Loading...
HomeMy WebLinkAboutSW8130906_HISTORICAL FILE_20130930STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 k30okOU DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS NtJ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ZU\3 dg30 YYYYMMDD NC®ENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. Skvarla, III, Secretary September 30, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 25842 Subject: State Stormwater Management Permit No. SW8 130906 Parking Lot Addition to Building FC308 High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Parking Lot Addition to Building FC308 on September 24, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 130906 dated September 30, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject protect. This permit shall be effective from the date of issuance until September 30, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to transfer the permit, or to renew the permit will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory, hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson in the Wilmington Regional Office, at (910) 796-7215. Sincpfely, 57ft Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/ can: S:\WQS\Stormwater\Permits & Projects\2013\2013 HD\2013 09 permit 130906 cc: Joe Avolis, Avolis Engineering Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SWS 130906 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO MCB Camp Lejeune Parking Lot Addition, Building FC308 H.M. Smith Blvd, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until September 30, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater control has been designed to handle the runoff from 19,784 square feet of impervious area. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. 5. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. This permit does not provide any allocation of built -upon area for future development. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 7. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 130906 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, Acres: Onsite, ft : Offsite, ft2: b. Total Impervioul Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSY g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.815 35,508 none 19,784 19,784 none 1.5 3.0 90% 19.0 3,675 3,280 19.7 0.02 1.0"0 pipe 0.01 1,452 N/A Cogdel's Creek / White Oak 19-23 "Sc, NSW" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DENR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system as the permanent pool volume is less than 30,000 ft3. 6. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 130906 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; Page 4 of 7 State Stormwater Management Systems Permit No. SW8 130906 The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 30`h day of September 2013. CAROLINA VIRONMENTAL MANAGEMENT COMMISSION A c t jbt'�Ce�ki Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 130906 Parking Lot Addition, Building FC308 Stormwater Permit No. SW8 130906 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 130906 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEMLR Wilmington Regional Office Page 7 of 7 '°DWQ USE ONLY Date Received Fee Paid Permit Number - /- 3 ODD, ° 53�T Gv Applicable Rules: ❑ Coastal SW -1 95 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Parking Lot Addition, Building FC-308 2. Location of Project (street address): City: MCB Camp Leieune County: Onslow Zip: 28547 3. Directions to project (from nearest major intersection): Project is located at Building FC-308 400 feet northeast of the interestion of H.M. Smith Boulevard and Conner Street along H.M. Smith Boulevard. Site is on eastern side of H.M. Smith Boulevard. 4. Latitude:34° 38' 53" N Longitude:77° 19' 52" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals vrith modifications also requires SWU-102 - Reneeaal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number—, its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 1.5 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? NNo, ❑Yes If yes, see S.L. 2012-200, Part Vl: http:Hportal.ncdenr.org/web/wq/ws/su/stat(EsW/rules,laws+r� n-" t1v� li.. •,- 1 9 f� .i SEr 11 2013 Form SWU-101 Version 06Aug2012 Page 1 of 6- _ BY:_ Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Commanding Officer - MCB Camp Lejeune North Carolina Signing Official & Title: Neal Paul, Deputy Public Works Director b.Contact information for person listed in item la above: Street Address:1005 Michael Road City: Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): City: Phone: (910 ) 450-5803 Email:neal.12aul@usmc.mil State: Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/' Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: ( ) State: Fax: ( 1 - 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: David Towler, EI/Public Works Signing Official & Title: Neal Paul, Deputy Public Works Director b.Contact information for person listed in item 3a above: Mailing Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Phone: (910 ) 450-5803 Email:david.towler@usmc.mil 4. Local jurisdiction for building permits: Point of Contact: Fax: (910 ) 451-2927 Phone #: Form SWU-101 Version 06Aug2012 Page 2 of 6 a SEP 11 2013 V GY: IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be treated in a wet detention pond sized for 90% TSS removal. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 0.82 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:0.82 acres Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area between the batiks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Nori-coastal wetlands landward of tlne NHW (or MHW) line nay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 55.7 % 9. How many drainage areas does the project have? 1 (For high densihl count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area _ Drainage Area Receiving Stream Name Cogdel's Creek Stream Class * SC; NSW Stream Index Number * 19-23 Total Drainage Area (sf) 35,508 On -site Drainage Area (so 35,508 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 1 19,784 % Impervious Area*" total 55.7 Impervious— Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area On -site Buildings/Lots (so 0 On -site Streets (so 0 On -site Parking (so 18,500 On -site Sidewalks (so 0 Other on -site (so 0 Future (so 0 Off -site (so 0 Existing BUA*** (so 1,284 Total (so: 19,784 Stream Class and Index Number call be determined at: Idtp:/(portal.nedenr.org/web/wq/ps/esu/classi6cations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parkiiig"areas,, „ sidewalks, gravel areas, etc. ���-- .y s `L_ t SEP 11 2013 { `i Form SWU-101 Version 06Aug2012 Page 3 of 6 BY: 'Report only that anion tit of existing BUA that will remain after development. Do not report any existing BUA that ,6 is to be rentoved mtd which will be replaced by Witt BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Field Visit and Topographic Survey Proiects in Union County: Contact DWQ Central Office staffto check if Ste project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklistsareavailablefromhttp://portal.ncdennorg/web/wg/ws/so/statesw/forms does. Thecomplete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdennorg/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hap://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. I itials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.orgLpages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius the map. '7. 'Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. :. ,-, n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. �''s=�tti-;i o. Drainage areas delineated (included in the main set of plans, not as a separate document). _' t 7 p. Vegetated buffers (where required). � SEA' 11 2013 Form SWU-101 Version 06Aug2012 Page 4 of 6 6Y: 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify �''k elevations in addition to de ths) as well as a m g A copy of the most current property deed. Deed book: Military Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hqp://www.secretarV.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Joseph C. Avolis, PE Consulting Firm: Avolis Engineering, PA Mailing Address:P.O. Box 15564 City:New Bern State:NC Zip:28561 Phone: (252 ) 633-0068 Email:avolisengineering@rmbarqmail.com Fax: (252 ) 633-6507 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. SEt 1 1 2013 t, BY:------, Form SWU-101 Version 06Aug2012 Page 5 of 6 F 31 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 clays; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type natne of person listed in Contact Information, item la) Neal Paul certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storm t r rules under 15 CAC 2Ii .1000 and any other applicable state stormwater requirements. j� � Signare: tu/y- Date: 0l I L I, V V`V t V L\AQAQtirx Public for4he State of 1 , ' County of V V !`h W rU do hereby certify that 1 V before me this (A day of a stormwater permit. Witness in; hand and official set LLEY VANDECOEVERi NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA SEAL My commission expires v V `WTI I / personally appeared application for SEP 1 1 2g13 Form SWU-101 Version 06Aug2012 Page 6 of 6 —MEMORY TRANSMISSION REPORT SE FILE NO. 348 DATE 10.01 21:37 TO :n 919104512927 DOCUMENT PAGES 8 START TIME 10.01 21:37 END TIME 10.01 21:39 PAGES SENT 8 STATUS OK TIME FAX NO.1 NAME `SUCCESSFUL TX NOTICE' 10-01-2013 21:39 sxaxo or ivorxe cgronQa Dapv r[meo[ of Envleon ment vnd Nvtu rvl Rmou rcee WIIm1nQ<on Reglonvl pfflcc Yaf MCGYpry� Govvrnnr FAX COVER SHEET John SSRvnrm i!!, Pxcrc(ary /� -_ � —/3 To: W.. Pages (excl. coyer)o / i(/E.4 L �.O✓L � 6L . � G,7 cn .c-/ice' s From: O GFi "c FC_ Co: CA"m P LeT.r✓ .✓ E M c L3- Phone: (9101-196-OJ04 Pax: 9io - fsi - 2 9 m 7 Pax: ($101350-2004 wS- /3oya� 127 CnrUin Cl Oe(va Extension- W ilminQion- NC 29403 � (910)')96-'1113 � M Egval Opp orNnify q(pnneave Aotion Cmyloye� State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor . FAX COVER SHEET John ESkvarla III, Secretary Date: _ I — 3 No. Pages (excl. cover): To: /UE� L PR�/L ,✓dL GJo Q�Gs From: Jo Casmer OGGi c EG. Co: CAm P LETEd "I G Phone: -(910) 796-7336 Fax: 9/� ` % Z 7 Fax: (910) 350-2004 Re: �l� G C: eo T ,4dd r o,J To CJui'G a i n 9G30 �f '7sI/ihi /ssccci 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :10-01-2013 21:42 FAX NO.1 NAME FILE NO. 349 DATE 10.01 21:38 TO : n 912526336507 DOCUMENT PAGES 8 START TIME 10.01 21:40 END TIME 10.01 21:42 PAGES SENT 8 STATUS OK 'SUCCESSFUL TX NOTICE— Rfatn oT Nnrt6 CarNlnn DepartmenC o(Envlronm not end Nafu rnl Roeourcee WIIm InRlon Re610nn1 OMce Ports GSvry, Gweroor PAX COVER 9IIEET ✓opn SSA�nrin ///, 6ec refary Dnte: �� ^� ^� 3 To: �« �✓P Lim a Co: �✓o G s E � c� No. Pagec (excel. covnr�: From: to Ca�YiI' Phone: (910)>96-9336 i 2'1 Cardinni rtrivo P_xtene�on. Wilmington. NC 29903 � (910)>V6->213 � M tipu ni OpporNnity ARfem ntivn nmlon 1 mploYer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John ESkvarla III, Secretary Date: To: ✓OE %moo La's Co: Fax: ZS Z— 6.33—GSO� Re: 20 "4" ,'7 G o T 8' i3 0 91e9 G No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 .,Su.'La.-may 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer Page 1 of 1 Avolis Enaineerina. P.A. From: "Nelson, Christine" <christine.nelson@ncdenr.gov> Date: Friday, September 20, 2013 10:21 AM To: "Avolis Engineering, P.A." <avolisengineering@embargmail.com> Subject: RE: FC308 RE: Construct Parking Lots, Hadnot Point & French Creek Either way works for me. Also, I will be e-mailing a request for additional information on the 313 project soon. hope to wrap that one up today. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Avolis Engineering, P.A. [mailto:avolisengineering@embargmail.com] Sent: Friday, September 20, 2013 8:32 AM To: Nelson, Christine Subject: Re: FC308 RE: Construct Parking Lots, Hadnot Point & French Creek Christine, The orifice should be 1" 0 on the plans. I can send you a new plan sheet or bring it when I am down there Tuesday morning. Joe Avolis, PE /A I avolisenoi Engineering, PA argmail. com P ` Avolis Engineering, PA 252.633.0068 '917 From: Nelson. Christine Sent: Thursday, September 19, 2013 2:09 PM To: Avolis Engineering, P.A.,Subject: FC308 RE: Construct Parking Lots, Hadnot Point & French Creek Sl c0fl'e Joe, Can you please confirm the diameter of the orifice to be used for this project? The supplement and calculations indicate a 1" orifice will be used but the outlet detail on plan sheet C-16 calls for a 1-1/4" orifice. Thanks, Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-2512 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law �C and may be disclosed to third parties unless the content is exempt by statute or other regulation. E�+E1 G SEP 2 4 2013 9/20/2013 Stormwater Calculations Construct Parking Lots, Hadnot Point & French Creek, Building FC-308 Marine Corps Base Camp Lejeune, NC Prepared by: Avolis Engineering, PA PO Box 15564 New Bern, NC 28561 (252)633-0068 FAX (252) 633-6507 August 1, 2013 SEr 11 2013 BY:___ S-mlzvl&WATfY, CALCv.LA- jo&)5 (oJ57jZLIC1- Cl"AiZ-r-W6 LOTS, FrAVtjbj (`REEr— B(,(jLvWA FC-308 M C f3 Card V LEM.tn1 EI N c- iHt.t)fCC• VIZOV19L %!'APCP A bof AtiGZTra,'J /1,1 �XI�j7fJC 4AiZK!- C LoT ?t r.l,'LT/I,1( �-�/013, -rt1c 1Ah'�IJI, AND GVAP,Ep Rio 11)frT Or T-F. F:X15j"l1,)4 s� �f 'vto��� tfk?�X /I 1N6 -fr= A/�0 WILL 11i4Uc ,� f.�lG7 �6�1D r4f2 �7fhC�idrWHT�tC r�ERrME�T �j-E Pwu7Er_r pRAfnl5 -ro COC112EL5 C.tCE.k LAJIIICN 15 C�AS�I�rCr �I� S I Tt ';,A-r-A z PPIA1 A(1 : �'51501+ 5F:: (0, 82 Qc) NEGt) �MprKVIUUS f''A, KI JGi ARCA :5r OF5� / a0CrIJ(, �'i2Alt,= q, Y/uA= FRB -5F = 5s 3S,S08 �5` E--) 130514 r'EpEkA `���Rvr,(lilA7F:(Z f�u(E; (�GCLdt(Ll�y!Eit1T �;�����,%. 31 �!'.q�.;; ;,F L-'Frtft r:k3, lt'��=�✓�r�iV<I/L/f%'LE �f�/MFACL. �r�U(f,�G ��i�l'rlcn.f. �?;��(x:�rN'r TH'✓ a5"� '�E2GGNnc� f'afnl:A(,l. `vl:�T (��,qfr ,^.;: /?w� ��stlNF%`k;C, l".'Jt?,�1`t`> 9;r.�. t,ie,' �XC.E.k f�• �/"✓//IGL �'iA/✓r'R(E_ E.vCr.,%75 `n4Ar 11,2E o, i -TN6H or-- rr�c���rr� ��✓hc �:t, &r_cqusE Evtlurs aF -n+fs sf�E L-e,orf, AccrI D() (JOT Ar)y 44,54 t���ffi�e" l Un/bFF '(f15 'Ib a 5509 P7fOA) / G vq 6glA ,16"j, 6r6 GIs 1690ttJTtct XA/1-r,4c( Lvo\4- - Z. 0 z,�1GHt;5 i U5� /1 2.a �>x(+ 12A1n/r'/fLC Ev6nlr Z 5+r/S1I f r0ERAZ SEP 11 2013 lZ "7t1'f56AAL WAY A),47''/; TAeV.E ECEU#7lo1J tC5 CA"Lt,JA5/CCP 10A5 CoN7-Ac( y -vo i:,ErEg/u/-/z' 1tE 515Alk- HIAµ [.(J-;/-4-7gge.6 Ar 7')Iz5 si7Z'- :C5 v15rlz�7P PtC 4,1I4 Ar'WH'C.P k6F K7 5HOI,. -T-TK 57NOT A-T" AprPiN' OF Fou(Z FEET p<C.obj 77fE EK(5r/, C,(ou�D SuRr'f10E , '1G099ESf%0AJV(-Jl, SHI�JT 5F-r THE F'5!� t,SiWc'&rr ?Od (, r&CV/17'/6n) /{T /q. 6 FEt"T. 50116 FA5/6 GV'15' i*o.uD s l�67 46(, s�Jccu.�lu�) m / uzr' FUG✓afF VPcM !•S i✓G/l �{q(/l�F¢CC �LJ![ r—Jk rE7%FFg4''�✓ilZc'/+'7F_i,fl, • 3 rr. /iiJ/Ni.24w, 7vEiza�' (aveG v�p�r/ e Fl))-ZESA2( 9E61sr,,C2A�p (Zo°/ of Po,✓D I/orGr.NE�. ° FT. N7/N/i,1jo-r rgr- 1,4,4V4?6nht 4'4'"t) 7/ Tb 1,✓/a/?/ f 71 D = Vt514) (A)ET PoaTi FUZ 0106/T 5 VE 1 F_"VAO-Jt 3uFr 5o.0 55, 4 Q�0.0 �;.0 F7- 31S Fr 5"(0 5o 16,,)-,2 le,5;V SEP 1 1 2013 4 It'd' rv. Ao6 Fc-3o8 12 _.__-._�l_v_�a�E__O��1}l x.�_,gcc�v-��✓cE_ G�1i�1_ -r�. il'-r't�, �v = rO,25 �� t ��'e> s�r:'cf1� i fiSor SNfii t f�Bc7 �ovpl DEPil JIA/Zjel/YT 01"M 645HZ-eF �P�h/h V(;a(— sUicFACF /��1) /-j-T �c'2M/��FNT PnOG (li7k;,V �2✓�y, ICE%,9�� 504,FACE il'lel) 47- B67-r1cs" of Pow C CC f> IJl �EI'r. iE h STDRA'�,t �/'Gla/N �or�'L% U[t1LcI/ P>(r �brr2'M .u/a/._l /-76Nr' Clav = 0,Z* / / T 2?��� 11 + 2,3; S + 3 8 ; — �l (' ads ) FZo,�t f A -f 2 3,,0 Gf f�E�jJ> s� _5085O 46A PRov)vE1 = 3�� S > 2,2 �3 om-1 5TD9 ltir 2--'o.)rE DuF Tv /775n- ���� �'cRn1C7'1v,J) f 5EP 11 2013 BY:_ Li 'Ad s,tOd t I. d3S zeSS 1 -zst�l �Q— 4/90'C)� zo9� z��t�l I �L�bl ,71�1 3i ?.1)oi�al t} 4- I :b9T orb °11 OSl G I �2Nn�/ N/t:'Ilr/ Igo s,C) 70)b b 4 55Z C, •o gi SS I 8S g g 51 ,7aq ,end -ebb �7 AE # /3U �f el&6. ;cl"C-306 _CALCL4LI�TIWA-1 OF Voc.r�lv"�5 U5F- -CHE. `SreA PEE M fROU„ � v-- C.C9 1- 0,cl *-TA RV':: P-OA)CMF/` aEFFiC(GAJr`, S-M RU�a�F (zN��STO1vy r.A/.a i Sr+= macro,) Zv= 0.c a- o.q-X o• 55':- = 0, 551 V= VOLLJM E O% f :; U F� -To �3E G crJ i'�GLGr Y Fr 3/ wrarE25IkCTV r A6A (Ac.) i•s" iTogm : VoL. = 3(o�d += 1,G" 4 O•s6l 4- C7,SZ Ac. _—4rdo F+� L•0'S;Ck� VdL = 3,1o3b _ 7a'74( VbG. ELEVAT(UrO fi WA Q VbL. (Fffloor !r=•J � 0 O-S 19. SIS 2 212 Zr212 rp(�9fCfO7,l�ioo j�r3?i J • J C. r '•� 72¢O CZ SEP 11 2013 'I ' EY:_ �r E CAtc"&47*E 9156 /�o PbA)p 1.5" sng.,A Yo"t-ol"g Z,+,(Dp_ p+3 VOL. STORED all- tg.o/ F13 3 F'(sc For 4 zo-o' co., ro�u IZ5. F 3 o.as W I.So' s-nRv%A Tr�m I eofzUi etot, AoA — 5115 oT(�((M-- +5)7 CALCU&41-9, Z,O' �;-MRM P-156 I/i Pa'uv - ,2.0" -5-nfM VbL(AMF-= 312901 F+ 3 VOL, 5-r'Oel—D Bj-r t44. r+3 RE JAJJ,Ajti V--o I.vot,-- 3,29qR'3 Ff3 R156 el-r tq.S- 4-Zo.o U r4, :1 4. 0 -r416 2I5 ll+le- T"FOWLA FUOL. "VA'rl.'-J' 5 1-f-f 1 M\51cc r- o?- s- VQA1Jp0WA) 3 vAvt,5. A5 A 7A?-a-Er :Tl�EFP-4106 Tv -vPAW .120woo WAA 0. ooqg 14014e5\ &O,AA I coo 5155 /L4 w SEP. 11 20t, i Y hi5,ff. 1304=1- !>Lgi, h-C- -2 OUFIC,E ECt-!ATio,J GZ= C.vA F3 �p - C F�iertnrT ©� Dr5Cl/AACR f}= bRrFIC� CROs,� SEcrrun���L f<`i-Wq = Cat gv�iz� (3Z.2 rf154 cth= 1-1611P (r=1) r o. dD95 hy�.s �•� � (32.2 Iq•5S- 1°1•D 3 O- 00 4b F+ z Sor-vE wr, ir^i TR i.ou; C�= A ��� = ©,fo� ���� �(3Z,2)�/{q.SI- KO = O.WOV Fi' VVAu,)V L,J0 TIME = —ZA(oo r43 l ,MiA) % I Hoot I O.okw3 rS t3')�CoD 5 �(voM/A)) (2`{-Rotlk) = I Z, 6 'DA-'g5 — 0K USt l 0 0n/FI4E n: a .J u 1 SE' 11 209 Y:—_ J CFIEc VF?f�GJr�oCJn) o� Z.0 ��cf+ S�rty�� (I/0( .� 2-6 Ff'' �z 4 v 3 - 01013 .�{315 n-i 1/0 � r>A (�. 013.. [ 43 5� I\ (ap 5rG (or M r. iJ0 L_ Haut) 2,} 0A- f5 — ov-, P65r GEvtLQVME.vT G= (Ci.15)�J,`{Sf�C� i fJ,gZA �o-V�. 24.-F!2 5-ru�r�•,�, = 3,rrS �r�CNtS eVF L,0fV 9EA.rr I��Ri Z4-H-2 SrMVM FLOW = !zA if2 J ?usT l-tJ� 24-f , :5-mp m d• U 13 Cis i �f M SEP 11 2013' BY: !,G W- PPAFR.ow R�V2ol,�-70T a Tu I ` 5- STM (Pd,-� vRT)VOU,,H .o. usE ;cs Tf--SS ME-�W2 PEMOYO,s-rgArL Cx(r,,-, �( ;/l ki iL t lI ��E- UE`Vr(rA,+tf,J1` / F26ST DEVEcc19�1607 �U�OF< /2g7r5. T}FE SITS /5 L15rEr12 A-5 14AVw(i ",eA�mfAvr Soft T'1�E :1NICN 17 l3yV<oL.061c, GRuup A, ON-- 3v (A.1�su775) Y9E-(2EVEGuf>rf1�Nr C/V- 31 (s,,DK/ dN7 lTf9J L1 ,11IJ5) pv5r DEVEL0��6,vt' ((3EFGRE I2aur�,J( Tff2auhM �a,yj cN = (39�(c� 3�r�c) + (98)(o•9S;c� — 41 0,82,+G Q, = l.®2. vF5 +oprj`J' QE- IEUEcc a+FrJ7' �ajr 17=VEc,o PvtirM F= 3-65rw (SCFOkE Fcou; I,v" F0 /J.D) �s-ra,✓c,�sN A+� c�rrGF_-r vr_ui�G -i-v ElrrEtiu��,�E •�-}tE (�c�K,�4-NR s7o2M h(-..TE I yl-�- Pos rUF_�u�7;i�/,ri 5rTD944n `Woa,l)o AIJP -FH-E OV.r(.E.7 -�rp-bicT` 9E, '4 W912 rT pup STAGE = 19,55 FT SEt 1 1 2013 BY.- e ku-y� sTvF-VIA. s,Arjf = I(t•g1 Fs. Gp,o = 3.31 CifS P61)D1 aP�= 0•B4 CFS (PosT PEVO-6p,M6,rr, Ar=r5lt('oido) 7 J oKVE9, To r'tEET FrZEE&lA)ZP (�EGZu!! Asa �iS, DUEL d4Rou vr7 �a�/f; MU577- i3E 1.0 d=T OR 114OR6 ,4,9oW5 /q. q I FT, or: (• 0 FT- CK- WiL RAvc 22 F-T- CI-EJMT(od /IR uh17 Nola PE&IME7E . SEP 11 2013 a BY.-�_ r To P ST f4kCT(A Z(•0 r4 cLEANo(41' Z� C)j IV LL) Cl Rr 5 DE OW-1/ J= 1R,7 Top coNc2E7�,= V8-`� i i5 it CAP lSEP 11 2013 BY. CAccur A-i e FE-04)12Eri AA)C-. l c9Ar E U,,jc(ZE7t: C,16 z ctic((•,.Nr= l'-, (41xs)+ 2(3'x5')��a•S�(/� ib/�,�) 0,:�5 AL C�NCr2EiE F«� w ��s�rZ = (3'X3'��18.5'—I(a,v145- Ib/Ff 3FlaS�F # (;QA%C:E"(X 4=oo-t,x7G, �0916Hr Ina G.")A-� (a' x 11,703 0 Fog- J? pA't'�L F�x�Ttu,J Fg_ 4 (l•ZS�Z(t'�(�0 •�{ Itfr"T� von. ;�,��,: a7 IE; = o.a3 rt3 J �F 14�- �az•°f iblF�-3 -rNicK Cc�,aCt Tr /gNC140Z*6 I 6't,tin, I.6b �(�r oF��E •. ak I� SE' 11 2013 , � v EY: Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 0.00 2 0 0 1 — PRE-DEV 2 SCS Runoff 1.02 2 724 3,238 1 — POST-DEV BEFORE PO 3 SCS Runoff 3.37 2 724 10,062 10 — — — 10-YR POST 4 Reservoir 0.02 2 1350 2,103 1 2 19.55 2,480 1-YR POST 5 Reservoir 0.84 2 748 8,509 10 3 19.91 4,454 10-YR POST Proj. file: 130446LDGFC308.G OF file: NEW BERN.IDF Run date: 07-31-2013 I SEP 11 2013 EY: Hydrograph Report Page 1 Hyd. No. 4 1-YR POST Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 2 Max. Elevation = 19.55 ft Stotage IndlW00n method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage English = 0.02 cfs = 2 min = FC-308 = 2,480 cult Total Volume = 2,103 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 720 0.67 19.08 4.56 0.00 - - - - - - 0.00 750 0.25 19.31 11.74 0.01 - - - - - - 0.01 780 0.12 19.37 13.69 0.02 - - - - - - 0.02 810 0.10 19.41 15.11 0.02 -- -- -- -- --- -- 0.02 840 0.08 19.44 16.68 0.02 - - - - -- -- 0.02 870 0.07 19.46 17.73 0.02 - - - - - - 0.02 900 0.06 19.48 18.45 0.02 - - - - - - 0.02 930 0.05 19.50 19.04 0.02 - - - - - - 0.02 960 0.05 19.51 19.40 0.02 - - - - - -- 0.02 990 0.04 19.52 19.68 0.02 -- - - -- -- -- 0.02 1020 0.04 19.53 19.92 0.02 - - - - - --- 0.02 1050 0.03 19.53 20.10 0.02 - - - - -- - 0.02 1080 0.03 19.54 20.24 0.02 - - - - - - 0.02 1110 0.03 19.54 20.35 0.02 - - - - - - 0.02 1140 0.03 19.54 20.44 0.02 -- - - - - - 0.02 1170 0.02 19.54 20.51 0.02 -- - -- - -- -- 0.02 1200 0.02 19.55 20.58 0.02 - - -- -- - - 0.02 1230 0.02 19.55 20.62 0.02 - - - - - - 0.02 1260 0.02 19.55 20.66 0.02 - - - - - - 0.02 1290 0.02 19.55 20.67 0.02 - - - - -- - 0.02 1320 0.02 19.55 20.68 or02 - - --- -- - - 0.02 1350 0.02 19.55 << 20.71 0.02 -- - -- -- - - 0.02 << 1380 0.02 19.55 20.71 0.02 - - - - - - 0.02 1410 0.02 19.55 20.69 0.02 - - - - - - 0.02 1440 0.02 19.55 20.66 0.02 - - - - - - 0.02 1470 0.00 19.54 20.48 0.02 -- - -- -- -- - 0.02 1500 0.00 19.54 20.27 0.02 -- -- -- - - - 0.02 1530 0.00 19.53 20.06 0.02 - - - - - -- 0.02 1560 0.00 19.52 19.86 0.02 - - - - - - 0.02 1590 0.00 19.52 19.66 0.02 - - - - - - 0.02 1620 0.00 19.51 19.45 0.02 - - - - - - 0.02 1650 0.00 19.51 19.25 0.02 - - -- -- - - 0.02 1680 0.00 19.50 19.05 0.02 -- - - - -- - 0.02 1710 0.00 19.49 18.80 0.02 - - - -- - - 0.02 1740 0.00 19.49 18.56 0.02 - - - - - - 0.02 1770 0.00 19.48 18.31 0.02 - - - - - - 0.02 Continues on next page... it SEP 11 2013 i p BY: 1-YR POST Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1800 0.00 19.47 18.07 0.02 -- -- - - - -- 0.02 1830 0.00 19.46 17.83 0.02 - - - - -- -- 0.02 1860 0.00 19.46 17.59 0.02 - - - - - - 0.02 1890 0.00 19.45 17.35 0.02 - - - - - - 0.02 1920 0.00 19.44 17.01 0.02 - - - - - - 0.02 1950 0.00 19.44 16.65 0.02 - - - - - - 0.02 1980 0.00 19.43 16.30 0.02 --- --- -- - - - - 0.02 2010 0.00 19.42 15.95 0.02 - - -- - - - 0.02 2040 0.00 19.42 15.61 0.02 - - - - - - 0.02 2070 0.00 19.41 15.27 0.02 - - - -- --- - 0.02 2100 0.00 19.40 14.93 0.02 - - - - - - 0.02 2130 0.00 19.40 14.63 0.02 - - - - - - 0.02 2160 0.00 19.39 14.40 0.02 --- -- - -- - --- 0.02 2190 0.00 19.39 14.19 0.02 -- - - - - - 0.02 2220 0.00 19.38 13.97 0.02 - - - - - - 0.02 2250 0.00 19.37 13.76 0.02 -- - -- - - -- 0.02 2280 0.00 19.37 13.54 0.01 - - -- - -- - 0.01 2310 0.00 19.36 13.33 0.01 - - - - - - 0.01 2340 0.00 19.35 13.12 0.01 --- --- --- - ---- --- 0.01 2370 0.00 19.35 12.92 0.01 - - - - - - 0.01 2400 0.00 19.34 12.72 0.01 - - - - - - 0.01 2430 0.00 19.34 12.52 0.01 - - -- - - - 0.01 2460 0.00 19.33 12.33 0.01 - - - - - - 0.01 2490 0.00 19.33 12.13 0.01 - - - - - - 0.01 2520 0.00 19.32 11.94 0.01 -- -- --- --- -- --- 0.01 2550 0.00 19.31 11.75 0.01 - - - - - - 0.01 2580 0.00 19.31 11.56 0.01 - - - - - - 0.01 2610 0.00 19.30 11.38 0.01 - - - - - - 0.01 2640 0.00 19.30 11.20 0.01 - - -- - - - 0.01 2670 0.00 19.29 11.02 0.01 - - - - - - 0.01 2700 0.00 19.29 10.85 0.01 -- -- -- -- - - 0.01 2730 0.00 19.28 10.68 0.01 - - - - - - 0.01 2760 0.00 19.28 10.51 0.01 - - - - -- - 0.01 2790 0.00 19.27 10.34 0.01 - - - - -- - 0.01 2820 0.00 19.27 10.17 0.01 - - - - - - 0.01 2850 0.00 19.26 10.01 0.01 - - - - - - 0.01 2880 0.00 19.26 9.85 0.01 -- --- - -- --- -- 0.01 End L SEP i' 2013 BY: Reservoir Report Pegs, English Reservoir No. 1 - FC-308 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cult cuft 0.00 19.00 3,675 0 0 0.50 19.50 5,175 2,213 2,213 1.00 20.00 5,664 2,710 4,922 2.00 21.00 6,696 6,180 11,102 Culvert / Orifice Structures Weir Structures [A] [B] [C] ID] [A] [B] [C] [D] Rise in = 15.0 1.0 0.0 0.0 Crest Len ft = 2.0 0.0 0.0 0.0 Span in = 15.0 1.0 0.0 0.0 Crest El. ft = 19.65 0.00 0.00 0.00 No. Barrels = 11 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 18.80 19.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 40.0 0.1 0.0 0.0 Multi -Stage = No No No No Slope % = 0.50 0.50 0.00 0.00 N-Value = .013 .013 .000 .000 Drift. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 0.00 ft Note: All oufflows have Even analned weer inlet and outlet Control. Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 19.00 2.13 0.00 - - 0.00 - - - 0.00 0.50 2,213 19.50 19.05 0.02 - - 0.00 - - - 0.02 1.00 4,922 20.00 31.66 0.03 --- - 1.24 -- -- - 1.27 2.00 11,102 21.00 74.66 0.04 - - 9.41 - - - 9.45 »... i - 5EP 11 2013 BY: Hydrograph Report Page 1 Hyd. No. 5 10-YR POST Hydrograph type Storm frequency Inflow hyd. No. Max. Elevation Storage Indiaeeon method used. = Reservoir = 10 yrs = 3 = 19.91 ft Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage English = 0.84 cfs = 2 min = FC-308 = 4,454 tuft Total Volume = 8,609 cult Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 690 0.24 19.16 6.96 0.01 - - - - - - 0.01 720 2.41 19.49 18.69 0.02 --- --- --- --- -- -- 0.02 750 0.68 19.91 30.52 0.02 - - 0.80 - - - 0.83 780 0.32 19.84 29.21 0.02 - - 0.48 - -- - 0.50 810 0.26 19.79 27.99 0.02 - - 0.32 - - - 0.35 840 0.21 19.77 27.20 0.02 - -- 0.25 - -- -- 0.27 870 0.19 19.75 26.69 0.02 -- - 0.20 - - - 0.22 900 0.16 19.74 26.39 0.02 -- -- 0.17 - - - 0.19 930 0.14 19.73 26.13 0.02 - - 0.15 - - - 0.17 960 0.11 19.72 25.88 0.02 - - 0.12 - - - 0.14 990 0.10 19.71 25.67 0.02 - - 0.10 - - - 0.12 1020 0.09 19.71 25.51 0.02 -- --- 0.09 -- -- -- 0.11 1050 0.08 19.70 25.38 0.02 - - 0.07 - - - 0.10 1080 0.07 19.70 25.25 0.02 - - 0.06 - - - 0.09 1110 0.07 19.69 25.12 0.02 - - 0.06 - - - 0.08 1140 0.06 19.69 25.01 0.02 - - 0.05 - -- - 0.07 1170 0.06 19.69 24.92 0.02 -- -- 0.05 -- -- - 0.07 1200 0.06 19.68 24.83 0.02 - - 0.05 - --- -- 0.07 1230 0.05 19.68 24.76 0.02 - - 0.04 - - - 0.06 1260 0.05 19.68 24.68 0.02 - - 0.04 - - - 0.06 1290 0.05 19.68 24.61 0.02 - - 0.03 - - - 0.06 1320 0.04 19.67 24.54 0.02 - -- 0.03 - -- - 0.05 1350 0.05 19.67 24.54 0.02 -- --- 0.03 ---- ---- -- 0.05 1380 0.04 19.67 24.48 0.02 - -- 0.03 - -- -- 0.05 1410 0.04 19.67 24.42 0.02 - - 0.03 - - - 0.05 1440 0.04 19.67 24.37 0.02 - - 0.02 - - -- 0.04 1470 0.00 19.66 24.06 0.02 - - 0.01 - - - 0.03 1500 0.00 19.65 23.84 0.02 - --- --- -- -- -- 0.02 1530 0.00 19.64 23.63 0.02 - -- - -- -- - 0.02 1560 0.00 19.64 23.42 0.02 - - - - - - 0.02 1590 0.00 19.63 23.22 0.02 - - - - - - 0.02 1620 0.00 19.62 23.02 0.02 - - -- -- - -- 0.02 1650 0.00 19.62 22.81 0.02 -- - - - - - 0.02 1680 0.00 19.61 22.61 0.02 - - - -- - -- 0.02 1710 0.00 19.60 22.41 0.02 - - - - - - 0.02 1740 0.00 19.60 22.21 0.02 - - - - - - 0.02 Continues on next page... �Smu' SEP 11 2013 6Y: ;J 10-YR POST Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1770 0.00 19.59 22.00 0.02 - -- - -- - - 0.02 1800 0.00 19.58 21.79 0.02 - - - - - - 0.02 1830 0.00 19.58 21.58 0.02 -- -- --- -- - - 0.02 1860 0.00 19.57 21.38 0.02 - - - - - - 0.02 1890 0.00 19.56 21.17 0.02 - - - - - - 0.02 1920 0.00 19.56 20.97 0.02 - -- - - - - 0.02 1950 0.00 19.55 20.77 0.02 - - - - - - 0.02 1980 0.00 19.54 20.56 0.02 - -- -- - - - 0.02 2010 0.00 19.54 20.35 0.02 - - - - - -- - 0.02 2040 0.00 19.53 20.15 0.02 - - - - - - 0.02 2070 0.00 19.53 19.94 0.02 -- --- -- - - -- 0.02 2100 0.00 19.52 19.74 0.02 - - - - - - 0.02 2130 0.00 19.51 19.53 0.02 - - - - - - 0.02 2160 0.00 19.51 19.33 0.02 --- -- -- -- -- - 0.02 2190 0.00 19.50 19.13 0.02 - - - - - - 0.02 2220 0.00 19.50 18.90 0.02 - - - - - - 0.02 2250 0.00 19.49 18.66 0.02 - - --- - - -- 0.02 2280 0.00 19.48 18.41 0.02 - - - - - - 0.02 2310 0.00 19.47 18.17 0.02 - - - - - - 0.02 2340 0.00 19.47 17.92 0.02 -- -- -- -- - - 0.02 2370 0.00 19.46 17.68 0.02 - - - - - - 0.02 2400 0.00 19.45 17.44 0.02 - - - - - - 0.02 2430 0.00 19.45 17.15 0.02 - - - - - - 0.02 2460 0.00 19.44 16.79 0.02 - - - - - - 0.02 2490 0.00 19.43 16.44 0.02 -- --- -- --- --- -- 0.02 2520 0.00 19.43 16.09 0.02 - - - - - - 0.02 2550 0.00 19.42 15.75 0.02 - - - - - - 0.02 2580 0.00 19.41 15.40 0.02 - - - - - - 0.02 2610 0.00 19.41 15.06 0.02 - - - - - - 0.02 2640 0.00 19.40 14.72 0.02 - - - - - - 0.02 2670 0.00 19.39 14.49 0.02 - - - - -- - 0.02 2700 0.00 19.39 14.27 0.02 - - - - - - 0.02 2730 0.00 19.38 14.06 0.02 -- - -- -- - -- 0.02 2760 0.00 19.38 13.84 0.02 - - - - - - 0.02 2790 0.00 19.37 13.63 0.02 - - - - - - 0.02 2820 0.00 19.36 13.42 0.01 - -- -- - -- -- 0.01 2850 0.00 19.36 13.21 0.01 - - -- - - - 0.01 2880 0.00 19.35 13.00 0.01 - - - - -- - 0.01 End r 6 SEP 11 2013 EY: Reservoir Report Page t Reservoir No. 1 - FC-308 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cuft cuft 0.00 19.00 3,675 0 0 0.50 19.50 5,175 2,213 2,213 1.00 20.00 5,664 2,710 4,922 2.00 21.00 6,696 6,180 11,102 English Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 15.0 1.0 0.0 0.0 Crest Len ft = 2.0 0.0 0.0 0.0 Span in = 15.0 1.0 0.0 0.0 Crest El. ft = 19.65 0.00 0.00 0.00 No. Barrels = 11 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 18.80 19.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 40.0 0.1 0.0 0.0 Multistage = No No No No Slope % = 0.50 0.50 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 0.00 ft Note: All outflows have been analyzetl under inlet and outlet control. Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 19.00 2.13 0.00 - --- 0.00 - - - 0.00 0.50 2,213 19.50 19.05 0.02 - - 0.00 --- -- - 0.02 1.00 4,922 20.00 31.66 0.03 - -- 1.24 - - -- 1.27 2.00 11,102 21.00 74.66 0.04 - - 9.41 - - - 9.45 I 5EP 11 2013 EY: �l 4 V I/�IIF/ n OMF.n1T �F_�D?- R AW 2 - SCS Runoff -1 Yr - Qp = 1.02 cfs 1.5 1. Ci 0.5 0.0 0 5 10 15 20 25 Time (hrs) ® Hyd. 2 5EP 11 2013 .; BY: � l o — LW� Pas r 'DE e-nam etir 6Ecow FLbu) -rtjn P(j,3 3-SCS Runoff - 10 Yr - Qp = 3.37 cfs 4- 3- 4 0 2 CY 1 0 0 5 10 15 20 25 Time (hrs) ® Hyd. 3 SEP 11 2013 EY: V, �- �? �o�r- e—DejemPme/jr Apmg FLo 4 - Reservoir -1 Yr - Qp = 0.02 cfs 1. 1. C� 0.5 0.0 0 10 20 30 40 50 Time (hrs) / Hyd. 2 ® Hyd. 4 r-, 5EP 11 2013 By .______'; 3- ��, �bs-r DgueLbgMEt,)r A-fl-r� CL6� -OQ(j4 5- Reservoir -10Yr-Qp=0.84cfs 4 3- 2- 0 0 10 20 30 40 50 Time (hrs) / Hyd. 3 ® Hyd. 5 u 6 SEP 11 2013 EY: E11CFA9\ ECS YllYl6f L1NAS, LLP 'Settirtgthe a'4i}:}[Pp`}/{'jRli '. iy. ;'J •. Geotachnicat • CcnstNe'u;rj ienviroorn-^tal • i"r.•i 4iha5 August 21, 2013 Mr. Kevin Avolis, P.E. Avolis Engineering, PA P.O. Box 15564 New Bern, North Carolina 28583 Reference: Report of Seasonal High Water Table Estimation FC-308 and Buildings 313 and 1747 Camp Lejeune, Onslow County, North Carolina ECS Project No. 22,19323 Dear Mr. Avolis ECS Carolinas, LLP (ECS) recently conducted an estimation of the Seasonal High Water Table (SHWT) for the proposed stormwater best management practice (BMP) areas for three parking lots; FC-308, Building 313, and Building 1747 located on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our estimation. Field Testing On August 19, 2013, ECS conducted an exploration of the subsurface soil and groundwater conditions at three requested locations shown on the attached Boring Location Plans (Figures 1,2, and 3). The purpose of this exploration was to estimate the SHWT of the in place soils for the design of for the proposed stormwater BMP areas. ECS met with Mr. Kevin Avolis with Avolis Engineering in order to locate the borings. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface 'soils and obtained representative samples of each soil type encountered. ECS recorded the SHWT and groundwater level observed at the time of each hand auger boring. The attached SHWT sheet provides a summary of the subsurface conditions encountered at each hand auger boring location. The groundwater level and the SHWT were estimated at each boring location below the existing grade elevation. Below is a summary of each boring location. Location SHWT 1 FC-308 48 inches 2(Building 1747 30 inches 3(Building 313 24 inches The SHWT may vary within the proposed site due to changes in subsurface elevation. �, 1--0 , St P 1 1 2013 ,f conditions' and '1711 0cy im tlm;in4: f'q P' A, y gltl� P 1', Vdi!r t tt , t, u 1744, f 1 • 1`: 910-0i�-0114 • F: 91 0'6840u5 i;:.,. �'-:+era:a rr.:W.:t6 rOlf, Gi✓J M:+tfr.�i,tif' ?' _"+7 :.r.J°1 .±CM b3'rxfW n f}".;i.)'r;ii:s: 41-C �r.:�m'.^.,�.� r r.';'i s'rtttix: E...ti; .r T,rs.re..:. (.• Report of SHWT Estimation FC-308, Buildings 313 and 1747 Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.19323 August 21, 2013 Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. Our testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project If you have any questions concerning this report or this project, please contact us at (910) 686-9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Geologist Attachments: Boring Location Plans SHWT sheet Kris J. Stamm Principal rvnrn-„ P^M1 SEP 1 2013 'I { � �;. .� / r is •i i p� FC-308 Camp Leleune, NC ECS Project # 19323 August 19, 2013 KBW r APPROXIMATE BORING LOCATION 1 FC308 SOIL BOPoNG MAP Figure 1 — Boring Location Plan Not to Scale Provided by: Avolis Engineering, • PA �� SEP 1 1 2013 :' 71 I l � {1�t I 1 / x w II �v • 04.r�-/ � • •� it rat BULDING 1747 / x SOIL BORING MAP 1nm1 p.n1/"� y // � ram wYc •. i rm�1slE�rA�ec 0 APPROXIMATE BORING LOCATION Building 1747 Figure 2 — Boring Location Plan - Camp Lejeune, NC '�' Not to Scale ECS Project # 19323 August 19, 2013 :. Provided by: Avolls Engineering. KBW PA ,w SEP 1 1 2013 0 BY: yI 'r 3 e �?✓: BUILDING313 P� •,• 1 i,.'%• i ,c� SOIL BoaING W us �f ama,aw.ma .wtav� ... - F Building 313 Camp Lejeune, NC ECS Project 9 19323 August 19, 2013 KBW APPROXIMATE BORING LOCATION Figure 3 — Boring Location Plan Not to Scale Provided by: Avolis Engineering, PA ro SEP 1 12013 By:� Season High Water Table Estimation FC-308 and Buildings 313 and 1747 Camp Lejeune, Onslow Co., North Carolina ECS Project No. 22.19323 August 19, 2013 Location Depth 1 (FC-308) 0-6" 6"-14" 14"-48" 48"-60" Soil Description Gray silty SAND Tan/gray/orange fine SAND w silt Tan/orange clayey SAND Gray sandy CLAY Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. - -Location Depth 2 0-3" (Building 1747) 3"-18" 18"-30" 30"-60" Soil Description Gray silty SAND Tan/gray/orange silty SAND Orange/gray silty SAND Dark gray silty SAND Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Location Depth 3 0-4" (Building 313) 4"-36" Soil Description Brown silty SAND Tan fine to med. SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. C SEP 11 2013 t �. BY:_ v Stormwater Management Narrative Construct Parking Lots, Hadnot Point and French Creek MCB Camp Lejeune, NC Building FC-308 This project proposes to construct a new asphalt paved parking area in an area currently existing as woodlands. The parking area will be an extension of an existing parking lot that existed before the Coastal Stormwater Regulations. The site is located in an older area of the base with no surrounding stormwater boundaries. The runoff from the existing impervious areas around the site will be diverted around the drainage basin for the new parking area with the exception of 1,284 SF of existing jogging trail being relocated. The project will create 19,784 SF (0.425 Ac.) of grassed area into asphalt parking area. The drainage boundary established for this project is 35,508 SF in size. The BUA consists of 19,784 SF of new parking area and 1,284 SF of existing BUA. The project built -upon area percentage is 55.7. Stormwater treatment will be by a wet pond sized for 90% TSS. The SA/DA ratio is 6.4%. The pond average depth is 3.0 feet and it is sized to contain and drawdown the runoff volumes associated with both the 1.5 and 2.0 inch storms. The minimum required pond surface area is 2,273 SF compared to the 3,675 SF provided. The work area does not impact any wetlands The site drains to Cogdel's Creek which is classified as SC;NSW (Index #19-23). All work is located greater than fifty feet from surface waters. 1.5 acres of the site will be disturbed by this project in order to construct the parking area. The sedimentation and erosion control plan is being concurrently submitted. The soils on the site are classified as Baymeade by the Onslow County Soil Survey. Baymeade is described as a loamy sand at the depths to be disturbed by this project. The property is owned by the Federal Government. There are not any known historic sites on the property. 1 0VER I� g SEP 1 1 2013 4 J BY. 11 �� //` , r_.•'ii►® r�������r.�:. .N �f,. .. )Vc . u ny Yea ) � CRE bxi y,�j �yR? mg tt�fP'.yy m - T — hi'� J Jh � 3-0 YmpoOuade Copyright 0 1999 DeLormO Yarmouth, 6D: 08096 Sauce Data: OSSS 1000,£b^Scale:—lt:-85,000•; Detail: 13-0 Datum: 86S81 .;, .�.9 ,, .,L:Z,; g�DG. FC-308 SEEP 1 1 2013 r `' 1 ,11 1, 1I i Y J 1 t. I 1 I I Fa DEN Use ONLY } AMA North Carolina Department of Environment and Review : GT3 000H Natural Resources submit: - 5 —PT 5 NCDENR Request for Express Permit Review T" 1e — . 3% Conflrm: 5-2 FILL-IN all the information below and CHECK the Permit(s) you 'are requesting for express review. FAX or Email the completed form to Coordinator along with a completed DETAILED narrative site plan (PDF role) and vicinity map (same items expected in the application I of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(o)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203, david.100()mcmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan ((Dncmail net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(rilncmail net • Wilmington Region -Janet Russell 910-350.2004 orLnet.russey-r cmail net NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW v6Lt - t Prolect Name: FY13 CONSTRUCT PARKING LOTS HADNOT PT & FRENCH CRK (FC308� County: ONSLOW Applicant: COMMANDING OFFICER Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28547-_ Phone: 910.451.2213, Fax: 910-451-2927 Email: NEAL.PAUL@USMC.MIL Physical LocationAW. SMITH BOULEVARD Project Drains into COGDEL'S CREEK waters— Water classification SC: NSW (for classification see-http://h20.enr.state nc us/bims/repgrts/reportsWB.himl) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within % mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: JOSEPH C. AVOLIS RE, Company: AVOLIS ENGINEERING P A - , ra•-- f1 /^ f�^ Address: P.O. BOX 15564 City: NEW BERN, Stale: NC Zip: 28560-_ 7 Phone: 252-633-0068, Fax: 252-633-6507, Email: AVOLISENGINEERING@EMBAROMAIL.COM n ( SECTION ONE: REQUESTING A SCOPING MEETING ONLY AUG 2 2 2013 ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING GY: 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear fl or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site (SW _ (Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit in ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges &Culverts ❑Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 15 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both stoning and express_meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No !iv!}!i!Y}si}liiYRnpry.iiin}y,iry.Y... 1.SR}};L19}} For DE\ R ll$r Un VhY!}}i}Yy}i Wiry{ V}4}i}}i}}}}}}4M}}yi4ryrtpii4Rnw}it Y}S!i}i M}}9i Fee Split for multiole permits: ICherta r SUBMITTAL DATES Fee e. rra n,nuunr a SUBMITTAL DATES IFae CAMA $ Variance (❑ Mal: ❑ Min) $ SW ( HD, LD, ❑ Gen) $ 401: Los $AM Stream Deter,_ $ $ NCDENR EXPRESS March 2009 Stormwater Management Narrative Construct Parking Lots, Hadnot Point and French Creek MCB Camp Lejeune, NC Building FC-308 This project proposes to construct a new asphalt paved parking area in an area currently existing as woodlands. The parking area will be an extension of an existing parking lot that existed before the Coastal Stormwater Regulations. The site is located in an older area of the base with no surrounding stormwater boundaries. The runoff from the existing impervious areas around the site will be diverted around the drainage basin for the new parking area with the exception of 1,284 SF of existing jogging trail being relocated. The project will create 19,784 SF (0.425 Ac.) of grassed area into asphalt parking area. The drainage boundary established for this project is 35,508 SF in size. The BUA consists of 19,784 SF of new parking area and 1,284 SF of existing BUA. The project built -upon area percentage is 55.7. Stormwater treatment will be by a wet pond sized for 90% TSS. The SA/DA ratio is 6.4%. The pond average depth is 3.0 feet and it is sized to contain and drawdown the runoff volumes associated with both the 1.5 and 2.0 inch storms. The minimum required pond surface area is 2,273 SF compared to the 3,675 SF provided. The work area does not impact any wetlands. The site drains to Cogdel's Creek which is classified as SC;NSW (Index #19-23). All work is located greater than fifty feet from surface waters. 1.5 acres of the site will be disturbed by this project in order to construct the parking area The sedimentation and erosion control plan is being concurrently submitted. The soils on the site are classified as Baymeade by the Onslow County Soil Survey. Baymeade is described as a loamy sand at the depths to be disturbed by this project. The property is owned by the Federal Government. There are not any known historic sites on the property. 1 9 TARP :T i 'l �' 3 Weil Pt d- � s e —� a a o 0 a 0 St Scale: 1 : 35,000 Detail: U-0 MISS: OOS01 FL% FC-3o8