.rr.com] Sent: Monday, February 27, 2012 2:04 PM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Yes .... I will send Jeannie or Pascal down there..... Please have that drawing handy so we can get a copy Thanks From: Pusey, Steven [mailto:steven.ousey(dncdenr.gov] Sent: Monday, February 27, 2012 2:00 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 The drawings are size 24 x 36 so you will need to come to Wilmington and make copies if you can't get them directly from Mulkey. I think Mulkey is located in Raleigh. I can make a file review appointment for you if you wish. Steve From: David Newsom [mailto:crystalcoasteng(cbbizec rr.com] Sent: Monday, February 27, 2012 1:55 PM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 How best for me to get that info. From: Pusey, Steven [mailto:steven.pusey(alncdenr.aov] Sent: Monday, February 27, 2012 1:50 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 Yes, there are drawings that show the drainage area boundaries for pre and post construction, and showing delineation of BUA such as sidewalks, parking lots, and buildings. They are located in an engineering report booklet sealed on 8-1-06 by Stanley Fortier of Mulkey. Steve From: David Newsom [mailto:crystalcoasteng(ubbizec.rr.com] Sent: Monday, February 27, 2012 11:59 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve Is there anything in your file that show the Drainage Area for the 2006 pond (Mulkey Pond). Would be nice to have that drainage area shown on my Master Plan that I am developing. From: Pusey, Steven [mailto:steven.pusey(d)ncdenr.gov] Sent: Monday, February 27, 2012 9:16 AM To: David Newsom Cc: Johnson, Kelly; 'Brian Jarman' Subject: RE: Onslow Memorial Hospital - SW8 950317 David, I checked the calculation sheet from Mulkey that we have in the permit file. Please reference the attached. These numbers match the permit data and our data sheet. Hopefully, this answers your questions. Give me a call if we need to discuss. Thanks, Steve From: David Newsom [mailto:crystalcoasteng(a)bizec.rr.com] Sent: Sunday, February 26, 2012 1:49 PM To: Pusey, Steven Cc: Johnson, Kelly; 'Brian Jarman' Subject: RE: Onslow Memorial Hospital - SW8 950317 As I was not involved in the 2006 application whatsoever, I am a little reluctant to accept figures from that application (page 2 of 6) that were PREPARED BY OTHERS (I have no absolutely no way of verifying those numbers). Also, I question the validity of the DA2 (HD Pocket 12006 DWQ) figure for Pre1988 BUA DA2.... I see on sheet 3 of your spreadsheet where the 115,179 sf appears on Mulkey calculation sheet, however, it does not appear that any of the other figures on that calc sheet correspond to the actual permit data. That being the case, are we comfortable relying on that figure? Is short, I think it difficult if not impossible to "deduct out' pre1988 BUA using only the permit records available to us. From: Pusey, Steven [mailto:steven.pusey(ancdenr gov] Sent: Friday, February 24, 2012 10:21 AM To: David Newsom Cc: Johnson, Kelly; Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 David, We are using the 2006 permit to define the pre-1988 BUA. See attached page 2/4 of the permit. The amounts are 260,924 sf in DA1 and 115,179 sf in DA2, the HD pocket. Also, it appears that the Jax permit had no pre-1988 BUA. So the total pre-1988 BUA is the sum of these amounts or 376,103 sf. Please reference the attached excel spreadsheet which shows the complete breakdown and overall density calculation. I need you to verify these numbers are correct and send it back with your PE stamp. Let me know if you have any questions. Regards, Steve From: David Newsom [mailto:crystalcoasteng(albizec.rr.com] Sent: Friday, February 24, 2012 8:50 AM To: Pusey, Steven Cc: Johnson, Kelly; Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 Yes... Looks good to me..... But, I need the Hospitals help to additionally break out the pre 1988 BUA from the Total Existing categories ..... I need to make them understand that it is to their benefit to do so ...... I think I can do that, but just need their help. Brian Any response from the Hospital? Steve might be willing to write this permit modification for the parking now, but the Hospital really should spend the time/money to differentiate the pre 1988 BUA. It could be as simple as someone from the hospital "color coding" your asbuilt survey (pre 1988 and post 1988)..... If I get that info, I can then re -measure all the BUA (quite an undertaking in itself), and differentiate what MAY BE EXEMPT BUA from the Total BUA. This is certainly in the Hospitals interests, particularly if they ever intend to do additional development in the future. From: Pusey, Steven [mailto:steven.pusey(&ncdenr.gov] Sent: Thursday, February 23, 2012 3:19 PM To: David Newsom Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High David, I corrected the "Remaining Low Density" numbers slightly due to math errors. Please confirm that this is now correct. changed the total BUA for DA1 to be 465,088 sf (including new and pre-88 BUA). This time, I attached the file. Steve From: David Newsom [mailto:crystalcoasteng(abizec.rr.com] Sent: Thursday, February 23, 2012 1:20 PM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Looks fine to me From: Pusey, Steven [mailto:steven.pusey( ncdenr.gov] Sent: Wednesday, February 22, 2012 6:56 PM To: David Newsom Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High David, Please confirm that the information in the attached file that I revised is correct. Let me know if you have any questions. Thanks, Steve From: David Newsom [mailto:crystalcoasteng(albizec.rr.com] Sent: Wednesday, February 22, 2012 1:16 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly; Scott, Georgette; Lewis,Linda; Pat Donovan -Potts Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve See the revised Summary, where I added FUTURE BUA as requested..... Be aware, however, that City of Jacksonville permits (as well as Application Forms) are completely different from DWQ forms, and the COJ permits do not specifically identify and classify "FUTURE" BUA as does DWQ permits (i.e., "apples and oranges") In short, although I designed the pond for the Oncology Center (i.e., the Jax issued permit) to include an allowance for FUTURE 41,000 sf, the City Permit does not set aside, or even identify for that matter, that "FUTURE" BUA (at least to my knowledge). I have, for years now, tried to convince the City to simply adopt the DWQ Application Forms and Permit formats.... however they did/have not. It would be much simpler for those of us who have to operate in both "realms" if the formats were the same (or even SIMILAR) for that matter... Pat I know you guys like your permit applications forms and Permit Format.... but the fact that they are SO DIFFERENT from DWQ forms makes "reconciling" projects such as this (Onslow Memorial Hospital) very difficult....... At the very least, I think your Permit Application package should include a Page 3 of 6 of the DWQ SW application form (i.e., Drainage Area Chart).... and your Permits themselves I thing ought to include a "Design Criteria" section (including info such as Drainage Area and a breakdown of BUA) similar to the DWQ permits. Without such documentation, it is difficult or impossible to "reconcile" BUA after the fact (as I am trying to do now). Not trying to be critical.... but rather helpful.... Let me know if I can help. From: Pusey, Steven [mailto:steven.pusey(&ncdenr.gov] Sent: Wednesday, February 22, 2012 12:08 PM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly; Scott, Georgette Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High It appears that my preliminary calculations of overall percent density may not be correct. So, I need for you to double check and revise your spreadsheet. In order to properly evaluate the BUA for this permit, it looks like you need to add some things. Here are my questions: 1) Does your column 1 (Total Existing BUA) include Pre-1988 BUA? 2) Does your column 2 (HD pocket) include Pre-1988 BUA? 3) Does your column 1 include the additional 3,660 sf BUA from the HD pocket for this permit? Also, is this included in your column 2? 4) It appears that you have not included the 41,000 sf future BUA in the Jacksonville permit. You should include this as BUA since it has already been permitted. Shouldn't it go in your column 3 (Jax permit)? 5) Your overall density calculation should exclude all pre-88 BUA and the DA associated with it. Also, you may want to exclude the Jacksonville permit from your project area. Please revise and resubmit by tomorrow. Let me know if you need more time or have any questions. Thanks, Steve From: David Newsom [mailto:crystalcoasteng0bizec.rr.com] Sent: Thursday, February 16, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 Here are my numbers .... as they stand at this juncture.... Column 1 "Total Existing BUA" is my measurement of ALL BUA that exist on the site, based on the AsBuilt Survey that John Pierces office has provided. Pusey, Steven From: Johnson, Kelly Sent: Wednesday, February 22, 2012 4:01 PM To: Pusey, Steven Cc: Scott, Georgette; Lewis,Linda Subject: RE: Final Calcs. - Onslow Memorial Attachments: 950317 MOD 2 worksheet KJ 4 2012 02 22 Short Version2.xlsx Steve, I talked with Linda about the methodology for calculating this, and it is in the attached file. We just need to get the following data finalized. It needs to show what is permitted to be built not just what has been surveyed. He needs to include the 41,000 future permitted under Jacksonville because they are allowed to build it. He also needs to figure out what is going on with the 51,224 below. If 51,224 is included in the Jacksonville permit then it needs to be included in the total and not taken out of the LID DA. (The numbers can't be negative.) Once we have the data in this table we will be able to move forward. X Total DA2 DA3 DA3 HD Pocket 1 HD Jax LD (2006 DWty Impervious (Pre1988+"new") bldg 210,469 69,313 9,824 131,332 street 0 0 0 0 parking (includes 3,660sf applying for in 2012) 436,796 95,885 38,971 301,940 sidewalk 42,557 8,233 2,508 31,816 other 0 0 1 51,224 -51,224 offsite 0 0 0 0 future 41,000 0 41,000 SUA Total (Pre1988+"new") 730,822 173,431 143,527 413,864 From: Pusey, Steven Sent: Wednesday, February 22, 2012 3:26 PM To: Johnson, Kelly Cc: Scott, Georgette Subject: Final Calcs. - Onslow Memorial Kelly, Here are the final calcs for Onslow Memorial Hospital. I did the best I could with the numbers given by David Newsom. By these calculations, it passes the 30% rule for the low density section by Option 2 method. Also, the overall % density is lower than 30•A when you exclude the 115,179 sf pre-88 BUA, which was originally excluded in the pond design for our HD pocket. Steve l��- Y. - v1ti T+-. - S- i_'r o-. .- v ..-� ... tom•.-.: 'i": � }' .3 .. .'u' .i.r ^[ 1! .- .._ .. .�- - -_ • ♦ - -. .. v �.. Ll 1 _4 I_-- - - - - .i., iK � Q.JI � V!r'i!(J •. .. � l!.'t{'i :::�.-'hb,'C._ tll , -�P .. .Y e'°Ili'.. n':j�J :... :'f". � \• s -.1\: �Y,,.� i91<- Summary of BUA , lZev, 2- Onslow Memorial Hospital (Permit No. SW8 950317) Revised to include new BUA for this permit 22-Feb-12 Total Area = 1,948,003 sf 44.72 AC Total BUA Presently Existing on Hospital Tract On -site Bldg On -site Streets On -site Parking On -site Sidewalks Other on -site Off -site Future Pre-1988 Total Existing BUAM 210,469 0 436,796 42,557 incl above (4) incl above Ir] 41,0001 High Density Pocket 112) 69,313 0 95,885 8,233 High Density Pocket 2(3) 9,824 0 38,971 2,508 51,224 0 41,000 0 Remaining Low Density 131,332 0 301,940 31,816 -51,224 0 Subtotal 730,822I 288,6101 143,5271 I 298,6851 Low Density Area % BUA = (1)Based on as -built survey of ALL BUA & includes new BUA for this permit. (2)Aug 3, 2006 Modification (ER & Surgical Services Pavilion). (3)City of Jax Permit 09.05.003 (Oncology Pavilion) (4) Other on -site BUA and Pre-1988 BUA are hidden in the numbers for buildings, parking, and sidewalks. 15.33 % I I � 44: i Pusey, Steven From: David Newsom [crystalcoasteng@bizec.rr.com] Sent: Wednesday, February 22, 2012 12:48 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly; Scott, Georgette Subject: RE: Onslow Memorial Hospital - SW8 950317 See below.... Responses in RED From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, February 22, 2012 12:08 PM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly; Scott, Georgette Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High It appears that my preliminary calculations of overall percent density may not be correct. So, I need for you to double check and revise your spreadsheet. In order to properly evaluate the BUA for this permit, it looks like you need to add some things. Here are my questions: 1) Does your column 1 (Total Existing BUA) include Pre-1988 BUA?YES... I have no way of knowing what predates '88. 2) Does your column 2 (HD pocket) include Pre-1988 BUA? I have no way of knowing (those numbers come directly from the Aug 3, 2006 Mod which was prepared and permitted by others (Mulkey and Paul Bartlett) 3) Does your column 1 include the additional 3,660 sf BUA from the HD pocket for this permit? Also, is this included in your column 2? No..not yet ... I excluded that for now.... Regarding Column 2... again no .... the proposed BUA we are now requesting NOT included. 4) It appears that you have not included the 41,000 sf future BUA in the Jacksonville permit. You should include this as BUA since it has already been permitted. Shouldn't it go in your column 3 (Jax permit)? If permitted as FUTURE... yes, we probably should include. 5) Your overall density calculation should exclude all pre-88 BUA and the DA associated with it. Also, you may want to exclude the Jacksonville permit from your project area. I agree ... but it is impossible for me to know what predates'88. Please revise and resubmit by tomorrow (Sorry, probably not going to happen, 1 am also involved in another Permitting Fiasco (Wellington/Carolina Forest Entrance Road) that is pretty much occupying ALL MY TIME at this point.. Let me know if you need more time or have any questions. Thanks, Steve From: David Newsom[mailto:crvstalcoasteng@)bizec.rr.com] Sent: Thursday, February 16, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 Here are my numbers .... as they stand at this juncture.... Y.asi 4�r [A.RK.a I. r. _. .. ...ei •.-. -. ... 4. a Y �_ .. ._.� _.V.: Y, c� u..v u. l--'. ••-r .. Ri_ _ � hc"n.. . ' • .mot. '`.'1 /t ..�� P 0 Column 1 "Total Existing BUA" is my measurement of ALL BUA that exist on the site, based on the AsBuilt Survey that John Pierces office has provided. My responses to your below questions are below in red: From: Pusey, Steven [mailto:steven.Du5gy(alncdenr.00vl Sent: Tuesday, February 14, 2012 10:46 AM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SWB 950317 David, I talked with John Pierce last week about the possibility of expediting this permit. I still need to discuss this with Georgette Scott who is out sick today. So, just keep working on the BUA calculations for now. We will accept it as long as it is logical and it sounds like your methodology is on track. Please email me a copy of your calculations as soon as possible and I will review it and get back with you. We will extend the due date for another week to Feb. 22. About the 95/96 permit for the Urgent Care facility, this impervious area was permitted as 28,610 sf in a low density permit dated May 28, 1996 but never built. However, there is another building and parking lot in that general location, the "Imaging Center for Women", a one-story brick medical office (reference plans by Mulkey Engineers, approved August'06). This area was counted as impervious in the'06 permit for ER & Surgical Services Pavilion by Mulkey Engineers. Note that the Mental Health Center was not included in the drainage area of this permit but it may be considered offite. It is my understanding that the Mental Health Center, although technically part of the Onslow Memorial tract, is a separate lease, and therefore probably NOT APPROPRIATE to account for it under the Hospital SW permit. It is my understanding the BUA in that facility pre -dates the Stormwater Rules .... and therefore no SW permit exists (at least does not exist to my knowledge). I have combined all the numbers I can find into the spreadsheet attached. These number match the numbers I submitted in my previous Add Info request letter. Hopefully, we can use this spreadsheet to validate the numbers. Basically, I need to know two (2) things: 1. Where is the offsite area in the 2006 permit (5,378 so? Is this the Mental Health Center? I have no way of knowing ..... as 1 believe Mulkey computed/provided those BUA figures.... Do you have a contact for someone at Mulkey who we can perhaps contact in an effort to answer this question? 2. How does the pre-88 BUA add up to 114,998 sf? Again, I have noway of knowing..... These items would be best explained in a drawing. If these numbers are incorrect, it would be best to correct them now. One additional note: the site area in acres appears to have gone from 54.88 in 2006 to 44.72 in 2012. Reasons for this? Again, I have no idea ... I can't imagine how it could be that large (54,88). GIS shows the total tract area as 47.98.... which includes the leased area (3.27 ac) to the Mental Health Center. I believe the correct area, for SW permitting purposes, would be the difference (47.98 Ac — 3.27 Ac = 44.72 Ac). Please review this info and give me a call tomorrow... so we can figure where we go from here. Let me know if you have any questions. Regards, Steve Pusey 0 9 0 , 0 From: David Newsom fmailto:crvstalcoasteno(a)bizec.rr.com] Sent: Saturday, February 11, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve Despite working on this for days (and weekends), rest assured I will NOT be ready to resubmit by Feb. 15t".... The is a REAL MESS with all these overlapping permits .... It is difficult, if not impossible, to reconcile all these permits (at least I don't know how to do it) .... too many different Engineers/permit preparers involved and no way to confirm the BUA numbers in the various permits. The only way I know to resolve this mess is to measure ALL EXISTING BUA on site, including the 2 pockets of high density. Then deduct the BUA in the individual pockets from that total to determine the percentage BUA in the remaining Low Density area. I ask that you consider and approve that methodology before I spend any more time. Regardless, I will need more time, Brian I need your parking improvements plan .... I need to understand where the add BUA and the deduct BUA come from .... and I need the drainage area boundary for the ER and Surgical Services Pavilion. Also, I need a boundary that matches that shown on GIS..... biggest difference is the Onslow County Mental Health Center ... which show up on the GIS as being on -site, yet our boundary excludes it. Is it IN ... or OUT .... If in, we need to determine whether there is a separate permit for it .... if not, we need to somehow determine the BUA associated with it. Also, I need to confirm my understanding that little or no BUA associated with the 1995/1996 permit activity for the Urgent Care Facility was constructed... That permit required a pond ..... I am aware of no such pond, so I presume that project was never constructed .... If not, it may be easier to simply VOID that particular permit medication as opposed to trying to reconcile it in the BUA numbers. From: Pusey, Steven fmailto:steven.Dusev(@ncdenr.gov] Sent: Monday, January 23, 2012 4:06 PM To: David Newsom; Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High We will extend the due date by 3 weeks as requested. Therefore, the revised due date will be February 15, 2012. Regards, Steve Pusey DWQ From: David Newsom [mailto:crystalcoastena(a)bizec rr com] Sent: Saturday, January 14, 2012 10:09 AM , , 1 7 C. .1 To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Will have to wait 3 weeks .... I am out of country on business .... I will need an extension, in order to adequately address your comments. Thanks From: Pusey, Steven[mailto:steven.ousey(a)ncdenr.aov] Sent: Friday, January 13, 2012 5:33 PM To: David Newsom; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Sorry I wasn't able to meet you today. I was out all day on inspections. I will be glad to discuss it with you next week. Steve From: David Newsom fmailto:crystalcoasteno(a)bizec.rr.com1 Sent: Friday, January 13, 2012 10:15 AM To: 'David Newsom'; Pusey, Steven; 'Pascal Pandosy Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve... While I am there today ... can I look at your Onslow Mem file .... and see if there are any old Drainage Area Info or BUA summaries from those old permits that might be of help to us. Thanks From: David Newsom[mailto:crystalcoasteng(a)bizec.rr.com] Sent: Friday, January 13, 2012 9:50 AM To: 'Pusey, Steven'; 'Pascal Pandosy Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve We are certainly going to ATTEMPT to address the below comment(s), however, I am DOUBTFUL that it is possible (at least for me .... perhaps I'm just too stupid) to "reconcile" all these BUA figures as you request. These previous permit applications were prepared and submitted by various Engineers, at differing times, under varying permitting requirements, and the respective permits issued by various DWQ staff with often varying requirements. In short, it is difficult, if not impossible, for one to measure and categorize BUA from the pre-existing development .... and to have those figures "match" those prepared and permitted previously by others as listed in those old permits. I am currently involved in another situation that is very similar (old Low Density Permits with various Engineers involved) which is very similar. I have now been "reconciling" those numbers for over 3 weeks (including all the holidays except Christmas Day itself), and I STILL can't reconcile the figures to exactly match those measured and permitted by others. In fact, I have a meeting with DWQ today at 1:30 to discuss that project...... if you have a moment, perhaps you could join us and we can discuss this project (Hospital) in a little more detail. r �! � :jf [" fL: Ji � �l �' .... .I _ +� Lf� T+ t ,� _. C. �� i � i _ fT' a 'y; _ .� i' 1� . � �+ � r - _ n �'� T f �uf `a _ .��P .. nt '- i i � '�� �_ •� _ � r r ..i h: .�.. ui ;f r- C.. _ U �; __ l•}`. i � J �' � y f J ` �. `, 1 � !': 1_ _l �� C J `` �r �• _y From: Pusey, Steven[mailto:steven.ouseva)ncdenr.aovl Sent: Thursday, January 05, 2012 4:11 PM To: David Newsom; 'Pascal Pandosy' Subject: Onslow Memorial Hospital - SW8 950317 Importance: High David Newsom, PE Crystal Coast Engineering Dear Mr. Newsom: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Onslow Memorial Hospital on November 29, 2011. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please report all data in square feet for both drainage areas land 2 in the table on the permit application page 4 (similar to the previous 2006 permit). For example, both the 2006 permit and the new permit application should be stated as follows for drainage areas 1 & 2: DAl DA2 Buildings 91,476 82,851 sf Streets 10,890 0 Parking 130,406 180,431 sf Sidewalk 8,712 16,290 sf Offsite 0 5,378 sf Other 20,038 0 Existing Pre-1988 ? ? TOTAL 2. In reference to the above item, the total existing pre-1988 BUA for DA2 was shown as 114,998 sf in the 2006 application. We need this broken down into subcomponents for both the 2006 permit and the new permit for both DAl and DA2. In other words, we need to know how the pre-1988 BUA adds up. 3. What does the offsite area in DA2 represent? The pond should be sized such that it can handle the entire DA2 plus the offsite. The previous drainage area map shows a portion of the helipad and a road outside the drainage area line. Is this the offsite area? Please explain and show how all BUA, including pre-1988, is handled by the pond. This may require new pond calculations. 4. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 20, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. ANN 0, 2 - Wl j- wo, wry. 11. i"aw0n: M A a im " FAqvt r" n n I , A n, I I i 0 !T a 3, i,,L to, K, �s ., -, ., ... , _;_. ;C0 Imn -1 u .1 on v lee no, T - ;A '3'.) %,;., " .. w1m, Au, cc .: W %w :C YA 0. -ir-, 'A'M C ON. A KN G :.in, h Wn 7 jim Q j ad! Y, , :,to m On, - it q : W& .. 5, Az&.: I r - a 1 C1, . I).. 'T , .II.' , . i0"-71Lij Uv qb - a '0 Q. W r al suds, b, 901 Awahm 1's can k> k , 1 0 0 QY t%j .I-. - - I,._ J, , . I . 'J V .. *!IV A:. K I. - - I I .I q, .. -. �." , a!!if," ., A I'I ... ... 1, 0 d -4; hi 40L W, NAMA mr, _, a " 1- :44; 1, Irt 11 r- ji, nl brr - r1 , ^o . JIlly., o ;-lwvn01 'A Saw w 'Cow r 1 no" k vw ?0 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7334 or email me at the email address above. Regards, Steve GDS/sgp: S:\WQS\Stormwater\Permits & Projects\1995\950317 HD\2012 01 addinfo 950317 cc: David Newsom, PE Wilmington Regional Office Stormwater File crf� 47. PM Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 `c7ss' Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address maybe subject to the North Carolina Public Records Law and maybe disclosed to third parties. r;��j.�!i�r[i :{ry. ;a,, ^. t,;:.: l.l�!, -. .':Ci: •:r.`: `.a �l�q '�; 'C-f' e.'.i. 'y;;.:(�fra: _ �'..{: 1l _Q •;r;"i..,Y,� J'e ... '�( Ic; ��i� ,�I;'r.J7.,.�;}:...:)iSt; _l. •s ...5 1AaR ;fe(.: PA OnQuid 15:i.+t.t, ,01. Pusey, Steven From: Pusey, Steven Sent: Friday, February 17, 2012 11:31 AM To: 'David Newsom' Cc: 'Brian Jarman'; Johnson, Kelly; Scott, Georgette Subject: RE: Onslow Memorial Hospital Attachments: 950317 MOD 2 worksheet.xlsx I had to add 37,344 sf of built -upon area into the low density drainage area to correct our numbers to match yours. I assume this is due to differences in parking and building areas. However, I am calling it "Other Unknown" in this permit. You will have to reconcile this amount in the next permit modification. See worksheet attached. Regards, Steve Pusey From: David Newsom [mailto:crvstalcoastenci a)bizec.rr.com] Sent: Friday, February 17, 2012 9:40 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital Thanks..... And we will continue to work on getting this permit straightenend out. From: Pusey, Steven[mailto:steven.Dusev@ncdenr.govl Sent: Friday, February 17, 2012 9:26 AM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly Subject: Onslow Memorial Hospital David, I just recalculated the percent density for the overall low density permit requirements, including all pre-1988 drainage area, as stated in my previous email. The new calculation is as follows: Your calculated as -built BUA is 413,864 sf or 9.5 ac. Your site area for calculating % density should be 47.98 (total site area) —13.64 (DA in 2006 mod HD pocket) — 3.97 (DA in Jax permit) + 2.64 (pre-1988 DA in HD pocket) = 33.01 acres. Therefore, BUA / Site Area = 9.5 / 33.01= 0.288 = 28.8% This meets the requirements for overall low density limit with as -built BUA. So, I will proceed with the permit. Steve I- I I ti cft.� Q. V"&A . Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 ` aWj Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. d� NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor January 5, 2012 Mr. Daniel T. Waller Onslow Memorial Hospital f 241 New River Drive Jacksonville, NC 28540 Division of Water Quality Charles Wakild, P. E. Director Subject: Request for Additional Information Stormwater Project No. SW8 950317 Mod 2 ER & Surgical Services Pavilion Onslow County Dear Mr. Waller: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Onslow Memorial Hospital on November 29, 2011. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Dee Freeman Secretary Please report all data in square feet for both drainage areas 1 and 2 in the table on the permit application page 4 (similar to the previous 2006 permit). For example, both the 2006 permit and the new permit application should be stated as follows for drainage areas 1 & 2: DA1 DA2 Buildings 91,476 82,851 sf Streets 10,890 0 Parking 130,406 180,431 sf Sidewalk 8,712 16,290 sf Offsite 0 5,378 sf Other 20,038 0 Existing Pre-1988 ? ? TOTAL ------------- ? -------------- ? In reference to the above item, the total existing pre-1988 BUA for DA2 was shown as 114,998 sf in the 2006 application. We need this broken down into subcomponents for both the 2006 permit and the new permit for both DA1 and DA2. In other words, we need to know how the pre-1988 BUA adds up for both drainage areas 3. What does the offsite area in DA2 represent? The pond should be, sized such that it can handle the entire DA2 plus the offsite. The previous drainage area map shows a portion of the helipad and a road outside the drainage area line. Is this the offsite area? Please explain and show how all BUA, including pre-1988, is handled by the pond. This may require new pond calculations. 4. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX 910-350-20041 DENR Assistance: 1-877-623-6748 North Carolina Internet' w nmaterquality.org Va F'/Nn ly (/ V K`{3 s !i(` Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 20, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7334 or email me at the email address above. Regards, Steven G. Pusey Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 GDS/sgp. S:\WQS\Stormwater\Permits & Projects\1995\950317 HD\2012 01 addinfo 950317 cc: David Newsom, PE Wilmington Regional Office Stormwater File Pave 2 of 2 Pusey, Steven From: Pusey, Steven I Sent: Thursday, February 16, 2012 5:02 PM To: 'David Newsom'; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 David, I believe you need to subtract out the drainage areas for the high density pockets from the overall site area in your calculation. Therefore, your site area for calculating the % density would be 44.72 ac. — 13.64 ac. (2006 mod) — 3.97 ac.(Jax permit) = 27.11 ac. So, your overall %density would be 9.5 ac / 27.11 ac = 35%. Or, if you use the previous 54.88 ac. overall site area, it would be 9.5 / 37.27 = 25.5%. Finally, if you use the actual recorded tract area of 47.98 ac., you would have 9.5 / 30.37 = 31.3%. 1 prefer the latter because we are including all drainage area for pre-88 BUA; this would include the Mental Health Center. The only thing we are subtracting is the high density pockets (both BUA and drainage area). Let me know if you get the same numbers and agree with my math on calculating overall density. Thanks Steve From: David Newsom [mailto:crystalcoasteng@bizec.rr.com] Sent: Thursday, February 16, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 Here are my numbers....as they stand at this juncture.... Column 1 'Total Existing BUA" is my measurement of ALL BUA that exist on the site, based on the AsBuilt Survey that John Pierces office has provided. My responses to your below questions are below in red: From: Pusey, Steven [mailto:steven.ousey ncdenr.aovl Sent: Tuesday, February 14, 2012 10:46 AM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 David, I talked with John Pierce last week about the possibility of expediting this permit. I still need to discuss this with Georgette Scott who is out sick today. So, just keep working on the BUA calculations for now. We will accept it as long as it is logical and it sounds like your methodology is on track. Please email me a copy of your calculations as soon as possible and I will review it and get back with you. We will extend the due date for another week to Feb. 22. inniver. too: V ^O:)?'',: 03Nq V MC:: tutor - ',�.` -t J•� n• .` _•d'•l :.11 Pusey, Steven From: David Newsom (crystalcoasteng@bizec.rr.com] Sent: Thursday, February 16, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 Attachments: BUA Summary.xlsx Here are my numbers .... as they stand at this juncture.... Column 1 "Total Existing BUA" is my measurement of ALL BUA that exist on the site, based on the ASBuilt Survey that John Pierces office has provided. My responses to your below questions are below in red: From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, February 14, 2012 10:46 AM To: David Newsom; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SW8 950317 David, I talked with John Pierce last week about the possibility of expediting this permit. I still need to discuss this with Georgette Scott who is out sick today. So, just keep working on the BUA calculations for now. We will accept it as long as it is logical and it sounds like your methodology is on track. Please email me a copy of your calculations as soon as possible and I will review it and get back with you. We will extend the due date for another week to Feb. 22. About the 95/96 permit for the Urgent Care facility, this impervious area was permitted as 28,610 sf in a low density permit dated May 28, 1996 but never built. However, there is another building and parking lot in that general location, the "Imaging Center for Women", a one-story brick medical office (reference plans by Mulkey Engineers, approved August'06). This area was counted as impervious in the'06 permit for ER & Surgical Services Pavilion by Mulkey Engineers. Note that the Mental Health Center was not included in the drainage area of this permit but it may be considered offite. It is my understanding that the Mental Health Center, although technically part of the Onslow Memorial tract, is a separate lease, and therefore probably NOT APPROPRIATE to account for it under the Hospital SW permit. It is my understanding the BUA in that facility pre -dates the Stormwater Rules .... and therefore no SW permit exists (at least does not exist to my knowledge). /^ b^ [ jet pre _ 1 4 00Q I have combined all the numbers I can find into the spreadsheet attached. These number match the numbers I submitted in my previous Add Info request letter. Hopefully, we can use this spreadsheet to validate the numbers. Basically, I need to know two (2) things: 1. Where is the offsite area in the 2006 permit (5,378 sf)? Is this the Mental Health Center? I have no way of knowing ..... as I believe Mulkey computed/provided those BUA figures.... Do you have a contact for someone at Mulkey who we can perhaps contact in an effort to answer this question? �� /dam J—PG^ 2. How does the pre-88 BUA add up to 114,998 sf? Again, I have noway of knowing..... QK ,i �1 Fo•� Dnrrev, These items would be best explained in a drawing. If these numbers are incorrect, it would be best to correct them now! A404M Newj_% 1 ( 4e . One additional note: the site area in acres appears to have gone from 54.88 in 2006 to 44.72 in 2012. Reasons for this? Again, I have no idea ... I can't imagine how it could be that large (54,88). GIS shows the total tract area as 47.98....which includes the leased area (3.27 ac) to the Mental Health Center. I believe the correct area, for SW permitting purposes, would be the difference (47.98 Ac — 3.27 Ac = 44.72 Ac). 0 /' Please review this info and give me a call tomorrow ... so we can figure where we go from here. Let me know if you have any questions. Regards, Steve Pusey From: David Newsom [mailto:crystalcoasteng(a)bizec.rr.coml Sent: Saturday, February 11, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve Despite working on this for days (and weekends), rest assured I will NOT be ready to resubmit by Feb. 15`n The is a REAL MESS with all these overlapping permits .... It is difficult, if not impossible, to reconcile all these permits (at least I don't know how to do it) .... too many different Engineers/permit preparers involved and no way to confirm the BUA numbers in the various permits. The only way I know to resolve this mess is to measure ALL EXISTING BUA on site, including the 2 pockets of high density. Then deduct the BUA in the individual pockets from that total to determine the percentage BUA in the remaining Low Density area. I ask that you consider and approve that methodology before I spend any more time. Regardless, I will need more time, Brian I need your parking improvements plan .... I need to understand where the add BUA and the deduct BUA come from .... and I need the drainage area boundary for the ER and Surgical Services Pavilion. Also, I need a boundary that matches that shown on GIS..... biggest difference is the Onslow County Mental Health Center ... which show up on the GIS as being on -site, yet our boundary excludes it. Is it IN ... or OUT .... If in, we need to determine whether there is a separate permit for it .... if not, we need to somehow determine the BUA associated with it. Also, I need to confirm my understanding that little or no BUA associated with the 1995/1996 permit activity for the Urgent Care Facility was constructed... That permit required a pond ..... I am aware of no such pond, so I presume that project was never constructed .... If not, it may be easier to simply VOID that particular permit medication as opposed to trying to reconcile it in the BUA numbers. From: Pusey, Steven [mailto:steven.puseyCalncdenr.gov] Sent: Monday, January 23, 2012 4:06 PM To: David Newsom; Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High We will extend the due date by 3 weeks as requested. Therefore, the revised due date will be February 15, 2012. Regards, Steve Pusey DWQ From: David Newsom [mailto:crystalcoastengCalbizec.rr.coml Sent: Saturday, January 14, 2012 10:09 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 - Will have to wait 3 weeks .... I am out of country on business .... I will need an extension, in order to adequately address your comments. Thanks From: Pusey, Steven [mailto:steven.pusey(a)ncdenr.gov] Sent: Friday, January 13, 2012 5:33 PM To: David Newsom; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Sorry I wasn't able to meet you today. I was out all day on inspections. I will be glad to discuss it with you next week. Steve From: David Newsom [mailto:crystalcoasteng@bizec.rr.com] Sent: Friday, January 13, 2012 10:15 AM To: 'David Newsom'; Pusey, Steven; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve... While I am there today ... can I look at your Onslow Mem file .... and see if there are any old Drainage Area Info or BUA summaries from those old permits that might be of help to us. Thanks From: David Newsom [mailto:crystalcoasteng(cbbizec.rr.com] Sent: Friday, January 13, 2012 9:50 AM To: 'Pusey, Steven'; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve We are certainly going to ATTEMPT to address the below comment(s), however, I am DOUBTFUL that it is possible (at least for me .... perhaps I'm just too stupid) to "reconcile" all these BUA figures as you request. These previous permit applications were prepared and submitted by various Engineers, at differing times, under varying permitting requirements, and the respective permits issued by various DWQ staff with often varying requirements. In short, it is difficult, if not impossible, for one to measure and categorize BUA from the pre-existing development .... and to have those figures "match" those prepared and permitted previously by others as listed in those old permits. I am currently involved in another situation that is very similar (old Low Density Permits with various Engineers involved) which is very similar. I have now been "reconciling" those numbers for over 3 weeks (including all the holidays except Christmas Day itself), and I STILL can't reconcile the figures to exactly match those measured and permitted by others. In fact, I have a meeting with DWQ today at 1:30 to discuss that project...... if you have a moment, perhaps you could join us and we can discuss this project (Hospital) in a little more detail. From: Pusey, Steven[mailto:steven.ouseyCalncdenr.gov] Sent: Thursday, January 05, 2012 4:11 PM To: David Newsom; 'Pascal Pandosy' Subject: Onslow Memorial Hospital - SW8 950317 Importance: High David Newsom, PE Crystal Coast Engineering Dear Mr. Newsom: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Onslow Memorial Hospital on November 29, 2011. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please report all data in square feet for both drainage areas 1 and 2 in the table on the permit application page 4 (similar to the previous 2006 permit). For example, both the 2006 permit and the new permit application should be stated as follows for drainage areas 1 & 2: DA1 DA2 Buildings 91,476 82,851 sf Streets 10,890 0 Parking 130,406 180,431 sf Sidewalk 8,712 16,290 sf Offsite 0 5,378 sf Other 20,038 0 Existing Pre-1988 ? ? TOTAL 2. In reference to the above item, the total existing pre-1988 BUA for DA2 was shown as 114,998 sf in the 2006 application. We need this broken down into subcomponents for both the 2006 permit and the new permit for both DA1 and DA2. In other words, we need to know how the pre-1988 BUA adds up. 3. What does the offsite area in DA2 represent? The pond should be sized such that it can handle the entire DA2 plus the offsite. The previous drainage area map shows a portion of the helipad and a road outside the drainage area line. Is this the offsite area? Please explain and show how all BUA, including pre-1988, is handled by the pond. This may require new pond calculations. 4. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 20, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7334 or email me at the email address above. Regards, Steve GDS/sgp: S:\WQS\Stormwater\Permits & Projects\1995\950317 HD\2012 01 addinfo 950317 cc: David Newsom, PE Wilmington Regional Office Stormwater File ciicvcrc 4G. P Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 `W Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Pusey, Steven From: Betty Bullock [BettyBullock ?jlpnc.com] Sent: Thursday, February 16, 2012 12:41 PM To: Pusey, Steven Subject: FW: 215 Memorial Drive - Mental Health John asked I forward this information to you. Betty Betty Bullock, Office Manager John L. Pierce & Associates, P.A. P.O. Box 1685 405Johnson Blvd. (28540) Jacksonville, NC28541 (910)346-9800 Fax (910)346-1210 The mental health facility was built in 1977. The address is 215 Memorial Drive. Sincerely, Connie Kellum Engineering Secretary 215 Station Street Jacksonville, NC 28546 910-577-2410 connie. kel lum@onslow.org 2 -16 - 17 . I/Pr,A'e-4 -fl' Sl 1 AIr OnllOW lQr 4e4/ �e�/�•1 C Or.1511 r. w ass ba, / � ,l-la,,f,n,, ? Sere; cc SJ. 1,377 2 / $ Aforr°fret %><ouse ©pe w<rons R4: 910-2rp-8000 1 G a - 4 � J � k _ - � 1 ' - a t m Pusey, Steven From: Pusey, Steven Sent: Tuesday, February 14, 2012 10:46 AM To: 'David Newsom'; 'Brian Jarman' Cc: Johnson, Kelly Subject: RE: Onslow Memorial Hospital - SWB 950317 Attachments: 950317 MOD 2 worksheet.xlsx David, I talked with John Pierce last week about the possibility of expediting this permit. I still need to discuss this with Georgette Scott who is out sick today. So, just keep working on the BUA calculations for now. We will accept it as long as it is logical and it sounds like your methodology is on track. Please email me a copy of your calculations as soon as possible and I will review it and get back with you. We will extend the due date for another week to Feb. 22. About the 95/96 permit for the Urgent Care facility, this impervious area was permitted as 28,610 sf in a low density permit dated May 28, 1996 but never built. However, there is another building and parking lot in that general location, the "Imaging Center for Women", a one-story brick medical office (reference plans by Mulkey Engineers, approved August'06). This area was counted as impervious in the'06 permit for ER & Surgical Services Pavilion by Mulkey Engineers. Note that the Mental Health Center was not included in the drainage area of this permit but it may be considered offite. I have combined all the numbers I can find into the spreadsheet attached. These number match the numbers I submitted in my previous Add Info request letter. Hopefully, we can use this spreadsheet to validate the numbers. Basically, I need to know two (2) things: 1. Where is the offsite area in the 2006 permit (5,378 sf)? Is this the Mental Health Center? 2. How does the pre-88 BUA add up to 114,998 sf? These items would be best explained in a drawing. If these numbers are incorrect, it would be best to correct them now. One additional note: the site area in acres appears to have gone from 54.88 in 2006 to 44.72 in 2012. Reasons for this? Let me know if you have any questions. Regards, Steve Pusey From: David Newsom [mailto:crystalcoasteng@bizec.rr.com] Sent: Saturday, February 11, 2012 1:54 PM To: Pusey, Steven; 'Brian Jarman' Subject: RE: Onslow Memorial Hospital - SWEI 950317 Steve Despite working on this for days (and weekends), rest assured I will NOT be ready to resubmit by Feb. 151h.... The is a REAL MESS with all these overlapping permits .... It is difficult, if not impossible, to reconcile all these permits (at least I don't know how to do it) .... too many different Engineers/permit preparers involved and no way to confirm the BUA numbers in the various permits. 4 .. ..:4 � _... _.-.. ... .. .. ..ram.. .� r..• a... _ a The only way I know to resolve this mess is to measure ALL EXISTING BUA on site, including the 2 pockets of high density. Then deduct the BUA in the individual pockets from that total to determine the percentage BUA in the remaining Low Density area. I ask that you consider and approve that methodology before I spend any more time. Regardless, I will need more time, Brian I need your parking improvements plan .... I need to understand where the add BUA and the deduct BUA come from .... and I need the drainage area boundary for the ER and Surgical Services Pavilion. Also, I need a boundary that matches that shown on GIS..... biggest difference is the Onslow County Mental Health Center ... which show up on the GIS as being on -site, yet our boundary excludes it. Is it IN ... or OUT .... If in, we need to determine whether there is a separate permit for it .... if not, we need to somehow determine the BUA associated with it. Also, I need to confirm my understanding that little or no BUA associated with the 1995/1996 permit activity for the Urgent Care Facility was constructed... That permit required a pond ..... I am aware of no such pond, so I presume that project was never constructed .... If not, it may be easier to simply VOID that particular permit medication as opposed to trying to reconcile it in the BUA numbers. From: Pusey, Stevenfmailto:steven.ousey(ancdenr.aov] Sent: Monday, January 23, 2012 4:06 PM To: David Newsom; Brian Jarman Subject: RE: Onslow Memorial Hospital - SW8 950317 Importance: High We will extend the due date by 3 weeks as requested. Therefore, the revised due date will be February 15, 2012. Regards, Steve Pusey DWQ From: David Newsom[mailto:crystalcoasteno(a)bizec.rr.com] Sent: Saturday, January 14, 2012 10:09 AM To: Pusey, Steven Subject: RE: Onslow Memorial Hospital - SW8 950317 Will have to wait 3 weeks .... I am out of country on business .... I will need an extension, in order to adequately address your comments. Thanks From: Pusey, Steven [mailto•steven ousev@)ncdenr ci Sent: Friday, January 13, 2012 5:33 PM To: David Newsom; 'Pascal Pandosy Subject: RE: Onslow Memorial Hospital - SW8 950317 Sorry I wasn't able to meet you today. I was out all day on inspections. I will be glad to discuss it with you next week. I Steve From: David Newsom [mailto:crystalcoastengCa)bizec.rr.com] Sent: Friday, January 13, 2012 10:15 AM To: 'David Newsom'; Pusey, Steven; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve... While I am there today... can I look at your Onslow Mem file .... and see if there are any old Drainage Area Info or BUA summaries from those old permits that might be of help to us. Thanks From: David Newsom fmailto:crystalcoastena(ulbizec.rr.coml Sent: Friday, January 13, 2012 9:50 AM To: 'Pusey, Steven'; 'Pascal Pandosy' Subject: RE: Onslow Memorial Hospital - SW8 950317 Steve We are certainly going to ATTEMPT to address the below comment(s), however, I am DOUBTFUL that it is possible (at least for me .... perhaps I'm just too stupid) to "reconcile" all these BUA figures as you request. These previous permit applications were prepared and submitted by various Engineers, at differing times, under varying permitting requirements, and the respective permits issued by various DWQ staff with often varying requirements. In short, it is difficult, if not impossible, for one to measure and categorize BUA from the pre-existing development....and to have those figures "match" those prepared and permitted previously by others as listed in those old permits. I am currently involved in another situation that is very similar (old Low Density Permits with various Engineers involved) which is very similar. I have now been "reconciling" those numbers for over 3 weeks (including all the holidays except Christmas Day itself), and I STILL can't reconcile the figures to exactly match those measured and permitted by others. In fact, I have a meeting with DWQ today at 1:30 to discuss that project...... if you have a moment, perhaps you could join us and we can discuss this project (Hospital) in a little more detail. From: Pusey, Steven [mailto:steven.ousev(alncdenr.govl Sent: Thursday, January 05, 2012 4:11 PM To: David Newsom; 'Pascal Pandosy' Subject: Onslow Memorial Hospital - SW8 950317 Importance: High David Newsom, PE Crystal Coast Engineering Dear Mr. Newsom: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Onslow Memorial Hospital on November 29, 2011. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: o7 ... ...... . 1. Please report all data in square feet for both drainage areas land 2 in the table on the permit application page 4 (similar to the previous 20G6 permit). For example, both the 20G6 permit and the new permit application should be stated as follows for drainage areas 1 & 2: DAl DA2 Buildings 91,476 82,851 sf Streets 10,890 0 Parking 130,406 180,431 sf Sidewalk 8,712 16,290 sf Offsite 0 5,378 sf Other 20,038 0 Existing Pre-1988 ? ? TOTAL 2. In reference to the above item, the total existing pre-1988 BUA for DA2 was shown as 114,998 sf in the 2006 application. We need this broken down into subcomponents for both the 2006 permit and the new permit for both DAl and DA2. In other words, we need to know how the pre-1988 BUA adds up. 3. What does the offsite area in DA2 represent? The pond should be sized such that it can handle the entire DA2 plus the offsite. The previous drainage area map shows a portion of the helipad and a road outside the drainage area line. Is this the offsite area? Please explain and show how all BUA, including pre-1988, is handled by the pond. This may require new pond calculations. 4. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 20, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7334 or email me at the email address above. Regards, Steve GDS/sgp: 5:\WO,S\Stormwater\Permits & Projects\1995\950317 HD\2012 01 addinfo 950317 cc: David Newsom, PE Wilmington Regional Office Stormwater File s>a� q. P Environmental Engineer Pusey, Steven From: Betty Bullock [BettyBullock@jlpnc.com] Sent: Friday, February 10, 2012 12:30 PM To: Pusey, Steven Subject: Onslow Memorial Hospital - Parking Addition Mr. Pusey: On November 23, 2011, we submitted an application for a stormwater pond modification' for Onlsow Memorial Hospital SW8 950317. We would appreciate it if you could process this application as quickly as possible. The N.C. Department of Transportation has taken over a portion of the parking area for the new roadway and the hospital is in distress for parking. We are in the process of preparing a complete As -Built survey of the hospital property along with drainage data (BUA) and will forward to you when complete. The hospital intends on adding an additional + 80 parking spaces and access road on the hospital grounds. We hope to have the plans complete and submitted to you within the next 3 months. We would appreciate any help you could give us on the existing permit submittal. John L. Pierce Betty Bullock, Office Manager John L. Pierce & Associates, P.A. P.O. Box 1685 405Johnson Blvd. (28540) Jacksonville, NC28541 (910)346-9800 Fox (910)346-1210 , .��. .t:�... �.. it. I:wW i:v«n i.. ...�.1. ..... Yr .. .. .,n ..: Lam. a.�:S'/.n[...... .... �..ia. .. .. �• �. .ti. ♦ ..lP..�..:`Y.'.Y.f..: n.�v .�..vr.l+'.n. .Y.> 4 n won? W.M.!t .at.J ,:: /'.:,'�1 ... ''iba .Ili t: 1.. .h ia�l, t, a y JI'.,. .t; li •%n v 1 a, _ - ". ., ' l ln� .rlv�rll lv 11 1 .�� t l+Ii. ,. -LI•I l,il �,1 i � ��1 '�flfl 1. j ' _� 11 v r I ..Intl. .1 .J J. a i Y:Y . l \ . Svp 1 04: { 1 r / 'I l t q �J' _•. ^q:.hl•'.I,1!:. ..1. 1 Ox, .tl',on1r. .:I .:," :,lTVl;r,.,..it: .' 1, , .>r.',. n''i. !•fJ .i �I 'P:j.L. L:.'d'� (i'a, '1L, ..>)�,; �: hill .:i W�!r 9d Y.1' , l:J! ] � 1Ll it `<�. �":l �.. 1.`C'"u' :�4C ,I:`;t•r, _ ...,;'S,`l .' 116A , his, . i" A.I. Pusey, Steven From: Pusey, Steven Sent: Thursday, January 05, 2012 4:11 PM To: _'David Newsom'; 'Pascal Pandosy' Subject: Onslow Memorial Hospital - SW8 950317 Importance: High David Newsom, PE Crystal Coast Engineering Dear Mr. Newsom: The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Onslow Memorial Hospital on November 29, 2011. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please report all data in square feet for both drainage areas 1 and 2 in the table on the permit application page 4 (similar to the previous 2006 permit). For example, both the 2006 permit and the new permit application should be stated as follows for drainage areas 1 & 2: DAl DA2 Buildings 91,476 82,851 sf Streets 10,890 0 Parking 130,406 180,431 sf Sidewalk 8,712 16,290sf Offsite 0 5,378 sf Other 20,038 0 Existing Pre-1988 ? ? 1111.1/n11 �-H��D sk ctMc�re� rr . 5 FAI 2. In reference to the above item, the total existing pre-1988 BUA for DA2 was shown as 114,998 sf in the 2006 application. We need this broken down into subcomponents for both the 2006 permit and the new permit for both DA1 and DA2. In other words, we need to know how the pre-1988 BUA adds up. 3. What does the offsite area in DA2 represent? The pond should be sized such that it can handle the entire DA2 plus the offsite. The previous drainage area map shows a portion of the helipad and a road outside the drainage area line. Is this the offsite area? Please explain and show how all BUA, including pre-1988, is handled by the pond. This may require new pond calculations. 4. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 20, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. 'eThe construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143- 215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7334 or email me at the email address above. Regards, Steve GDS/sgp: S:\WQS\Stormwater\Permits & Projects\1995\950317 HD\2012 01 addinfo 950317 cc: David Newsom, PE Wilmington Regional Office Stormwater File d'tave., 47. P..afty. Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 '*- ' Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. t. a j Completeness Review Checklist Project Name: P17 Received Date: ,'(rrJdlll I Project Location: r Ck Ymu,\\? 1� n A MoQ Accepted Date: Rule(s) El2008 Coastal 11995 Coastal r❑Phase II (WiRO) Universal F-11988 Coastal Type of Permit: New or Mod or PR Existing Permit # (Mod or PR): �SO'� s� nPE Cert on File? Density: Yor AD) Type: Commercial or Residential ONCG: %: (Yo OK?) Stream�as$,s: 5C, \3u+,Ns� MSA Map nOffsite to SW8 auoarviaeor: �,uoowision or singie Lot) 11 IORW Map I ) )Exempt Paperwork ��_ 7 b ---���� ��' oob 'To r�cV e�, 3� /j5ypplement(s) (1 original per BMP) (e u-' IMP Type(s): Cn(QAL,_ L_p 'J/ �tA� IN% CPt s TWA-? ��O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) C-4S-7Wh 3'n 9 C-F'11-1 l t� tc rZ Application with correct/original signatures 110 Y-w W 1p (_"An 6laU � T rp or LLC: Sig. Auth. per SoS or letter (within 6mo) ils Report with SHWT KCulations (signed/sealed) nNo obvious errors !nsity includes common areas, etc Restrictions, if subdivided: & Notarized Note to Reviewer: • 4ts gQouC'j Tionl J`f3+�5 In S !S lt�iy\PC.£-Ie-0 V n(O1C 5 or) m ItZz Si IX His \tC7 Plans Sets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading Wetlands: Delineated or No Wetlands Vicinity Map Layout (proposed BUA dimensions) Legend �DA Maps Project Boundaries Infiltration Wet Pod Off Soils Rep t Soils R art �PE Ce \for Master Lot #: SHWT:SHWT: Bottom: Visited: PP: Deed Rest Master Lot # Matches Master BUA Permitted (Mas sf BUA Proposed (Offsite): sf Additional Information: Permitted Proposed: Proposed: Proposed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) I�sV�u( �o� �LI/c��iu�' (3�\u oa-opj(v NoiL C Q 060, 5\ Q nc z+:� I LL %l ell L3rvlSvmZ nz L ()%(hge _9\ I°)C)e -cwp Taa Qe Q r401LA) Dkrylb , 3UnI lnN ; i CI LL'1o' I )1dn`d NZ x\a3z-)N-F-j1 LY3d'L. °1- Qoo� oHocl Icy CJ'1 — V �l C-1 bvl v1ry, s35�w'J e 8AI °C.I � U' �-Pcu clNDL. yJv�1 sj-9 cvl-a�g ° bC,% L N\&� o -�\°a10 \\(De u I I- JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING — LAND PLANNING —MAPPING P.O. BOX 1685 JACKSONV ILLE, NC 28541 OFFICE: (910) 346-9800 FAX: (910) 346-1210 E-MAIL: bettvbnilonacom Or brianjnjl no c.com TO: Ms. Kelly Johnson N.C. Department of Environment and Natural Resources — Department of Stormwater 127 Cardinal Drive Extension Wilmineton, NC 28405 Letter of Transmittal DATE: November 23, 2011 ATTENTION: Kelly Johnson Re. Onslow Memorial Hospital — Parking addition COPIES DATE NUMBER DESCRIPTION 2 Sets of plans 2 Stormwater applications with calculations 1 Check in the amount of $505.00 2 Narrative 1 Copy of Deed of Record I SIGNED:ll>G�. I Boa 477 PACE 204 NORTH CAROLINA: ONSLOW COUNTY: AGREEMENT THIS LEASE, made and entered into this 5th day of February, 1973, by and between Onslow County, a body politic and corporate of the State of North Carolina, hereinafter called the County, and Onslow County Hospital Authority, a public body and a body corporate and politic under and ursuant to Article 13, Chapter 131. of the General Statutes of North Carolina, having its principal office in the City of Jacksonville, North Carolina, hereinafter called the Authority; WITNESSETH: That whereas, the County is the owner of a tract of land situ a in the Township of Jacksonville, OnslOW County, North Carolina, and iescribed as follows: BEGINNING at an iroi. stake in the western right of way lit,e of Western Boulevard, State Road 1470 which stake is 1184. 88 feet from the center line of Carolina Power and Light Company 100 -foot right of way when measured along Western Boulevard right of way in anorthern 6.rect47n: ;.`.encc fre:a said BEGINNING South 85 degrees 52 minutes West 250.0 feet to an iron stake; thence South 4 degree- 08 minutes East 642.10 feet to an iron stake in the center of ;t 30 foot drainage and utility easement; thence following the center of the easement South 35 degrees 80 minutes West 174. 47 fF et to 4 point on top of a corrugated metal pipe in the northern right of way of Oxford Road; thence following said right of way North 53 degrees 02 minutes West 1350. 61 feet to an iron stake; thence South 26 degrees 31 minutes West 20.34 feet to an iron stake in the northern right of way line of Carolina Power and Light Company rig'nt of way; thence following said right of way North 52 degrees 59 minutes West 610. 50 feet to an iron stake in the Stiles and White property line; thence fol- lowing the said line North 26 degrees 31 minutes East 412. 82 feet to'a Railroad iron, Arnold heirs corner; thence following ` the Arnold line North 17 degrees 50 minutes East 628. 80 feet to an iron stake; thence South 65 degrees 08 minutes East 1207.01 feet to the point of curvature; said curve having a radius of 411, 97 feet; thence with the curve in a nortneastern direction Narc distance of 217. 14 feet to the potnL of tangency; thence orth 84 degrees 40 minutes East 138. 83 feet to an iron stake in the right of way curve of Western Boulevard; said curve having a radius of 3111. 46 feet; thence in a southeastern direction with the right of way an arc distance of 65. 0 feet to the point of tangency; thence continuing with the right of way South 4 degrees 08 minutes East 735.0 feet to the point of BEGINNING; being a small portion of the Weyerhaeuser Properties Inc. Land, Parcely0 8, recorded in Map Book 9, Page 49, and Parcel 3, recordedf Map Book 10, Page 42, Onslow County Registry, st A`b Subject to a 20 foot easement across the Western Boulevard BOON 477 % 'PACE205 frontage used jointly by Jones-Onslow Electric Membership Corporation; Brynn Marr Utility Company, utility easement; Weyerhaeuser Properties, Inc. , drainage easement. And whereas, the County has agreed to lease said land and hospital facilities to the Authority, and the Authority has agreed to maintain and oper said hospital facilities in order to provide hospital and clinic services to the people of this County and the general public for the preservation of the public health; NOW, THEREFORE, in consideration of the premises and subject to the terms and conditions hereinafter set forth, the County does hereby lease tc the Authority for a term endind-September 30, 1983; the premises and hospital facilities above described. The terms and conditions of this agreement are as follows; I. This lease shall commence upon the completion of construction of the hospital facility presently under construction on the property hereinbefore described and its acceptance by the North Carolina Medical Care Commission. 2. The Authority agrees to establish, maintain and operate said hos- pital facilities for the preservation of Public Health and in order to provide hospital and clinic services to the general public and in all respects to carry out and per the objects for which .said hospital facility is being construct 3. The hospital facility shall be operated at all times and in every respect administered as a charitable, non-profit facility; no part of the net earnings of the Authority shall ever uiure to the benefit of any individual, firm or corporation. 4. The Authority shall, by regulations, establish a reasonable but adequate and uniform scale of fees and charges for the use of the facilities and services of the hospital facility. All persons financially able to do so shall pay full fees and charges or furnish acceptable security for same. Those persons not financially able to pay full fees and charges but able to pay or secure a part or portion of same shall be required to so do according to their financial ability. Any profits derived from the operation of the hospital facility shall be used exclusively for the purposes and objectives of the hos facility, including expansion of facilities, to be used for patients. purchase of supplies and equipment 1 BOOT( 477 PACE 206 5. The Authority shall observe the rule of furnishing each person admitted to the hospital with equal facilities and the same standard of service and treatment, irrespective of race, color, descent or creed; but this rule shall not prohibit the assignment of separate rooms, wards or sections for certain types of diseases. No favoritism or discrim-ination shall be shown or made because of any person's rank, profession, financial status, or station in life. 6. The Authority agrees to maintain said hospital facilities and equip- ment in good repair and modern condition. 7. The Authority agrees to adequatelyt b.aff the hospital with sufficient professional personnel or arrange with the members of the Hospital Medical Staff to provide for a physican on call at all times to handle emergency cases at the hospital. 8. Upon the commencement of the term of this lease and thereafter, the Authority agrees to keep the hospital facilities, equipment and contents insured against loss by fire, explosion and other casualty in reliable insurance companies in such amounts as the Authority may deem necessary, and the I Authority agrees to pay the premiums for such insurance. 9. The Authority agrees to maintain an accounting system in such a manner as to give a true and accurate accounting of financial transactions of the hospital facility. I 10. The Authority agrees to furnish the County an audit report at least annually by a Certified Public Accountant designated by the County and such other, information of a fiscal nature as may be required by the County. 11. The County shall have the right, ,after review of the financial status of the Authority, to require any excess cash in the opinion of the County to be transferred from the Authority to the County to help cover the hospital bond commitments for payment of principal and interest. 12, If the Authority fails to comply with any of the terms and condition of this agreement, said County may re-enter and take possession of said hos- pital facilities, and use or re -let the same as if this agreement had not been entered into. BOOK 477 PAU207 13, The Authority agrees that in the event of its failure at any time to operate said hospital facilities as herein provided, the Authority shall deliver and convey all its moneys, properties and other assets to the County 14. Regardless of any other provision hereof, the Authority shall oper ate pursuant to and under the provisions of Article 12, Chapter 131 of the Gen- eral Statutes of North Carolina. 15L The County shall be solely responsible for naming the hospital being constructed upon the leased premises. 16. The Authority shall have the right and option to purchase the prop- erty herein leased during the term of this lease for a sum to be mutually agreed upon by the parties hereto at the time of purchase and the County, upor receipt from the Authority of the purchase price agreed upon, shall transfer any and all assets of the hospital facility or facilities, both tangible and intan- gible, including cash, to the Authority. IN TESTIMONY WHEREOF, the County has caused this instrument to be executed in its corporate name by the Chairman of its Board of Commis- sioners and attested by the Clerk to said Board, all by authority of the Board Of Commissioners duly given and the Authority has caused this instrument to be executed by its Chairman and attested by its Secretary, all by authority of its Board of Trustees duly given and flies respective corporate seals to be hereunto affixed this the day and year first above written. ,V BOARD OF COMMISSIONERS OF r ONSLOW COUNTY BY:�r) n rai n 1hQ—� !221—CI rk Chairman ONSLOW COUN^Y HOSPITAL AU': HORITy By; , ecre ary Char an 1 a � bou 477 ( PACEGVO NORTH CAROLINA: ONSLOW COUNTY: This (_ day of 222 0-7 � _, 1973, personally came before me Timothy Wood, who, being by me duly sworn, says that he knows the com- mon seal of the Board of Commissioners of Onslow County, and is acquainted with Ormond Barbee, who is Chairman of said Board, and that he, Timothy Wood, is Clerk Ex-Officio to said Board, and saw the said Chairman sign the foregoing instrument and saw the said common seal of said Board affixed to th said instrument by the Chairman, and that he, Timothy Wood, signed his name in attestation of the execution of said instrument in the presence of the Chain . man. 1973. Witness my hand and notarial seal, this day offQ,.,, My commission expires; tk Notary Pu is NORTH CAROLINA: CAROLINA: ONSLOW COUNTY: Personally appeared before me Glenn L. Hooper Jr who, being by me duly, sworn, says that he is Chairman of the Onslow County Hospital Authority and that saia writing was signed and sealed by him in behalf of said body by its authority duly given. And the said Chairman ledged the said writing to be the act and deed of said Onslow County Hospital Authority. Witness my hand, and official seal, this day of 1973. Notary Public My commission expires: -ZZ4v al t 19Z�, BOOK 41 ( PACE�9 NORTH CAROLINA, ONSLOW COUNTY, The foregoing certificates of Jane T. price and William E. Mann, Jr, are certified to be correct. This instrument was presented for -registration and recorded in this office in Book 477, Page 204. This 20 day of May, 1976 at 11:48 o'clock A.M. MiYdred M. Thomas, Register of Deeds, k o"'In ,, 1. L.:�s :'i�= w.: r: •.t. .<:. 3q_a_ _ ✓:"::., �ii' .k !i�.ik".... )t ,.nF.. ° =aa M„tb. .14, 0..., _. C., 625 and saw, the said Chairman sign the foregoing instrument and'saw the said common seal of said Board affixed to the said instrument by the Chairman, and that she, Mildred M. Thomas, signed her name in attestation of the execution of said instrument in the pre- sence of the Chairman. Witness my hand and notarial Beal, this 22nd day of October, 1969. A111BOD Campers My commission "expires: 4-14-71 Notary Public N. P. Seal. NORTH CAROLINA ONSLOW COUNTY The foregoing certificates of Mary Jane Webster and Allison Campen is certified to be correct.. This 1 day of December, A. D. 1969. Mildred M. Thomas, Register of Deeds Filed for registration 3 o'clock P.M. December 1, 1969, and duly recorded Dec, 1, 1969, Mildred M. Thomas, Register of Deeds WEYERHAEUSER PROPERTIES, INC. TO ONSLOW COUNTY December 1, 1969 M NORTH CAROLINA �ONSLOW COUNTY DEED `i THIS DEED, made this 7th day of October, 1969, b Weyerhaeuser Pro YJk Y Y y parting, Inc., a corporation organized and existing under the laws of the State of Washington, euthOriza to do business in the State of North Carolina, with an office in the City of Tacoma, (State of Washington, party of the first part, to ONSLOW COUNTY, a body politic and J corporate under the laws of the State of North Carolina, party o1 the second part: ` WITNESSETH: i .,�.' That said party of the first part, in consideration of TEN DOLLARS ($10.00) and other valuable considerations to it paid by the party of the second part, the receipt of q - which is hereby acknowledged, has bargained and sold and by these presents does grant, bargain, sell, and convey to said Onsiow County, party of the second part, its success and assigns, a certain tract or parcel of land located on the eastern side of Western Boulevard in Jacksonville Township, Onslow County, North Carolina, said tract of land being more fully described as follows: i Beginning at an iron stake in the western right of way line of Western Boulevard State Road 1470 which stake is 1184.88 feet from the center line of Carolina Power andl Light Company 100 foot right of way when measured along Western Boulevard right of wayl S in a northern direction; thence from said beginning South 85 degrees 52' West 250.0 ? JJfeet to an iron stake; thence South 4 degrees 08' East 642.10 feet to an iron stake Il in the center of a 30 foot drainage and utility easement; thence following the center j wNN of the easement South 35 degrees 30' West 174.47 feet to a point on top of a corrugateG metal pipe in the northern right of way of Oxford Road; thence following said right off way North 53 degrees 02' West 1350.61 feet to an iron stake; thence South 26 degrees 31' West 20.34 feet to an iron stake in the northern right of way line of Carolina . Power and Light Company right of way; thence following said right of way North 52 de- I -r grees 59' West 610.50 feet to an iron stake in the Stiles and White property line; l thence following the said line North 26 degrees 31' East 412.82 feet to a Railroad iron, Arnold heirs corner; thence following the Arnold line North 17 degrees 50' East '628.80 feet to an iron stake; thence South 65 degrees 08' East 1207.01 feet to the .i point of curvature; said curve having a radius of 411.97 feet; thence with the curve JJJJ1 in a northeastern direction an are distance of 217.14 feet, to the point of tangency; thence North 84 degrees 40' East 138.83 feet to an iron stake in the right of way curve of Western Boulevard; as id curve having a radius of 3111.46 feet; thence in a south- I eastern direction with the right of way an arc distance of 65.0 feet to the point of 3 tangency; thence continuing with the right of way South 4 degrees 08' East 735.0 feet to the point of beginning; being a small portion of the Weyerhaeuser Properties, Inc.j Land, Parcel 6, recorded in Map Book 9, Page 45, and Parcel 3, recorded In Hap Book 101 Page 42, Onslow County Registry. , Subject to a 20 foot easement across the Western Boulevard frontage used jointly by Jones-Onslow Electric Membership Corporation; Bryan Marr Utility Company, utility easement; Weyerhaeuser Properties, Inc., drainage easement. This Deed is also made subject to the terms conditions and covenants contained i❑ that certain Agreement between the parties hereto dated October 7, 1969, and which has been duly filed for record with the Register of Deeds for Onslow County, North l' Carolina. TO.HAVE AND TO HOLD, the aforesaid tract or parcel of land and all privileges and appurtenances thereto belonging, to the said Onslow County, party of the second part, its successors and assigns, to its only use and behoof forever. 7:7UUS.:...tu x >� .. qi, ,7. � ,...-........,.e';:....uhf;�ii4:4:'W..s4i'4' 6: a :+..:.:au:ui,`i "�Cf;.'{((1 a ti :qq7• 14 p ^" WACCai ty 390 nn �.' F� And the said party of the first part, for itself and its successors and assigns, covens is I,with the said party of the second part,, its successors and assigns, that it ie seized;, !; of said premises in fee and has a right to convey, in fee simple; that the same are free from and clear all encumbrances, except .for the easements and agreement hereinabove re- F,'yjr r% Mi yferred to, and that it does hereby forever warrant and will forever defend the sold t it le to the same against the claims of all persona whomsoever, F rPIN TESTIMONY WHEREOF, the said .Weyerhaeuser Properties, Inc., party of the first part �i'-•� � ;has caused these presents to be signed in its corporate name by its Vice -President and. attested by its Assistant Secretary and its corporate seal to be hereunto affixed, the ")• �,.. (' ;day and year first above written. 9 WEYERHAEUSER PROPERTIES, INC, r 7 BY Lon Varnadore �('• Vice President 'ATTEST: Lloyd C. Reed Assistant Secretary ,CORPORATE SEAL STATE OF WASHINGTON *' COUNTY OF PIERCE " I, Mary Jane Webster, a Notary Public, do hereby certify that Lloyd C. Reed personally ' appeared before me this day and -acknowledged that he is Assistant Secretary of Weyer- haeuser Properties, Inc., a corporation, and that by authority duly given and as the ',•: 'act of the corporation, the foregoing instrument was signed in its name by its Vice - President, sealed with its corporate seal, and attested by himself as its Assistant Secretary. (• Witness my hand and notarial seal, this 22nd day of October, 1889. Mary Jane Webster 'My commission expires: 2-14-73 Notary Public �'. N. P. Seal. NORTH CAROLINA. �'• ONSLOW COUNTY The foregoing certificate of Mary Jane Webster is certified to be correct. This I day of December, A. D. 1969. _ Mildred M. Thomas, Register of Deeds Filed for registration 3:30 o'clock P.M. December 1, 1969, and duly recorded Dec, 1, I: .1969. r, Mildred M, Thomas, Register of Deeds ?; ####################################################################################### # 4 +y� WEYERHAEUSER PROPERTIES, INC. TO DONALD BAYBDON AND WIFE December 1, 1989 f. NORTH CAROLINA a".•I ONSLOW COUNTY DEED - THIS DEED, made this 29th day of October, 1969, by WEYERHAEUSER PROPERTIES INC., corporation organized and existing under the laws of the State of Washington, authorized to do business in the State of North Carolina, with an office in the City of Tacoma, - State of Washington, party of the first part, to Donald Baysdon and wife, Ina Bayedon, of Onslow County, North Carolina, parties of the second part; " WITNESSETH: That said party of the first pert, in consideration of ONE HUNDRED DOLLARS ($100,00) "' �•' and other valuable considerations to it paid by the parties of the second par the receipt of which is hereby acknowledged, has bargained and sold and by these present,8 does grant, bargain, sell and convey to said Donald Bayedon and wife, Ina Bayedon, parties of the second part, their heirs and assigns, a certain tract or parcel of land lying and being in Jacksonville Township, Onslow County, North Carolina, and more parti `s cularly bounded and described as follows: !a BEGINNING at an iron stake in the right of way of Seaboard Coastline Railroad; which i • stake is 130.0 feet from the center line of Fairway Road when measured along the �f•ail- 'road right of way in a northeastern direction; said Fairway Road is hewn on a map of Weyerhaeuser Properties, - Inc., Parcel 4, Block A, recorded in Map Book 9, -Page 66, •Onslow County Registry, for a more complete reference, thence from said beginning and • ;following the railroad right of way North 54 degrees 25' East 600.0 feet to Ah iron " • stake; thence following the line South 35 degrees 33' East 400.0 feet to an iron stake' �in the proposed right of way line of Commerce Road; thence following same proposed righ Hof way South 54 degrees 25' West 600.0 feet to an iron stake; thence following the line North 35 degrees 35' West 400.0 feet to the point of beginning. Subject to the restric 't ive and protective covenants appearing of record in the chain of title. S •I TO HAVE AND TO HOLD the aforesaid tract or c i enances thereto belonging, to the said Donald Baysdona andwife,Ina Bayed n,o partiesappur of the second part, their heirs and assigns, to their only use and behoof forever, And the said party of the first part, for itself and its successors and assigns, covenants _ ' �rith said parties of the second part, their heirs and assigns, that it is seized of asi - remises,in fee and has a right to convey in tee simple, that the some are free and y' s' u Design Calculations Existing Wet Detention Pond Capacity Analysis for Onslow Memorial ER & Surgical Suite Pavilion located in Onslow County 1. PROJECT DESCRIPTION I Check the capacity of the existing Wet Detention Pond constructed to accommodate the Pocket of High Density which includes the ER and Surgical Pavilion, to accommodate this project, proposed Driveway/Parking Improvements- 2. EXISTING AND PROPOSED IMPERVIOUS AREAS/DRAINAGE AREA a. Compute Percent Impervious: Impervious Areas: On -Site Buildings On -Site Streets On -Site Parking On -Site Sidewalks Other on -site Off -site Sub -Total FUTURE FUTURE(reserved) Total Total Area Drainage to Pond: Percent Impervious = 2. POND SURFACE AREA ANALYSIS 69,313 -- ` C _.0 92,225 8,233- :. L 0 169.771 3,6R Total 69,313 SF 0 SF 95,885 SF 8,233 SF 0 0 173,431 SF 0SF 0 0 0 169,771 3,660 173,431 SF 0.292 or 29.2 % a. Compare Required Pond Surface area to that Provided in existing Pond: Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming foot pond depth: (per existing permit) sq-T, T5_B1 SF SA/DA = 2.63 % (interpolated - Select from Highlighted Cell in SA/DA) Therefore: Surface Area = SA/DA x Drainage Area Required Surface Area = 15,609 sfi� :;. 9€;83ik, sf Provided per Permit Must be > 15,609 sf (OK) Stormwater Treatment Narrative ER & Surgical Services Pavilion - Onslow Memorial Hospital Modification to SW8 950317 Onslow Memorial Hospital currently holds a stormwater permit SW8 950317 authorizing all the existing development and impervious surfaces located on their 44.72 acre tract located on Western Boulevard. Current permit is a Low Density permit which includes a "Pocket of High Density" The Hospital now proposes to construct Driveway and Parking Improvements in the rear (westerly portion) of their site. This project (Driveway/Parking Improvements Plan) spans both the Low Density and High Density "zones" of that permit. The portion of the project within the Low Density zone results in less impervious surface (4,630 sf BUA to be removed) than that currently allowed by the permit. However, that portion of the project within the High Density zone results in a net increase of 3,660 sf of impervious surface (7,310 sf BUA to be added & 3,650 sf BUA to be removed). Calculations are attached which indicate that the existing wet detention pond serving this Pocket of High Density area is more than adequate to accommodate the marinal increase in BUA associated with this project. 1. PROJECT DESCRIPTION Design Calculations Stormwater Treatment Facilities for Onslow Memorial Radiation Oncology Pavillion located in Onslow County The Project consists of proposed expansion to hospital. 2. COMPUTE POND AREA REQUIRED a. Compute Percent Impervious: Impervious Areas On -Site Buildings On -Site Streets On -Site Parking On -Site Sidewalks Other on -site Off -site Sub -Total FUTURE FUTURE(reserved) Total Total Area Drainage to Pond: Percent Impervious = b. Compute Pond Surface Area 10 ` �p ':50,532 ':.::`: 38s71 692 '` 25©8 4 ... 0 Total 9,824 SF 0 SF 89,503 SF 3,200 SF 0 0 102,527 SF 0 SF 0 41,000 41,000 51,224 92,303 143,527 SF 0.830 or 83.0 % -17-2-,9-4-51 SF Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming : ;326 foot pond depth: SA/DA = 9.01 % (interpolated - Select from Highlighted Cell in SA/DA) Therefore: Surface Area = SA/DA x Drainage Area = 15,589 SF say fS:,:66>"fSF must be > 15,589 SF c. Compute Minimum Pond Dimensions Assume rectangular shape with 3:1 Length (L) to Width (W) Ratio: Min Length = 216.26 feet Min Width = 72.09 feet Site conditions, however, dictate irregular shaped pond: Hydr. Length = `:377:7784;0 feet so, Hydr. Width (a% 55.0 feet (avg) Actual L/W = 5.2 (irregular shape) 3. DETERMINE REQUIRED STORAGE VOLUME Design Rainfall Depth = 15 inches Using Schuler "Simple Method": Rv = 0.05 + 0.009(I) where I = percent impervious Rv = 0.797 in/in Control Volume = Design Rainfall x Rv x Drainage Area 'y+ ._ ..,... Control Volume = 17,228 CF say";;j73?77wCF Must be> 17,228 SF 4. DETERMINE REQUIRED STORAGE DEPTH Assume: 3:1 side slopes solving for depth (d) by trial & error: d = 1.04 5. DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day - 5 day period. Using orifice equation, solve for Diameter (D) that results in 3-1/2 day period: D=(Q/0.026(h)e)" Where: Q = (Control Volume / 3.5 days x 86,400 sec/day) 0.057 cis h= D/3 = 0.35 Solving for D: D = 1.93 Use[`:::'.:'-:;2;tj0 " pipe Actual Drawdown with actual drawdown pipe diameter (using orifice equation): Q= 0.061 cfs Draw Down Period = F�K . - ::,,x ' $days OK, 5.0 6. SELECT OUTLET STRUCTURE SIZE Size outlet structure such that depth of Q 10 flow < or + to F77T7Feet Using Rational Formula (Q=CIA) where: Cimper Cpery= 0.2 Ccum = 0.69 110 = 716 in/hr A = 3.97 ac Q10 = 19.60 cfs Using Francis Formula (Q=3.OLH"') to solve for L such that H = Min L = 3.556 Linear Feet Use —77—, 4 Linear Foot Weir Use 5 Square Precast Structure 7. DETERMINE 010 STAGE Q 10 = 19.60 cfs From Routing Analysis, H10= B. DETERMINE Q100 STAGE (ELEV. OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA) where: Cimper= 0.8 Cpery = 0.2 Ccum = 0.69 1100 = 7* ;. `.950 in/hr A = 3.97 ac 1.5 Feet Q100= 26.00 cfs From Routing Analysis, H100 36.53 9. DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV.) Assume primary spillway blocked (i.e., emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm. Using broad crested weir equation H = (Q/(Cw x L))211 where: Q = Q100 26.00 cfs Cw = 3.0 Length = . :30 feet H = 0.44 feet 10. FOREBAY SIZING Compute Actual Pond Volumes (using average end method) Avg Incr. Incr. Cum. Main Bay Volume - Elevation Area (SF) Area (SF l Depth (FT l Vol (CF) Vol 1CF1 Pond Bottom 27.001';fl56 Bottom Veg Shelf 3,50" ';"" 9;t378 5,367 6.50 34,886 34,886 Normal Pond _y34.66 -°' ,.i2,839 11,159 0.50 5,579 40,465 Main Bay Volume = 40,465 CF Embabay Volume Elevation Area (SF) Area (SF Dv th (FT) Vol (CF l Vol (CF) Pond Bottom .29.00 :.1;225 Normal Pond 34.00 ::':.``3;a22 2,124 5.00 10,618 10,618 Forebay Volume = 10,618 CF Total Pond Volume = 51,082 CF Total Pond Area = 15,661 SF ForebaY q Volume equates to '' ''>'y' •<(#-$ % of Total Volume H> Must be > 18% and < 22% Average Pond Depth = 3.26 feet S Compare to assumed Depth u��;�;�Fr�feet Imp.Storage Volume • Elevation Area (SF) Area (SF) Depth (FT) Vol (CF 1 o C Normal Pond 34.00 15,661 Temp. Pond Level ":35ip0 =`':.18;t�93 17,327 1.00 17.327 17,327 Temporary Level should be 35.04 or greater Temp. Pool Volume = 17,327 CF 11. SUMMARY Pond Elevations: Top Berm (minimum) Relative 9.91 Actual 35.91 H= 0.44 100-Yr. Storm 9.47 35.47 (emerg. weir elev) H100 = 1.47 10-Yr. Storm 9.24 35.24 H10 = 1.24 1-inch Storage 8.00 35.00 (primary weir elev) storage depth = 1.00 Permanent Pool 7.00 34.00 (invert out elev) pond depth = 7.00 Pond Bottom 0 27.00 12, WET DETENTION BASIN SUPPLEMENT Site Characteristics Drainage Area 172,945 sf Impervious Area 143,527 sf % Impervious 83.0 % Design Rainfall Depth 1.5 in Storage Volume Min. Volume Required 17,228 cf Volume Provided 17,327 cf Peak Flow Calculations 1-yr, 24 hour rainfall depth 3i65 in Rational C, predevelopment 0:45 Rational C, post development 0.69 Rainfall Intensity 1 yr24 hr 0.15 in/hr Pre Dev Q1(24 hour) 0.27 Post Dev Q1 (24 hour) 0.42 Pre/Post Flow Control 0.14 Basin Elevations Basin Bottom Elevation 26.00 feet (Elev) Sediment Cleanout Elevation 27.00 feet (Elev) Permanent Pool Elevation 34.00 feet (Elev) Temporary Pool Elevation 35.00 feet (Elev) Volume and Surface Area Calculations SA/DA ratio 9.01 Surface Area Required 15,589 sf Surface Area Provided 15,661 sf Permanent Pool Volume 51,082 cf Average Depth 3.26 feet Forebay Volume 10,618 cf Forebay % of Total Volume 20.8 % Temporary pool Area 18,993 sf Drawdown Calculations Drawdown Time 3.28 days Discharge Rate 0.061 cfs Pre Dev Q1(24 hour) 0.27 cfs Post Dev Q1 (24 hour) 0.42 cfs Additional Information Diameter of orifice 2.00 in Design TSS Removal 90 % Basin Side Slopes 3 :1 Vegetated Shelf Slope 10 :1 Vegetated Shelf Width 10 ft Length to Width Ratio 5 :1 Trash Rack? Yes Freeboard Provided? Yes Vegetated Filter Provided? No Recorded Easement? Yes Captures all Runoff? Yes Drain Mechanism Pump Simplified Routing Procedure Project: ;Onslomvtemorjal RatliatioN©ncolog`Pavillion 10 Yr Event Date: Increment "tl °"'"" ^,.���1� minutes (Must be < 15 minutes) Time Time Inflow(cfs) Inflow Stored Volume 'Stage Water Surface Orifice Outflow Weir Outflow Pump Outflow Total Outflow Total Outflow (gin) Wan) 1rw �4 CFD (ftl Elevaton (-QW (sfsl (QW (-QW (-QD 0 0.0 0.00 0.00 0 0.00 34.00 0.00 0.00 0.00 0.00 0 1 0.0 0.22 12.98 13 0.00 34.00 0.00 0.00 0.00 0.00 0 2 0.0 0.86 51.35 64 0.01 34.01 0.01 0.00 0.00 0.01 1 3 0.0 1.89 113.42 177 0.02 34.02 0.01 0.00 0.00 0.01 1 4 0.0 3.27 196.45 373 0.03 34.03 0.02 0.00 0.00 0.02 1 5 0.0 4.95 296.77 668 0.06 34.06 0.02 0.00 0.00 0.02 1 6 0.0 6.83 409.96 1077 0.08 34.08 0.03 0.00 0.00 0.03 2 7 0.0 8.85 531.02 1606 0.12 34.12 0.04 0.00 0.00 0.04 2 8 0.0 10.91 654.62 2258 0.16 34.16 0.04 0.00 0.00 0.04 3 9 0.0 12.92 775.29 3031 0.21 34.21 0.05 0.00 0.00 0.05 3 10 0.0 14.80 887.72 3916 0.27 34.27 0.05 0.00 0.00 0.05 3 11 0.0 16.45 986.94 4900 0.33 34.33 0.06 0.00 0.00 0.06 4 12 0.0 17.81 1068.57 5965 0.39 34.39 0.07 0.00 0.00 0.07 4 13 0.0 18.82 1129.02 7090 0.45 34.45 0.07 0.00 0.00 0.07 4 14 0.0 19.43 1165,61 8251 0.52 34.52 0.08 0.00 0.00 0.08 5 15 0.0 19.61 1176.74 9423 0.58 34.58 0.08 0.00 0.00 0.08 5 16 0.0 19.37 1161.90 10580 0.65 34.65 0.08 0.00 0.00 0.08 5 17 0.0 18.70 1121.76 11697 0.71 34.71 0.09 0.00 0.00 0.09 5 18 0.0 17.63 1058.08 12750 0.76 34.76 0.09 0.00 0.00 0.09 6 19 0.0 16.26 975.73 13720 0.82 34.82 0.09 0.00 0.00 0.09 6 20 0.0 14.91 894.32 14609 0.86 34.86 0.10 0.00 0.00 0.10 6 21 0.0 13.66 819.71 15422 0.91 34.91 0.10 0.00 0.00 0.10 6 22 0.0 12.52 751.32 16168 0.94 34.94 0.10 0.00 0.00 0.10 6 23 0.0 11.48 688.63 16850 0.98 34.98 0.10 0.00 0.00 0.10 6 24 0.0 10.52 631.18 17475 1.01 35.01 0.11 0.02 0.00 0.12 7 25 0.0 9.64 578.52 18046 1.04 35.04 0.11 0.10 0.00 0.21 13 26 0.0 8.84 530.25 18564 1.07 35.07 0.11 0.22 0.00 0.32 19 27 0.0 8.10 486.01 19031 1.09 35.09 0.11 0.34 0.00 0.45 27 28 0.0 7.42 445.47 19449 1.11 35.11 0.11 0.46 0.00 0.57 34 29 0.0 6.80 408.30 19823 1.13 35.13 0.11 0.58 0.00 0.69 42 30 0.0 6.24 374.23 20156 1.15 35.15 0.11 0.69 0.00 0.81 48 31 0.0 5.72 343.01 20451 1.16 35.16 0.11 0.80 0.00 0.91 55 32 0.0 5.24 314.39 20710 1.18 35.18 0.11 0.90 0.00 1.01 61 33 0.0 4.80 288.16 20937 1.19 35.19 0.11 0.99 0.00 1.10 66 34 0.0 4.40 264.12 21135 1.20 35.20 0.11 1.07 0.00 1.18 71 35 0.0 4.03 242.09 21307 1.21 35.21 0.12 1.14 0.00 1.25 75 36 0.0 3.70 221.89 21453 1.22 35.22 0.12 1.20 0.00 1.31 79 37 0.0 3.39 203.38 21578 1.22 35.22 0.12 1.25 0.00 1.37 82 38 0.0 3.11 186.41 21682 1.23 35.23 0.12 1.30 0.00 1.41 85 39 0.0 2.85 170.86 21768 1.23 35.23 0.12 1.33 0.00 1.45 87 40 0.0 2.61 156.60 21838 1.23 35.23 0.12 1.36 0.00 1.48 89 41 0.0 2.39 143.54 21893 1.24 35.24 0.12 1.39 0.00 1.50 90 42 0.0 2.19 131.56 21934 1.24 35.24 0.12 1.41 0.00 1.52 91 43 0.0 2.01 120.58 21963 1.24 35.24 0.12 1.42 0.00 1.54 92 44 0.0 1.84 110.52 21981 1.24 35.24 0.12 1.43 0.00 1.54 93 45 0.0 1.69 101.30 21990 1.24 35.24 0.12 1.43 0.00 1.55 93 46 0.0 1.55 92.85 21990 1.24 35.24 0.12 1.43 0.00 1.55 93 47 0.0 1.42 85.10 21982 1.24 35.24 0.12 1.43 0.00 1.54 93 48 0.0 1.30 78.00 21968 1.24 35.24 0.12 1.42 0.00 1.54 92 49 0.0 1.19 71.50 21947 1.24 35.24 0.12 1.41 0.00 1.53 92 50 0.0 1.09 65.53 21921 1.24 35.24 0.12 1.40 0.00 1.52 91 51 0.0 1.00 60.06 21890 1.24 35.24 0.12 1.39 0.00 1.50 90 52 0.0 0.92 55.05 21855 1.24 35.24 0.12 1.37 0.00 1.49 89 53 0.0 0.84 50.46 21816 1.23 35.23 0.12 1.35 0.00 1.47 88 54 0.0 0.77 46.25 21774 1.23 35.23 0.12 1.34 0.00 1.45 87 55 0.0 0.71 42.39 21729 1.23 35.23 0.12 1.32 0.00 1.43 86 56 0.0 0.65 38.85 21682 1.23 35.23 0.12 1.30 0.00 1.41 85 57 0.0 0.59 35.61 21638 1.22 35.22 0.12 1.27 0.00 1.39 83 58 0.0 0.54 32.64 21582 1.22 35.22 0.12 1.25 0.00 1.37 82 59 0.0 0.50 29.92 21530 1.22 35.22 0.12 1.23 0.00 1.35 81 60 0.0 0.46 27.42 21476 1.22 35.22 0.12 1.21 0.00 1.32 79 61 0.0 0.42 25.13 21422 1.21 35.21 0.12 1.19 0.00 1.30 78 62 63 0.0 0.0 0.38 23.04 21367 1.21 35.21 0.12 1.16 0.00 1.28 77 64 0.0 0.35 0.32 21.11 21311 1.21 35.21 0.12 1.14 0.00 1.25 75 65 0.0 0.30 19.35 17.74 21256 1.21 35.21 0.12 1.12 0.00 1.23 74 66 0.0 0.27 16.26 21199 1.20 35.20 0.12 1.09 0.00 1.21 72 67 0.0 0.25 14.90 21143 1.20 35.20 0.11 1.07 0.00 1.19 71 68 0.0 0.23 13.66 21087 1.20 35.20 0.11 1.05 0.00 1.16 70 69 0.0 0.21 12.52 21031 1.19 35.19 0.11 1.02 0.00 1.14 68 70 0.0 0.19 11.47 20975 1.19 35.19 0.11 1.00 0.00 1.12 67 71 0.0 0.18 10.52 20919 20864 1.19 35.19 0.11 0.98 0.00 1.10 66 72 0.1 0.16 9.64 20809 1.19 1.18 35.19 0.11 0.96 0.00 1.07 64 73 0.1 0.15 8.84 20755 1.18 35.18 0.11 0.94 0.00 1.05 63 74 0.1 0.13 8.10 20701 1.18 35.18 0.11 0.92 0.00 1.03 62 75 0.1 0.12 7.42 20648 1.17 35.18 0.11 0.90 0.00 1.01 61 76 0.1 0.11 6.80 20596 1.17 35.17 0.11 0.88 0.00 0.99 59 77 0.1 0.10 6.24 20544 1.17 35.17 0.11 0.86 0.00 0.97 58 78 0.1 0.10 5.72 20493 1.17 35.17 0.11 0.84 0.00 0.95 57 79 0.1 0.09 5.24 20442 1.16 35.17 0.11 0.82 0.00 0.93 56 80 0.1 0.08 4.80 20392 35.16 0.11 0.80 0.00 0.91 55 81 0.1 0.07 4.40 20343 1.16 1.16 35.16 0.11 0.78 0.00 0.89 54 82 0.1 0.07 4.03 20294 1.16 35.16 0.11 0.76 0.00 0.87 52 83 0.1 0.06 3.70 20247 1.15 35.16 35.15 0.11 0.74 0.00 0.86 51 84 0.1 0.06 3.39 20200 1.15 35.15 0.11 0.11 0.73 0.00 0.84 50 85 0.1 0.05 3.11 20153 1.15 35.15 0.11 0.71 0.69 0.00 0.00 0.82 49 86 87 0.1 0.05 2.85 20108 1.15 35.15 0.11 0.68 0.00 0.81 0.79 48 47 88 0.1 0.1 0.04 0.04 2.61 20063 1.14 35.14 0.11 0.66 0.00 0.77 46 89 0.1 0.04 2.39 2.19 20019 1.14 35.14 0.11 0.65 0.00 0.76 46 90 0.1 0.03 2.01 19976 1.14 35.14 0.11 0.63 0.00 0.74 45 91 0.1 0.03 1.84 19933 1.14 35.14 0.11 0.62 0.00 0.73 44 92 0.1 0.03 1.69 19891 1.14 35.14 0.11 0.60 0.00 0.72 43 93 0.1 0.03 1.55 19850 1.13 35.13 0.11 0.59 0.00 0.70 42 94 0.1 0.02 1.42 19809 1.13 35.13 0.11 0.58 0.00 0.69 41 95 0.1 0.02 1.30 19770 1.13 35.13 0.11 0.56 0.00 0.67 40 96 0.1 0.02 1.19 19730 1.13 35.13 0.11 0.55 0.00 0.66 40 97 0.1 0.02 1.09 19692 1.13 35.13 0.11 0.54 0.00 0.65 39 19654 1.12 35.12 0.11 0.52 0.00 0.64 38 98 99 0.1 0.02 1.00 19617 1.12 35.12 100 0.1 0.1 0.02 0.92 19580 1.12 35.12 101 0.1 0.01 0.84 19544 1.12 35.12 102 0.1 0.01 0.01 0.77 19509 1.12 35.12 103 0.1 0.01 0.71 19475 1.12 35.12 104 0.1 0.01 0.65 19440 1.11 35.11 105 0.1 0.01 0.59 19407 1.11 35.11 106 0.1 0.01 0.54 0.50 19374 1.11 35.11 107 0.1 0.01 0.46 19342 1.11 35.11 108 0.1 0.01 0.42 19 1.11 35.11 109 0.1 0.01 0.38 1927979 1.11 35.11 110 0.1 0.01 0.35 19248 1.10 35.10 111 0.1 0.01 0.32 19218 1.10 35.10 112 0.1 0.00 0.30 19188 1.10 35.10 113 0.1 0.00 0.27 19159 1.10 35.10 114 0.1 0.00 0.25 19130 1.10 35.10 115 0.1 0.00 0.23 19102 1.10 35.10 116 0.1 0.00 0.21 19074 1.09 35.09 117 0.1 0.00 0.19 190 1.09 35.09 118 0.1 0.00 0.18 19020 1.09 35.09 119 0.1 0.00 0.16 18993 1.09 35.09 120 0.1 0.00 0.15 18967 1.09 3509 18942 1.09 35.09 0.11 0.51 0.00 0.62 37 0.11 0.50 0.00 0.61 37 0.11 0.49 0.00 0.60 36 0.11 0.48 0.00 0.59 35 0.11 0.47 0.00 0.58 35 0.11 0.46 0.00 0.57 34 0.11 0.45 0.00 0.56 33 0.11 0.44 0.00 0.55 33 0.11 0.43 0.00 0.54 32 0.11 0.42 0.00 0.53 32 0.11 0.41 0.00 0.52 31 0.11 0.40 0.00 0.51 31 0.11 0.39 0.00 0.50 30 0.11 0.38 0.00 0.49 30 0.11 0.37 0.00 0.48 29 0.11 0.36 0.00 0.47 28 0.11 0.36 0.00 0.47 28 0.11 0.35 0.00 0.46 28 0.11 0.34 0.00 0.45 27 0.11 0.33 0.00 0.44 27 0.11 0.33 0.00 0.44 26 0.11 0.32 0.00 0.43 26 0.11 0.31 0.00 0.42 25 Inflow Hydrograph C= ; AI-N0?69 (Using Malcolm Step Function) I = "; �7;,',1(6) in/hr A= tE 3Q7 a Qpeak 19.6 cfs tp = 15 minutes Time Flow (Q) (min) (cfs) 0 0.00 1 0.22 2 0.86 3 1.89 4 3.27 5 4.95 6 6.83 7 8.85 8 10.91 9 12.92 10 14.80 11 16.45 12 17.81 13 18.82 14 19.43 15 19.61 16 19.37 17 18.70 18 17.63 19 16.26 20 14.91 21 13.66 22 12.52 23 11.48 24 10.52 25 9.64 26 8.84 27 8.10 28 7.42 29 6.80 30 6.24 31 5.72 32 5.24 33 4.80 34 4.40 35 4.03 36 3.70 37 3.39 38 3.11 39 2.85 Length W'shed=RIM Height W'shed= jX tc= 15 40 2.61 41 2.39 42 2.19 43 2.01 44 1.84 45 1.69 46 1.55 47 1.42 48 1.30 49 1.19 50 1.09 51 1.00 52 0.92 53 0.84 54 0.77 55 0.71 56 0.65 57 0.59 58 0.54 59 0.50 60 0.46 61 0.42 62 0.38 63 0.35 64 0.32 65 0.30 66 0.27 67 0.25 68 0.23 69 0.21 70 0.19 71 0.18 72 0.16 73 0.15 74 0.13 75 0.12 76 0.11 77 0.10 78 0.10 79 0.09 80 0.08 81 0.07 82 0.07 83 0.06 84 0.06 85 0.05 86 0.05 87 0.04 88 0.04 89 0.04 90 0.03 91 0.03 92 0.03 93 0.03 94 0.02 95 0.02 96 0.02 97 0.02 98 0.02 99 0.02 100 0.01 101 0.01 102 0.01 103 0.01 104 0.01 105 0.01 106 0.01 107 0.01 108 0.01 109 0.01 110 0.01 111 0.01 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 Accum Z Volume StagQ 1t1S 11 Z Z2 1 Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bottc 17327 1 46 6Q021='`=zL°°'c "> 0= 1.004911 37220 2 ti51'055246 ,0 6931,472 1.984151 58939 3; ,POF98426a Pi0986.1,231 2.986716 82536.5 4 +' 9`16?321 r1"3862944° 4.030093 108065.5 5 11.59049 1.6094379 5.122162 135578.5 6 11.81731 1.7917595 6.267551 Contour at Berm Top b = 1.1239005 Ks = 17231.858 ,Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.9999248 R Square 0.9998495 Adjusted R 0.9997743 Standard E 0.0101518 Observatio 4 ANOVA df SS MS F ignificance F Regressior 1 1.369519 1.369519303 13288.78 7.52E-05 Residual 2 0.000206 0.000103058 Total 3 1.369725 Intercept 9.7545151 0.009261 1053.280549 9.01E-07 9.714668 9.794362 X Variable 1.1239005 0.00975 115.2769762 7.52E-05 1.081952 1.16585 Outlet Device 1 (Orifice) Diameter of Orifice = Cd = Cross Sectional Area = 9= 0.021806 sf 32.2 fUsec2 Stage Head Q (feed aw) (QW 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.05 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 Outlet Device 2 (Weir) Weir Length ==t4;feet Cw= V ?=, 31 Weir Elevations = M.-MM35lfeet Stage Head Q kiwi) l4 IQw 0.00 -1.00 0.00 0.01 -0.99 0.00 0.02 -0.98 0.00 0.03 -0.97 0.00 0.04 -0.96 0.00 0.05 -0.95 0.00 0.06 -0.94 0.00 0.07 -0.93 0.00 0.08 -0.92 0.00 0.09 -0.91 0.00 0.10 -0.90 0.00 0.11 -0.89 0.00 0.12 -0.88 0.00 0.13 -0.87 0.00 0.14 -0.86 0.00 0.15 -0.85 0.00 0.16 -0.84 0.00 0.17 -0.83 0.00 0.18 -0.82 0.00 0.19 -0.81 0.00 0.20 -0.80 0.00 0.21 -0.79 0.00 0.22 -0.78 0.00 0.23 -0.77 0.00 0.24 -0.76 0.00 0.25 -0.75 0.00 0.26 -0.74 0.00 0.27 -0.73 0.00 0.28 -0.72 0.00 0.29 -0.71 0.00 0.30 -0.70 0.00 0.31 -0.69 0.00 Use 3.33 for Sharp, 3,00 for Broad or Free 0.32 -0.68 0.00 0.33 -0.67 0.00 0.34 -0.66 0.00 0.35 -0.65 0.00 0.36 -0.64 0.00 0.37 -0.63 0.00 0.38 -0.62 0.00 0.39 -0.61 0.00 0.40 -0.60 0.00 0.41 -0.59 0.00 Simplified Routing Procedure Project: I " «+� - �Q_ sl_ow3Mein_urial R4adiation Oncology+Pavillion 100 Yr Event Date: l?F3/L7/260�; � ���: Increment srl minutes (Must be < 15 minutes) Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Orifice Outflow eir Outflow Pump Outflow Total Outflow Total ttnu) idaYB.) (r�w (4 itf,l (ft) Elevation Outflow 0 0.0 0.00 0.00 (QW iCW �Qw (QW (M 1 0.0 0.29 17.22 0 0.00 34.00 0.00 0.00 0.00 0.00 0 2 0.0 1.14 68.14 17 0.00 34.00 0.00 0.00 0.00 0.00 0 3 0.0 2.51 150.49 85 0.01 34.01 0.01 0.00 0.00 0.01 1 4 0.0 4.34 260.65 235 0.02 34.02 0.02 0.00 0.00 0.02 1 5 0.0 6.56 393.76 495 0.04 34.04 0.02 0.00 0.00 0.02 1 6 0.0 9.07 543.94 887 0.07 34.07 0.03 0.00 0.00 0.03 2 7 0.0 1429 0.11 34.11 0.03 0.00 0.00 0.03 2 8 11.74 704.57 2132 0.16 34.16 0.04 0.00 0.00 0.04 2 0.0 14.48 868.56 2998 0.21 34.21 0.05 0.00 0.00 0.05 9 0.0 17.14 1028.67 4024 0.27 34.27 0.05 0.00 0.00 0.05 3 10 0.0 19.63 1177.84 5198 0.34 34.34 0.06 0.00 0.00 0.06 3 11 0.0 21.82 1309.48 6504 0.42 34.42 0.07 0.00 0.00 0.07 4 12 0.0 23.63 1417.80 7918 0.50 34.50 0.07 0.00 0.00 0.07 4 13 0.0 24.97 1498.00 9411 0.58 34.58 0.08 0.00 0.00 4 14 0.0 25.78 1546.55 10953 0.67 34.67 0.09 0.00 0.00 0.08 0.09 5 15 0.0 26.02 1561.31 12509 0.75 34.75 0.09 0.00 0.00 0.09 5 16 0.0 25.69 1541.63 14045 0.83 34.83 0.10 0.00 0.00 0.10 5 6 17 18 0.0 24.81 1488.37 15528 0.91 34.91 0.10 0.00 0.00 0.10 6 19 0.0 23.40 1403.88 16926 0.98 34.98 0.10 0.00 0.00 0.10 6 20 0.0 21.58 1294.61 18214 1.05 35.05 0.11 0.14 0.00 0.24 15 21 0.0 0.0 19.78 1186.60 19386 1.11 35.11 0.11 0.44 0.00 0.55 33 22 18.13 1087.60 20441 1.16 35.16 0.11 0.80 0.00 0.91 55 23 0.0 16.61 996.86 21383 1.21 35.21 0.12 1.17 0.00 1.28 77 0.0 15.23 913.69 22220 1.25 35.25 0.12 1.53 0.00 1.65 99 24 25 0.0 13.96 837.46 22958 1.29 35.29 0.12 1.88 0.00 2.00 120 0.0 12.79 767.59 23605 1.32 35.32 0.12 2.20 0.00 2.33 140 26 27 0.0 11.73 703.55 24169 1.35 35.35 0.12 2.50 0.00 2.62 157 28 0.0 10.75 644.85 24657 1.38 35.38 0.12 2.76 0.00 2.88 173 29 0.0 9.85 591.05 25075 1.40 35.40 0.12 2.99 0.00 3.12 187 30 0.0 9.03 541.74 25430 1.41 35.41 0.12 3.19 0.00 3.32 199 31 0.0 8.28 496.54 25727 1.43 35.43 0.13 3.37 0.00 3.49 209 32 0.0 7.59 455.11 25973 1.44 35.44 0.13 3.51 0.00 3.64 218 33 0.0 6.95 417.14 26172 1.45 35.45 0.13 3.63 0.00 3.75 225 34 0.0 6.37 382.34 26329 1.46 35.46 0.13 3.72 0.00 3.85 231 35 0.0 5.84 350.44 26449 1.46 35.46 0.13 3.79 0.00 3.92 235 36 0.0 5.35 321.20 26534 1.47 35.47 0.13 3.85 0.00 3.97 238 37 0.0 0.0 4.91 294.40 26591 1.47 35.47 0.13 3.88 0.00 4.01 240 38 4.50 269.84 26620 1.47 35.47 0.13 3.90 0.00 4.02 241 39 0.0 4.12 247.33 26626 1.47 35.47 0.13 3.90 0.00 4.03 242 40 0.0 3.78 226.69 26611 1.47 35.47 0.13 3.89 0.00 4.02 241 41 0.0 3.46 207.78 26577 1.47 35.47 0.13 3.87 0.00 4.00 240 42 0.0 3.17 190.44 26528 1.47 35.47 0.13 3.84 0.00 3.97 238 43 0.0 2.91 174.56 26464 1.46 35.46 0.13 3.80 0.00 3.93 236 44 0.0 2.67 159.99 26389 1.46 35.46 0.13 3.76 0.00 3.88 233 45 0.0 2.44 146.64 26302 1.46 35.46 0.13 3.71 0.00 3.83 230 46 0.0 2.24 134.41 26207 1.45 35.45 0.13 3.65 0.00 3.77 226 47 0.0 2.05 123.20 26103 1.45 35.45 0.13 3.59 0.00 3.71 223 48 0.0 1.88 112.92 25993 1.44 35.44 0.13 3.52 0.00 3.65 219 49 0.0 1.72 103.50 25878 1.44 35.44 0.13 3.45 0.00 3.58 215 0.0 1.58 94.86 25758 1.43 35.43 0.13 3.38 0.00 3.51 211 50 0.0 1.45 86.95 25635 1.42 35.42 0.13 3.31 0.00 3.44 206 51 0.0 1.33 79.69 25508 1.42 35.42 0.13 3.24 0.00 3.36 202 52 0.0 1.22 73.04 25379 1.41 35.41 0.12 3.16 0.00 3.29 197 53 0.0 1.12 66.95 25249 1.40 35.40 0.12 3.09 0.00 3.22 193 54 0.0 1.02 61.36 25117 1.40 35.40 0.12 3.02 0.00 3.14 188 55 0.0 0.94 56.24 24985 1.39 35.39 0.12 2.94 0.00 3.07 184 56 0.0 0.86 51.55 24853 1.39 35.39 0.12 2.87 0.00 2.99 180 57 0.0 0.79 47.25 24720 1.38 35.38 0.12 2.80 0.00 2.92 175 58 0.0 0.72 43.31 24589 1.37 35.37 0.12 2.72 0.00 2.85 171 59 0.0 0.66 39.70 24457 1.37 35.37 0.12 2.65 0.00 2.78 167 60 0.0 0.61 36.38 24327 1.36 3536 0.12 2.58 0.00 2.70 162 61 0.0 0.56 33.35 24198 1.35 35.35 0.12 2.51 0.00 2.64 158 62 63 0.0 0.0 0.51 30.57 24071 1.35 35.35 0.12 2.45 0.00 2.57 154 64 0.0 0.47 28.02 23945 1.34 35.34 0.12 2.38 0.00 2.50 150 65 0.0 0.43 25.68 23820 1.33 35.33 0.12 2.32 0.00 2.44 146 66 0.0 0.39 23.54 23698 1.33 35.33 0.12 2.25 0.00 2.37 142 67 0.0 0.36 21.57 23577 1.32 35.32 0.12 2.19 0.00 2.31 139 68 0.0 0.33 19.77 23458 1.32 35.32 0.12 2.13 0.00 2.25 135 69 0.0 0.30 0.28 18.12 23341 1.31 35.31 0.12 2.07 0.00 2.19 131 70 0.0 0.25 16.61 15.22 23226 1.30 35.30 0.12 2.01 0.00 2.13 128 71 0.0 0.23 13.95 23114 1.30 35.30 0.12 1.96 0.00 2.08 125 72 0.1 0.21 12.79 23003 1.29 35.29 0.12 1.90 0.00 2.02 121 73 0.1 0.20 11.72 22894 1.29 35.29 0.12 1.85 0.00 1.97 118 74 0.1 0.18 10.75 22788 1.28 35.28 0.12 1.80 0.00 1.92 115 75 0.1 0.16 9.85 22683 1.28 35.28 0.12 1.75 0.00 1.87 112 76 0.1 0.15 22581 1.27 35.27 0.12 1.70 0.00 1.82 109 77 0.1 9.03 22481 1.27 35.27 0.12 1.65 0.00 1.77 106 78 0.1 0.14 8.27 22383 1.26 35.26 0.12 1.61 0.00 1.73 104 79 0.1 0.13 7.58 22287 1.26 35.26 0.12 1.57 0.00 1.68 101 80 0.1 0.12 6.95 22193 1.25 35.25 0.12 1.52 0.00 1.64 98 81 0.1 0.11 6.37 22101 1.25 35.25 0.12 1.48 0.00 1.60 96 82 0.1 0.10 5.84 22011 1.24 35.24 0.12 1.44 0.00 1.56 93 83 0.1 0.09 5.35 21923 1.24 35.24 0.12 1.40 0.00 1.52 91 84 0.1 0.08 0.07 4.91 21836 1.23 35.23 0.12 1.36 0.00 1.48 89 85 0.1 4.50 21752 1.23 35.23 0.12 1.33 0.00 1.44 87 86 0.1 0.07 4.12 21670 1.23 35.23 0.12 1.29 0.00 1.41 84 87 0.1 0.06 3.78 21589 1.22 35.22 0.12 1.26 0.00 1.37 82 88 0.1 0.06 3.46 21510 1.22 35.22 0.12 1.22 0.00 1.34 80 89 0.1 0.05 3.17 21433 1.21 35.21 0.12 1.19 0.00 1.31 78 90 0.1 0.05 2.91 21358 1.21 35.21 0.12 1.16 0.00 1.27 76 91 0.1 0.04 2.67 21284 1.21 35.21 0.12 1.13 0.00 1.24 75 92 0.04 2.44 21212 1.20 35.20 0.12 1.10 0.00 1.21 73 93 0.1 0.04 2.24 21141 1.20 35.20 0.11 1.07 0.00 1.18 71 94 0.1 0.03 2.05 21072 1.20 35.20 0.11 1.04 0.00 1.16 69 95 0.1 0.03 1.88 21005 1.19 35.19 0.11 1.01 0.00 1.13 68 96 0.1 0.03 1.72 20939 1.19 35.19 0.11 0.99 0.00 1.10 66 97 0.1 0.1 0.03 1.58 20874 1.19 35.19 0.11 0.96 0.00 1.08 65 0.02 1.45 20811 1.18 35.18 0.11 0.94 0.00 1.05 63 98 99 0.1 0.1 0.02 1.33 20749 1.18 100 0.1 0.02 1.22 20689 1.18 101 0.1 0.02 1.12 20629 1.17 102 0.1 0.02 1.02 20571 1.17 103 0.1 0.02 0.94 20515 1.17 104 0.1 0.01 0.86 20459 1.17 105 0.1 0.01 0.79 20405 1.16 106 0.1 0.01 0.72 20352 1.16 107 01 0.01 0.66 20300 1.16 108 0.1 0.01 0.61 20249 1.15 109 0.1 0.01 0.56 20199 1.15 110 0.1 0.01 0.51 20150 1.15 111 0.1 0.01 0.01 0.47 20102 1.15 112 0.1 0.01 0.43 20055 1.14 113 0.1 0.01 0.39 20010 1.14 114 0.1 0.01 0.36 19965 1.14 115 0.1 0.01 0.33 19 1.14 116 0.1 0.00 0. 19877 77 1.14 11 0.1 0.00 0.28 19835 1.13 118 0.1 0.00 0.25 0.23 19793 1.13 119 0.1 0.00 0.21 19753 1.13 120 0.1 0.00 0.20 19713 1.13 19674 1.13 35.18 0.11 0.91 0.00 1.03 62 35.18 35.17 0.11 0.89 0.00 1.00 60 35.17 0.11 0.11 0.87 0.00 0.98 59 35.17 0.11 0.85 0.83 0.00 0.96 58 35.17 0.11 0.80 0.00 0.94 5 35.16 0.11 0.78 0.00 0.00 0.92 55 35.16 0.11 0.77 0.00 0.90 0.88 54 35.16 0.11 0.75 0.00 0.8 53 52 35.15 0.11 0.73 0.00 0.84 50 35.15 0.11 0.71 0.00 0.82 49 35.15 0.11 0.69 0.00 0.81 48 35.15 0.11 0.68 0.00 0.79 47 35.14 0.11 0.66 0.00 0.77 46 35.14 0.11 0.64 0.00 0.76 45 35.14 0.11 0.63 0.00 0.74 44 35.14 0.11 0.61 0.00 0.73 44 35.14 0.11 0.60 0.00 0.71 43 35.13 0.11 0.58 0.00 0.70 42 35.13 0.11 0.57 0.00 0.68 41 35.13 0.11 0.56 0.00 0.67 40 35.13 0.11 0.54 0.00 0.66 39 35.13 0.11 0.53 0.00 0.64 39 Inflow Hydrograph C= 11-V nQx69 Length W'shed= (Using Malcolm Step Function) I = k,:: 9z5j in/hr Height W'shed= Qpeak tp = Time Flow (Q) (min) (cfs) 0 0.00 1 0.29 2 1.14 3 2.51 4 4.34 5 6.56 6 9.07 7 11.74 8 14.48 9 17.14 10 19.63 11 21.82 12 23.63 13 24.97 14 25.78 15 26.02 16 25.69 17 24.81 18 23.40 19 21.58 20 19.78 21 18.13 22 16.61 23 15.23 24 13.96 25 12.79 26 11.73 27 10.75 28 9.85 29 9.03 30 8.28 31 7.59 32 6.95 33 6.37 34 5.84 35 5.35 36 4.91 37 4.50 38 4.12 39 3.78 26.0 cfs 15 minutes tc= 15 40 3.46 41 3.17 42 2.91 43 2.67 44 2.44 45 2.24 46 2.05 47 1.88 48 1.72 49 1.58 50 1.45 51 1.33 52 1.22 53 1.12 54 1.02 55 0.94 56 0.86 57 0.79 58 0.72 59 0.66 60 0.61 61 0.56 62 0.51 63 0.47 64 0.43 65 0.39 66 0.36 67 0.33 68 0.30 69 0.28 70 0.25 71 0.23 72 0.21 73 0.20 74 0.18 75 0.16 76 0.15 77 0.14 78 0.13 79 0.12 80 0.11 81 0.10 82 0.09 83 0.08 84 0.07 85 0.07 86 0.06 87 0.06 88 0.05 89 0.05 90 0.04 91 0.04 92 0.04 93 0.03 94 0.03 95 0.03 96 0.03 97 0.02 98 0.02 99 0.02 100 0.02 101 0.02 102 0.02 103 0.01 104 0.01 105 0.01 106 0.01 107 0.01 108 0.01 109 0.01 110 0.01 111 0.01 112 0.01 113 0.01 114 0.01 115 0.01 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 Accum Z Volume Stage Ind 1nZ Zest Comment 0 0 Contour at Normal Pond (wet pond) or Basin Bottc 17327 1 %760021 ", t ' 0= 1.004911 37220 2 %iN O f5246M0 693,,1;472 1.984151 58939 3 ; 10198426-Yr1t'0986123 2.986716 82536.5 4.030093 108065.5 5 11.59049 1.6094379 5.122162 135578.5 6 11.81731 1.7917595 6.267551 Contour at Berm Top b = 1.1239005 Ks = 17231.858 Regression Analysis Y Data Range `` Regression Analysis X Data Range 2 _. k! 9 Y 9 SUMMARY OUTPUT Regression Statistics Multiple R 0.9999248 R Square 0.9998495 Adjusted R 0.9997743 Standard E 0.0101518 Observatio 4 ANOVA of SS MS F ionificance F Regressior 1 1.369519 1.369519303 13288.78 7.52E-05 Residual 2 0.000206 0.000103058 Total 3 1.369725 Intercept 9.7545151 0.009261 1053.280549 9.01E-07 9.714668 9.794362 X Variable 1.1239005 0.00975 115.2769762 7.52E-05 1.081952 1.16585 Outlet Device 1 (Orifice) Diameter of Orifice = Cd = Cross Sectional Area = 9= +0 a 6" 6SIaV� 0.021806 sf 32.2 ft/sec2 Stage Head Q 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.03 0.00 0.00 0.04 0.00 0.00 0.05 0.00 0.00 0.06 0.00 0.00 0.07 0.00 0.00 0.08 0.00 0.00 0.09 0.01 0.01 0.10 0.02 0.01 0.11 0.03 0.02 0.12 0.04 0.02 0.13 0.05 0.02 0.14 0.06 0.02 0.15 0.07 0.03 0.16 0.08 0.03 0.17 0.09 0.03 0.18 0.10 0.03 0.19 0.11 0.03 0.20 0.12 0.04 0.21 0.13 0.04 0.22 0.14 0.04 0.23 0.15 0.04 0.24 0.16 0.04 0.25 0.17 0.04 0.26 0.18 0.04 Outlet Device 2 (Weir) Weir Length = -I' feet Weir Elevations = ti�M5 feet Ak-M Stage Head Q (fDQ0 (feed ww 0.00 -1.00 0.00 0.01 -0.99 0.00 0.02 -0.98 0.00 0.03 -0.97 0.00 0.04 -0.96 0.00 0.05 -0.95 0.00 0.06 -0.94 0.00 0.07 -0.93 0.00 0.08 -0.92 0.00 0.09 -0.91 0.00 0.10 -0.90 0.00 0.11 -0.89 0.00 0.12 -0.88 0.00 0.13 -0.87 0.00 0.14 -0.86 0.00 0.15 -0.85 0.00 0.16 -0.84 0.00 0.17 -0.83 0.00 0.18 -0.82 0.00 0.19 -0.81 0.00 0.20 -0.80 0.00 0.21 -0.79 0.00 0.22 -0.78 0.00 0.23 -0.77 0.00 0.24 -0.76 0.00 0.25 -0.75 0.00 0.26 -0.74 0.00 0.27 -0.73 0.00 0.28 -0.72 0.00 0.29 -0.71 0.00 0.30 -0.70 0.00 0.31 -0.69 0.00 Use 3.33 for Sharp, 3,00 for Broad or Free 0.32 -0.68 0.00 0.33 -0.67 0.00 0.34 -0.66 0.00 0.35 -0.65 0.00 0.36 -0.64 0.00 0.37 -0.63 0.00 0.38 -0.62 0.00 0.39 -0.61 0.00 0.40 -0.60 0.00 0.41 -0.59 0.00 i 'lei • (` + ' � ,�_?` Y x r r UM,021%4e, <F'.l epw,, Mun'e �fcM N Proiect Information 5w$g5o3(� u�"dFOR°OFFICE`175E ONLYv� Date Received: Review Fee: 5 Permit No: City of Jacksonville L Application for Stormwater Permit Date Issued: Project Name: Onslow Memorial Hospital — Radiation/Oncolocry Pavilion Project Location: Highway/Street: 317 Western Blvd. Latitude: 3445.74' Longitude: 7723.12' Property Owner: Onslow County Property Owner Address: 512 Mill Ave.. Jacksonville, NC 28540 Property Owner Telephone: 910-347-4717 Deed Book: 390147711041 Page No. 62WO41351 respectively PIN # 438714427532 Lot Acreage 44.72 Purpose of Development: Residential Q Commercial F--1 Other XQ Existing Impervious Coverage (acres) 14.99 ac F—IXHighDensity Low Density Proposed Impervious Coverage (acres) 15.03 ac Applicant Information (Owner/Developer) Business Name(s): Onslow County Hospital Authority Applicant Name(s): Onslow County Hospital Authority Address: 241 New River Drive, Jacksonville NC Telephone: 910-577-4705 Fax: n/a Email Address: n/a Designer Information (Person to contact regarding questions or revisions to the plan Company: Crystal Coast Engineering PA Contact Name: David K. Newsom Address: 3817-3 Freedom Way Hubert NC Telephone: 910325-0006 Fax: 910-326-0060 Email Address: crvstalcoasteng()bizec.rr.com ATTACH PERMIT TO THIS APPLICATION Stormwater Application Page 1 of 18 March 1, 2009 Permit Holder's Name:Ons/ow County Hospital Authority Stormwater Permit #: Permit SECTION 1. APPROVAL: Having reviewed the application and all supporting materials the City of Jacksonville has determined that the application is complete, and subject to the conditions imposed below, and the proposed development meets the requirements of the City's Phase II Stormwater Ordinance. SECTION 2. CONDITIONS: Therefore, the above referenced site and land used is hereby approved and subject to all applicable provisions of the City of Jacksonville Phase II Stormwater Ordinance, Sections 3 and 4 of this permit, and the following condition(s) which the City of Jacksonville finds necessary for the proposed development to meet the intent of the ordinance: This permit shall be valid for a period of two years from the date of issuance unless a valid building permit has been issued and maintained for the site or the permit has been revoked by the City of Jacksonville. If, after two years the permitted activity has not begun nor a valid building permit secured, this permit shall expire. 2. All land purchases and transfers necessary to secure the property for development shall be completed prior to recordation of this permit. 3. The development of the tract shall proceed in conformity to all plans, design features, and restrictions submitted as part of the stormwater permit application and kept on file by the City Planning Department except that the City of Jacksonville's Public Services Director may approve minor changes to such plans as required by field conditions. 4. The petitioner shall complete all required off -site stormwater improvements and receive approval from the City for such improvements prior to the release of any certificates of occupancy. 5. The petitioner shall submit a Floodplain Development Permit Application and receive approval from the City Planning Department prior to any land disturbance or filling of land located within Special Flood Hazard Areas. 6. The petitioner shall submit a Sedimentation and Erosion Control Plan Application and receive approval from the City of Jacksonville prior to any land disturbance or filling of land. SECTION 3. VESTED RIGHTS. Approval of this permit confers upon the property the right to develop with the type and intensity of use only as such relates to the requirements of the Phase II stormwater ordinance and in the manner as herein described and as shown on the approved site plan. Development of the property, however, shall be subject to any and all future amendments to this ordinance which do not affect such type and intensity of use and shall proceed in full compliance with all other applicable local, state and federal regulations. Stormwater Permit Page 2 of 18 March 1, 2009 Permit Holder's Name:Ons/ow County Hospital Authority Stormwater Permit #: SECTION 4. DEED RESTRICTION -PROTECTIVE COVENANT. The following deed restrictions and protective covenants shall be recorded for all subdivisions, outparcels, and future development prior to the sale of any lot: ARTICLE STORMWATER OPERATION AND MAINTENANCE, EASEMENT AND ACCESS AGREEMENT FOR STRUCTURAL MANAGEMENT OF BMPS AND ESCROW CONTRIBUTION CONTRACT 1. Definitions. As used within this Maintenance Covenant Section, the following words and terms have the following definitions. (a) "Maintain", "Maintenance", "Maintaining" or any similar term used herein is defined to include one or more of the following, as the context requires: acquisition, purchase, construction, re -construction, installation, maintenance, inspection, examination, upkeep, cleaning, renewal, alternation, repair, replacement, repainting, remodeling, restoration, removal, improvement, administration, operation, use, planting, mowing, cutting, trimming, pruning, fertilizing, watering and preservation. (b) "Maintenance Covenant" is defined as this Article. (c) "Structural BMPs" is defined collectively as the stormwater control structures and other stormwater structural Best Management Practices (BMPs) and associated appurtenances and vegetation as stipulated on the approved final plat for said Property. 2. Location and Identification of Structural BMPs. A description of the portions of the Property where all the Structural BMPs are located, as well as a description of the Property in the Contract executed between the Association and the City of Jacksonville entitled "City of Jacksonville's Stormwater Operation, Maintenance, Easement and Access Agreement for Structural Stormwater Management of BMPs and Escrow Contribution Contract" which has been registered at the Onslow County Register of Deeds to run with said Property. 3. Maintenance of Structural BMPs. Structural BMPs shall be maintained by the Association in strict compliance with the Stormwater Ordinance and Agreement. At all times, the Structural BMPs shall comply with all applicable laws, ordinances, regulations, and rules. Membership in the Association is mandatory for each Owner of a Lot with membership being appurtenant to the Lot and running with ownership of the Lot. The Association or its Board of Directors shall levy assessments for the costs and expenses of maintaining the Structural BMPs in further compliance with the City of Jacksonville Stormwater Ordinance and Agreement. Upon compliance with the provisions of Chapter 47F of the North Carolina General Statutes (or any applicable successor provision), all assessments levied against a Lot that remain unpaid for a period of thirty (30) days or longer shall constitute a lien on that Lot. Stormwater Permit Page 3 of 18 March 1, 2009 Permit Holder's Name:Onslow County Hospital Authority Stormwater Permit #: 4. Association Costs and Expenses for Maintenance of Structural BMPs The costs and expenses of maintaining the Structural BMPs shall be a common expense of the Association and shall include, without limitation, all contribution payment obligations owed to the City of Jacksonville under a Stormwater Agreement covering the Property. 5. Establishment of an Escrow Account. The initial construction cost for the Structural BMP will be used to establish the level to which the escrow account will be funded. The sinking fund budget is established in the Stormwater Maintenance Agreement. Any funds drawn down from the escrow account shall be replaced in accordance with the schedule of contributions specified by the City of Jacksonville prior to the withdrawal of said funds. 6. Penalties Associated with Failure to Maintain Structural BMPs Operation and Maintenance of the Structural BMPs must comply with all relevant provisions of the Ordinance, as may be amended from time to time, and the Operation and Maintenance Agreement. Failure to maintain the Structural BMPs is a violation of the Ordinance and may subject each Lot Owner to significant daily civil penalties and other enforcement actions by the City of Jacksonville. 7. Grant of Easement. Association hereby dedicates, bargains, sells, grants, and conveys unto the City of Jacksonville, its successors and assigns, a perpetual, non-exclusive and irrevocable right and easement over, under, through, and across the Stormwater Areas and access through the Property to and from the Stormwater Areas for the purpose of permitting City inspection and, if deemed necessary, as determined by the City, maintenance, replacement, reconstruction, and repair of the Structural BMPs. 8. Joint and Several Liability. Each Owner shall be jointly and severally responsible for maintenance and operation of the Structural BMPs, including payment of any unpaid expenses related to the maintenance of the Structural BMPs and including all interest charges thereon, together with the costs and expenses of collection incurred, including court costs and reasonable attorneys' fees actually incurred. 9. Action for Specific Performance. Recognizing the consequences to the City of Jacksonville of non-compliance with the obligations of this Maintenance Covenant, Association hereby grants the City of Jacksonville the right to seek, in any court of appropriate jurisdiction, judicial action for specific performance of any of the obligations established within this Maintenance Covenant. This right of the City shall not limit any other remedies or enforcement options available to the City under the Ordinance, any other applicable law, or the Stormwater Agreement. SECTION 5. SEVERABILITY. Invalidation of any one or more of the conditions set forth herein shall not adversely affect the balance of said conditions, which shall remain in full force and effect. Stormwater Permit Page 4 of 18 March 1, 2009 Permit Holder's Name:Ons/ow County Hospital Authority Stormwater Permit #: City Manager NORTH CAROLINA ONSLOW COUNTY that Date a Notary Public of the aforesaid County and State, certify ersonally appeared before me and acknowledged that he is the City Manager for the City of Jacksonville, North Carolina and pursuant to authority duly given, and as an act of the City; he executed this Agreement for the purpose herein expressed. WITNESS my hand and Notarial Seal this the _ day of , 20 NOTARY PUBLIC My Commission Expires: SEAL (Seal) Stomwater Permit Page 5 of 18 March 1, 2009 Permit Holder's Name: Stormwater Permit #: I, Daniel T.-Waller, SRVP Support Services For The Onslow County Hospital Authority subject property, do hereby acknowledge receipt of this Stormwater Permit and agree to he conditions stated within. I further acknowledge that no work may be done pursuant to this Permit except in accordance with all of the conditions and requirements listed and that these conditions and requirements shall be binding upon me and my successors in interest and shall run with the land in perpetuity. Owner Name NORTH CAROLINA ONSLOW COUNTY ,a Notary Public, do hereby certify that _ [owner Name(s)] personally appeared before me this day and acknowledged that [he/she/they] [is/are] the owner(s) of [address] WITNESS my hand and Notarial Seal this the 21 day of (Seal) *OTARYUBLIC ��4 My Commission Expires:' 3FL Gy 0 a- p M SERL. =z cp GeCIC c Stormwater Permit COUNT Stormwater March t. 2009 Page 35 of 49 .�:� •I,� 4 �� � }'� `�J .: � � � � O � S a c, ? � ;., �G . �. �.. '�ir�,tiit�'iltl;';� Instrument Prepared By: Brief Description for Index: Parcel Identifier: Mail After Recording To: City of Jacksonville Attorney's Office City Attorney's Office PO Box 128 Jacksonville, NC 28541 STATE OF NORTH CAROLINA COUNTY OF ONSLOW CITY OF JACKSONVILLE'S STORMWATER OPERATION, MAINTENANCE, EASEMENT AND ACCESS AGREEMENT FOR STRUCTURAL STORMWATER MANAGEMENT OF BMPS THE CITY OF JACKSONVILLE'S STORMWATER OPERATION, MAINTENANCE, EASEMENT AND ACCESS AGREEMENT FOR STRUCTURAL STORMWATER MANAGEMENT OF BMPS (the "Agreement") made this day of 20 , by and between Onslow County Hospital Authority , whose address and telephone number are 241 New River Drive Jacksonville N. C 28541, (hereinafter referred to as "Developer") with, to and for the benefit of the CITY OF JACKSONVILLE, a municipal corporation of the State of North Carolina, whose address is PO Box 128, Jacksonville, North Carolina 28541 (hereinafter referred to as the "City"). Developer, or any subsequent successors and assigns are herein referred to collectively as the "Owners" and individually as "Owner". WITNESSETH WHEREAS, the City, under various state and federal laws, is required to regulate the maintenance of Structural BMPs (as defined herein) constructed to serve new or re -development within the City's planning jurisdiction to ensure that, following initial construction, the Structural BMPs are operated, maintained, and to the extent necessary, repaired in accordance with applicable state and federal laws; and WHEREAS, the City may be subject to substantial regulatory and financial penalties from the State of North Carolina and the federal government if the above -referenced rules and regulations are not applied to new or re -developments occurring within the planning jurisdiction of the City; and WHEREAS, the City Council of the City of Jacksonville has determined that, to maintain the City of Jacksonville's compliance under applicable state and federal regulations, certain obligations are to be met by Developers and subsequent owners of Structural BMPs; and WHEREAS, Developer is the owner in fee simple of that certain "Property" situated in Onslow County, North Carolina and more particularly described on Exhibit A; and WHEREAS, the Property is located within the planning jurisdiction of the City and subject to certain stormwater standards set forth in Jacksonville City Ordinance 2009-07 (the "Ordinance"), as may be amended from time to time; and WHEREAS, the Developer has submitted construction drawings depicting the Stormwater Area and Structural BMPs (both herein defined), for the purpose of establishing a stormwater management system for the Property, and WHEREAS, these Structural BMPs are required to comply with the Ordinance and that failure to maintain the Structural BMPs is a violation of the Ordinance potentially subjecting each lot owner of the Property to significant daily civil penalties and other enforcement actions; and WHEREAS, the City also requires that the Developer grant or dedicate to the City an access and maintenance easement over and across the Property and Stormwater Areas for the purpose of inspecting, maintaining, repairing, reconstructing and replacing the Structural BMPs set forth in the Ordinance and this Agreement; and WHEREAS, this Agreement has been procured in accordance with the requirements of N.C. General Statutes Chapter 143, Article 21, Part I and Jacksonville City Ordinance 2009-07. NOW, THEREFORE, for a valuable consideration, including benefits Developer may derive there from, the receipt of which is hereby acknowledged, the Owner and City hereby agree as follows: 1. RECITALS. The foregoing recitals shall constitute an integral part of this Agreement, and this Agreement shall be incorporated herein and made a part thereof. 2. PROPERTY. As required by the City in connection with the development of this Property, the Developer shall install engineered stormwater control structures and other stormwater structural Best Management Practices (BMPs) and associated appurtenances and vegetation (collectively, the "Structural BMPs") as shown on the construction drawings prepared by John L. Pierce & Associates/Crystal Coast Engineering PA, entitled Radiation/Oncology Pavilion and dated March 9 2009 on portion of Property as described in Exhibit B (the "Stormwater Areas"), for purposed of establishing a stormwater management system for the Property, and that Developer assumes specific maintenance, replacement, reconstruction and repair, responsibilities set forth in the Ordinance and with respect to the Structural BMPs; and 3. GRANT OF EASEMENT. Developer hereby dedicate, bargain, sell, grant, and convey unto the City, its successors and assigns, a perpetual, non-exclusive and irrevocable right and easement over, under, through, and across the Stormwater Areas and access through the Property to and from the Stormwater Areas for the purpose of permitting City inspection and, if deemed necessary, as determined by the City, maintenance, replacement, reconstruction, and repair of the Structural BMPs, as more fully set forth herein and in the Ordinance (the "Protection Easement"). Said easement shall be clearly identified and labeled on the approved final plat for Property. Said easements shall be permanent and shall run with the land. 4. CONSTRUCTION AND MAINTENANCE STORMWATER MANAGEMENT FACILITIES. The Developer shall be responsible for the construction of the Stormwater BMPs; and prior to conveying control of the Stormwater Area, their appurtenances and vegetation to another Owner by deed or easement, the Developer will be responsible for maintenance, repair, reconstruction, and replacement thereof in the manner specified herein and in strict compliance with the Stormwater Ordinance 2009-07 which is incorporated herein by reference and made a part thereof (the "Ordinance"). At all times, the Stormwater BMPs shall perform as designed and shall at all times comply with all applicable laws, ordinances, regulations, rules and directives of governmental authorities. 5. OWNERSHIP AND/OR TRANSFER OF PROPERTY AND STORMWATER AREAS. Developer agrees that it shall not transfer ownership and/or control of the Structural BMPs until construction has been completed in accordance with the Stormwater Permit, as defined in the Ordinance, approved Stormwater Areas and Structural BMPs plans, and the City hasinspected and approved the same. In addition, the Developer and any new Owner must request that the Permit for the Structural BMPs be reissued to any subsequent Owner. The Developer agrees that it shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Structural BMPs until a Permit has been issued to Developer's successor, or new owner at which time Developer shall be released from any obligations hereunder arising from events or circumstances occurring after the date the Structural BMPs is transferred and the Permit is reissued to the new Owner of the Property; and 6. INSPECTION. The Developer, its successors and assigns, shall ensure that the Structural BMPs are inspected by one of the following professional services: Qualified Registered North Carolina Professional engineer, surveyor, landscape architect, soil scientist, aquatic biologist, or person certified by the North Carolina Cooperative Extension Service for Stormwater treatment practice inspection and maintenance (the "Professional"). The Professional shall submit an annual inspection report, a copy attached hereto as Exhibit C, which may be amended from time to time, to the City. The inspection report shall be due annually 30 days from the date of the final structural stormwater BMP construction inspection approval by the City. The inspection shall cover the entire Stormwater Area as well as any Structural BMPs. 7. USE OF PROTECTION EASEMENT. The City, its officers, employees, contractors and agents may access the Property and enter the Stormwater Areas for purposes of exercising City's rights hereunder. This Agreement shall in no way obligate the City to maintain, replace, reconstruct and repair the Structural BMPs, and the City shall not be liable to any person, firm, partnership, company, corporation, governmental agency, or entity for the condition or operation of the Structural BMPs. Further, this Agreement shall in no way diminish, limit, or restrict the right of the City to enforce any of its ordinances as permitted by law. 8. DEFAULT. If the Developer, or subsequent Owners shall fail to comply with the foregoing requirements or any other obligations imposed herein, in the Ordinance as the same may be amended from time to time, the City, in its sole discretion, may perform such work and recover the costs thereof from the person who is then responsible for the performance of such requirements and obligations provided, however, that, except in cases of emergencies, the City will give the Owner written notification of deadline for correcting the violation and an opportunity to cure the Owner's default hereunder. If the City exercises its right hereunder and maintains, repairs, reconstructs or replaces all or a portion of the Structural BMPs, then following acceptance and payment of the work, the City shall deliver to the Owner written notice of the costs of such work, and the Owner shall pay all such costs within forty-five (45) days after receipt of such notice.. Any costs not paid by the Owner to the City within the forty-five (45) day period shall be delinquent, and the Owner shall be considered in default of this Agreement. In the event of such default, the City may either bring an action at law against the Owner for the cost of the work, plus interest at the rate of eight percent (8%) per annum, collection costs, and reasonable attorney fees, or foreclose a lien against the Property, or both. Any payment required by this Agreement which is not paid to the City within thirty (30) days after its due date shall be delinquent. In the event of such default, the City may bring an action against the Owner for nonpayment plus interest at a rate of eight percent (8%) per year, collection costs, a late payment charge of three hundred dollars ($300) during the first forty five (45) days of default and five hundred dollars ($500) thereafter and reasonable attorneys' fees. The remedies set forth herein are cumulative; the City may, for example, bring an action for collection and foreclose its lien claim. 9. RESERVATION BY RECORD OWNER. The Developer and its successors and assigns shall in all other respects remain the owner of the Property, subject to the Protection Easement, and may make all lawful uses of the Property not inconsistent therewith. 10. NO WAIVER OF RIGHT. The City does not waive or forfeit the right to take action to ensure compliance with the terms, conditions and purposes of this Agreement by a prior failure to act. 11. NOTICE. Written notice as required hereunder shall be provided to the City Manager of the City of Jacksonville at PO Box 128, Jacksonville, NC 28541, and to the Owner at Onslow County Hospital Authority, 241 New River Drive Jacksonville NC 28541. Written notice shall be deemed received four (4) days following its deposit, first class mail, with the United States postal system. In the event notice to the Owner is returned, the City may notify the Owner at the mailing address provided by the Onslow County Tax Assessor. 12. SUCCESSORS AND ASSIGNS. The designation of Developer and Owner shall include the heirs, assigns, and successors to the Developer and Owner. The designation of City shall include the assigns and successors to the City. 13. TERM. This Agreement shall continue as a servitude running in perpetuity with the Property. 14. CONTROLLING LAW. This Agreement is to be governed by the laws of the State of North Carolina. Any and all applicable laws, rules, and regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts will be construed pursuant to the laws of the State of North Carolina. All claims and disputes arising from any contract shall be construed pursuant to the laws of the State of North Carolina. The State of North Carolina is the proper jurisdiction for all claims and disputes arising under any contract and the proper venue is the Onslow County Superior Court. 15. INDEMNIFICATION. Developer and successors and assigns agree to protect, defend, indemnify and hold the City, its officers, employees and agents free and harmless from and against any losses, penalties, damages, settlements, costs, charges, professional fees or other expenses or liabilities in connection with or arising out of this Agreement and/or the performance hereof that are due to the negligent acts of the Developer, its officers, employees, or agents. TO HAVE AND TO HOLD the aforesaid rights, privileges and easements herein to the City, its successors and assigns forever, and Developer does covenant that Developer are seized of said premises in fee or by easement and have the right to convey the same, the Developer will warrant and defend such title to the same against claims of all persons whosoever. IN WITNESS WHEREOF, the Developer and City have executed this Agreement and under seal as of the day and year first above written. DEVELOPER: 0&Q1w County Hospital Authori By: z �� - ji2/ ' (SEAL) Name: / • Gfi�'�Fc f�✓f' Its: -9Ck1l �.eu�crrr (Title) STATE OF NORTH CAROLINA COUNTY OF u 1, the undersigned Notary Public, certify personally came before me this day and acknow of S� DEVELOPER ACKNOWLEDGEMENT -pGv1.G1 -V. �&)_G\ e (edged he/she is the (title) Scn:o r `` SLlO.LeS Cc,( Oncl6J cowyJ l�P:%s, iAswo':Xy (name of entity) a (circle one) corporation, limited liability company, general partnership and the he/she as such officer being authorized to do so executed the foregoing instrument on behalf of said entity. WITNESS my hand and official stamp seal this the 1,_ day of !1_ Ot . ` 20001. (SEf �aa NOTAq` 9` N A&SLIG 04,r001U tt, 0����`\ otary Pu lic My Commission Expires: 1nr. . 15 ZU�3 CITY OF JACKSONVILLE: By: (SEAL) Name: Kristoff T. Bauer Its: City Manager (Title) ATTEST: STATE OF NORTH CAROLINA COUNTY OF ONSLOW This is to certify that on the day of City Clerk CITY MANAGER ACKNOWLEDGEMENT 20 , before me personally came , with whom I am personally acquainted, who, being by me duly swom, says that she is the City Clerk and Kristoff T. Bauer is the City Manager of the City of Jacksonville, the municipal corporation described in and which executed the foregoing; that she knows the corporate seal of said municipal corporation; that the seal affixed to the foregoing instrument is said corporate seal, and the name of the municipal corporation was subscribed thereto by the said City Clerk and that the said corporate seal was affixed, all by order of the governing body of said municipal corporation, and that the said instrument is the act and deed of said municipal corporation. WITNESS my hand and official stamp seal this the day of , 20 (SEAL) Notary Public My Commission Expires: APPROVED AS TO FORM: City Attorney Date CITY OF JACKSONVILLE Checklist for Stormwater Standards Plan Requirements (Indicate "NIA" where appropriate): Yes , I No 1 N/A I Sheet No. I Description Remarks ❑ ❑ Development Name 9/ ❑ ❑ Owner / ❑ ❑ Design Firm 0 ❑ Sealed, Signed and Dated ❑ ❑ Sheet Number ❑ ❑ Date ❑ 0 Revision Numbers and Dates along with a list of all revisions made ❑ ❑ Designer's Certification ❑ ❑ Owner's/Developer's Certification qJ ❑ ❑ North Arrow Q/ ❑ ❑ Property Lines '-/ ❑ ❑ Legend ❑ ❑ Vicinity Map Rfroject ❑ ElScale (min at T•=50- ❑ ❑ General Descriptio ❑ ❑ ❑ General Description of Erosion Controls G✓ ❑ 0 ❑ General Description of Stormwater Management Facilities &e-T-7o 0 ❑ Project Schedule, Narrative, Sequence / of Construction ❑ ❑ Adjacent Property Owners ❑ 0 Existing Streets, Buildings, etc. ❑ ❑ Wooded Limits 0 ❑ ❑ Wetland Limits ❑ ❑ ❑ Water Quality Buffers 0 0 ❑ Proposed Public Drainage Easements / shown /ff� ❑ ❑ Land Use of Surrounding Areas ❑ ❑ Original Contours (2-toot intervals) ❑ ❑ ❑ Proposed contours (2-foot intervals) or / sufficient number of spot elevations C7at/G A�i_ ❑ ❑ Actual Field Survey / ❑ ❑ City/USGS Topographical Data 12 ❑ ❑ Existing Streams, Lakes, etc. V ❑ ❑ Size and Location of Existing Culverts v// ❑ ❑ ❑ ❑ Size and Location of Proposed Culverts Limits of Drainage Area Z/ ❑ ❑ Limits of Construction, Clearing & Grading Checklist for Stormwater standards Page 36 of 49 March 1, 2009 0 ❑ Existing & Proposed Improvements (including utilities and protective measures) D ❑ Delineation of FEMA 100-yr Floodplain w/i 200 feet of project, 100 year BFE shown / 0, ❑ ❑ Location and elevation of the lowest floor in all proposed and existing buildings ❑ ❑ Location of Stormwater Management Facilities (includes details, plan, profile, and cross sections) ❑ ❑ Maintenance plan for stormwater management facilities 7 Timsng44/f f ❑ ❑ Submitting 7 Set Plans of Calculation Requirements Note: Drainage structures should be designed to handle all upstream flow when the basin is fully built out. Yes No N/A Sheet No. Description Remarks Kr ❑ ❑ Development Name ❑ 0 Owner ] / ❑ ❑ Design Firm y ❑ ❑ Sealed, Signed and Dated ❑ D Capacity of receiving channel downstream of channel, pipe or basin system �j.�/ Ado o/rrLLy f� 0 D Total area, impervious area, CN, Tc, QPre and, Q.st for 10-year/25-year/100- / year storms as applicable ❑ 7 25-year (where required) flows at cross - street drainage structures 7/ ❑ ❑ 10-year and 100-year flood routing analysis through all detention/retention facilities ❑ ❑ Design flows and velocities in open channels ❑ ^/ 4J Quality control computations ❑ ❑ Soils/Geotechnical Report/Analysis (for / infiltration facilities) 0 0 Submit 2 Sets of Calculations Piped Systems*: (For Residential Streets) !y I& f_es I No I N/A I De cripti n Remarks Li ❑ ❑ Analyzed and designed for 10-yr Storm ❑ ❑ Designed for 25-year (where required) flows at cross -street drainage structures ❑ ❑ Minimum Velocity = 2.5 FPS ❑ 0 Headwall or Flared End Sections ❑ ❑ D Energy Dissipater Calculations checklist for Stormwater Standards Page 37 of 49 March 1. 2009 ❑ ❑ ❑ Capacity of receiving channel downstream of channel or pipe system ❑ ❑ Gutter spread limited to '/2 lane width from the face of the curb, for a rainfall igt��ty of 4 inches per hour oen Channel Svstems- �� �-#— ❑ ❑ Capacity analyzed and designed for 10- yr Storm ❑ ❑ Lining Designed for 2-yr Storm ❑ ❑ Side Slopes 3 to 1 or flatter ❑ ❑ ❑ Minimum Bottom Width = 3 Feet ❑ ❑ ❑ Velocity Check (Liners provided, I needed) ❑ ❑ Capacity of receiving downstream channel Other Plan Submittals: The following permits or items may need to be considered by the designer. Check off those that are applicable to this project. All below shaded items are to be submitted to the City. Other items shall be Slltlmiit}Prt Itnnn rannact nnhi ❑ ❑ Maintenance plan for all stormwater / facilities ❑ ❑ Landscaping details for stormwater management BMP's �j ❑ ❑ Name and address of entity responsible ❑ ❑ for maintenance Submit Erosion & Sedimentation Control Plan to City of Jacksonville ❑ ❑ er/ Submit permits to NCDOT for encroachments and driveways ❑ ❑ US Army Corps of Engineers 404 permits ❑ Comply with water supply watershed protection ordinance ❑ Complete survey of threatened or endangered species ❑ NCDENR, Water Quality permits Contact Public Services Director for requirements if other than Residential Streets. Comments: MQVr-e1C4!fA0a 70 EW6710( Checklist for Stormwater Standards Page 38 of 49 March 1, 2009 Submittal Worksheet for Dry Detention, Wet Retention, Extended Detention Wetland Basins, and other BMP Facilities: The City of Jacksonville will follow the City Code and the North Carolina Department of Environment and Natural Resources, Division of Water Quality Stormwater Site Planning Guidance Manual and the Stormwater Best management Practices Handbook with regard to Dry Detention, Wet Retention Basin, Extended Detention Wetland Basins and other BMP's within the City's jurisdiction. Please provide complete documentation and details where applicable. A complete stormwater management plan submittal includes a worksheet for each basin, design calculations, plan and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Indicate "Not Applicable" where appropriate if design is a dry detention basin. I. Project Information (please complete the following information): Project Name: Onslow Memorial Hospital — Radiation/Oncology Pavilion For projects with multiple basins, specify which basin this worksheet applies to Basin Bottom Elevation 27.00 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 34.00 ft. (elevation of the orifice invert out) Temporary Pool Elevation 35.00 ft. (elevation of the outlet structure invert in) Permanent Pool Surface 15661 s ft. (water surface area at permanent pool Area , q' elevation) Drainage Area 3.97 ac. (on -site and off -site drainage to the basin) Impervious Area 3.29 ac. (on -site and off -site drainage to the basin) Permanent Pool Volume 51,082 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 17,327 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 10,618 cu. ft. (volume detained on top of the forebay pool) SA/DA used 9.01 (surface area to drainage area ratio) Diameter of Orifice and 1 2„ (draw down orifice diameter and number Number of) Submittal Worksheet Page 10 of 18 March 1, 2009 II. Required Items Checklist The following checklist outlines design requirements per the North Carolina Stormwater Best Management Practices Handbook (NCDENR, Division of Water Quality, April, 1999). Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicant's Initials Dry Detention Basin (standarddetail 640:01j Impervious areas used for sizing is based on expected final build out of the development and any offsite runoff that drains to the pond. The basin length to width ratio is 3:1 or greater or correctly spaced baffles D441 placed to lengthen the flow path between the inlet and outlet. A 20-foot vegetation buffer to the maximum surface water elevation is provided. Flood control goal: Pond outflow from principle outlet structure must not exceed the 10-year storm pre -development flow. or 25 year storm in areas with a history of localized flooding problems. Basin side slopes are no steeper than 3:1. Emergency spillway safely passes the 100-year storm with velocity less than 3 fps across stabilized spillway designed per NCDENR regulations with a minimum of a 1-foot freeboard. The basin designed using 2-yr Storm for channel adequacy. The storage for flood control located above the temporary storage pool. Outlet structure checked for buoyancy. Splitter plate and trash rack provided on principle outlet structure. Anti -seep collar on outlet pipe Access is provided for maintenance Design checked an certified f9r s)ructural int Drity a d floodplain impacts for the 100-yr StormQarc yvgYiP/ � A site specific operation anr�aintenance (O&M) plan is provided lkjr�i✓�20.t�/ A vegetation management/mowing schedule is provided in the O&M plan' A debris check is specified in the O&M plan after every storm event 116 Semi-annual inspections are specified in the O&M plan Y The Operation & Maintenance checklist is specified in the O&M plan to be performed after every storm event. 11`� A responsible party is designated in the O&M plan Submittal Worksheet March 1, 2009 Page 40 of 49 Applica'nYs Wet Detention Ponds Initials; ; (itefns to,,be,added to Dry Detention.�oondT:requirernents,to yield a Wet Detention Pond) SA/DA is based on minimum 8fr% TSS removal (based on Coastal Counties 'P&I Tables). a(9 The temporary pool, located above the permanent pool, sized to detain the runoff volume from the 15f inch aPr�ngf ("first flush"). The 1"inch draws down f�(/J/j/ in a minimum of 2 to 5 days. CC Minimum perrnent water quality pool depth is 3 to 6 feet with minimum of 3 feet. AvZ, = & 2L The forebay volume is approximately equal to a minimum of 20% of the total basin volume 20,8�0 _ f7lti/ Sediment storage is provided in the permanent pool /The storage for flood control located above both the permanent and temporary (1st inch of runoff) water quality pools. A submerged and vegetated 10' wide perimeter shelf provided (below the normal pool elevation) at a slope not exceeding 6:1. Inward from edge of shelf, basin side slopes are no steeper than 3:1 An emergency basin drain with cdate—vafve ispLp&ided to drain the basin _ sufficient to drain the pond in 24 hours for riser repairs and sediment removal. A minimum 30-foot vegetated filter is provided at the outlet (� A specific sediment � clean -out be chmark7 is listed (eleva�on or depth) in the O&M plan p'CI At &W04 M C)o Applicarit:s - Extended Detention Wetlands (standard. detai1:640Q.0); I �/ Initials (additionalite'ms applicable-foExtended'Detention=WetlandBasins) Determine the surface areas of the pond using 3 foot depth (this does not mean the pool depth will be 3 feet deep! It is for pool area computation only) 70% of pool area is designed as a marsh with a depth of 0 to 18" with an almost equal distribution of area (35% and 35%) between 0 to 9" and 9" to 18" A small pool (15% of the surface area) is located at the outlet to prevent sediment form interfering with the outlet structure functions. 15% forebay Plant specification and installation of plants shown (it is not necessary to plant cattails as they will volunteer on their own). Contour pond using 0.5 foot contours. The shelf from the normal pool elevation contour inward needs to be 6:1 on the perimeter only. Once away from the shelf areas, contours can vary as desired. Minimum shelf width = 10 feet. Submittal Worksheet Page 41 of 49 March 1, 2009 Permit Application and Plan Submittals Approval of Stormwater Management Plans and Calculations by the City of Jacksonville does not complete the City of Jacksonville review process. All other applicable City Departments, State, and Federal agencies must also approve the plan as warranted. It shall be the sole responsibility of the Owner/Developer/Designer to acquire all applicable approvals. SUBMITTAL REQUIREMENTS Four original permit applications, including checklist, four complete sets of site plan drawings and four complete sets of calculations shall be submitted to the City of Jacksonville. The following certifications shall appear on the first Stormwater Management sheet in the plan set. DESIGNER'S CERTIFICATION hereby certify that, to the best of my ability, this plan has been prepared in ,ordance with the latest City of Jacksonville Manual of Specifications and mdard Details and City Code." Signature:_ 1� Printed Name and Title:John L. Pierce, P.L.S. Date: 4/2/09 Registration Number:L-2596 OWNER'S/DEVELOPER'S CERTIFICATION "I/We hereby certify that all site construction, drainage and grading will be done pursuant to this plan and that the applicable Stormwater Management conditions and requirements of the City of Jackso 'Ile, the State of North Carolina and the Federal Government and its agencies ar a by a pa 1 is plan." Signature: Printed Name: Daniel T_ Waller SRVP tal Authority Permit Application and Plan Submittals March 1, 2009 Page 29 of 49 -MULKEY ENGINEERS & CONSULTANTS July 30, 2008 Edward Beck Regional Supervisor Surface Water Protection Section Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stonnwater Pernvt No. SW8 950317 Modification ER & Surgical Services Pavilion - Onslow Memorial Hospital Dear Mr. Beck: Mulkey Engineers & Consultants has periodically Visited the project site and hereby certify that the permitted facility has been installed in accordance with the permit and the approved plans. I have enclosed the designer's certification for your files. If Von have any questions please do not hesitate to call. Sincerely, 2le}'1 t order, P.E. Project Manager SJF Attachments: 7/30/08 Designer's Certification .�CEaVEI� AUG 0 1 2008 gY: MULKEY. INC. 4I6 [AY=EVIu[ 9m[[i MALL Runart NC 27601 PQ Boz 33129 RALU.., INC 27636 PH. 919-836 4800 FAY: 919-836-4801 w .uuLKE"NC-Corn