Loading...
HomeMy WebLinkAboutSW8950303_HISTORICAL FILE_19950516STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 L rS 0303 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE IggS 0 51kD YYYYMMDD State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager May 16, 1995 Mr. M. Kent Mitchell Bald Head Island, Ltd. Post Office Box 3069 Bald Head Island, North Carolina 28461 Subject: CERTIFICATION OF COMPLIANCE with Stormwater Regulations Stormwater Project No. SW8 950303 Saba] Palm Cottages Brunswick County Dear Mr. Mitchell: This Certification is pursuant to the application for Sabal Palm Cottages received on March 7, 1995, with additional information received May 9, 1995. Staff review of the project plans and specifications has determined that the stormwater control system as proposed will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1003(h). Stormwater runoff will be treated by 4 infiltration basins and a perimeter infiltration Swale sized to contain the runoff from a 25 year, 24 hour storm event from 34,412 square feet of built upon surfaces located on the site. Any modification of the plans submitted to and approved by this Office or further development of this site regardless of the fact that such modification may be less than l.acre, will require an additional Stormwater Submittal/Modification and approval prior to initiation of construction. Modifications include but are not limited to; project name changes, transfer of ownership, redesign of built -upon surfaces, addition of built -upon surfaces, redesign or further subdivision of the project area as shown on the plans submitted to and approved by this Office. This Certification shall be effective from the date of issuance until rescinded. The project shall be constructed and maintained in accordance with the plans and specifications approved by the Wilmington Regional Office. This Certification does not supersede any other permit or approval. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project. This could include the Division of Coastal Management under CAMA requirements, The Division of Environmental Management under Wetland 401 Water Quality Certification, and/or a Dredge and Fill Permit, and/or a Sewer Extension/Collection Permit, U.S. Army Corps of Engineers 404 Wetland Permit, NPDES Stormwater Permit if disturbing five acres or more, local County or Town Agency permits under their local ordinances, or others that may be required. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Mitchell May 16, 1995 Stormwater Project No. SW8 950303 A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications upon completion of construction. The attached certification should be received by this Office within 30 days of construction completion. The infiltration basins and Swale shall be constructed in their entirety, permanently vegetated, and operational prior to the construction of any impervious surfaces proposed for the project, except roads. If you have any questions concerning this matter, please call Ms. Linda Lewis or me at (910)- 395-3900. Sincerely, Dave Adkins Water Quality Supervisor DA/arl: S:\WQS\STORMWAT\CERTIFIC\950303.MAY cc: Dwight Waser, P.E. Delaney Aycock Brunswick County Building Inspections Bradley Bennett Linda Lewis W iLnington=Regional Office Central Files DIVISION OF ENVIRONMENTAL MANAGEMENT INFILTRATION SYSTEM PROTECT DATA Project Name: Project No.: Location: Applicant Name: Mailing Address: Submittal Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Basin size: Basin Depth: Bottom Elevation: Design Storage Elevation: Total Impervious Surfaces Allowed: Green Areas Draining to Basin: Storage volume required: Storage volume provided: Infiltration Rate and Type of Soil: Sabal Palm Cottages SW8 950303 Brunswick Mr. M. Kent Mitchell Bald Head Island, Ltd. Post Office Box 3069 Bald Head Island, North Carolina 28461 March 7, 1995 Bald Head Creek "SA" #1-150 sf, #2-185 sf, #3-180 sf, #4-465 sf, perimeter swale-660 If #1-2', #2-2', #3-2', #4-l', perimeter swale-l' #1-6, #2-8, #3-8, #4-6, perimeter Swale-6 MSL #1-8, #2-10, #3-10, #4-7, perimeter swale-7 MSL 34,412 square feet #1-4,094 sf, #2-9,431 sf, #3-.26 ac, #4-.35 ac, perimeter swale-.74 ac square feet #1-277 cf, #2-277 cf, #3-533 cf, #4-1,322 cf, perimeter swale-1,560 cf cubic feet #1-300 cf, #2-277 cf, #3-540 cf, #4-1,480 cf, perimeter swale-5,280 cf cubic feet 20"/hr. Coarse Sand Comments: The system is designed to infiltrate the runoff from a 25 yr-24 hr event quickly enough that storage capacity above the 1.5" event is not required. 1. Yes 2. Yes 3. Yes 4. Yes 5. Yes 6. Yes 7. Yes 8. Yes 9. Yes 10. Yes 11. Yes Date P*MTRATION SYSTEM EVALUATION No System is capable of treating and disposing of runoff from all impervious surfaces resulting from the 25 yr-24 hr storm. No The system is located at least 50 feet from surface waters. No The system is a minimum of 100 feet from water supply wells. No The bottom of the system is a minimum of 2 feet above the seasonal high water table. No The vegetative filter provides non -erosive flow for the 10 year storm, even distribution of the runoff over the length of the filter, a slope of 5 % or less, and is planted with natural, grassed, or artificially planted wetland vegetation. No The system has been shown to completely draw down in 5 days. No Soil has a minimum hydraulic conductivity of 0.52 in/hr. No The system is not sited on or in fill material. No The system has an observation well. No An Operation and maintenance plan has been provided for the system. No THIS PROJECT MEETS THE STORMWATER CONTROL REQUIREMENTS OF 15 NCAC 2H. (g), (h), 0), (k) and (1). For YES, items 1-11 must all be highlighted YES., DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Wilmington Regional Office l G Hei 9_ Date Date Individual Evaluating Form/Plans TiRegionnalll Soil Scientist Regional Water Quality Supervisor cc:Applicant/Bradley Bennett/arl/WiRO/CF DIVISION OF ENVIRONMENTAL MANAGEMENT i DENSITY ENGINEERED E 'rx PROJECT DATA A v Project Name Sabal Palm Cottages -------------------- Location (County, Township/Municipality, Address, State Road) Brunswick County Bald Head Island, NC _ Owner's Name Bald Head Island Limited MailingAddress P. 0. Box 3069 Bald Head Island, NC 28461 Phone Number (910) 457-5000 Submittal Date March 6, 1995 Brief Description (include map and approptiate drawilrgs) 15 Multi -family units with detached garages and associated amenities. Name of Water Body Receiving Stormwater Runoff. Bald Head Creek Classification of Water Body SA -If SA waters, engineered system, and distance is <0.5 miles, attach report of chloride sampling results mg/1 State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major No 404 Permit No Other (Soecifv) CALCULATION OF BUILT UPON AREA Sedimentation/Erosion Control No DEM/DHS Sewage Disposal No Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them- separately below. Classification Built upon area Total Project Area % Built upon Area Allowable B/U Area Subwatershed SA 34.412 SE" 98,881 SF — �n� 24,720 SF .Subwatershed Is the Project B/U Area S the Allowable B/U Area? No (If no; % Built upon area = (built upon area / total project area) * 100 Built upon area limits for projects to meet density: SA. waters — 25 %, STORMWATER COLLECTION SYSTEM Describe how the runoff will be treated infiltration system. Grassed swales and resubm jecj S— I.—q5 an engineered system is Other —30% lung MAR 0 7 1995 U D E M zo?5 talalat: ; ar_� Is the built upon area at least 30 feet from mean high water of all surface waters? Yes If no, please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS By my signature below, I certify that the recorded deed restrictions and protective covenants for this project shall limit the allowable built -upon area per lot to NIA square feet inclusive of right -of --way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. Cr, T:T_u':CATION 1, M. Kent Mitchell , certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the below named person or firm to submit stormwater plans on my behalf, and agree to abide by the deRMT above. /11wrielSignAud Date Provide authorized person or firm name and address below: Mr. Dwight Waser, P.E. McKim and Creed 243 North Front Street Wilmington, NC 28401 I,C Z&LIa ( .oi/GL/I/1r'Ii allotary Public forth eStaty of Q4 County of (ado hereby certify that /f% 9('P/If /B/ personally appeared hefore me rhi,� 4A _ day of ,r1. .19 , �_ d acknowl-dges t_".e d:e e: atiea of the foregoinig%instrument. Witness my hand and official seal, My commission expires COMMISSION DIPMES DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Regional Office Icy HA-Y c S Date ��M.9t'1 lS'SI Date cc: Applicant/WiRO/Bradley Bennett/Central Files May 9, 1995 Ms. Linda Lewis ENGINEERS NCDEHNR/DEM 127 Cardinal Drive Extension SURVEYORS Wilmington NC 28405 ARCHITECTS RE: Additional Information PLANNERS Stormwater Project No. SW8 950303 Bald Head Island Sabal Palm Cottages Brunswick County 243 NORTH FRONT STREET WILMINGTON. NC 28401 9101343-1048 FAX 9101251-8282 Dear Ms. Lewis: MAY � 9 1995 D ................ M&C0049.0049(12) We are in receipt of your letter dated May 3, 1995 requesting additional information. We are providing the following comments. 1) Pond #4 data has been changed to specify a bottom elevation of 6.0, which matches the bottom elevation as drawn. 2) The application form has been revised to indicate that 34,412 square feet (.79 acres) will be impervious, providing a 35% total impervious area. This matches the amount used in the calculations. If you have any questions regarding this please give me a call. Sincerely, McKIM & CREED ENGINEERS, P.A. 'r 0 00-/, wight . Waser, P.E. Project Engineer /bbs PC: Dan Weeks ST U $ P1 LR Ip�E9E1.VV UD �j MAY 0 9 1995 D E M eaoj si 91750303 •. � e�,. SrArEu State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager Mr. Dwight Waser, P.E. McKim and Creed 243 North Front Street Wilmington, North Carolina Dear Mr. Waser: May 3, 1995 28401 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950303 BII-Sabal Palm Cottages Brunswick County The Wilmington Regional Office received previously requested information for BHI-Sabal Palm Cottages on April 7, 1995. A preliminary review of that information has determined that the submittal for -the subject project is not complete. The following information is needed to continue the stormwater review: j/1. Pond #4 data lists a bottom elevation of 7.0, yet shows a 6.0 contour. Please clarify. ✓2. Adding up the impervious areas accounted for in the pond volume calculations, yields a total greater than the amount listed on the submittal form. Please revise the form (original enclosed) and return. . Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 3, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950303.MAY cc: Lgii da Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal opportunity Affirmative Action Employer SG�B g5v3p3 5-3-95 In rlh-2h�� C'a/cs wv Z Lov Green = 3Z:5* 0 = C',i A C > . ¢7 A- = , I45 oc 01703 cf5 une - bm vi d e J 9 - ¢Zv y9 ¢zo�2 �19—EF i 2 117 �"l/Ys�o.v occurrinq-�f kry? ey�: Zoi, /Ar AT A- L 5-F_ I,(P7 14hr X 60s - U Z z cf5 / 5r qq s = Z,7*7 cis ,oz-? cis -7 , oi7 ifs �� z SY; CeS Irk, vovs : ( (0274 6r� 1 /5705 - 62-?4 = ct431 gurioR' fizz-n 8" 25y- Z¢hr 5/brm� 5� = cx A I�r/�rvn Scuale = 22S cF 3 f74 - ii zS = Z Fq-c! cr- rA _� ,• , �,� ., h, i-�-- - - - AMC AI Mq(H 044 March 2, 1995 Ms. Linda Lewis ENGINEERS NCDEHNR/DEM 127 Cardinal Drive Extension SURVEYORS Wilmington NC 28405 ARCHITECTS RE: Additional Information PLANNERS Stormwater Project No. SW8 950303 Bald Head Island Sabal Palm Cottages Brunswick County Dear Ms. Lewis: M&C0049.0048(12) 0.�t r� APR 1 9 1995 �RoJ s gyso 3o3 We are in receipt of your letter dated April 13, 1995 requesting additional information. Apparently the revised calculations were separated from your package which may have clarified several of the issues. The items listed below correspond to the items in your letter. 1) The system has been designed to handle the run-off from a 25-year-24 hour storm without flushing. The calculations show that the storage volume in combination with the high infiltration rate does not permit flushing of the system. 2) Attached calculations provide required volume of pond and swales. The ponds are designed for full depth during the design storm event. 3) We have used 1341 square feet of impervious area for each building in sizing ponds and swales. 4) The perimeter walks will be constructed of wooden decking, and is considered pervious. 5) The area of the perimeter Swale is slightly larger than 8 cf/If to the top of the swale. 8 cf/If is used as a conservative figure to allow extra 243 NORTH FRONT STREET volume to be available as a safety factor. WILMINGTON, NC 28401 6) As clarification, the perimeter walkway will be above grade similar to a pier. This will allow the perimeter infiltration swale to follow a level 910/3431048 contour while zig-zagging across the walkway several times. It should be noted that the buildings will also be on piers allowing the swale to FAX 910/251 8282 cross under them as necessary. This will allow the swale to infiltrate as designed. 7) It is certainly our intention and obligation to provide 2 feet separation from the bottom of the swale to the water table. We propose to strictly enforce this requirement at construction. Since the exact elevation of your field investigation auger holes is not known, we could invite your staff to the site at the time the swale is constructed to ensure the separation is available. Also, we as the engineer of record, will be required to certify the swale meets the requirements of DEM. We feel that the plans do meet the requirements and intention of the Code, and the design has a very high safety factor due to the extremely high seepage rate in the soils. If you have any questions please do not hesitate to call. We would also be glad to review the design in a meeting with you at your convenience. Sincerely, McKIM & CR ED ENGINEERS, P.A. Dwi4tWaser, P.E. Project Engineer /bbs PC: Dan Weeks 46 MCKM&C = CALCULATION (R PROJECT PROJ. NO.41�04S(24) CtIENT DATE SUBJECT DES, BY CHK. BY REMARKS F,o t, 5--OAA WAT—Ek MANA66XI6'A/>_ 17 46-- IS(AN)IS(AN)IZ MW cc.J4, APR I 9� 1995 DEh 5wg 950 30 3 Q) • SEAL-- 15489 u I N1 I. L 4 18 —.,REv CALCULATION PROJECT %II�PA PA m si CLIENT PHI S SUBJECT PC12WFLCW SW&C_ ?ROJ. NO. DATE DES. BY CHK. BY REMARKS ._.--�-- _-._LZ�—F3tFst_DK':f.LCiJ.v_CFF I -----��_► �Mr--_i�� ; �.w��t �—i�_,�R«n�s._��_ti-oaf -=�o� I 12 ' � I $=----34 - _-_—'(- ------LI jr- --! 0 —G A 00SF_'_ 21SF I _I ;:ZSZ<<_ , Ktfi�_O.f _f6_K t9.c.7�n _./.d/cft77t�.rlvii-_��Jfc _Cl? _Scc7/0./_ = o`SF 23,8 I i CALCULATION C PROJECT too////S PROJ.NO. CUENT SUBJECT IDATE DES. BY CHK. BY -— — -- -- - -- - - - - - - REMARKS — Wit.—..IlA3__.icc.t/._ r , rF / Fv -> �'��^ is R'V1, 7__._6.«c-F'-F_.�tJ O r` F"1"cc%; fcfT,.,_, Fif'c" •. Wl. f L , p ------�,..�PrrVGul—ti76f7 _1�25Z'Sc ".'3�1G, - - - — - —.----<:41-C_v_tfi7Ei_CG�ir?Ofl7_r— G------------- ipc,2✓IGUS:,._G,'_7.5. lo CH Ot c — --—_....V.ocu E_o✓F&_ �O a/v._'.-%1.6�r:_ �60s= /�,., _l.`,r-,:=_.1560_cF .— _ 6K No- -3F._3s_[P 13�Fs --- --- _�� / �, 1NF/CrPFrlG1✓_ (F�)le __7"j' a =� A�CR-/_660cr-:Gs =I3ZO5l J_!T _ ' McIQM&CIZFm PROJECT CUENT CALCULATION Q PROJ. NO. DATE SUBJECT 2M "' 2 DES. BY CHK. BY I _..__ I /'4°.ZS.__t �I _2Z20s- ov--k.-222-0_tVOF_r .�EQJ__, I ; I.__Pk�h 1'h�j�(J//'�%i7Qi.-i'•OA✓J-%i �'-/.Y�'Oc___I _j f Ili j l � cf —i--'- - -------__ .vfit4ELE_tti__[aAA_ (_2�_.300 > 2/6�r•-------- LHCck Zr,-- r- 24 e4. _ E vE ri rot ------ - 7 -----U<<_Z ilk 1411YLT&A{71ON IfAT(F-----Vf -OVE4.._ISO5F t REMARKS O/1 O�- _•�,$,iJ_Tcrt_ I�dFL�TRALES_I_�.'.•46y_SFS . Q�i::atr_ D�RIti6 zS_Ys='4,�,� I ' 1 I C,N{ kGE i PROJECT CALCULATION F90J. NO. CUENT DATE SUBJECT 2!OA/C `2 DES. BY CHK. BY REMARKS POO R alPLOP76 36 _'IS' 6v6& 222 cr 5� McF 600rF (;6?) -to E ro ro f (OFA(l 1191FA 1J�A(AJ.W6 tO POIVy gTe CgA?O,(T( 95(�0311 'CL143 6 i?04 __cF-- Z 6 i-A v L) "c. 2-0 t0f, FATt -lUtTl'-'i A ,_r,4 tu 5C Zo_Dcf)]m oo-t_ 3 A K Oor(- <Y T6 7'f ATu-,S Ica, -orl- :A/0 �e& CALCULATION C:= PROJECT CLIENT SUBJECT / "3 PROJ. NO. - DATE DES. BY CHK. BY 7_LZBOsr i _ �(77) .10,RJ0�r�60 I i n i �1 REMARKS O/c 20� ------'--'` sv 7-c/i 11Fil�7RATeS !A.L_..16%CC__,_RVnJ OFFf�JI?( /l I ----- 25%p-Z_4r: _5roa'M -- - I 0 Ok CALCULATION . PROJECT S Qg PR c �� S PROJ. NO. CUENT ll I /L DATE - SUBJECT ZONE4 DES. BY CHK. BY i cq�cuc�.F? coh�. -_DSO..- _13�2_Cr= I J• i i t R__IQ-7K-/QH ra STOFu __�?/r,, (4untc _ovr>t_ yjo 'A - (�- c.� - 4s • �3''__,.59— DrC'8�rs C=-;3�r%roc ?i(Qo�t 9E -- — it ZUOVCr_.7�IS,F = r2��rl" iIF. - 34ccS—t MKS REMARKS o1r ?t+s /CALCULATION PROJECT ` <� L. F 4 / /I ?ROJ. NO. CJENT r 1 DATE SUBJECT _ Pt Pi/ = TF 1' JAL [:- DES. BY CHK. BY I State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager April 13, 1995 Mr. Dwight W. Waser, P.E. McKim and Creed 243 North Front Street Wilmington, North Carolina 28401 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 950303 Bill - Sabal Palm Cottages Brunswick County Dear Mr. Waser: The Wilmington Regional Office received previously requested information for the BHI - Sabal Palm Cottages on April 4, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: 1. As requested on March 20, 1995, you do not show the ability to bypass the runoff in excess of the 1-1/2" requirement. As stated in the regulations, all infiltration systems must be able to bypass the excess runoff to prevent flushing of pollutants through the system. 2. As requested on March 20, 1995, please, calculate the volume required to be stored, the volume available in each pond and infiltration swale, and the depth that the runoff will reach in each pond and swale. The ponds have been revised, but revised and sealed calculations have not been received. 3. Per the typical footprint received, I calculate 1306 square feet of impervious area, assuming a covered entrance porch, for each unit. The old calculations appear to account for only 827 square feet per unit. Please clarify. This will increase the overall impervious percentage of the site, and increase the runoff volume for each pond/swale. 4. If pea gravel is used for the perimeter walks, then it will be considered as impervious, and must be included in the calculations for volume. If wooden decking is used, then it is considered pervious. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Waser April 13, 1995 Stormwater Project No. SW8 950303 5. I am unable to duplicate the 8 cf/lf of volume you calculate for the perimeter Swale. If elevation 8 is used as the top of the Swale, then the volume is significantly larger. If only the fast 1 foot is used, then the volume is only 5 cf/lf. 6. Please add the perimeter walkway location and width in relation to the infiltration swale to the detail. If the dark dashed and dotted line onthe plans indicates the location of the perimeter swale, then it appears to zigzag across. the perimeter walkway. Please clarify. 7. The perimeter swale bottom elevation of 6 is a concern. Our field investigation revealed that the water table on the down -side of the slope was less than 32" below the surface, making the proposed bottom elevation of 6 too low to meet the 2' separation. However, on the upper part of the slope, it was determined that the water table was more than 5' below the surface, indicating that infiltration could be sited there. Please clarify the location of the perimeter swale so that it is built on the upper part of the slope, where a bottom elevation of 6' will meet the 2' separation. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to May 13, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, y/ l Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950303.APR cc: �L'inda=Lewiss Dan Weeks, BHI Planning Central Files 02' 01, 78' 59, 58' 57'('''p�'f I 56' APR 0 4 1995 01� 34 BALD HEAD ISLAND April 3, 1995 59' Ms. Linda Lewis, Environmental Engineer 58 DEHNR/Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Dear Ms. Lewis: 57' Enclosed, please find a revised stormwater submittal package for Sabal Palm Cottages (SW8 950303. We believe we have addressed all of the items noted in your letter dated March 20, 1995 regarding this project. 56, If you should have questions or need additional information, please call me at 910-457-7339. Sincerely, 55' Daniel H. Weeks, ASLA Director of Planning liy8�1�� tl 54, Enclosure _, � � E u cc: Dwight Waser Sandy Darby APR 0 4 1995 53'11 DE14 ,Roj #.Iw 50303 52 ANOTHER WORLD pool6ER® POST OFFICE BOX 3069, BALD HEAD ISLAND, NORTH CAROLINA 28461 1-800-234-1666 o1' 59' 58' 57' 56' 55' 54' 53' 52' 02, O1' 78* 59' 58' 57' 56' INFILTRATION POND MAINTENANCE I D) E G E 0 V k w APR 0 4 1995 U Project Name: Saba1 Palm Cottages •Ro) As.,vf95mo303 Responsible Party Name: Bald Head Island, • Limited Address: P. 0 Box 3069 Bald Head Island N(' 22461 PboneNo:(910)457-7339 After every runoff producing rainfall event, or at least monthly, whichever comes first: 1. Inspect the infiltration pond(s) for erosion, trash accumulation, grass coverage, and general condition of the facility. 2. Repair eroded areas immediately, re -seed as necessary, keep side slopes and bottom mowed, and remove trash. 3. Check any inlet piping, swales and catch basins. Repair broken piping, reseed swales, and remove trash. 4. Inspect the bypass/overflow structure for blockage and deterioration. Remove blockage and repair structure to originally approved design specifications. 5. Check the depth of the pond(s) every six months. If siltation has occurred to the point that only 75% of the original design depth is provided, remove the excess silt to the original depth. Do not over -excavate, as this may cause the required water table separation to be reduced, and may affect the ability of the system to perform as designed. I, Daniel H. weeks, Director of Planning, agree tobe responsible for performing the maintenance items as listed above for this project. I agree to notify NCDEM of any problems with the system, Mmname of tl roject, name of the responsible party, or address. Signature Date March 31, 1995 I, lI%,,, �-1 gt)uerl . , State of signature below, that juee appeared before me this day of. the due execution of the foregoing instrument. a Notary Public in the County of C,g ry l i n c, , do hereby certify by my personally 19 2, and acknowledge Witness my seal and signature, SEAL My commission expires MyCOoMISSIONo�MM ; aniONEXMBE2 i f1 -r {., i � � � 11 { `. I i' `� �-� ! W U SABAL PALMS COTTAGES APR 0 4 1"S GEOTECHNICAL INVESTIGATION REPORT BALD HEAD ISLAND D E M BRUNSWICK COUNTY, NC ,Roj Sc29gSD303 PROJECT SITE DESCRIPTION: Bald Head Island 0049-0048.OW The proposed project consists of approximately 2.2 acres in the interior of Bald Head Island. It is located at the end of Sabal Palms culdesac. The tract drains from west to east with the elevations on the upper end averaging around 11 ft. with small peak high elevations of 15ft. The perimeter of the east end is adjacent to a lagoon at elevation 4. The middle of the tract is relatively flat with a steep slope to the south of 20% while the area to the north slopes at approximately 6%. Along the perimeter towards the lagoon, the land drops more steeply to the edge of the water. Bald Head Island proposes to develop the tract with fifteen-1,000 square foot units and associated drives. In order to meet the North Carolina Department of Environment, Health and Natural Resources requirements, the storm water will be controlled by infiltration swales intercepting the runoff prior to leaving the property boundaries. The purpose of this investigation is to evaluate the soils in regard to their infiltration - capabilities. SUBSURFACE CONDITIONS: The soils in this area of Bald Head Island are predominantly corolla fine sands. These sands are known to have slow run off due to their extremely rapid permeability and high seepage rate. The corolla sands consist of pale brown fine sands in the upper portion and lighter brownish gray fine sands toward the lower part. The sand consists of approximately 3% of clay material. This gives the material a very high permeability rate of well over 20 inches per hour. Soil Borings: 5 soil borings were taken at the proposed ponds in order to determine the water table elevation. These borings indicated that the water table was approximately at elevation 4 across the.property. The table below summarizes the findings: ��M�IQM&�REID PAGE t SOIL BORING DATA BORING SOIL 1 2 3 4 5 Fine Sand Fine Sand Fine Sand w/course shells @ 5' 0 deep Fine Sand Fine Sand w/dark silt sand @ 3' 9" SURFACE HIGH WATER ELEVATION TABLE ELEVATION 6 4 12 <7 9 <5 7 4 7 2.5 At the time the borings were done the area has been in a wet season with indications that the water table is near its seasonal high elevation. Using an elevation of 4 throughout the site for the seasonal high water table should provide a conservative basis for design. SUMMARY: Based on the geotechnical investigation of the soils, it is expected that using an infiltration rate of 20 inches per hour and providing a 2 foot separation between the water table at - elevation 4 and the swales and pond bottoms, should allow the infiltration system to provide adequate treatment of the soil runoff. ����&C= RAGE 2 I illR� .--.r...-_— � � --� 0 31✓ 4 (2 )'�s) h C!2�1?) + (FX(4-) -r' ( I ZuB) = LZ4�S-s- 4- S1S= I;50(0,5 yf ,� I ��I I ✓ rL� P5 ;3.5 lun(� U MAR 2 3 1995 pgpJ f$950303 Plana, ®vatic" and P" ylear .ubpat to without action..n; .sang" far SABAL PALM First Floor Plan �c`°L°"'of :' ue;�°"'° Th'.=ad.' t. to,„tn.t.attan nn,T.,t to COTTAGES not part of any contract bdw"n Rats Rana Wam .ad.ta.U&J vuTnbwT.. Bald Heed Island, NC 28461 Scale: VB" - 1' 0„ NOT MR CONRTRUMOR Residential - New Development Percent of Total Impervious Impervious Parcel Land Use Acres Units Coverage Coverage (Acres) A Single Family Lots 19.2 AC 28 21% 4.1 AC B Single Family Lots 24.6 AC 47 25% 5.1 AC C Single Family Cluster 10.5 AC 63 60% 6.3 AC D Multi -Family 6.5 AC 28 60% 3.9 AC E Single Family Lots 13.2 AC 26 22% 2.9 AC F Single Family Cluster 7.6 AC 45 60% 4.5 AC G Multi -Family 4.1 AC 26 30% 1.3 AC H Single Family Lots 8.2 AC 9 23% 1.94 AC I Single Family Lots 10.8 AC 17 22% 2.5 AC J Single Family Lots 7.5 AC 9 20% 1.5 AC K Multi -Family 9.9 AC 26 60% 5.9 AC L Single Family Cluster 22.6 AC 66 60% 6.7 AC M Single Family Cluster 8.5 AC 16 60% 5.1 AC N Single Family Cluster 2.8 AC 18 60% 1.6 AC O Single Family Cluster 2.0 AC 5 30% .6 AC P Single Family Lots 10.7 AC 16 14% 1.6 AC Sub -Total 168.7 AC 445 55.54 AC Non -Residential Service Village 37.4 AC 60% 22.4 AC Village Center 4.2 AC 60% 2.5 AC Recreation Center 11.3 AC 60% 6.7 AC Beach Club 4.0 AC 30% 1.2 AC East Beach Commercial and Beach Access 2.1 AC 30% .6 AC Park .3 AC 25% .07 AC Bald Head Island Nature Conservancy Complex .8 AC 30% .24 AC Commercial 2.6 AC 30% .8 AC Sub -Total 62.7 AC 34.51 AC Pre -Existing Residential (as per previous permit and/or modifications) Flora's Bluff 8.7 AC (26 lots) 25% 2.1 AC Killegray Ridge (FB II) 9.1 AC (29 lots) 25% 2.2 AC Muscadine Woods 14.0 AC (32 lots) 12.5% 3.5 AC Captain Charlie's Sta. 4.8 AC ( 4 lots) 5% .25 AC Pods 1, 2, and 3 54 .0 AC (89 lots) 20% 10.8 AC Sub -Total 90.6 AC (180 lots)"i k 18.85 AC Infrastructure Proposed Roadway 10.0 AC Parking & Circulation Total 332.0 AC 9H I �CE�Ukr 010.0 AC 625 �IUIU1�\J1 MAR 2 3 1995 118.9 AC DEM PROJ a>E Sr uB 95o303 :,.•!TIM to v. ] : zap , i:-/i_.:,5'•e i'Y.',• a. .. t]f.l t!':Y 'Vii^! to :ilbi.gn ..... , ' lb LE.Q C �: .tom :iq:r'.' >+ 3€> - Y;r��a �,r.tl`•ii:fS'i ,. Jf! n q :�fY) .. TRD 6iifi`"..r '17• .jJ �. .�� _. 14 Now �i's,. �! ! r ✓5. -i. 5'i,i!.] t{•.>AE .7 i•.r f-- '.'S.�:v?. i. F. mil.! s ,,.srnrto� State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager Mr. Dwight Waser, P.E. McKim and Creed 243 North Front Street Wilmington, North Carolina Dear Mr. Waser: March 20, 1995 28401 Subject: ADDITIONAL INFORMATION Stormwater Project'No. SW8 950303 Bald Head Island-Sabal Palm Cottages Brunswick County The Wilmington Regional Office received a Stormwater Submittal for Bald Head Island-Sabal Palm Cottages on March 7, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The foliewh.g information is needed to continue the stormwater review: 1. North Carolina registered Professional Engineers seal on the calculations. t/2. Signed and notarized Operation and Maintenance Plan. �. A dimensioned, typical footprint of the cottage. Please include any sidewalks from the garage to the cottage in your impervious area calculations. t �(aj 4. You do not show the ability to bypass the excess design storm. In order to obtain approval, you must demonstrate that the system can hold the runoff from a 25 year, 24 hour storm and not discharge. You have provided information on the 50 year, 10 minute storm. / rc 44 5. Please label the construction material for the gazebo - wood, concrete foundations, etc. and include in the built -upon area, if required. ydec nc� :A'DA 6%6. Please provide a road cross-section on the plans that clearly shows a continuous cross - slope. The runoff from areas 2, 3, 4, and 5 cannot cross over the road to the infiltration areas if a normal crown road section is specified. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Waser March 20, 1995 Stormwater Project No. SW8 950303 ,/ 7. A copy of a small scale map of the Master Plan Stage H with the project location highlighed, and a copy of the approved built -upon area list with the parcel number highlighted. 8. A copy of the soil survey indicating the soil permeability and the depth to the Seasonal High Water Table at each proposed basin and swale location. A minimum 2' separation / between the bottom of basin/swale and the SHWT is required. Z 9. Please revise the detail labelled as the infiltration "ditch", to the infiltration "swale" to match up with the plans. 10. Add swale bottom elevations at various locations to indicate to the contractor the depth of �l0 00� the swale at that particular location. nh� 0�aQ� 11. specify the surface areas of each pon and how you arrived at th provided volume in each pond. What epth will --the ach within each pond? 12. The deed restriction portion of the from must be completed. You are basing this design on a particular amount of impervious cover, and each lot must be restricted accordingly. A3. Please specify McKim and Creed Engineers on the back of the submittal form as authorized to submit plans on BHI's behalf. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 20, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\950303.MAR cc: (2) Linda Lewis Central Files 2 Pal Tc��,�a( %vf�rhf c�i;�,�.,s�a4ea�, l3re��clow� bags, rood, green toj*fh,�) e2cho.z,-eo, tv htip2s5 �ffe- I'�z'` I's c4ledea/. old yr SAD, ail �� Cl prC4-Sh w ^�P 22 ehU ool , co'? C-Kele 41 !2oaC� truss-ase_n-b e 4d CG/11h�000S GrvSS— N - IDV-er, Sl/vide u��� in �� �' 2 -A iyn i s —U ® on care Si(Ye of 5/ree/1 5a sedon Should _ relecf 1 Con i, n uau5 s (one. ibw ills-1 lry � l � + F�ow sb�et r-iCw �_(j,Py � 5i�'121� SG2�� rn _, W�fh �rvjecf �UG2h0r'1 h uhl Gh�eel DW61el # Coop, of 2oorove.d ` 4C f(jrm Piyerlf CC4 / 21n �J %Je/�/ e51 eC/ Flo of oLd e/S• - Q Co of so;�syryy _, Ili r i� �i-P ii�if✓�. 11 �/1 1 e�l�/�/-i� V_ Gar A �n ►GIs �Ireo5 err Ql h"e fho clvlo� o5cC( ib cJefer-n,iye �rvvjdee� Voju,z. A DIVISION OF ENVIRONMENTAL MANAGEMENT DENSITY ENGINEERED iJJ PROJECT DATA !^ I Project Name Sabal Palm Cottages ----------- __________ Location (County, Township/Municipality, Address, State Road) Brunswick County Bald Head Island. NC Owner's Name Bald Head Island Limited MailingAddress P. 0. Box 3069 Bald Head Island, NC 28461 Phone Number (910) 457-5000 Submittal Date March 6, 1995 Brief Description (include map and appropriate drawings) 15 'residential units with detached garages and associated amenities. Name of Water Body Receiving Stormwater Runoff Bald Head Creek Classification of Water Body SA If SA waters, engineered system, and distance is <0.5 miles, attach report of chloride sampling results mg/1 State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major No 404 Permit No Other (SDecifv) CALCULATION OF BUILT UPON AREA Sedimentation/Erosion Control No DEM/DHS Sewage Disposal No Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them separately below. Classification Built upon area -Total Project Area % Built upon Area Allo vable B/U Area Subwatershed SA 28,750 SF 98,881 SF 29% 24,720 SF . Subwatershed Is the Project B/U Area 5 the Allowable B/U Area? No (If no, an engineered system is % Built upon area = (built upon area / total project area) * 100 Built upon area limits for projects to meet density: SA waters — 25%, Other —30% STORMWATER COLLECTION SYSTEM Describe how the runoff will be treated Grassed swales and infiltration system. -> n Office use only , VV W MAR 0 7 1995 U zoo T u �303 BUFFER AREA Is the built upon area at least 30 feet from mean high water of all surface waters? yes If no, please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS By my signature below, I certify that the recorded deed restrictions and protective covenants for this project shall limit the allowable built -upon area per lot to NIA - square feet inclusive of right -of --way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. 1 M. Kent Mitchell , certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the below named person or firm to submit stormwater plans on my behalf, and agree to abide by the deed estricf n tat t above. // A" t0 wner's Signa Date Provide authorized person or firm name and address below: I, G �� • d✓ate /P allotary Public: for theStatgof County of / , do hereby ce ify that /i% 9(/P/� f e / personally appeared before me this 4A day of 192S, and acknowledges the due execution of the foregoing instrument. Witness my hand and official seal, COMMISSION WMM ' My commission expires ecgu DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Regional Office Date Individual Evaluating Forms/Plans Date Regional Water Quality Supervisor cc: Applicam/WiROBradley Bennett/Central Files M&C0049.0048(12) DESIGN NARRATIVE STORMWATER MANAGEMENT FOR I �1 MAR 7 1995 SABAL PALM COTTAGES ---»v BALD HEAD ISLAND Proiect Description: The Sabal Palm Cottages project is a 15 unit development located on Bald Head Island in Brunswick County. The site is located on the cul-de-sac of Sabal Palm Court. The project consists of fifteen 1,000 SF residential buildings, golf cart garages and associated streets on 2.3 acres of land. Site Topography: The 2.3 acre site is located within a natural depression which has no discharge to surface waters. The tract itself is relatively flat with exception to the southern boundary which is adjacent to the lagoon and drops off to the lagoon. General Soils: The soils within this site are generally identified as corolla sands by the USDA, Soil Survey. These sands are extremely well draining with percolation rates greater than 20 inchesihour. Site Drainage: Stormwater drainage shall be collected by sheet flow run-off into a system of infiltration swales and ponds. Overflow from those ponds would pool in the area of the ponds and ultimately sheet flow to the lagoon where further infiltration taken place. Erosion Control: Silt fence will be constructed around the site to prevent siltation and as a construction barrier. The infiltration swales and ponds shall be used as a sediment pit during construction and cleaned out at completion of the grading work. Grassing of all disturbed areas will be completed as soon after completion of grading work as practical. In any event, ground cover will be established within 30 days maximum time period. W bu YAR 0 7 1995 D E M �tzoi � $ �so3o3 M&C0049.0048(17-) SABAL PALM COTTAGE BALD HEAD ISLAND CONS"fRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Fla_ the work limits. 3. Hold pre -construction conference at least one week prior to starting construction. 4. Provide construction entrances. 5. Install silt fence as the first construction activity. 6. Excavate and construct holding ponds and swales. 7. Perform excavation and backfilling operations to point of fill/cuts being, completed. 8. Stabilize all exposed surfaces with mulch, seed, and fertilizer. Surface should be left slightly roughened. 9. Install stone base for asphalt areas. Place asphalt and concrete where shown on plans. 10. If temporary seeding mixture was placed, overseed area with permanent mixture at proper time. 11. Remove silt fence after vegetation has been established and approval given. M&C0049.0048(12) SABAL PALM COTTAGES BALD HEAD ISLAND INFILTRATION SYSTEM MAINTENANCE REQUIREMENTS Inspect After Every Run-off Producing Rainfall Event. A. Run-off Debris - remove debris accumulation B. Pond and Swale Side Slopes - repair eroded areas, remove trash II. Inspect Semi -Annually (every 6 months): A. Pond and System Depth - if < 75% of approved design depth (check approved drawings) excavate to design depth and reestablish vegetation. 02' 01' 78' 59' 58' 57' 56' 34 BALD HEAD ISLAND March 6, 1995 Ms. Linda Lewis 59. NCDEHNR/DEM ;� MAR 71995 127 Cardinal Drive Extension Wilmington, NC 28405�- 58' RE: Stormwater Submittal for Sabal Palm Cottages Dear Ms. Lewis: 59 58 Enclosed, please find a submittal package for Sabal Palm Cottages, a new project here on Bald Head Island containing 15 residential units built for sale with detached garages and associated 57' amenities. Also enclosed, is a stormwater management plan engineered by McKim and Creed 57' and cover letter describing the design intent. The overall project are is 2.3 acres with a build upon area of 28,750 SF which equates to 29% coverage. Since this exceeds our allowable 25% coverage, McKim and Creed has provided an 6' engineered stormwater management plan. Since this project is disturbing less that one acre, 6' no sedimentation and erosion control plan is necessary. We of course will take every precaution during construction to minimize impact to this unique and pristine site. 55 If you have any questions or comments, please call me at 910-457-7339. 55' Sincerely, 54' Daniel H. Weeks, ASLA Director of Planning Enclosures 53' cc: Carol Miller, DEM Sandy Darby Dwight D. Waser, P.E. 52' �gCC SAT gju1 am- L�3 ER IN MAR 0 7 1995 U D B ivl 'Rol #.L8 950303 POST OFFICE BOX 3069, BALD HEAD ISLAND, NORTH CAROLINA 28461 1-800-234-1666 54' 53' 52' 02, of 78' 59, 58, 57' 56' �r March 2, 1995 Ms. Linda Lewis NCDEHNR/DEM ENGINEERS 127 Cardinal Drive Extension Wilmington NC 29405 SURVEYORS ARCHITECTS RE: Stormwater Management Plan Sabal Palm Cottages PLANNERS Bald Head Island, Brunswick County Dear Ms. Lewis: rl' MAR7 1395 1sJ M&C0049.0048(12) Enclosed is a review submittal package for the referenced project on Bald Head Island. The project consists of 2.3 acres with fifteen residential units and associated roadway. The topography of the area surrounding the site consists of a natural depression with a lagoon which has no outlet to surface waters. The lagoon acts as an infiltration sink for that drainage basin. The stormwater management has been designed as an infiltration system draining to SA waters, only because Bald Head Island Creek is nearby, although not connected to the basin, to provide a conservative design. The system has been designed using a series of infiltration swales and ponds to provide sufficient volume. These are sized to-holii run -off -from a 1'0=year 24-hour storm_eyent, to the attached calculations for detailed The soils composing the swales are very rapid draining sands and would infiltrate their capacity in approximately 1 hour. This is considerably less than the five days maximum allowed. If you have any questions during your review please feel free to give me a call. 243 NORTH FRONT STREET Sincerely, � ���d r. 1-�.[.� 7Jt) WILMINGTON, NO 28401 Mt4ht1r, cKIM &CREED ENGINEERS, P.A. T 1'd4f01343f048 � r, ., _ �D . P.E. FAX 9101281�B282 Project Engineer MAR 0 7 1995 /bbs PC: Dan Weeks R of #2L 950 _ CALCULATION PROJECT P/,, 141 s PROJ. NO. CLIENT N T DATE� SUBJECT CTOPA W A 7-e k DES. BY CHK BY 'MMARA 1)5 Ilk bl; 7V opo,61ell 1q, 15—JA ?,01Th it 4� k-:s )& Al, CALCULATION PROJECT PROJ. NO. CLIENT DATE SUBJECT DES. BY j CHK. BY I ! f REMARKS .SUIC �VKV�y..__ji���cgiES__iG✓��cc�._L�i-i_.;�c��olRc�:r�� ._.. -- .._!—.1�/_? �t----? 20 �/Nre_ _ �_... f_USE __IS'_. fo%_ �o�✓_�E�y�;tvE . �;:>i �. �WE&-Tk�_7lo✓ I si<iEMs_ R�Q> V�wi!r lS_._titf'•r P!� t !ti Pv Uti AI%�IF:Lc""� 4��Z 'I%.E.�1_N---I���� UI� [ t . /li✓ �/�L1',. '---- I I-- 1 I f 1 —�— _!nL--��licc.,iy__ 7_i!R%�' ?/ c.._ �sr�_�t5 ���✓ _.. . GON.i9(n/ --Fa.—._SO Y�i'�'._ J� 1,nJt _n�lr�I _ y( •,';. -F t,/, c. — —1 —I —LPfiOD.V_StD _ oo—_tit_;— _c._LNE�SOtLf At[0(d Tr:JS_F.{•i`or°,�-_— - -rJI ...i-t,)�9 1 E . -j')' /� Zt_�, rani y ;Al �JrCI N[FVE/'JT✓ALC.Y c✓ QVE1.-- �fa.� _'llt:r..: i_Cii„1 1—lam 1 N I o'n/t of )-HC !DE'AR£35VP i -- --�-J -4- -- --- -� -----= - -- CALCULATION PROJECT A F- ! 1' ! :: C0' i 7 r C C PROJ. NO. — CLIENT M DATE SUBJECT STOF.M bJR 7! DES. BY DD IV CHK. BY 0F �(/=I[iKfiil iJ �YSTFro AC_- I olfl-- -,- --- t cr-S REMARKS -f Rua ~ -ez -- — �- P '7 2 ! I STOrt.M_'� ?-7_c.{5._G�iStclJ;!N.�� 21062 1 / 20' ,A 0A CALCULATION PROJECT CLIENT - SUBJECT. PROJ. NO. — DATE DES. BY — CHK. BY Cztt4��, I'7A- t"67)mJ 7--&/,l ---- - ------ ---;S!YJ 1& 16) 1c. `3 6 ---T-9TA( 'SIOCZFl6,6 ..... 4 1c AAL4S3 cr- > �g REMARKS OR if _q±L C2 r FM ; . MC71 CALCULATION PROJECT CLIENT SUBJECT PROJ. NO. DATE DES. BY CHK. BY E REMARKS -_ GH.ECh__C�q1BC17 .._F;& 91'E T ' —i Ccvl ((( 1 � lO -_ �-.--"',-_ .-__ ' i`. its •�� 1' . f'�:2g. _ -.. _ ._. ._.� 4�E1( .� _- r `__ I 2S ; �6 v. r 318 —---7O7At-_i SjOh9rc._A_'VAfLggccy.1260cf -----.Cticu-_._ SO.Yr`.- �{�Ml��._._..51;Q��✓_EVEJ i ------ - ------ , .. �.-- i q ''III oucF ii Ii_N6.0src4,1v 10„�=— t - -- I-1-,D��Ii— _ PROJECT CLIENT _ SUBJECT. CALCULATION PROJ. NO. DATE DES. BY CHK. BY i - C I t C kC!1rrlC1T---- -i/)7.Y 1)rj JJ .ii_ f c_g r Fv/! OGF�c— I r li rcr0o% fK(A= .ac - . j � C53C�Vt crr, loaf?JrE'- -- —'FEF/ov �= r �-C i 1 1 r --•--- -- --�--Gr:l-?---..:.__CHcclt ._LOT^;�_�UnrN—eyB.�r (�_- r r , r 1 /} 1 l.io_: 605C4�i;,a *110/firs--IooC/`-- I i 1 ._._.------- —:NIT --Fc ...... -"- l .— 7DF' r cc= I (f ` I( 1 r I 1 I V cr_S�H cc/r. ✓ �_— (oTFC / V/.fz !STOr3G 9 REMARKS Un_ M�IQM CREM r S V CALCULATION PPOJ. N 1 0 4�-OX6 PROJECT PAC Al 1,06 CLIENT DATE SUBJECT DES. BY J CHK. BY- rl vx; I:Y7 Zs 2r 27 00 7ZL� r- j 341 MCA El REMARKS A /65-' OF "V'Q11�1:10AI SIVA(c cr STUF:r(t POA.ID I VAJ(q8(.E: VOWAJ: av(f �14K-1 -Gomo; : , —1 L"4 A, -,A SLA �/W�l ��s > n /V_r = < j 0k 501� SURVEY D64 SGS OLD s UP vz-V - -- --- - s> YS CALCULATION PROJECT �7 P/9C PAC ms PROJ. NO. '0 - OX6 CLIENT h I DATE 7 ' 7n -9S SUBJECT l/:� " 4 � j �- , ;;��✓ DES. BY CHK. BY REMARKS .A ,23 , .066 3 60 F f' S_ _ 25/ jhr, 'cr- - f.` •73-,066-.._I 4Ac renlnt._39.6.-rr _ TOTAL REc1D VoLU�E-OF_._LNI=/LiRHTfo ✓ SYSiri� _ _ I �pEl� 1j, s: I S OF INF/LTRATIOI/ SW4ZC STOk:i(E fb �D 2. - WL AVAItA�Lc VpCV�1t = --- 6S3rF-.-.'_r9�G_�L.- �S�-G------ -; i T67-ai_ ! AvAl dpL1- 4i y �!1 t�� _ Id'"o7; /)k Alti _ Z�� GOROLiq S9tiDs > 20;�NR �c _w_DE_PTt��E.—SWACE__H-L1� :POD✓D__.=--I --AEG-- ---- — — '_— ow _ALE_ --------------------------_---- ------ i CALCULATION PROJECT �AI?P L PP. L M S - PROD. NO. Odd CLIENT h I DATE Z`ZA-9S �j SUBJECT l/J f !Z T f- 1:7; 0-✓ DES. BY CHK. BY REMARKS -4,L- :t�: I0 L — --- --- — --- -- r/",f'crv!�U;.06 cycr....._Z1 r F�Fios673_= -------- - Ar2CA HAS; 265- LF of NFIL7R,,1710d WALL r7Scv/F 102ScF SiUcgC FEND `3-y1AVA(LAE(t VOIu(9E _ 7?_D�F I_1SAvr, l Pii = 120 cJ- 71000cF 0K ) NNFA-v CALCULATION PROJECT t PAL /;15 PROD. NO. Q? �-f DATE 7 - CLIENT DES. BY SUBJECT IIJ F- k T r 6 jr1l CHK. BY REMARKS1.4 7 0 Vc K, c-', Al • .26 el Vt rl 67 —TO TA L CA t4 iA5 30-S Lr Or fVF1 r r F- 14311ct= 71 7)k4/)]A); -rf,-Wr ?cr,, cAbcL)l.A-rIo1L' CALCULATION PROJECT L PA6 /05-- PROJ. No - DATE -LIZ-B --29- CLIENT DES. BY SUBJECT CHK. BY- REMARKS A L APEA HAS.-3"2o' OF 1,0,;rlL'Fe4T)0A1 SWALE A&c (bl4l V11 AVA14,.1 ?LE -VOLUIOE 5ZZ SF. rq r 5,?2cF fit El 0 �A PC FA 9ml .—j i I k I ` CALCULATION PROJECT - ��) �P L PF L /✓I S PROJ. NO. Qr`O%�� CLIENT l 1a r DATE Z i2--& I Z/ SUBJECT 11JF Ic T ( A. 01✓ DES. BY CHK. BY