Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8130907_HISTORICAL FILE_20131009
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Yoc° 01 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2D13 to 09 YYYYMMDD . , NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Director October 9. 2013 Pat McCrory, Governor John E. Skvarla, III, Secretary Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 25842 Subject: State Stormwater Management Permit No. SW8 130907 Parking Lot Addition Building 313 High Density Commercial Wet Detention Pond Project Onslow County Dear-Mr_-P-asil: The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Parking Lot Addition to Building 313 on October 8, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the _Stormwater Regulations set forth_ in Title_15A NCAC 2H.1_000_and _Session Law 2008_211. We are forwarding PermifNb. SW8-130907 dafed'October 8, r-2013, fothe const�uctiori;-operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until October 9, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at WWW.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson in the Wilmington Regional Office, at (910) 796-7345. Sinc rely, eTrcy DaOvis, P.E., Director Division of Energy, Mineral and Land Resources GDS/ can: S:\WQS\Stormwater\Permits & Projects\2013\130907 HD\2013 10 permit 130907 cc: Joe Avolis, Avolis Engineering Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 130907 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO MCB Camp Lejeune Parking Lot Addition, Building 313 Building 313, H St., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until October 9, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater control has been designed to handle the runoff from 16,502 square feet of impervious area. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. 5. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. This permit does not provide any allocation of built -upon area for future development. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 7. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 130907 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ?cres: Onsite, ft : Offsite, ft2: b. Total Impervioul Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSI�: g. Permanent Pool Surface Area, ft h. Permanent Pool Volume, ft3: i. Permitted Storage Volume, ft3: j. Temporary Storage Elevation, FMSL: k. Pre-dev. 1 yr-24 hr. discharge rate, cfs: I. Controlling Orifice: m. Orifice flowrate, cfs: n. Permitted Forebay Volume, ft3: o. Fountain Horsepower P. Receiving Stream/River Basin: q. Stream Index Number: r. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.58 25,107 0 16,502 16,502 0 1.5 3.0 90% 7.00 2,732 4,840 2,725 7.75 0.03 0.75"0 pipe 0.01 951 n/a New River / White Oak 19-(15.5) "Sc, NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DENR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system as the permanent pool volume is less than 30,000 ft3. 6. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 130907 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes,.rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; Page 4 of 7 State Stormwater Management Systems Permit No. SW8 130907 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the gth day of October, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of nergy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 130907 Parking Lot Addition, Building 313 Stormwater Permit No. SW8 130907 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent 'of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 130907 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEMLR Wilmington Regional Office Page 7 of 7 ' DWQ USE ONLY Date Received Fee raid JPermit Number Applicable Rules: ❑ Coastal SW - ] 5 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Parking Lot Addition, Building 313 2. Location of Project (street address): Building 313, "H" Street City: MCB Camp Lejeune County: Onslow Zip: 28547 3. Directions to project (from nearest major intersection): Project is located at Buildign 313 at "H" Street and 750 feet southwest of the intersection of McHugh Boulevard and "H" Street 4. Latitude:34° 39' 43" N Longitude:77° 21' 00" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New []Modification ❑ Renewal w/ Modification[ t Renernals with modifications also requires SWU-102 - Reneinal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 1.5 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: httl2:/Iportal.ncdenr.org/web/wq/ws/su/statesw/rules laws 1,EE0VE r Form SWU-101 Version 06Aug2012 Page I of 6 j! 5❑a 1 1 2013 j'l III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Commanding Officer - MCB Camp Lejeune. North Carolina Signing Official & Title: Neal Paul, Deputy Public Works Director b.Contact information for person listed in item I above: Street Address:1005 Michael Road City: Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): Phone: (910 ) 450-5803 Fax: (910 ) 451-2927 Email:neal.paul@usmc.mil c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City: -- Phone: ( ) Email: State: Zip: -... Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: David Towler, EI/Public Works Signing Official & Title: Neal Paul, Deputy Public Works Director b.Contact information for person listed in item 3a above: Mailing Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Phone: (910 ) 450-5803 Email:david.towler@usmc.mil 4. Local jurisdiction for building permits: Fax: (910 ) 451-2927 Point of Contact: Phone #: Form SWU-101 Version 06Aug2012 Page 2 of 6 6u SEP 1 1 2013 ft v �l IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be treated in a wet detention pond sized for 90% TSS removal. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 0.58 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':0.58 acres Total project area shall be calculated to exclude the following the normal 001 of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NSW) line or Mean High Water (MHW) litre, and coastal wetlands landward from the NHW (or MHW) litre. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlannds landward of the NHW (or MHW) line nuay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 65.73 % 9. How many drainage areas does the project have? 1 (For high densihj, count I for each proposed engineered stornnVater BMP. For low density and other projects, use I for tlue whole properhd area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name New River Stream Class * SC; NSW Stream Index Number * 19-(15.5) Total Drainage Area (sf) 25,107 On -site Drainage Area (sf) 25,107 Off -site Drainage Area (sf) 0 Proposed Impervious Area** (so 16,502 % Impervious Area** total 65.73 Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 0 On -site Streets (so 0 On -site Parking (so 15,860 On -site Sidewalks (sf) 0 Other on -site (so 0 Future (so 0 Off -site (so 0 Existing BUA*** (so 642 Total (so: 1 16,502 * Stremn Class and Index Number call be determined at: lntty://nortal.nedeur.org oeb/wq(pslcsu/classifications Impervious area is defined as tlue built upon area including, bat not limited to, buildings, roadsrSEP n`g IN �I E sidewalks, grovel areas, etc. � 2 4 2013 Form SWU-101 Version 06Aug2012 Page 3 of 6 '"Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Field Visit and Topographic Survey Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state storm water management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htti)://oortal.ncdenr.ore/web/wo/ws/su/bmv-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.nccienr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at littp://portal.ncdenr.org/web/wq/ws/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromhttp://portaLnccienr,org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective CovenantsY Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or they v receiving stream drains to class SA waters within ih mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). --= 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. �-- _ n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. �� t+-: el V E +j o. Drainage areas delineated (included in the main set of plans, not as a separate document). g it p. Vegetated buffers (where required). SEP 11 2013 Form SWU-101 Version 06Aug2012 Page 4 of 6 I;Y; 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHINT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Military. Page No: li>AA�y 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N/ / Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secreta[y.state.nc.us/Corporations/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Joseph C. Avolis, PE Consulting Firm: Avolis Engineering, PA Mailing Address:P.O. Box 15564 City:New Bern State:NC Zip:28561 Phone: (252 1 633-0068 Email:avolisengineering@rmbarqmaii.com Fax: (252 1 633-6507 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. tL Form SWU-101 Version 06Aug2012 Page 5 of 6 SEP 11 2013z, BY: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of , do hereby certify that before me this _ day of County of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hJpe name of person listed in Contact Information, item 1a) Neal Paul certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covens will be recorded, a d that the proposed project complies with the requirements of the applicable stormwqvCer/ ules under IAA NC#C 2I-I .1000 and any other applicable state stormwater requirements. Sign ature: / Date: 1, ' a U Notafg Public for ire State of County of lJV \�1U V` _ do hereby certify that 711 I before me this C, day of a stormwater permit. Witness my hand and official NnTARY PUBLIC Ory;,L0,4 COUNTY STATE OF TEAL due personally appeared Vly commission expires 15 1 • ` m [� Form SWU-101 Version 06Aug2012 Page 6 of 6 nri,Estm?rs` id ,i SEP 1 1 20B tlY. MEMORY TRANSMISSION REPORT TIME :10-09-2013 11:27 FAX NO.1 NAME FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 555 10.09 11:22 e 912526336507 8 10.09 11:24 10.09 11:27 8 OK —SUCCESSFUL TX NOTICE' Sfalo of NOR6 Carolwn f)aparf man( o! Bnvlrov man! eod Na(ural Ra�ou rcw wnmin¢mn Ra¢mna omaa Pnr McCrory. Covarnor FAX COVER 9HE8'T JOAn S ShvoNo I!! Secr'afary C9101 796-')"336 Pnx: —FPS 2'--G� �✓O / Fnx: (Y 101350-2UOQ 127 Orlve NC 2vf0J . (910) -196-'121J - A B .., A. 0— Nm ploys' Pal McCrory, Governor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET John ESkvarla III, Secretary Date: /'00 �— , / To: ,ToE �kl S Cc: A�oLi s/Z:/7! //'17 eel - Fax: 9 2 Z C��J 4 5Q No. Pages (excl. cover): From: Jo Casmer Phone: (910)796-7336 Fax: (910)350-2004 -z � — %r��r°o�sy i; /'G , . 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 554 10.09 11:21 a 919104512927 8 10.09 11:21 10.09 11:23 8 OK TIME FAX NO.1 NAME 'SUCCESSFUL TX NOTICE- 10-09-2013 11:24 Stntn n! NortL Cnrollnn Department o(1Lnvtroo man[ and Natuot Renourun Wtlm tngton Rngto nat OMae PofM C}aryGovarnnr FAX COVLrR SIIY'.BT JOFn 6SkvoAn O! Secretary -rn: i!/E.�G �i9UG Prom: I-r'aem r 12'1 Cv d4�n1 Onve 6xtenf lon- WilmiryponNC 2gM5 � (910) ")96-7211 � M Gqu nl ppponunay ATrmnn vn Ae11nn rimployer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET Date: 1j% TO: Co: Fax: Re: i�i John E Skvarla 111, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910)796-7336 Fax: (910)350-2004 Cd9 . I:j�/, -- 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer Nelson, Christine From: Avolis Engineering, P.A. [avolisengineering@embargmail.com] Sent: Tuesday, October 08, 2013 4:28 PM To:' Nelson, Christine Subject: Re: request for additional info - 313 parking addition Yes; please! Thanks, Joseph C. Avolis, PE avolisengineering(a,)embargmail.com Avolis Engineering, PA 252.633.0068 From: Nelson..Christine Sent: Tuesday, October 08, 2013 4:16 PM To: Avolis Engineering. P.A. ,Subject; RE: request for additional info - 313 parking_addition _ Thank you! Do 1 have your permission to update the supplement to reflect the new drawdown time? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Avolis Engineering, P.A. [mailto:avolisengineering@embarqmail.com] Sent: Tuesday, October 08, 2013 11:12 AM To: Nelson, Christine Subject: Re: request for additional info - 313 parking addition Christine, I think I've got it now. Sending Bldg 1747 next. Joe Avolis, PE avolisengineering(a)embargmail.com Avolis Engineering, PA 252.633.0068 From: Nelson, Christine Senti Tuesday, October 08, 2013,10:02 AM To: Avolis Engineering. P.A. !Subject; RE: request for additional info - 313 parking addition Joe, Thanks, I saw the changes to page 8. The problem with the equation on page 8 is that it uses the 2inch storm volume, not the minimum required volume from the 1.5" storm as required by the rules. The equation on Page 7 also needs to reflect the 7.75' to demonstrate that the minimum required volume (1.5" storm) will drawdown in 2-5 days using the full head (7.75-7). Hope this helps to clarify things. Christine Nelson, Christine From: Avolis Engineering, P.A. [avolisengineering@embargmail.com] Sent: Tuesday, October 08, 2013 11:12 AM To: Nelson, Christine Subject: Re: request for additional info - 313 parking addition Attachments: 313 Parking Addition.pdf Christine, I think I've got it now. Sending Bldg 1747 next. Joe Avolis, PE avolisengineering(g)embargmail.com Avolis Engineering, PA 252.633.0068 From: Nelson Christine Seat: Tuesday, October 08, 2013 10:02 AM To: Avolis Engineering. P.A. Subject: RE: request for additional info.- 313 parking addition . Joe, Thanks, I saw the changes to page 8. The problem with the equation on page 8 is that it uses the 2inch storm volume, not the minimum required volume from the 1.5" storm as required by the rules. The equation on Page 7 also needs to reflect the 7.75' to demonstrate that the minimum required volume (1.5" storm) will drawdown in 2-5 days using the full head (7.75-7). Hope this helps to clarify things. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Avolis Engineering, P.A. [mailto:avolisengineering(a)embaromail.com] Sent: Monday, October 07, 2013 8:50 AM To: Nelson, Christine Subject: Re: request for additional info - 313 parking addition Christine: Please take a look at the top of page 8 of the calculations where the drawdown is also calculated using the 7.75' elevation referred to. The corresponding drawdown time of 4.2 days is also what is reported on page 2 of the supplement. The page 7 calculation using the 7.58' elevation demonstrates that the orifice draws down satisfactorily for both the 1.5 and 2.0 rainfall events. This looks like the information you may be looking for? Sincerely, Joe From: Nelson. Christine Sent:j Friday, October 04, 2013 12:35 PM To:'Ayolis Engineering, P.A. Cc: Russell. ]anet iSubje :_ RE request for additional info_-313 parking addition 1 'Nelson, Christine From: Nelson, Christine Sent: Friday, October 04, 2013 12:35 PM To: 'Avolis Engineering, P.A.' Cc: Russell, Janet Subject: RE: request for additional info - 313 parking addition Attachments: Average Head & Drawdown Calculation.pdf Joe, You are still using the wrong elevation in the drawdown talcs on page 7 of the revised calculations. Instead of 7.58, you should be using 7.75. The drawdown talcs should be based on the provided head for the next available outlet along with the minimum required volume. I have attached an old drawing that may help. Please let me know if you have questions. (If I remember correctly, this is one of the items I mentioned that also needs to be fixed on the 1747 project) Can you e-mail the updated page of the talcs and supplement for 313? The plans shouldn't change, right? Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Nelson, Christine Sent: Monday, September 30, 2013 3:46 PM To: 'Avolis Engineering, P.A.'; 'thomas.bradshaw@usmc.mil' Cc: Russell, Janet Subject: RE: request for additional info - 313 parking addition Joe, There are few items that required a second request for additional information for this project (attached). Please try to submit the corrected items by October 4`'. Thanks, Christine Emoi) correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Nelson, Christine Sent: Friday, September 20, 2013 12:31 PM To: 'Avolis Engineering, P.A.'; thomas.bradshaw(&usmc.mil Cc: Russell, Janet Subject: request for additional info - 313 parking addition Joe, Here's the request for additional information for the parking lot addition to Building 313. There are a few mismatched numbers that need to be worked out. Please try to submit the corrected items by September 27, 2013. Thanks! Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct:910-796-7345 / Main:910-796-2512 / Fax:910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. EXAMPLE AVERAGE HEAD / DRAWDOWN CALCULATION (with outlet set above the calculated min. Temp. Pool Elevation) Given: Required volume to store = 25,000 cubic feet Permanent Pool Elevation = 10.0 Calculated minimum 1" storage elevation = 11.35 Outlet weir set at elevation 13.0 (Temporary Pool Elevation) Total Head, H, = (13.0 - 10.0) = 3.0 Average Head ='/ (3. 0) = 1.0' (Approximate) Q2 (2 day flowrate) = 25,000 / 172,800 = .145 cfs Q5 (5 day flowrate) = 25,000 / 432,000 = .058 cfs Rearrange the orifice equation and solve for Area: A = Q / (Cd (2gh)05) where A is the orifice area in square feet Q is the 2 and 5 day flowrates, ofs Cd is 0.6 g = 32.2 ft/s2 And h = average head, feet A2 for the 2 day flowrate = .145 / (.6 (2'32.2`1.0)0S) = .0301 ft2 A5 for the 5 day flowrate = .058 / (.6 (2-32.2'1.0)05) = .0120 ft2 .0301 x 144 in2/ft2 = 4.33 square inches .0120 x 144 in2/ft2 = 1.73 square inches Solving for the radius, R and diameter D: A=TrxR2 R=(A/Tr)o.5 , R2 = (4.33 / Tr)" = 1.17 inches D2 = 2R2 = 2.35 inches R5 = (1.73 / Tr)0'6 = 0.74 inches Ds = 2R5 = 1.48 inches P?PE_ =10.0 EXAMPLE AVERAGE HEAD / DRAWDOWN CALCULATION (with outlet set at the calculated min. Temp. Pool Elevation) Given: Required volume to store = 25,000 cubic feet Permanent pool Elevation = 10.0 Calculated minimum 1" storage elevation = 11.35 Outlet weir set at elevation 11.35 (Temporary Pool Elevation) Total Head, H, = (11.35 - 10.0) = 1.35 feet Average Head, h, _'/ (1.35) = 0.45' (Approximate) Q2 (2 day flowrate) = 25,000 1172,800 = .145 cfs Q5 (5 day flowrate) = 25,000 / 432,000 = .058 cfs Rearrange the orifice equation and solve for Area: A = Q / (Cd (2gh)05) where A is the orifice area in square feet Q is the 2 and 5 day flowrates, cfs Cd is 0.6 g = 32.2 f /$2 And h = average head, feet A2 for the 2 day flowrate = .145 / (.6 (2'32.2"0.45)05) = .045 ft2 A5 for the 5 day flowrate = .058 / (.6 (2'32.2'0.45)05) = .018 ft2 .045 x 144 in2/ft2 = 6.46 square inches .018 x 144 in2/ft2 = 2.59 square inches Solving for the radius, R and diameter D: A = Tr x R2 R'= (A / Tr)0.5 R2 = (6.46 / Tr)05 = 1.43 inches D2 = 2R2 = 2.87 inches R5 = (2.59 / Tr)0 5 = 0.907 inches D5 = 2R5 = 1.81 inches 5:%WcQS\ 9tormwa+er\ Guid2nce\ T.P.E.=11.35 10.0 AVOLIS ENGINEERING, P.A. P.O. Box 15564 - New Bern, North Carolina 28561 - Office: 252.633.0068 October 2, 2013 Ms. Christine Nelson Environmental Engineer State Stormwater program NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Additional Information, Stormwater Project No. SW8 130907, Parking Lot Addition, Building 313 Dear Christine: Enclosed please find revised documents in response to your add info request of September 30, 2013. 1. 1 have adjusted the temporary pool elevation to 7.75' in response to an error associated with the volume table (0.5' increments vs. 1.0' increments). The temporary pool area is 2,725 SF. See calculation pages 5 &6 for clarification. 2. See top of calculation sheet 8/12 for drawdown time for the temporary pool elevation of 7.75'. The drawdown time is 4.2 days. 3. 1 have changed the forebay volume calculations to adjust for the error of using a 0.5' vs. 1.0' increment. This change also carried over to the % forebay volume which was also adjusted on the supplement. 4. With the lowered temporary pool to 7.75' vs. 8.0', I also changed the weir elevation. have attached revised plan sheets with this change along with the pond volume data and pool level data. I also rerouted the storms to show that the pond could still handle the design storms, which it does. The only significant change is that the 10-yr stage is now down from 8.14' to 8.0'. We appreciate your assistance with this project. Should you have any questions, please do not hesitate to give me a call. Sincer 9 is, I P esid nt FCF-E -fE OCT 0 3 2013 �x UY: Email: avolisengineering@embargmail.com Fax: 252.633.6507 tRe`visedlStormwater Calculations Construct Parking Lots, Hadnot Point & French Creek, Building 313 Permit No. SW8130907 Marine Corps Base Camp Lejeune, NC Prepared by: Avolis Engineering, PA PO Box 15564 New Bern, NC 28561 (252)633-0068 FAX (252) 633-6507 October 2, 2013 ECEIVE 1 OCT 0 3 2013 ev: 3 5MMWA,V-PA4.4 �-rMA6 G9tJSTRuc,F ' Ap-K-ijc hors f Dr?ot:.,Po.jn!> ArID Fg4co Ogut B�vl��i 313: /nc,>3 �gn-,P. t.irEUaE_, NC -Tw5 PWevr w(u. F"UIPE : a' NEW PAr_eiae, A -eA ATT Pc" r AE14 U F ..ptpEQ --ul'oi.)6; 5; Tk ' i6.7tcT 15 UCATED o"1 }f' S (1}£ QQ4fEt;T [7 In}5. TD `jbFr .. W F-IVEIZ., $G;Nsw 6ITE DATA DrAwAf,E Bow31vARI 25,l,Q.-�:Sr : CO3ggAo l�r rr� �ivp�rtVrous Ar? = lS, 9&0 5r. ,EXwsri,JA Ir1�E�vwvS AAA 7a ?EisrAlN 0/0 ZS r 10 SF ?IicumwA2.1( sly WET Qo")Z) :RO °r'o T55 - 1�ruUtM'D 3.0 FT 11V�2AGE. D6.M 4551AM ff/w , 4Z S�' �SIbEWAcK/STIe M/NI040M IEs'�ae�-�5 �4 FED 6n-tlt: SYo rz:rov��-Tr_2. 'Kui;Es REau ly-Ew�E�rr- 14NALyZ-E 31. -4fAas - 0.(-- -9 TA . fir. VrrWe2r AV14u.ABelt FAiNF�4t& ,s C /kU� l S rgTl oa.-_ p nt /,vE -f1+E �5 TH iEKf.Er1TI f,E .. i2A IIJ OW, e\16or (950/o ©F ALL PHIAL- sVEr►13` 'Do NDT EXGEED�.. SM.�Fu,_ 'FAINpAU, EVot's of .qT AiUe- ' 0. 1 sr)Ct+. M I,F55 A�£ _ EKCGut7Efl C" LO lM � Pr-P C6AiYI � ✓4,JAti J s (s : 5 � W6 E VWTS , .O F; -rH is 51ic 6EA)E(-Au- -p6 .Mt vEsuCr t �,J A,Ny M gt FF DuE TO R35*Pf.10AI1, .EVA?d2ATtu�J1 ETC, OCT 032013 bl r v. L)5E A'Z-6 :n-U4 RAwP,AU- .l vcnl'r T>t� yATlS z 2 5 vAj Ifl�� L✓/�7�K TAB EcEDario 5Z. CA12-dLtAJAs1.L! P VJAs CXA)rRCrrP -ra v67-69A41 6 r)fc %45W/4L R-77(n PM-64 -VfgtF Fl F_Uf}r!o/v 4T IW .5/7?-e . GCS V l5 1 r r-P INS 51rE A-Y114CWP pcpb�r sHQWs--. A ..6HWr .A-r R: ,5p'l a'F rW° .FEtr 13ELow rHE CK157'J,--)A, GQ014417 .;SUkF/4e.6, T I?I E CoK( 5�°,JDf.J�j SFFWT Ef,EvrlOal ... is. o F� SfT. tFi£ �ERMTAA, UT 17600, FGEf114 la./✓ fa,jp &kU/RE/d• X, Ur5 (N° T ,9'GG 0. /faLD f�uv.OFf "�Qo�,t /,S 2iJC// :.�.4/NFAGL ((N/GL _U5E Z•O,,ZrLe# ,cut GETJ�� T�EQu/,eEit,E.vyS� /7RA N PCkW, olf,6f Z-S VAtS. e � � M/Niyiuir1. ,.ff�r'�AGE Poov e �2EF,a✓.�ir �QU12E� �2v% C1c POND VOGLfME,- 1 Fr l/vi,HN�►t F�r;8a4RD oVE.2: /vi ax/.+�taM pe,�a .5>c, e It7 fT IN 1 DE_. _V�E�E713�D 5NG_� _ _ • yLt/N/rylk�'I :R4SInJ, :�<iiF1 ?b "w?� _:�A?/o = l Ste/ . .. _ �E51GN Wf�r- AAD, f"D DE l isE S IDR. Riaut�eEMF�ris �� 10mjv, 74401 10`3 3uA . 3.0 Fr 3,5 Fr woc>�rrr 7.0 F T.J L t; 91 dou = O.Zs l t f /4w:5b"Oy + Ry (�trSketj + ARaT_:PoND DEpll C 1 Apum P0'oc) \ 2 gnT 5 Abor5rricF = 5U4M�E` AoA Ar gortaM or'.!5M.4" (1t44111PbN,o-Gae�p�gi1) A Ff M Po U 12j'A09 . %zeC4 AT ` 4,vm/ . PDd 411V POA10 Vigor POND ' S'tiR� .. t /�- �i077'bnt OF. �nr� E1�uo�.�l �En�M�ar Sri GE `A416( P6AV 6AI&Y) = Pj. %rAtJ66 tlr. Bar'roAl Or—W(,F 8bmAl 6F MIAI eddP (t�KcLur/.J6 56plxievr. i;-ptz ti6 215ONC) 6.41 + 'Z,-$ = 30i Fr, USE 3. a; `FT ePoA CAC-6 4 af, , cAc-cui,4r16N6, .:5Aliq l a i 6 s F. 7 OK �t2E FnQF-� (rAN6PZ LuWE(C 1 Pr : n6PI-H ;5vgA F y-ru a� �onTE D u E -ru r�i�Jcnav t S F�iruF..ili ECE(1VU OCT 0 3 2013 BY: Z CcaJnWL _A AV(,., ArkeA% / Q -VOL, SEDrtit 2.5 to ... STD RRC,E 40 90 49" s<a .1a,9 141 !. a4g 0 332 Z&O ► . . '26 zgs�r i�'IR�N hbn1D- O: S 8� 4,5 3,0 qOZ 32�. I 3z� 4,0. ace 4q4 L 4�4 5n go3 � ��15 l f�95 �,b ►qo3 � 1s4� o•s ��- r-�z�gA— '�, E EavE OCT 0 3 20t3 BY: .. I I 7e C4LQU647-10A)",OF 5rOAM V066(1►,651 (15-" �- Z-07) L15 9 T)4,F- 0,05- + 0, IA 'Kv rujbfr e"oF'rrlcl&'Tj 5-7DA6A jZuJLIFr(fit J)/5;TDgm mlmfAa- Wv = 0,05 4- 0.9 1-' 0,6573 = 0. &-*Z Vot,,= 3Ao V= vo(-UM4 C)F- 9 Uljorr- P6514AI .,57T" - Vol-,=. 31630 ZoZo Vie,= 31630 -1k Z-O"' o— o-&z.,4L- F-uVATI 0 A vDb (r-0) A 8"o V6 q. 31g1 Icy V78 110 q 3- 9P CEIVE( CT 0 3 2013 BY: s �l E C E I V E , /•S.'' srti�M VoutME= 2,az8 p3 "1 OCT 03 2013 CIOL. sroagO 5/r. 7,0 7',S R ' CONT-ov-es REMA(fil/j(% 1.5 ,Vol; = 0OZ5 1(o3Z Ff3= ;50' F 3 2 3 F�3 :. 1.Stt _STvR!'H E(;EVAT Ior� PI)a-AIIZPoor. AIKM 3/jV t 0.08/�3g3—:3q 0.127 2 AV c cup : o". d ;2.0.s?akM l/44,u1"E _ . 0,70-3 Fla �. Vol— S-n ilcv Pi% 5� 8fr . •S8.(J� GavtowPS = lnZ5' F73 (o.5 ff 1p:_ .l5 �t�°�AY�-t Pops, oriJ, SIcE OKIfICr- FoK '.Z--S DAB D"'WDOW10 5e(Ac'T 3 : pA�tj 5 Fk:S A -n4r-"r .TIM6F94ME -r-o '➢RAW V60A) l4e 5T-6VtA Avg2Mvf F1 007k F}.3 s)IZ4 �� 1((ooR °M/N S Poo Vo 2 t2-o" s roR:w_6Ic7 E 12 i \. 01 F 1 CE EGtn). Q = CD A 2� , a= �Is�fwcLc (ems) Ch = C,o6FFICi6-Jr of b15C14AQd6 A= 0RirIC4E CpuSs 5EcrloJA4- A(ZXA (fZ) 5 CiRAVIrl (3Z:2 F057-) . h = 9PIVIAI,, P-6AP ..(Ft) SUL,VF_ roe OFJFIV- A4EA. = (Sl Co 2g� d•00 3. o. 003 FEZ V ./i t", IRE; �s. 0:� 6-_©odo57.F+3 4- C i i�� 17RAIJDuWn� llwmvE= 202Q Ft3 l�l PAIN\ A itnuE\ g m / q.o0:(0, 3 5 foo sic ron MAN 24.HokR •( I:_ DR�� -OK U5£ 314°fd.b2/F/CE S_5•tv�V!�_ = EIVI OCT 0 3 2013 6ui4,VWA 313 TM�a6� LvT rAIPJ IAAA+ REaUIMP VOLU,M6 152ow\ -W t.5" s6MUA = Z, OZS Ff3 CAL-cL,LUAM oRIFICL DLS--[+AZE V-"E $A5ED ovj T"o eM c, = C� �+ _ (o.�) 4 C� �s�2 2�3z.�—�.0 2 3 = O. ©0--4 F:+' I5 TJFAWDo�.Jn1 7�Mt = /2028 �3 l(�Mv) 1/-L---/ vcA i1j) �Iz+ OW-4 = 3•Z 'Dfl 5 — oK a C. �!l4111Itti1 J'D �3ojc 155'6� U it.�uJ �N itlG Z$S�o/ (1 633 �6) OCT 0 8 2013 f 35502 -.s-�-I � .1. I z DIZ4101,961A)A1- 24 %AOL. t) C12- )- 3 PVAVJlP0 tAJ.'j -J,\ Ho 14 l O.pp �}3' S) 0:5fc-KT0 M 4;N4 71 (a, &4-55 ?V->T 'DE\)e.0 PjAAF,/,Yr C- .0-59 Ac.. to P, 2Q -,144 6TDPIM 3-b5 Lrij, HES Ztj 0-151 Z4 P12.6- DEVELD?Vh Z,+-, HA SAS RDW,'- C=A 44 si-tw rWw - c4A -vilik)( 0, c',rs nEGEOVE OCT: 0*3 2013 BY: RoUrF, 5TvatA I'H;a&(AH PaJD USE 5c5 T2-Ss MET7fOP -ro ..Vef' 6A)5 -A4YM. &0MP(4Ad66 W ITN PR r--Vr-Va ffl4EArr` Pusr. %EVE[.aprNE Ru�oFF 55 IH� 51re 15 6L;- En A5 b�gVIA)4 W14IGH is RIDPW LOAIC G Vt4e, 16F- C N = 30, c N= 9 8 PAuE_9 . PA)q-/J 6 Go r. P65r -0Eyr/.opMjE )r reoU4�jH p6ly,D . cu=�3�)(o.zl�oAc) + (98)(b;3G44c) = �. b,s8 A-c Q � � 0, 00 0- C,Fs Pk - QEVEL40 PAA = O,q9- . Gf S _.; POST .17EvEc.o�mF,v�T C13EFu2E � (.01.� I.Jru �o 5r�6� lsN at ourrLEr DgvIr:E -rn Ar-zW Wr- 71 1- 24-1�2sroRM RbwTE ljir- . Parr :VeVeLoprrA60 ' 5To '11+Rou�kt-. f31E - . Pogo hN-v Tlt£ o �nr1.Er STRU cr(,t r?E. -V - z4 In1E1>; ITT cEt F.VAT1or�— % � ! ti (sue A�r�gcH�g cow�w�� Pw�rrours) ; . )ECESVEf -� OCT 0 3 2013 BY:___ I AE l3o I 0c,P6 3/3 clo_g- lz�=5- g—tA s E� r8f - P= QP. = ._ 2.�2 CFS �BEFOR.G PoND� t�oS-r `Dt.VE�bP,MEniT� w .. b + C�5 Chas-f Ptvew(m&q j o4ozz PO QP) FEW . REPu67-10� /�E�uiREwlFnh s A s�resFi�. N O�pE� -r b nnEEr FEE 80,49P, I �EJM L Ago N� MuST gE I.O flR dvtO�E ,4Bo✓ 'L8 0 cc,�An�a 2 I gA RaLEL; . 6, Fr o . V v � 344 Al Z It r �Con1C(1-ET FTC ��`k61� r- -' EGEI E OCT 03 2013 � UYi I Ac cp 110 3jj24s. cork tE RisER..wEi�t�r= C2( / 4,') + z(3'*4')](a%5j(14s_ Ib ' 40 0 sN,, Rlse)z C AW)C-rE FOOriA)6, w i�tFT l/j W4TZ:97 i0, 031a pj< FoR gUoy tivcy gacz L Fl.J�lQr�o J Fg = , (i:zs) I�(�z.1. wl -9 F 146 - 6 i, 4 1003 Z. F!. x : - .:-r4ok UA)Ci2EYE. Nic l-It MCI OP- . I. ... OCT ,0 3 2013 BY:. lz Hydrograph Summary Report-: Page 1 Hyd. No. ,Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (Yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 0.00 2 1324 33 1 — PRE-DEV 2 SCS Runoff 0.94 2 724 2,861 1 — POST-DEV BEFORE PO 3 SCS Runoff 2.72 2 724 8,158 10 — 10-YR POST BEFORE 4 Reservoir 0.01 2 1416 137 1 2 7.76 2,765 POST-DEV AFTER PON 5 Reservoir 0.75 2 744 5,433 10 3 8.00 3,775 POST-DEV 10-YR Proj. file: 13044-BIdg313.GPW FIDF file: NEW BERN.IDF Run date: 10-02-2013 t %-V C g V Ems. p' OCT 0 3 20B lBY: ?._�R�-, 74- 1 - SCS Runoff -1 Yr - Qp = 0.00 cfs 0.0025 0.0020 u) 0.0015 c 0.0010 0.0005 0.0000 0 5 10 15 20 25 Time (hrs) / Hyd. 1 rz•- EIVE F OCT 0 3 2M 2 - SCS Runoff -1 Yr - Qp = 0.94 cfs 1. 0.8 w 0.6 CY 0.4 0.2 0.0 0 5 10 15 20 25 Time (hrs) / Hyd. 2 4� OCT 0 3 2013 BY:- - rip) 3 SCS Runoff - 10 Yr - Qp = 2.72 cfs 3.0- 2.5- 2.0- 1.5- CY 1.0-- 0.5-- -- 0.01 0 5 10 15 20 25 Time (hrs) / Hyd. 3 ECEIVE OCT 0 3 2M ENT 4 - Reservoir -1 Yr - Qp = 0.01 cfs 1. 0.8 0.6 CY 0.4 0.2 0.0 0 5 10 15 20 25 30 Time (hrs) / Hyd. 2 / Hyd. 4 ECESVEf OCT 0 3 1013 BY: _ 5 - Reservoir -10 Yr - Qp = 0.75 cfs 3.0 2. 2. N w 1.5 1. 0.5 0.0 0 5 10 15 20 25 30 Time (hrs) / Hyd. 3 / Hyd. 5 E E5VE' " OCT 0 3 2013 BY: Reservoir Report Pegs, English Reservoir No. 1 - BLDG313 Pond Data Pond storage is based on known contour areas Stage I Storage Table Stage ft 0.00 0.50 1.00 2.00 3.00 4.00 Elevation ft 7.00 7.50 8.00 9.00 10.00 11.00 Contour area Incr. Storage Total storage sqft cult cuft 2,732 0 0 3,979 1,678 1,678 4,393 2,093 3,771 5,277 4,835 8,606 6,235 5,756 14,362 7,268 6,752 21,113 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 15.0 0.8 0.0 0.0 Crest Len ft = 2.0 0.0 0.0 0.0 Span in = 15.0 0.7 0.0 0.0 Crest El. ft = 7.75 0.00 0.00 0.00 No. Barrels = 1 11 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 7.80 8.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 40.0 0.0 0.0 0.0 Multi -Stage = No No No No Slope % = 0.50 1.00 0.00 0.00 N-Value = .024 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = - Yes No No Tailwater Elevation = 0.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage I Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 7.00 0.00 0.00 - - 0.00 - - - 0.00 0.05 168 7.05 0.00 0.00 - - 0.00 - - - 0.00 0.10 336 7.10 0.00 0.00 - - 0.00 - - - 0.00 0.15 503 7.15 0.00 0.00 - - 0.00 - - - 0.00 0.20 671 7.20 0.00 0.00 - - 0.00 - - - 0.00 0.25 839 7.25 0.00 0.00 --- - 0.00 - - --- 0..00 0.30 1,007 7.30 0.00 0.00 - - 0.00 - - - 0:00 0.35 1,174 7.35 0.00 0.00 - - 0.00 - - - 0.00 6.40 1,342 7.40 0.00 0.00 - - 0.00 - - - 0.00 0.45 1,510 7.45 0.00 0.00 -- - 0.00 - - - 0.00 0.50 1,678 7.50 0.00 0.00 - - 0.00 - - - 0.00 Continues on next page... ECEIVE A OCT 0 3 2013 BY: _. _ BWG313 Stage I Storage / Discharge Table Page 2 Stage Storage Elevation CIv A Clv B CIv C CIv D Wr A Wr B Wr C Wr D Discharge ft tuft ft cfs cfs cfs efs cfs cfs cfs cfs afs 0.55 1,887 7.55 0.00 0.00 - - 0.00 - - - 0.00 0.60 2,096 7.60 0.00 0.00 - - 0.00 - - - 0.00 0.65 2,306 7.65 0.00 0.00 - - 0.00 - - - 0.00 0.70 2,515 7.70 0.00 0.00 - - 0.00 - - - 0.00 0.75 2,724 7.75 0.00 0.00 - - 0.00 - - - 0.00 0.80 2,934 7.80 0.00 0.00 - - 0.07 - - - 0.07 0.85 3,143 7.85 0.01 0.00 - - 0.19 - - - 0.19 0.90 3,352 7.90 0.04 0.00 - - 0.35 - - - 0.35 0.95 3,561 7.95 0.09 0.00 - - 0.54 - - - 0.54 1.00 3,771 8.00 0.13 0.00 - - 0.75 - - - 0.75 1.10 4,254 8.10 0.32 0.05 - - 1.24 - - - 1.29 1.20 4,738 8.20 0.50 0.08 - - 1.81 - - - 1.89 1.30 5,221 8.30 0.72 0.10 - - 2.45 - - - 2.55 1.40 5,705 8.40 0.96 0.12 - - 3.14 - - - 3.26 1.50 6,188 8.50 1.27 0.13 - - 3.90 - - - 4.03 1.60 6,672 8.60 1.51 0.15 - - 4.70 - - - 4.85 1.70 7,155 8.70 1.72 0.16 - - 5.56 - - - 5.71 1.80 7,639 8.80 1.93 0.17 - - 6.46 - - - 6.62 1.90 8,122 8.90 2.06 0.18 - - , 7.40 - - - 7.58 2.00 8,606 9.00 2.13 0.19 - - 8.39 - - - 8.58 2.10 9,181 9.10 2.29 0.20 - - 9.41 - - - 9.61 2.20 9,757 9.20 2.71 0.21 - - 10.48 - - - 10.68 2.30 10,333 9.30 3.07 022 - - 11.58 - - - 11.80 2.40 10,908 9.40 3.39 0.22 - - 12.72 - - - 12.94 2.50 11,484 9.50 3.69 0.23 - - 13.89 - - - 14.12 2.60 12,059 9.60 3,96 0.24 - - 15.10 - - - 15.34 2.70 12,635 9.70 4.22 0.25 - - 16.34 - - - 16.59 2.80 13,211 9.80 4.46 0.25 - - 17.61 - - - 17.87 2.90 13,786 9.90 4.69 0.26 - - 18.92 - - - 19.18 3.00 14,362 10.00 4.90 0.27 - - 20.25 - - - 20.52 3.10 15,037 10.10 5.11 0.27 - - 21.61 - - - 21.89 3.20 15,712 10.20 5.31 0.28 - - 23.01 - - - 23.29 3.30 16,387 10.30 5.51 0.29 - - 24.43 - - - 24.72 3.40 17,062 10.40 5.69 0.29 - - 25.88 - - - 26.18 3.50 17,738 10.50 5.87 0.30 - - 27.36 -. - - 27.66 3.60 18,413 10.60 6.05 0.31 - - 28.87 - - - 29.17 3.70 19,088 10.70 6.22 0.31 - - 30.40 - - - 30.71 3.80 19,763 10.80 6.39 0.32 - - 31.96 - - - 32.28 3.90 20,438 .10.90 6.55 0.32 - - 33.54 - - - 33.87 4.00 21,113 11.00 6.71 0.33 - - 35.15 - - - 35.48 ...End ECESVE OCT 0 3 2013 cY:__-__.- Hydrograph Report Page 1 English Hyd. No. 4 POST-DEV AFTER POND Hydrograph type = Reservoir Peak discharge = 0.01 cfs Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 Reservoir name = BLDG313 Max. Elevation = 7.76 ft Max. Storage = 2,765 cuft storage Indkauon method deed. Total Volume = 137 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.47 0.02 7.75 0.00 - - - 0.00 - - - 0.00 21.50 0.02 7.75 0.00 - -- - 0.00 - - - 0.00 21.53 0.02 7.75 0.00 -- - -- 0.00 -- -- - 0.00 21.57 0.02 7.75 0.00 - - - 0.00 - - - 0.00 21.60 0.02 7.75 0.00 - - - 0.00 - - - 0.00 21.63 0.02 7.75 0.00 -- - - - 0.00 - -- - 0.00 21.67 0.02 7.75 0.00 - - - 0.00 - -- - 0.00 21.70 0.02 7.75 0.00 - - - 0.00 - -- - 0.00 21.73 0.02 7.75 0.00 - - -- 0.00 -- - - 0.00 21.77 0.02 7.75 0.00 --- --- - 0.00 -- --- - 0.00 21.80 0.01 7.75 0.00 - - - 0.01 - - - 0.01 21.83 0.01 7.75 0.00 - - - 0.01 - - - 0.01 21.87 0.01 7.75 0.00 - - - 0.01 - - --- 0.01 21.90 0.01 7.75 0.00 -- - - 0.01 - - - 0.01 21.93 0.01 7.75 0.00 - - - 0.01 - - - 0.01 21.97 0.01 7.76 0.00 - -- - 0.01 -- - - 0.01 22.00 0.01 7.76 0.00 - - - 0.01 - - -- 0.01 22.03 0.02 7.76 0.00 - - - 0.01 - - - 0.01 22.07 0.03 7.76 0.00 - - - 0.01 - - - 0.01 22.10 0.02 7.76 0.00 - -- - - 0.01 --- --- -- 0.01 22.13 0.02 7.76 0.00 - - - 0.01 - - - 0.01 22.17 0.02 7.76 0.00 - - - 0.01 - - - 0.01 22.20 0.02 7.76 0.00 - -- - 0.01 -- --- -- 0.01 22.23 0.02 7.76 0.00 - - - 0.01' - -- - 0.01 22.27 0.02 7.76 0.00 - - - 0.01 - - - 0.01 22.30 0.02 7.76 0.00 - - - 0.01 - - -- 0.01 22.33 0.02 7.76 0.00 - - - 0.01 - --- --- 0.01 22.37 0.02 7.76 0.00 - - - 0.01 - - -- 0.01 22.40 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.43 0.01 7.76 0.00 - - - 0.01 - --- - 0.01 22.47 0.01 7.76 0.00 - - - 0.01 - -- - 0.01 22.50 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.53 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.57 0.01 7.76 0.00 - - -- 0.01 -- -- - 0.01 22.60 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.63 0.01 7.76 0.00 - - -- 0.01 - - - 0.01 Continues on next page... 7fEOESVE ` OCT 0 3 2013 Y. POST-DEV AFTER POND Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.67 0.01 7.76 0.00 - -- -- 0.01 -- -- -- 0.01 22.70 0.01 7.76 0.00 - - -- 0.01 -- - - 0.01 22.73 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.77 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.80 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.83 0.01 7.76 0.00 - - - 0.01 - - - 0.01 22.87 0.01 7.76 0.00 - - - 0.01 - - -- 0.01 22.90 0.01 7.76 0.00 -- - - 0.01 - -- - 0.01 22.93 0.01 7.76 0.00 - - ---- 0.01 -- - 0.01 22.97 0.01 7.76 0.00 -- - -- 0.01 - -- -- 0.01 23.00 0.01 7.76 0.00 - - - 0.01 -- - - 0.01 23.03 0.01 7.76 0.00 - - - 0.01 -- -- -- 0.01 23.07 0.01 7.76 0.00 - -- -- 0.01 -- - - 0.01 23.10 0.01 7.76 0.00 - - - 0.01 - -- -- 0.01 23.13 0.01 7.76 0.00 - - - 0.01 - - -- 0.01 23.17 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.20 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.23 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.27 0.01 7.76 0.00 - - - 0.01 --- - -- 0.01 23.30 0.01 7.76 0.00 - - - 0.01 -- -- - - 0.01 23.33 0.01 7.76 0.00 - - - - 0.01 - - - 0.01 23.37 0.01 7.76 0.00 -- -- - 0.01 - - - 0.01 23.40 0.01 7.76 0.00 -- - - 0.01 - -- - 0.01 23.43 0.01 7.76 0.00 - - -- 0.01 - - - 0.01 23.47 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.50 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.53 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.57 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.60 0.01 7.76 << 0.00 - - -- 0.01 - -- - 0.01 << 23.63 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.67 0.01 7.76 0.00 --- - - 0.01 -- - -- 0.01 23.70 0.01 7.76 0.00 --- - -- 0.01 - -- ----- 0.01 23.73 0.01 7.76 0.00 -- - - 0.01 -- - -- 0.01 23.77 0.01 7.76 0.00 - - -- 0.01 - - - 0.01 23.80 0.01 7.76 0.00 - - - 0.01 - -- - 0.01 23.83 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.87 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.90 0.01 7.76 0.00 - - - 0.01 - - - 0.01 23.93 0.01 7.76 0.00 - -- - 0.01 - - - 0.01 23.97 0.01 7.76 0.00 - - - 0.01 - - - 0.01 24.00 0.01 7.76 0.00 -- - -- 0.01 - - - 0.01 24.03 0.01 7.76 0.00 --- -- -- 0.01 - - -- 0.01 24.07 0.00 7.76 0.00 --- ----- - 0.01 -- - - 0.01 24.10 0.00 7.76 0.00 -- - - 0.01 --- --- - 0.01 24.13 0.00 7.76 0.00 - - -- 0.01 -- - -- 0.01 24.17 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.20 0.00 7.76 0.00 - - - 0.01 -- - -- 0.01 24.23 0.00 7.76 0.00 - - - 0.01 - - - 0.01 24.27 0.00 7.76 0.00 - - - 0.01 - - - 0.01 Continues on next page... EGEIVE-, OCT 0 3 200 BY:- POST-DEV AFTER POND Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.30 0.00 7.76 0.00 -- - - - 0.01 ---- ---- --- 0.01 24.33 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.37 0.00 7.76 0.00 - - - 0.01 -- - - - 0.01 24.40 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.43 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.47 0.00 7.76 0.00 - - - 0.01 - - - 0.01 24.50 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.53 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.57 0.00 7.76 0.00 -- - - 0.01 - -- -- 0.01 24.60 0.00 7.76 0.00 - - - 0.01 -- - - 0.01 24.63 0.00 7.75 0.00 - - - 0.01 --- ---- --- 0.01 24.67 0.00 7.75 0.00 -- - - 0.01 - - - 0.01 24.70 0.00 7.75 0.00 -- - - 0.01 -- - - 0.01 24.73 0.00 7.75 0.00 - - - 0.01 - - - 0.01 24.77 0.00 7.75 6.00 - - - 0.01 - - - 0.01 24.80 0.00 7.75 0.00 - - - 0.01 - - - 0.01 24.83 0.00 7.75 0.00 - - - 0.01 - - - 0.01 24.87 0.00 7.75 0.00 - - - 0.01 - - - 0.01 24.90 0.00 7.75 0.00 - - - 0.00 -- - - 0.00 24.93 0.00 7.75 0.00 -- -- - - 0.00 --- -- --- 0.00 24.97 0.00 7.75 0.00 -- -- --- 0.00 -- - -- 0.00 25.00 0.00 7.75 0.00 - - --- 0.00 - - - - 0.00 25.03 0.00 7.75 0.00 - - - 0.00 - -- -- 0.00 25.07 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 25.10 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 25.13 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 25.17 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 25.20 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.23 0.00 7.75 0.00 - - - 0.00 --- - -- 0.00 25.27 0.00 7.75 0.00 -- - - 0.00 -- - - 0.00 25.30 0.00 7.75 0.00 -- - - 0.00 -- -- - 0.00 25.33 0.00 7.75 0.00 - - -- 0.00 - - - 0.00 25.37 0.00 7.75 0.00 - - - 0.00 - -- - 0.00 25.40 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.43 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.47 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.50 0.00 7.75 0.00 -- -- - 0.00 - - -- 0.00 25.53 0.00 7.75 0.00 - - - 0.00 - -- - 0.00 25.57 0.00 7.75 0.00 ---- - - 0.00 -- -- - 0.00 25.60 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.63 0.00 7.75 0.00 -- -- -- 0.00 -- - - - 0.00 25.67 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.70 0.00 7.75 0.00 - - - 0.00 - - - - 0.00 25.73 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.77 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.80 0.00 7.75 0.00 - - - 0.00 - - - 0.00 25.83 0.00 7.75 0.00 - - - 0.00 - -- - 0.00 25.87 0.00 7.75 0.00 - - - - 0.00 -- - - 0.00 25.90 0.00 7.75 0.00 ---- - - 0.00 - - - 0.00 Continues on next page... EGEIVEf' 11113 1113 6Y:------ POST-DEV AFTER POND Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.93 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 25.97 0.00 7.75 0.00 - -- - 0.00 -- - - 0.00 26.00 0.00 7.75 0.00 --- - -- 0.00 --- - - 0.00 26.03 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.07 0.00 7.75 0.00 - - - 0.00 - -- -- 0.00 26.10 0.00 7.75 0.00 - - - 0.00 - -- - - 0.00 26.13 0.00 7.75 0.00 -- - - 0.00 - -- -- 0.00 26.17 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.20 0.00 7.75 0.00 --- -- - 0.00 -- --- -- 0.00 26.23 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.27 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.30 0.00 7.75 0.00 -- - - 0.00 - - - 0.00 26.33 0.00 7.75 0.00 -- -- - 0.00 - - - 0.00 26.37 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.40 0.00 7.75 0.00 - - - 0.00 - - - 0.00 26.43. 0.00 7.75 0.00 - -- -- 0.00 - - -- 0.00 26.47 0.00 7.75 0.00 -- - - 0.00 - - -- 0.00 26.50 0.00 7.75 0.00 - - - 0.00 - - - 0.00 26.53 0.00 7.75 0.00 -- - - 0.00 -- - - 0.00 26.57 0.00 7.75 0.00 -- -- -- 0.00 - -- - - 0.00 26.60 0.00 7.75 0.00 - - - 0.00 - - - 0.00 26.63 0.00 7.75 0.00 - - - 0.00 - - - 0.00 26.67 0.00 7.75 0.00 --- - --- 0.00 --- - - 0.00 26.70 0.00 7.75 0.00 - - - 0.00 - - - 0.00 26.73 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.77 0.00 7.75 0.00 - - -- 0.00 - -- -- 0.00 26.80 0.00 7.75 0.00 -- -- -- 0.00 -- -- - 0.00 26.83 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.87 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.90 0.00 7.75 0.00 -- - - 0.00 - -- -- 0.00 26.93 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 26.97 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 27.00 0.00 7.75 0.00 -- -- - 0.00 - - - - 0.00 27.03 0.00 7.75 0.00 - - -- 0.00 - - - 0.00 27.07 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 27.10 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.13 0.00 7.75 0.00 --- - --- 0.00 -- - - 0.00 27.17 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 27.20 0.00 7.75 0.00 -- - - 0.00 - - -- 0.00 27.23 0.00 7.75 0.00 -- - - 0.00 -- - - 0.00 27.27 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.30 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.33 0.00 7.75 0.00 --- - - 0.00 -- - -- 0.00 27.37 0.00 7.75 0.00 - - - 0.00 - -- - 0.00 27.40 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.43 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.47 0.00 7.75 0.00 - - - 0.00 ---- ---- -- 0.00 27.50 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.53 0.00 7.75 0.00 - - - 0.00 - - - 0.00 Continues on next page... ECEIVE' f OCT 0 3 2013 I BY: POST-DEV AFTER POND Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A MIS Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 27.57 0.00 7.75 0.00 --- - - 0.00 --- -- - 0.00 27.60 0.00 7.75 0.00 - - - 0.00 -- - - 0.00 27.63 0.00 7.75 0.00 --- - - 0.00 - -- - 0.00 27.67 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.70 0.00 7.75 0.00 - - - 0.00 -- - -- 0.00 27.73 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.77 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 27.80 0.00 7.75 0.00 - - -- 0.00 - - -- 0.00 27.83 0.00 7.75 0.00 -- - - 0.00 - - -- 0.00 27.87 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.90 0.00 7.75 0.00 - - - 0.00 - - -- 0.00 27.93 0.00 7.75 0.00 - - - 0.00 - - - 0.00 27.97 0.00 7.75 0.00 - - - 0.00 - - - 0.00 28.00 0.00 7.75 0.00 - - - 0.00 - - - 0.00 28.03 0.00 7.75 0.00 - - - 0.00 - - - 0.00 End WFIVE-b -1 0CT 0 3 2013 BY:---- Hydrograph Report Page , English Hyd. No. 5 POST-DEV 10-YR Hydrograph type = Reservoir Peak discharge = 0.75 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 3 Reservoir name = BLDG313 Max. Elevation = 8.00 ft Max. Storage = 3,775 cuft Stomp lndlc hon method used. Total Volume = 5,433 curt Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.10 2.47 7.81 0.00 - - - 0.08 - - - 0.08 12.13 1.97 7.87 0.02 - - - 0.24 - - - 0.24 12.17 1.55 7.91 0.04 - - - 0.38 - - - 0.38 12.20 1.31 7.94 0.07 - -- - 0.49 - -- -- 0.49 12.23 1.20 7.96 0.10 - -- - 0.57 - - - 0.57 12.27 1.12 7.97 0.11 -- - - 0.64 - - - 0.64 12.30 1.04 7.99 0.12 - - - 0.69 - - -- 0.69 12.33 0.96 7.99 0.13 - - - 0.72 -- - - 0.72 12.37 0.87 8.00 0.13 - - - 0.74 - - - 0.74 12.40 0.79 8.00 << 0.13 0.00 - - 0.75 - - - 0.75 << 12.43 0.70 8.00 0.13 0.00 - - 0.75 - - - 0.75 12.47 0.62 8.00 0.13 - - - 0.74 - - - 0.74 12.50 0.53 7.99 0.13 - - - 0.72 - - - 0.72 12.53 0.45 7.99 0.12 -- -- - 0.70 - - - 0.70 12.57 0.39 7.98 0.11 - - - 0.66 -- - - 0.66 12.60 0.36 7.97 0.11 --- - - 0.63 ---- ---- - 0.63 12.63 0.35 7.96 0.10 - - - 0.60 -- - - 0.60 12.67 0.34 7.96 0.10 - - - 0.57 - -- - 0.57 12.70 0.33 7.95 0.09 - - - 0.54 - - - 0.54 12.73 0.32 7.95 0.08 - - - 0.52 - - - 0.52 12.77 0.31 7.94 0.08 - - - 0.50 - - - 0.50 12.80 0.30 7.93 0.07 - - - 0.48 - - -- 0.48 12.83 0.29 7.93 0.07 -- - - 0.46 - - - 0.46 12.87 0.28 7.92 0.06 - - -- 0.44 - - - 0.44 12.90 0.27 7.92 0.06 - - - 0.42 -- - - 0.42 12.93 0.26 7.92 0.05 - - - - 0.41 -- -- -- 0.41 12.97 0.25 7.91 0.05 -- -- - 0.39 - - - 0.39 13.00 0.25 7.91 0.04 - - - 0.38 -- - - 0.38 13.03 0.24 7.90 0.04 - - - 0.36 - - - 0.36 13.07 0.23 7.90 0.04 - - - 0.35 - - - 0.35 13.10 0.23 7.90 0.03 - - - 0.34 - - - 0.34 13.13 0.22 7.89 0.03 - - - 0.33 - - - 0.33 13.17 0.22 7.89 0.03 - - - 0.32 - - - 0.32 ,13.20 022 7.89 0.03 - - - 0.31 - - - 0.31 13.23 0.22 7.89 0.03 - -- -- 0.30 - - - 0.30 13.27 0.21 7.88 0.03 - - - 0.30 - - -- 0.30 Continues on next page... rO CEIVECT 0 3 200 BY: POST-DEV 10-YR Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Civ C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs Cfs cfs 13.30 0.21 7.88 0.03 - - - 0.29 -- - - 0.29 13.33 0.21 7.88 0.02 - - - 0.28 - - - 0.28 13.37 0.21 7.88 0.02 - - - 0.28 - - - 0.28 13.40 0.20 7.88 0.02 - - - 0.27 --- ---- -- 0.27 13.43 0.20 7.87 0.02 -- - - 0.26 -- -- -- 0.26 13.47 0.20 7.87 0.02 - - - 0.26 - - - 0.26 13.50 0.20 7.87 0.02 - - - 0.25 - - -- 0.25 13.53 0.19 7.87 0.02 - - - 0.25 -- -- - 0.25 13.57 0.19 7.87 0.02 ---- - - -- 0.24 -- - - - 0.24 13.60 0.19 7.87 0.02 - - -- 0.24 - - - 0.24 13.63 0.19 7.86 0.02 - - - 0.23 - - - 0.23 13.67 0.19 7.86 0.02 - - - 0.23 - - - 0.23 13.70 0.18 7.86 0.02 --- - - - 0.23 - -- - 0.23 13.73 0.18 7.86 0.02 ---- -- - 0.22 -- - -- 0.22 13.77 0.18 7.86 0.01 - - - 0.22 - - -- 0.22 13.80 0.18 7.86 0.01 - - - 0.21 - - - 0.21 13.83 0.17 7.86 0.01 - - - 0.21 - - - 0.21 13.87 0.17 7.86 0.01 - - - 0.21 - - - 0.21 13.90 0.17 7.85 0.01 -- - - 0.20 - -- - 0.20 13.93 0.17 7.85 0.01 -- - - 0.20 - - - 020 13.97 0.16 7.85 0.01 - - - 0.20 - - - 0.20 14.00 0.16 7.85 0.01 - - - 0.19 - - - 0.19 14.03 0.16 7.85 0.01 - -- - 0.19 - - - -- 0.19 14.07 0.16 7.85 0.01 --- - - 0.19 -- - - 0.19 14.10 0.15 7.85 0.01 - - - 0.19 - - - 0.19 14.13 0.15 7.85 0.01 - - - 0.18 - - - 0.18 14.17 0.15 7.85 0.01 - - - 0.18 - - - 0.18 14.20 0.15 7.85 0.01 - - - 0.18 -- - - 0.18 14.23 0.15 7.85 0.01 - -- -- 0.18 - - - 0.18 14.27 0.15 7.84 0.01 - - - 0.18 - - - 0.18 14.30 0.15 7.84 0.01 - - - 0.17 - - - 0.17 14.33 0.15 7.84 0.01 - - - 0.17 - - - 0.17 14.37 0.15 7.84 0.01 -- - - 0.17 - - --- 0.17 14.40 0.14 7.84 0.01 - -- - 0.17 - -- - 0.17 14.43 0.14. 7.84 0.01 -- - - 0.17 - -- --- 0.17 14.47 0.14 7.84 0.01 - - - 0.17 - - - 0.17 14.50 0.14 7.84 0.01 - - - 0.16 - - - 0.16 14.53 0.14 7.84 0.01 - - - - 0.16 - - - 0.16 14.57 0.14 7.84 0.01 -- - - 0.16 - -- - 0.16 14.60 0.14 7.84 0.01 - - - 0.16 - - - 0.16 14.63 0.14 7.84 0.01 - - - 0.16 - - - 0.16 14.67 0.14 7.84 0.01 - - - 0.16 - - - 0.16 14.70 0.13 7.84 0.01 -- - - 0.15 - - - 0.15 , 14.73 0.13 7.84 0.01 --- -- - 0.15 - -- - - 0.15 14.77 0.13 7.83 0.01 -- - - 0.15 - - - 0.15 14.80 0.13 7.83 0.01 - - - 0.15 - - - 0.15 14.83 0.13 7.83 0.01 - - - 0.15 - - - 0.15 14.87 0.13 7.83 0.01 - - - 0.15 - - - 0.15 14.90 0.13 7.83 0.01 -- - - 0.15 --- -- - 0.15 Continues on next page... OCT 0 3 2M E. BY:---- POST-DEV 10-YR Page 3 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) efs ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 14.93 0.13 7.83 0.01 - - - 0.14 - - -- 0.14 14.97 0.12 7.83 0.01 - - - 0.14 - - - 0.14 15.00 0.12 7.83 0.01 --- -- - 0.14 -- -- - 0.14 15.03 0.12 7.83 0.01 -- - - 0.14 - - - 0.14 15.07 0.12 7.83 0.01 - - - 0.14 - - - 0.14 15.10 0.12 7.83 0.01 - - - 0.14 - - - 0.14 15.13 0.12 7.83 0.01 - -- --- 0.14 --- - - 0.14 15.17 0.12 7.83 0.01 - - -- 0.14 -- - -- 0.14 15.20 0.12 7.83 0.01 - - - 0.13 - - - 0.13 15.23 0.11 7.83 0.01 - - - 0.13 - - - 0.13 15.27 0.11 7.83 0.01 -- -- -- 0.13 - -- -- 0.13 15.30 0.11 7.83 0.01 --- -- -- 0.13 -- - -- 0.13 15.33 0.11 7.83 0.00 - - - 0.13 ---- -- - 0.13 15.37 0.11 7.82 0.00 - - - 0.13 - - - 0.13 15.40 0.11 7.82 0.00 - - - 0.13 - - - 0.13 15.43 0.11 7.82 0.00 - - - 0.13 --- - -- 0.13 15.47 0.11 7.82 0.00 -- - -- 0.12 -- -- - - 0.12 15.50 0.11 7.82 0.00 -- - - 0.12 - - - 0.12 15.53 0.10 7.82 0.00 - - - 0.12 - - - 0.12 15.57 0.10 7.82 0.00 -- - - 0.12 - - - 0.12 15.60 0.10 7.82 0.00 -- - - 0.12 -- - - 0.12 15.63 0.10 7.82 0.00 - - -- 0.12 - - -- 0.12 15.67 0.10 7.82 0.00 - - - 0.12 - - - 0.12 15.70 0.10 7.82 0.00 - - - 0.12 - - - 0.12 15.73 0.10 7.82 0.00 - - - 0.11 --- - - 0.11 15.77 0.10 7.82 0.00 -- - - 0.11 --- - - 0.11 15.80 0.09 7.82 0.00 - - - 0.11 - - - 0.11 15.83 0.09 7.82 0.00 - - - 0.11 - - - 0.11 15.87 0.09 7.82 0.00 -- - - 0.11 - - - 0.11 15.90 0.09 7.82 0.00 -- - - 0.11 -- - -- 0.11 15.93 0.09 7.82 0.00 - - -- 0.11 -- -- - 0.11 15.97 0.09 7.82 0.00 - - - 0.11 - - - 0.11 16.00 0.09 7.82 0.00 - - - 0.10 - - - 0.10 16.03 0.09 7.81 0.00 - - - 0.10 - -- - 0.10 16.07 0.08 7.81 0.00 - - -- 0.10 --- --- --- 0.10 16.10 0.08 7.81 0.00 - - - 0.10 - - - 0.10 16.13 0.08 7.81 0.00 - - - 0.10 - - - 0.10 16.17 0.08 7.81 0.00 - - - 0.10 - - - 0.10 16.20 0.08 7.81 0.00 - -- - 0.10 -- - - 0.10 16.23 0.08 7.81 0.00 -- -- - 0.10 - -- -- 0.10 16.27 0.08 7.81 0.00 - - 0.10 - -- -- 0.10 16.30 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.33 0.08 7.81 0.00 - -- - 0.09 - - -- 0.09 16.37 0.08 7.81 0.00 - - - 0.09 --- - - 0.09 16.40 0.08 7.81 0.00 - -- - 0.09 - - -- 0.09 16.43 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.47 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.50 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.53 0.08 7.81 0.00 --- - -- 0.09 -- -- -- 0.09 Continues on next page... EGEIVE- OCT 0 3 2013 nv. POST-DEV 10-YR . Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.57 0.08 7.81 0.00 - - - 0.09 - - -- 0.09 16.60 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.63 0.08 7.81 0.00 - - - 0.09 - - - 0.09 16.67 0.08 7.81 0.00 - - - 0.09 - - -- 0.09 16.70 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.73 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.77 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.80 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.83 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.87 0.07 7.81 0.00 - - - 0.08 - - -- 0.08 16.90 0.07 7.81 0.00 - - - 0.08 - - - - 0.08 16.93 0.07 7.81 0.00 - - - 0.08 - - - 0.08 16.97 0.07 7.80 0.00 - - - - 0.08 -- -- - 0.08 17.00 0.07 7.80 0.00 - - -- 0.08 - - - 0.08 17.03 0.07 7.80 0.00 - - - 0.08 -- - - 0.08 17.07 0.07 7.80 0.00 - - - 0.08 - - - 0.08 17.10 0.07 7.80 0.00 --- - - 0.08 --- ---- - 0.08 17.13 0.07 7.80 0.00 -- - - 0.08 - - - 0.08 17.17 0.07 7.80 0.00 --- - - 0.08 -- -- -- 0.08 17.20 0.07 7.80 0.00 - - - 0.07 --- ---- - 0.07 17.23 0.07 7.80 0.00 -- - -- 0.07 - -- - - 0.07 17.27 0.07 7.80 0.00 - - - 0.07 -- - - 0.07 17.30 0.06 7.80 0.00 -- - - - 0.07 --- -- - 0.07 17.33 0.06 7.80 0.00 -- -- - 0.07 --- - - 0.07 17.37 0.06 7.80 0.00 - -- - 0.07 --- -- - 0.07 17.40 0.06 7.80 0.00 - - - 0.07 -- - -- 0.07 17.43 0.06 7.80 0.00 - - - 0.07 -- -- -- 0.07 17.47 0.06 7.80 0.00 - - - 0.07 -- - - 0.07 17.50 0.06 7.80 0.00 - - - 0.07 -- - -- 0.07 17.53 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.57 0.06 7.80 0.00 - - - 0.07 - - - - 0.07 17.60 0.06 7.80 0.00 - - - 0.07 - - - - 0.07 17.63 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.67 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.70 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.73 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.77 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.80 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.83 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.87 0.06 7.80 0.00 - - - 0.07 - - - 0.07 17.90 0.06 7.80 0.00 - - - 0.06 - - - 0.06 17.93 0.05 7.80 0.00 - - - 0.06 - - - 0.06 17.97 0.05 7.80 0.00 -- - - 0.06 - - - 0.06 18.00 0.05 7.80 0.00 - - - 0.06 - - - 0.06 18.03 0.05 7.80 0.00 - - - 0.06 - - - 0.06 18.07 0.05 7.80 0.00 - - - 0.06 - - - 0.06 18.10 0.05 7.80 0.00 --- - - 0.06 - - - 0.06 18.13 0.05 7.80 0.00 - - - 0.06 - - -- 0.06 18.17 0.05 7.80 0.00 - -- - 0.06 - - - 0.06 Continues on next page... E(CE4 !ir E)'k OCT 0 3 2013 BY:__ POST-DEV 10-YR Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv, A Clv B Clv, C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.20 0.05 7.80 0.00 - -- - 0.06 -- -- - 0.06 18.23 0.05 7.80 0.00 - - - 0.06 - - - 0.06 18.27 0.05 7.80 0.00 - - - 0.06 - - - 0.06 18.30 0.05 7.79 0.00 - - - 0.06 - - -- 0.06 18.33 0.05 7.79 0.00 - - -- 0.06 - - - 0.06 18.37 0.05 7.79 0.00 - -- - 0.06 - -- - - 0.06 18.40 0.05 7.79 0.00 -- ---- -- 0.06 - - - 0.06 18.43 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.47 0.05 7.79 0.00 - - - 0.06 - - -- 0.06 18.50 0.05 7.79 0.00 - - -- 0.06 - - - 0.06 18.53 0.05 7.79 0,00 -- - - - 0.06 - - --- 0.06 18.57 0.05 7.79 0.00 -- -- - 0.06 --- - - 0.06 18.60 0.05 7.79 0.00 -- - - 0.06 -- - - 0.06 18.63 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.67 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.70 0.05 7.79 0.00 - - - -0.06 -- - -- 0.06 18.73 0.05 7.79 0.00 --- -- - 0.06 -- - - 0.06 18.77 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.80 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.83 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.87 0.05 7.79 0.00 - - - 0.06 - - - 0.06 18.90 0.05 7.79 0.00 -- - - 0.06 --- --- -- 0.06 18.93 0.05 7.79 0.00 --- - - " 0.05 - - - 0.05 18.97 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.00 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.03 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.07 0.05 7.79 0.00 --- --- - 0.05 -- - - 0.05 19.10 0.05 7.79 0.00 -- -- - 0.05 - - - 0.05 19.13 0.05 7.79 0.00 -- -- --- 0.05 -- -- - 0.05 19.17 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.20 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.23 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.27 0.05 7.79 0.00 - -- - 0.05 - -- - 0.05 19.30 0.05 7.79 0.00 -- - -- 0.05 - - -- 0.05 19.33 0.05 7.79 0.00 - - -- 0.05 -- - -- 0.05 19.37 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.40 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.43 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.47 0.05 7.79 0.00 -- - -- 0.05 - ----- - 0.05 19.50 0.05 7.79 0.00 - -- --- 0.05 - - -- 0.05 19.53 0.05 7.79 0.00 - - -- 0.05 - - -- 0.05 19.57 0.05 7.79 0.00 - - - 0.05 - - - 0.05 19.60 0.05 7.79 0.00 - - - 0.05 - - -- 0.05 19.63 0.05 7.79 0.00 -- - - 0.05 - -- -- 0.05 19.67 0.04 7.79 0.00 -- - - 0.05 - - - 0.05 19.70 0.04 7.79 0.00 - --- -- 0.05 - -- - 0.05 19.73 0.04 7.79 0.00 - - - 0.05 - - - 0.05 19.77 0.04 7.79 0.00 - - - 0.05 - - - 0.05 19.80 0.04 7.79 0.00 - - - 0.05 - - - 0.05 Continues on next page... E(CEIVER OCT 032013 BY:-� POST-DEV I0.YR Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.83 0.04 7.79 0.00 - -- --- 0.05 - --- ---- 0.05 19.87 0.04 7.79 0.00 - - - 0.05 - - - 0.05 19.90 0.04 7.79 0.00 - - - 0.05 - - - 0.05 19.93 0.04 7.79 0.00 - - - 0.05 - - -- 0.05 19.97 0.04 7.79 0.00 - - - 0.05 - - -- 0.05 20.00 0.04 7.79 0.00 - - - 0.05 - - - 0.05 20.03 0.04 7.79 0.00 - - -- 0.05 - --- --- 0.05 20.07 0.04 7.79 0.00 -- - -- 0.05 ---- --- - 0.05 20.10 0.04 7.79 0.00 - ---- --- 0.05 -- - - 0.05 20.13 0.04 7.79 0.00 - - - 0.05 -- -- -- 0.05 20.17 0.04 7.79 0.00 - -- - 0.05 - -- -- 0.05 20.20 0.04 7.79 0.00 - - - 0.05 - - -- 0.05 20.23 0.04 7.78 0.00 - - - 0.05 - - -- 0.05 20.27 0.04 7.78 0.00 - - - 0.05 - - - 0.05 20.30 0.04 7.78 0.00 - - - 0.05 - - -- 0.05 20.33 0.04 7.78 0.00 - - - 0.05 -- - -- 0.05 20.37 0.04 7.78 0.00 --- - - 0.05 -- - - 0.05 20.40 0.04 7.78 0.00 --- -- - 0.05 - -- - - 0.05 20.43 0.04 7.78 0.00 -- - -- 0.05 - - - 0.05 20.47 0.04 7.78 0.00 - - - 0.05 - - - 0.05 20.50 0.04 7.78 0.00 - - - 0.05 -- - - 0.05 20.53 0.04 7.78 0.00 - - - 0.05 - - - 0.05 20.57 0.04 7.78 0.00 - - - 0.05 - - - 0.05 20.60 0.04 7.78 0.00 - - - 0.04 - - - 0.04 20.63 0.04 7.78 0.00 - - - 0.04 - - - 0.04 20.67 0.04 7.78 0.00 - - - 0.04 - -- - 0.04 20.70 0.04 7.78 0.00 - - - 0.04 - -- -- 0.04 20.73 0.04 7.78 0.00 --- - - 0.04 -- - - 0.04 20.77 0.04 7.78 0.00 ---- -- - 0.04 -- -- - 0.04 20.80 0.04 7.78 0.00 - -- - 0.04 - -- -- 0.04 20.83 0.04 7.78 0.00 - - - 0.04 -- - -- 0.04 20.87 0.04 7.78 0.00 - - - 0.04 - - - 0.04 20.90 0.04 7.78 0.00 - - - 0.04 - - - 0.04 20.93 0.04 7.78 0.00 - - - 0.04 - - - 0.04 20.97 0.04 7.78 0.00 - - - 0.04 - - - 0.04 21.00 0.04 7.78 0.00 - - -- 0.04 - - - 0.04 21.03 0.04 7.78 0.00 -- -- -- 0.04 -- -- -- 0.04 21.07 0.04 7.78 0.00 -- -- - 0.04 - -- - 0.04 21.10 0.04 7.78 0.00 - -- -- 0.04 - - - - 0.04 21.13 0.04 7.78 0.00 -- - - 0.04 -- -- - 0.04 21.17 0.04 7.78 0.00 - - - 0.04 --- - - 0.04 21.20 0.04 7.78 0.00 - - - 0.04 - - - 0.04 21.23 0.04 7.78 0.00 - - - 0.04 - - - 0.04 21.27 0.04 7.78 0.00 - - - 0.04 - - - 0.04 21.30 0.04 7.78 0.00 - - - 0.04 - - - 0.04 21.33 0.04 7.78 0.00 - - - 0.04 - - -- 0.04 21.37 0.04 7.78 0.00 - -- - 0.04 -- - -- 0.04 21.40 0.04 7.78 0.00 - -- -- 0.04 - - - - 0.04 21.43 0.04 7.78 0.00 -- - - 0.04 - -- - - 0.04 Continues on next page... E(CEI i OCT 032013 JV. --- POST-DEV 14YR Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.47 0.04 7.78 0.00 - - - 0.04 - - -- 0.04 21.50 0.04 7.78 0.00 -- - -- 0.04 - - - 0.04 21.53 0.04 7.78 0.00 -- - - 0.04 - - - 0.04 21.57 0.04 7.78 0.00 -- - -- 0.04 -- --- - 0.04 21.60 0.04 7.78 0.00 - - - 0.04 --- - - 0.04 21.63 0.04 7.78 0.00 - - - 0.04 - - --- 0.04 21.67 0.04 7.78 0.00 - - - 0.04 - -- -- 0.04 21.70 0.04 7.78 0.00 - - --- 0.04 - - - 0.04 21.73 0.03 7.78 0.00 -- -- -- 0.04 -- - - 0.04 21.77 0.03 7.78 0.00 - - - 0.04 -- -- -- 0.04 21.80 0.03 7.78 0.00 - - - 0.04 --- -- -- 0.04 21.83 0.03 7.78 0.00 - - - 0.04 - - -- 0.04 21.87 0.03 7.78 0.00 - -- -- 0.04 - - -- 0.04 21.90 0.03 7.78 0.00 -- --- - 0.04 -- - - 0.04 21.93 0.03 7.78 0.00 - -- -- 0.04 - -- - 0.04 - 21.97 0.03 7.78 0.00 - - - 0.04 - - - 0.04 22.00 0.03 7.78 0.00 - - - 0.04 - -- -- 0.04 22.03 0.05 7.78 0.00 - - - 0.04 - - - 0.04 22.07 0.06 7.78 0.00 --- - - 0.04 - - -- 0.04 22.10 0.06 7.78 0.00 - - - 0.04 - - -- 0.04 22.13 0.05 7.78 0.00 - - - - 0.04 - - -- 0.04 22.17 0.04 7.78 0.00 - - - 0.04 - - - 0.04 22.20 0.04 7.78 0.00 - - - 0.04 -- -- - 0.04 22.23 0.04 7.78 0.00 - - - 0.04 - - - 0.04 22.27 0.03 7.78 0.00 - --- -- 0.04 - - - 0.04 22.30 0.03 7.78 0.00 - -- -- 0.04 -- - - 0.04 22.33 0.03 7.78 0.00 - - -- 0.04 -- - - - 0.04 22.37 0.03 7.78 0.00 - - - 0.04 - --- - - 0.04 22.40 0.03 7.78 0.00 - - - 0.04 - - - 0.04 22.43 0.03 7.78 0.00 - - - 0.04 - - - 0.04 22.47 0.03 7.78 0.00 - -- -- 0.04 - - - 0.04 22.50 0.03 7.78 0.00 - - -- 0.04 - -- - 0.04 22.53 0.03 7.78 0.00 - - - 0.04 -- - - 0.04 22.57 0.03 7.78 0.00 - - - 0.04 -- -- -- 0.04 22.60 0.03 7.78 0.00 -- -- - 0.04 - -- -- _ 0.04 - 22.63 0.03 7.78 0.00 - -- - 0.04 - - - 0.04 22.67 0.03 7.78 0.00 -- - -- 0.04 - - - 0.04 22.70 0.03 7.78 0.00 -- - - 0.04 - -- - 0.04 22.73 0.03 7.78 0.00 - - -- 0.04 -- --- -- 0.04 22.77 0.03 7.78 0.00 - - - 0.04 - - - 0.04 22.80 0.03 7.78 0.00 - - - 0.04 - - -- 0.04 22.83 0.03 7.78 0.00 -- - - 0.04 - - - 0.04 22.87 0.03 7.78 0.00 - - - - 0.04 --- - - 0.04 22.90 0.03 7.78 0.00 - - - 0.04 - - - 0.04 22.93 0.03 7.78 0.00 - - - 0.04 -- -- - 0.04 22.97 0.03 7.78 0.00 - - - 0.04 - - --- 0.04 23.00 0.03 7.78 0.00 - - - 0.04 - -- -- 0.04 23.03 0.03 7.78 0.00 -- - - 0.04 - - - 0.04 23.07 0.03 7.78 0.00 - - - 0.04 - - - 0.04 Continues on next page... 11ECEI E OCT 0 3 2013 Bv: POST-DEVI4YR Page 8 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 23:10 0.03 7.78 0.00 --- ---- --- 0.04 --- --- -- 0.04 23.13 0.03 7.78 0.00 - - - 0.04 - - - 0.04 23.17 0.03 7.78 0.00 - -- -- 0.04 --- -- -- 0.04 23.20 0.03 7.78 0.00 -- --- -- 0.04 - - - 0.04 23.23 0.03 7.78 0.00 - - -- 0.04 - - - 0.04 23.27 0.03 7.78 0.00 - - - 0.03 - - - 0.03 23.30 0.03 7.78 0.00 --- --- - 0.03 - -- -- 0.03 23.33 0.03 7.78 0.00 - - - 0.03 - - - 0.03 23.37 0.03 7.78 0.00 - - - 0.03 - -- - 0.03 23.40 0.03 7.78 0.00 - - -- 0.03 -- - --- 0.03 23.43 0.03 7.78 0.00 -- - - 0.03 - - -- 0.03 23.47. 0.03 7.78 0.00 - - - 0.03 - - -- 0.03 23.50 0.03 7.78 0.00 --- -- ---- 0.03 - --- --- 0.03 23.53 0.03 7.78 0.00 - - - 0.03 - - -- 0.03 23.57 0.03 7.78 0.00 - - - 0.03 - -- . -- 0.03 23.60 0.03 7.77 0.00 -- - - -- 0.03 -- -- - 0.03 23.63 0.03 7.77 0.00 - -- - 0.03 - - - 0.03 23.67 0.03 7.77 0.00 - - - 0.03 - - - 0.03 23.70 0.03 7.77 0.00 -- - -- 0.03 --- --- --- 0.03 23.73 0.03 7.77 0.00 - - - 0.03 - - - 0.03 23.77 0.03 7.77 0.00 - - - 0.03 - - - 0.03 23.80 0.03 7.77 0.00 - -- -- 0.03 --- -- -- 0.03 23.83 0.03 7.77 0.00 - -- -- 0.03 - - - - 0.03 23.87 0.03 7.77 0.00 - - - 0.03 - - -- 0.03 23.90 0.03 7.77 0.00 - --- -- 0.03 -- -- --- 0.03 23.93 0.03 7.77 0.00 - - - 0.03 - - - 0.03 23.97 0.03 7.77 0.00 - - - 0.03 - - - 0.03 24.00 0.03 7.77 0.00 - - -- 0.03 -- -- - 0.03 24.03 0.02 7.77 0.00 -- - - 0.03 - - -- 0.03 24.07 0.01 7.77 0.00 - - - 0.03 - - - 0.03 24.10 0.00 7.77 0.00 - -- --- 0.03 -- --- --- 0.03 24.13 0.00 7.77 0.00 - -- -- 0.03 - - - 0.03 24.17 0.00 7.77 0.00 - - - 0.03 - - - 0.03 24.20 0.00 7.77 0.00 - - - 0.03 - --- -- 0.03 24.23 0.00 7.77 0.00 - -- - 0.03 - - - 0.03 24.27 0.00 7.77 0.00 - - - 0.03 - - - 0.03 24.30 0.00 7.77 0.00 --- -- -- 0.02 -- - --- 0.02 24.33 0.00 7.77 0.00 - -- - 0.02 - - - 0.02 24.37 0.00 7.77 0.00 - - - 0.02 -- - - 0.02 24.40 0.00 7.77 0.00 - -- - 0.02 - - -- 0.02 24.43 0.00 7.77 0.00 - -- - 0.02 - - -- 0.02 24.47 0.00 7.76 0.00 - - - 0.02 - - - 0.02 24.50 0.00 7.76 0.00 - - - 0.02 -- --- ----- 0.02 24.53 0.00 7.76 0.00 -- - -- 0.02 - - - 0.02 24.57 0.00 7.76 0.00 - - - 0.02 - - - 0.02 24.60 0.00 7.76 0.00 - -- -- 0.02 - - - 0.02 24.63 0.00 7.76 0.00 - - -- 0.02 - - - 0.02 24.67 0.00 7.76 0.00 - = - 0.02 - - - 0.02 24.70 0.00 7.76 0.00 - - - 0.02 -- -- 0.02 Continues on next page... ECER YY E OCT 0 3 2013 BY: POST-DEV 10-YR Page 9 Hydrograph Discharge Table Time Inflow Elevation Clv, A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft CfS CfS cfs CfS CfS cfs CfS CfS CfS 24.73 0.00 7.76 0.00 - - - 0.01 - -- -- 0.01 24.77 0.00 7.76 0.00 - - - 0.01 - - - 0.01 24.80 0.00 7.76 0.00 - - - 0.01 - - - 0.01 24.83 0.00 7.76 0.00 - - -- 0.01 - -- - 0.01 24.87 0.00 7.76 0.00 -- --- - 0.01 --- - --- 0.01 24.90 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 24.93 0.00 7.76 0.00 -- --- - 0.01 - - - 0.01 24.97 0.00 7.76 0.00 - - - 0.01 - -- 0.01 25.00 0.00 7.76 0.00 - - - 0.01 - - - 0.01 25.03 0.00 7.76 0:00 - - - 0.01 - - -- 0.01 25.07 0.00 7.76 0.00 - - - 0.01 -- -- - 0.01 25.10 0.00 7.76 0.00 - - - 0.01 - -- -- 0.01 25.13 0.00 7.76 0.00 - --- --- 0.01 ----- -- 0.01 25.17 0.00 7.76 0.00 - - - 0.01 - -- - 0.01 25.20 0.00 7.76 0.00 - -- - 0.01 -- - -- 0.01 25.23 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 25.27 0.00 7.76 0.00 - - - 0.01 - - -- 0.01 25.30 0.00 7.76 0.00 - - - 0.01 - - - 0.01 ... End ECER F' E OCT 0 3 2013 bi, 9 BY. NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Director September 30, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 25842 Subject: Request for Additional Information Stormwater Project No. SW8 130907 Parking Lot Addition, Building 313 Onslow County Dear Mr. Paul: Pat McCrory, Governor John E. Skvarla, III, Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for the Parking Lot Addition, Building 313 on September 11, 2013 with additional information submitted on September 24, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue theestormwater review: 1. Please confirm the surface area and volume associated with the temporary pool elevation. The temporary pool elevation, considered to be the elevation of the next available outlet, appears to be set at 8.0 ft. The supplement indicates that the temporary pool surface area and volume is 4,049 ft2 and 2,028 ft3, respectively. However, the calculations indicate that the surface area and volume provided at an elevation of 8.0 ft is 4,393 ft2 and 3,771 ft3, respectively. 2. Please confirm the drawdown calculations presented on page 7 of the calculations. It appears that the temporary storage elevation (8.0 ft) was not used in the drawdown calculations; instead the minimum required storage elevation appears to have been / used. Please confirm the volume provided in the forebay. On page 4 of the calculations, it appears that a depth of 1 ft was used when determining the volume of the forebay between elevations 3.5 ft and 4.0 ft. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 8, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 Neal Paul September 30, 2013 Stormwater Application No. SW8 130907 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, �l 11e" Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2013\130907 HD\2103 09 addinfo_2 130907 cc: Joe Avolis, Avolis Engineering Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Monday, September 30, 2013 3:46 PM To: 'Avolis Engineering, P.A.'; 'thomas.bradshaw@usmc.mil' Cc: Russell, Janet Subject: RE: request for additional info - 313 parking addition Attachments: 2013 09 addinfo_2 130907.pdf Joe, There are few items that required a second request for additional information for this project (attached). Please try to submit the corrected items by October 4`h. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Nelson, Christine Sent: Friday, September 20, 2013 12:31 PM To: 'Avolis Engineering, P.A.'; thomas.bradshaw(c)usmc.mil Cc: Russell, Janet Subject: request for additional info - 313 parking addition Joe, Here's the request for additional information for the parking lot addition to Building 313. There are a few mismatched numbers that need to be worked out. Please try to submit the corrected items by September 27, 2013. Thanks! Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-2512 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. AVOLIS ENGINEERING. P.A. P.O. Box 15564 New Bern, North Carolina 28561 - Office: 252.633.0068 September 24, 2013 Ms. Christine Nelson Environmental Engineer State Stormwater program NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Additional Information, Stormwater Project No. S W8 130907, Parking Lot Addition, Building 313 Dear Christine: Enclosed please find revised documents in response to your add info request of September 20, 2013. 1. Corrected the total BUA in the second table to read 16,502. 2. Corrected page I and 4 of the supplement. Top of sediment elevations are o.5' for the main pond and 2.5' for the forebay. , 3. Changed the temporary pool volume to be that associated with the 1.5 inch storm vs. the 2 inch storm. I have attached revised supplement pages. 4. Changed page 8 of the calculation sheet to use 8.0' vs. 7.99' in calculating the orifice driving head. The pond draws down within 2-5 days for both the 1.5 and 2.0 inch storms. 5. The adjacent ditch is not a surface water feature. We appreciate your assistance with this project. Should you have any questions, please do not hesitate to give me a call. Si erel AvolisPE P e dent E"3EIVEG I SEP 2 4 2013 BY:------- Email: avolisengineering@embargmaii.com Fax: 252.633.6507 Neal Paul September 20, 2013 Stormwater Application No. SW8 130907 September 20, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 25842 Subject: Request for Additional Information Stormwater Project No. SW8 130907 Parking Lot Addition, Building 313 Onslow County Dear Mr. Paul: The Wilmington Regional Office received an Express Stormwater Management Permit Application for the Parking Lot Addition, Building 313 on September 11, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 2. Correc.�S-c� -H� SuP9�erMe.��-- FAg� 4. ov,- G. Please confirm that the information presented in Section IV.10 of the application is correct. It appears that the total impervious area presented in the second table is the same as the drainage area. ft9UC7ED� Ne LJ AFPWCA'noa PA6,E ArtW-N,E D Please confirm the elevations of the pond as well as the average depth presented in the supplement, operation and maintenance agreement, and calculations. The supC�RREcr indicates that the bottom of the main pond (top of the sediment cleanout) will b 1.5 ft however the O&M appears to indicate it will be 0.5 ft. The average depth calcu indicates that the depth, which is the distance between the bottom of the vegetated shelf �(eS and the bottom of the main pond, is 5 L ✓ Please confirm the volume to be stored in the temporary pool. The volume presented in the supplement, 2,703 ft3, appears to be the volume of the 2 inch design storm used to satisfy federal requirements. Gofro3aA C 4. Please confirm the drawdown calculations. It appears that the temporary storage elevation (8.0 ft) was not used in the drawdown calculations; instead the minimum required storage elevation appears to have been used. N' @ t^%5. The plans identify the top of bank of an existing ditch feature to the west of the site. NOT A, foot wi blease clarify if this is a surface water feature. If surface waters, please provide the 50 foot buffer from the top of the bank. Also, please note that wet detention ponds are not Snzm permitted to be located within the 50 foot buffer per Section 2.(b)(3)b.5 of Session Law L *4 2008-211. 3. Elc7 6. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. 7. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. ECEIVEft Page 1 of 2 SEP 2 4 2013 91 6Y: PF - Neal Paul September 20, 2013 Stormwater Application No. SW8 130907 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to September 27, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: S:\WQS\Storm Water\Permits & Projects\2013\130907 HD\2103 09 addinfo 130907 cc: Joe Avolis, Avolis Engineering Wilmington Regional Office Page 2of2 mECEIVE 5EP 2 4 2013 NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Director September 20, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 25842 Subject: Request for Additional Information Stormwater Project No. SW8 130907 Parking Lot Addition, Building 313 Onslow County Dear Mr. Paul: Pat McCrory, Governor John E. Skvarla, III, Secretary '11c, P--Y-AGA The)WilmingtonRegional Office received an Express Stormwater Management Permit Application for the Parking Lot Addition, Building 313 on September 11, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please confirm that the information presented in Section IV.10 of the application is correct. It appears that the total impervious area presented in the second table is the same as the drainage area. V 2. Please confirm the elevations of the pond as well as the average depth presented in the supplement, operation and maintenance agreement, and calculations. The supplement indicates that the bottom of the main pond (top of the sediment cleanout) will be 1.5 ft however the O&M appears to indicate it will be 0.5 ft. The average depth calculation indicates that the depth, which is the distance between the bottom of the vegetated shelf and the bottom of the main pond, is 5 ft. 3. Please confirm the volume to be stored in the temporary pool. The volume presented in the supplement, 2,703 ft', appears to be the volume of the 2 inch design storm used to satisfy federal requirements. 4. Please confirm the drawdown calculations. It appears that the temporary storage elevation (8.0 ft) was not used in the drawdown calculations; instead the minimum required storage elevation appears to have been used. 5. The plans identify the top of bank of an existing ditch feature to the west of the site. Please clarify if this is a surface water feature. If surface waters, please provide the 50 foot buffer from the top of the bank. Also, please note that wet detention ponds are not permitted to be located within the 50 foot buffer per Section 2.(b)(3)b.5 of Session Law 2008-211. 6. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 Neal Paul September 20, 2013 Stormwater Application No. SW8 130907 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to September 27, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.neison@ncdenr.gov. Sincerely, CLJ .l �I Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2013\130907 HD\2103 09 addinfo 130907 cc: Joe Avolis, Avolis Engineering Wilmington Regional Office Page 2 of 2 ` Nelson, Christine From: Nelson, Christine Sent: Friday, September 20, 2013 12:31 PM To: 'Avolis Engineering, P.A.'; thomas.bradshaw@usmc.mil Cc: Russell, Janet Subject: request for additional info - 313 parking addition Attachments: 2013 09 addinfo 130907.pdf Joe,• Here's the request for additional information for the parking lot addition to Building 313. There are a few mismatched numbers that need to be worked out. Please try to submit the corrected items by September 27, 2013. Thanks! Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-2512 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute orother regulation. Stormwater Management Narrative Construct Parking Lots, Hadnot Point and French Creek MCB Camp Lejeune, NC Building 313 This project proposes to construct a new asphalt paved parking area in an existing grassed area. The parking area will be an extension of an existing parking lot. The site is located in an older area of the base with no surrounding stormwater boundaries. The runoff from the existing impervious areas, with the exception of 642 SF of street/sidewalk area, around the site will be diverted around the drainage basin for the new parking area. The project will convert 15,860 SF (0.364 Ac.) of grassed area into asphalt parking area. The drainage boundary established for this project is 25,107 SF in size. The BUA consists of 15,860 SF of new parking area and 642 SF of existing BUA. The project built -upon area percentage is 65.73. Stormwater treatment will be by a wet pond sized for 90% TSS. The SA/DA ratio is 7.63%. The pond average depth is 3.0 feet and it is sized to contain and drawdown the runoff volumes associated with both the 1.5 and 2.0 inch storms. The minimum required pond surface area is 1,916 SF compared to the 2,732 SF provided. The work area does not impact any wetlands. The pond and parking area are located in a managed lawn area that is not regulated by the US Army Corps of Engineers. The site drains to the New River which is classified as SC;NSW (Index #19-(15.5)). All work is located greater than fifty feet from surface waters. 1.5 acres of the site will be disturbed by this project in order to construct the parking area. The sedimentation and erosion control plan is being concurrently submitted. The soils on the site are classified as Baymeade by the Onslow County Soil Survey. Baymeade is described as a loamy sand at the depths to be disturbed by this project. The property is owned by the Federal Government. There are not any known historic sites on the property. yy � I Al�Mc�^j Y. �,r 1� r SEP 11 2013 w ✓ f heaA 13 'M)nvei 03 ieuyie, *Tank 4- 'BA :4 A eSW Tani -'Sphng KiR w All .1 n'N. 3-D TopoQuads COpyright 0 1999 DeTAM yamuth, M 04006 Bounce Data: ISGS 14%fe'-sa;ed 25',400(yD!talli 13-0 Data: IGS14 A SE? 11 2013 FC - 313 � b ,��a Yr � JIi gar C� n�i4 rs> � rF .,.,F°N QUA NCDENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all the information below and CHECK the Permit(s) you are requesting for express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity r of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(rDncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(alncn il.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.arogan(a)ncmail.net • Washington Region -Lyn Hardison 252.946.9215 or lyn.hardison(Dncmail.net Wilmington Region -Janet Russell 910-350.2004 or ianet.russell(ciircmail.net NOTE. Project application received after 12 noon will be stamped in the following work day For D'eNR UR ONLY �t 1 Review 'f&) "�"i Submit 5_ 3n Tim; � -� Confirm: review. FAX or Email the completed form to Permits of request SW SW SW SW SW Project Name: FY13 CONSTRUCT PARKING LOTS HADNOT PT & FRENCH CRK (313) County: ONSLOW Applicant: COMMANDING OFFICER Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28547•_ Phone: 910-451-2213, Fax: 910-451-2927, Email: NEAL.PAUL@USMC.MIL Physical Location:'H' STREET Project Drains into NEW RIVER waters — Water classification SC NSW (for classification see-http #h2o env state nc uslbimslreports/reoortsWB.himl) Project Located in WHTIE OAK River Basin. Is project draining to class ORIN waters? N , within''/2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: JOSEPH C. AVOLIS, P.E. Company: AVOLIS ENGINEERING, P.A. Address: P.O. BOX 15564 City: NEW BERN, State: NC Zip: 28560-_ Phone: 252-633-0068, Fax: 252-633,6507; Email: AVOLISENGINEERING@EMBARQMAIL.COM SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittenVPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retenfion _ # Treatment Systems ElHigh Density —SW Wetlands _ # Treatment Systems ElHigh Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit a) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 1_5 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property [I Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No zrrzsasrrasrarrxrssrrsrrzzrzszrrrrrraraarza++rsaa zaaazsrFor DENR use onh,rarr+arsarazzasrzzr<a+<zazraarr+aarrararrzzarrzraaszzrzaanrz r Total Fen Amount E SUBMITTAL DATES Fee SUBMITTAL DATES Fee LAMA $ Variance (❑ Mal; Ell Min) $ SW (❑ HD, LD, El Gen) $ 401: $ LOg I$ Stream Deter,_ $ NCDENR EXPRESS March 2009 BUILDING *313 /\ •\ fJ r ;off, fi r ct- 7-1 i a {F t \ lye S•9 ` NO WETLANDS EXIST WITHIN I / �I( THE PROJECT ` LIMITS OF NEW §TOR WATER / DISTURBANCE I DETENTION POND / pR 14Mra —Ndr FDIZ �aS7Kuci Z I I ''` SITE PLAN - BUILDING 313 az=. AVOLIS ENGINEERING, PA P.O.BOX15564 SCALE: 1"=SOS NEWBERKNC29561 PH.(252) 833-0068, FAX (252) 633-05W Stormwater Management Narrative Construct Parking Lots, Hadnot Point and French Creek MCB Camp Lejeune, NC Building 313 This project proposes to construct a new asphalt paved parking area in an existing grassed area. The parking area will be an extension of an existing parking lot. The site is located in an older area of the base with no surrounding stormwater boundaries. The runoff from the existing impervious areas, with the exception of 642 SF of street/sidewalk area, around the site will be diverted around the drainage basin for the new parking area. The project will convert 15,860 SF (0.364 Ac.) of grassed area into asphalt parking area. The drainage boundary established for this project is 25,107 SF in size. The BUA consists of 15,860 SF of new parking area and 642 SF of existing BUA. The project built -upon area percentage is 65.73. Stormwater treatment will be by a wet pond sized for 90% TSS. The SA/DA ratio is 7.63%. The pond average depth is 3.0 feet and it is sized to contain and drawdown the runoff volumes associated with both the 1.5 and 2.0 inch storms. The minimum required pond surface area is 1,916 SF compared to the 2,732 SF provided. The work area does not impact any wetlands. The pond and parking area are located in a managed lawn area that is not regulated by the US Army Corps of Engineers. The site drains to the New River which is classified as SC;NSW (Index #19-(15.5)). All work is located greater than fifty feet from surface waters. 1.5 acres of the site will be disturbed by this project in order to construct the parking area The sedimentation and erosion control plan is being concurrently submitted. The soils on the site are classified as Baymeade by the Onslow County Soil Survey. Baymeade is described as a loamy sand at the depths to be disturbed by this project. The property is owned by the Federal Government. There are not any known historic sites on the property. "jn SEP 051013 BY:_ LJ l ti� 5tPQ52013 �,C ZhO _� -�, 'J "v -- _ ' `� _ ` _ l � _