Loading...
HomeMy WebLinkAboutSW8130906_CURRENT PERMIT_20210526STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 \3 OgOlo DOC TYPE] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021052to YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI secretary BRIAN WRENN i9trector May 26, 2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Division 1005 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Fnvtron iwAtal Quai ty Subject: Permit Renewal State Stormwater Management Permit No. SW8 130906 Parking Lot Addition to Building FC308 Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 130906 has been renewed on May 26, 2021, and shall be effective until September 30, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on September 30, 2013 and most recently modified October 23, 2019 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAR). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAR with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, CAU'" J� Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: %Stormwater\Permits & Projects\2013\130906 HD\2021 05 permit 130906 cc: NCDEQ-DEMLR Wilmington Regional Office ®wn A , North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 cnaaucm�+r� / 910.7%.7215 State Stormwater Management Permit No. SW8 130906 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US MCB Camp Lejeune French Creek Ambulatory Care Clinic H.M. Smith Boulevard, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond, one (1) infiltration basin, and an area of redevelopment ("stormwater control measures" or "SCMs") in compliance with the provisions of Title 15A NCAC 2H .1000 as amended by Session Law (SL) 2008-211 and subsequently amended on January 1, 2017 (2017 Rules) (collectively, the "stormwater rules") and the approved stormwater management plans, application, supplements, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until September 30, 2029 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the management and volume of stormwater described in the approved plans and specifications. The maximum amount of built -upon area (BUA) allowed for the entire project is 170,064 square feet. 2. The drainage areas for the on -site stormwater systems will be limited to the amounts of built - upon area indicated in this permit and the approved plans and specifications. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater control measures labeled Drainage Area 1 and Drainage Area 3 have been designed using the runoff treatment method to handle the runoff from 19,784 and 29,620 square feet of built -upon area, respectively. This permit does not provide any allocation of built -upon area for future development. 3. Drainage Area 2 is being redeveloped and is exempted from State Stormwater permitting requirements under the following conditions: a. The project must be constructed as shown on the plans submitted to this Office, b. The total proposed built -upon area of 120,660 square feet does not exceed the existing built -upon area of 160,300 square feet; and, c. The proposed stormwater controls; a dry detention basin, grass channels, vegetated sheet flow, and piped collection systems, provides equal protection of surface waters as the existing stormwater control; which is grass channels, vegetated sheet flow, and piped collection systems. Page 1 of 5 State Stormwater Management Permit No. SW8 130906 A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters, measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline in accordance with the stormwater rules and the approved plans and specifications. 5. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. 6. The following design criteria have been provided in the wet detention pond treating Drainage Area 1 and which must be maintained at design condition: a. Rules: Session Law 2008-211 b. Drainage Area, acres: 0.815 Onsite, ft2: 35,508 Offsite, ft2: 0 c. Total Impervious Surfaces, ft2: 19,784 Onsite, ft2: 19,784 Offsite, ft2: 0 d. Design Storm, inches: 1.5 e. Average Pond Design Depth, feet: 3.0 f. TSS Removal Efficiency: 90% g. Permanent Pool Elevation, FMSL: 19.0 h. Permanent Pool Surface Area, ft2: 3,675 i. Permitted Storage Volume, ft': 3,280 j. Temporary Storage Elevation, FMSL: 19.7 k. Pre-dev. 1-yr 24-hr discharge rate, cfs: 0.02 I. Controlling Orifice: 1.0" dia. pipe m. Orifice Flowrate, cfs: 0.01 n. Permitted Forebay Volume, ft': 1,452 o. Fountain Horsepower: n/a p. Receiving Stream / River Basin: Cogdel's Creek / White Oak q. Stream Index Number: 19-23 r. Classification of Water Body: Sc, NSW 7. Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30,000 cubic feet. 8. The infiltration basin treating Drainage Area 3 is permitted based on the design criteria presented in the sealed, signed and dated supplements and as shown in the approved plans and specifications. The infiltration basin is designed based on the 2017 Rules and 2017 minimum design criteria (MDC). This stormwater control measure must be provided and maintained at the design condition. The approved supplement is incorporated by reference into this permit. 9. The peak flow from the 10-year storm event directed to the infiltration basin shall not cause erosion downslope of the stormwater outlet discharge point. 10. The following pretreatment devices have been provided for the infiltration basin to prevent clogging: grass channel, sumps, and gravel diaphrams. 11. Areas of landscape material have been proposed within the project area with the intent of providing vegetative control such that they are considered a pervious surface. If, in the future, this area is found to no longer be pervious through resurfacing, a permit modification will be required. Page 2 of 5 State Stormwater Management Permit No. SW8 130906 II. SCHEDULE OF COMPLIANCE 1. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 2. The on -site stormwater management system shall be entirely constructed, vegetated, and operational for its intended purpose prior to the construction of any development within the drainage area, per the approved plans and specifications. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. All stormwater control measures, stormwater collection systems vegetated conveyance systems, and/or maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. 5. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement, to assure that all components of the permitted on -site stormwater system functions at the approved design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 7. The final plats for the project must be recorded with the Office of the Register of Deeds. The recorded plat must reference the Operation and Maintenance Agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 8. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the maximum allowed by this permit. 9. Upon completion of the project, the permittee shall determine whether or not the project is in compliance with the permitted plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the permitted plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded maintenance agreement, iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the permitted plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. Page 3 of 5 State Stormwater Management Permit No. SW8 130906 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. 12. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 4 of 5 State Stormwater Management Permit No. SW8 130906 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08, C. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121, Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project, C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 26 day of May 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION �-J'I%LIOY�-�1 �N+X..r f, rian�n Dire for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 State Stormwater Management Systems Permit No. SW8 130906 French Creek Ambulatory Care Clinic Stormwater Permit No. SW8 130906 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date cc: NCDEQ-DEMLR Regional Office SEAL Page 1 of 2 State Stormwater Management Systems Permit No. SW8 130906 General Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. All slopes are grassed with permanent vegetation. 6. Vegetated slopes are no steeper than 3:1. 7. The inlets are located per the approved plans and do not cause short-circuiting of the system. 8. The permitted amounts of surface area and/or volume have been provided. 9. All required design depths are provided. 10. All required parts of the system are provided. 11. The required dimensions of the system are provided, per the approved plan. 12. All components of the stormwater control measure are located in either recorded common areas. or recorded easements. Wet Pond Certification Requirements: The outlet/bypass structure elevations are per the approved plan. 2. The outlet structure is located per the approved plans. 3. A trash rack is provided on the outlet/bypass structure. 4. Required drawdown devices are correctly sized per the approved plans. Infiltration System Certification Requirements: The bypass structure weir elevation is per the approved plan. 2. The bypass structure is located per the approved plans. 3. A trash rack is provided on the bypass structure. Page 2 of 2 Attachment C - Permitting History P4040 French Creek Ambulatory Care Clinic Permit No. SW8 130906 A Date Date permit Action BIMS Version Description of the Changes 9/30/2013 Original Approval 10 Expansion of project area to 1/8/2018 Modification 1.1 cover entire complex; additional BUA Revised layout: redevelopment of drainage 10/23/2019 Modification 12 area; reduction in project area and BUA; design of infiltration basin shape and volume change 5/26/2021 Renewal 2.0 & Maintenance Agreement Project Name Project Location P4040 French Creek Ambulatory Care Clinic Addition/Alteration Marine Corps Base, Camp Lejeunne Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & coresponding O&M tables will be Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity:I Disconnected Impervious Area Present: User Defined BMP Pr.C.nt. Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): rnn.i�••/•.\. 1 Ad No CLICK TO UPDATE O&M MANUAL I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Neal Paul Deputy Public Works Officer, MCB Camp Lejeune Building 1005 Michael Road MCB Camp Lejeune 910-451-2213 neal.paul@usmc.mil Signatu L) , I D tAe:'► l , a Notary Public for the State of County of do hearby certify ,th�,a,t��,tQ personally appeared before me this v fL day of L. ����-( and acknowledge the due execution of the Op rations and Maintenance Agreement . Witness my hand and official se �Nn p10TAR1- �'LBLIG commission expires ECEIVE' OCT 0 8 1019 BY STORM-EZ Version 1.4 O&M Manual 8/29/2019 Page 1 of 3 =V -� ti i'..±- l �..! S `� �: C Important maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or Swale The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the swale (if applicable). Regrade the swale if necessaryto smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated and reduced the depth to 75% of the original design depth. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or riprap is displaced. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment has accumulated. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than 5 days after a storm event, Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. ' Weeds and noxious plants are growing in the main Remove the plants by hand or by wiping them with pesticide (do not spray). treatment area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. CC� to grow on the embankment. C O V An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local INC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM LZ Version 1.4 O19 Page 2 of 3 O&M Manual �5 �'� . ��' i !i � ��it1 � ' �� � Important operation and maintenance procedures: The roof area will be maintained to reduce the debris and sediment load to the system. Excess debris can clog _ the system and lead to bypass of the design storm, and reduced infiltration and pollutant removal. To ensure proper operation as designed, a licensed Professional Engineer, Landscape Architect, or other qualified professional will inspect the system annually. The system components will be repaired or replaced whenever they fail to function properly. The system will be visually inspected by the owner/operator at least quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately BMP element: Potentialproblem: How to remediate theproblem: The captured impervious area Excess debris or sediment is present on the rooftop or Remove the debris or sediment as soon as possible. impervious surface. The gutter system (if applicable) Gutters are clogged, or water is backing up out of the gutter Unclog and remove debris. May need to install gutter screens to prevent future clogging. system. Rooftop runoff not making it into gutter system. Correct the positioning or installation of gutters. Replace if necessary to capture the roof runoff. Rooftop runoff causing Install or repair splash blocks as needed. erosion at outlet. Roadways & parking lots (if applicable) Runoff flows to the pervious area as concentrated flow. Remove any sediment or obstructuions at the edge of the impervious area, repair gravel verge Energy dissipaters are unever Repair or replace energy dissipater. settled, undercut, eroded or otherwise damaged. The pervious area Erosion is evident Repair the eroded area and stabilize immediately. There is erosion around the end of the pervious area that shows stormwater has Regrade the soil to create a small berm, and then plant turf grass and water until it is established. Provide lime and a one-time fertilizer application. bypassed it. Unintended trees or shrubs have begun to grow in the Remove them and re-establish vegetation per the original landscaping plan. pervious area. Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant with turf grass and water until it is established. Provide lime and a one- time fertilizer application. Standing water is present 24 hours after rainfall. Fill shallow depressions with topsoul and seed mix. Regrade the area as necessary to reestablish sheet flow across the pervious area. Vegetation is too long. Maintain vegetation at a height of approximately 2 to 6 inches.. Property Owner Participation Homeowners have re-routed gutters or otherwise altered Provide educational materials to homeowners, and contact neighborhood HOA. the system in a manner which adversely impacts performance. ECEINE OCT 0 8 2019 STORM-EZ P Version 1.4 O&M Manual 8/29/2019 Page 3 of 3 �. I l i � •, _ _r-e^ rY:,.1,.�.-... Permit Number: (to be provided by DWQ) Drainage Area Number: / Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 l j SEP 11 2013 BY: Page I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: / BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced, turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 5EP 1 203 !� „„ Page 2 of 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5_0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 19.0 14.0 Pe anen Pool ------------ -- Volume Sediment Removal Elevation 14.0 Volume 13.0-ftMin. -------------------------------------- Sediment Bottom Elevation 13.0 1-ft r Storage Sedimet Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 SEP 11 2013 BY: Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Constructy Parking Lots, Hadnot Point and French Creek, Building FC-308 BMP drainage area number: Print name: Title: Deputy Public Works Director Address:MCB Camp Lejeune, 1005 Michael Road, Camp Lejeune, NC 28547 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of V Vkt-k J L iV , do hereby certify that personally appeared before me this 04 day of j-L) , and acknowledge the due execution of the forgoing wet detention basin seal, KELLEY VANDECOEVERINOF NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA SEAL My commission expires Witness my hand and Form SW401-Wet Detention Basin O&M-Rev.4 tSEP i i 2013 C �t 41 BY: - Page 4 of 4 I]FMI H HSF_ UNLV DateRe•eive Fee Paid I Permit Number 61)P10 A 7 v: S D CIO (P J I i;lEc-Ironic, ( NC DEO Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM i In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 130906 2. Project name: Parking Lot Addition to Building FC308 High Density Commercial Wet Detention Pond Proiect/French Creek Ambulatory Care Clinic 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? N/A If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/energy- mine ral-land- resources/e ne rqv- mine ral-land-rules/stormwate r-prog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/enerav-mineral-land- rules/stormwater-Drooram/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor, or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ` ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PER EE'S CERTIFICATI N the person legally responsible for the permit, certify that I have a copy bf the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon and to submi roper forms to modify or transfer the permit prior to any changes to the project, SC nand o nership. II info mation provided on this permit renewal application is, to the best of my knowledge, Corr ct nd m lete. Signature: Date: 'L NOTARIZATION: Uorc, a Notary Public for the State of Ak)A t' County of r\S(O r , do hereby certify that ' I L� �'� personally appeared before me this the day of ' `Q-C.\ 20 2-1 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) ", r r r r r I III %�J SRSp� Notary Signature: = W My commission expires PV O ., 0 rCo�`��,, Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System 1 Drainage Area 3 - Adjacent to Dumpster Pad Bioretention Cell Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: Andrea Landfair, P.E. Organization: Bamforth Engineers + Surveyors Street address: 2207 Hampton Boulevard City, State, Zip: Norfolk, VA 23517 Phone number(s): 757-627-7079 Email: atm@bamforth.com Designer ,�Urrrrrrrr %QOFESS/p �� 'Q PAL r 04816 ' \ �rrr2Q . FNGINE�P•��: r'r�9Fq . LP�.�0�' Signature of Designer Date Applicant: COvINNnN. . o�rr Pro'ect Name: Fench Greekm u a ory Gare Clinic ii i n Address MCB Camp Lejeune, H. M. Smith Boulevard City / Town Jacksonville, NC Company: Commanding Officer, Marine Corps Base, Camp Lejeune Contact: Neal Paul, Deputy Public Works Officer Mailing Address: Building 1006 Michael Road City, State, Zip: MCB Camp Lejeune, NC 28547 Phone number(s): 910-451-2213 Email: neal.paul@usmc.mil Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. ECEi`/E OCT 082019 'ay:_--- Cover Page 1 4:39 PM 10/4/2019 JA- INFILTRATION SYSTEMS P4040 Fench Creek Ambulatory Care Clinic Addition/Alteration THE DRAINAGE AREA Drainage area number 3 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (so ft) - Parking I driveway (sq ft) 19875 al Total surface water area (sq fit) - Sidewalk (so ft) 1745 of Total drainage area aq ft) 60112 of - Roof (so ft) BUA associated with existing development Isq ft) 8592 of - Roadway (sq ft) 8000 of Proposed new BUA (so ft) 21028 of - Other, please specify in the comment box below (sq ft) Percent BUA of drainage area 49% Total BUA (sq ft) 29620 at COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater programfs) that apply (please specify): iDesigh rainfall depth (in) 1.601n Coastal, SC Waters JiMmunum volume required (cu ft) 3888 cf Design volume of SCM (so ft) 3893 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yee #7 If applicable, with the Si be cleaned out after construction? #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetanance access comply with General MDC (B)? Yee #3 What are the Side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC 9 ? 43 Dees the SCM have retaining walls, grown walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? ti A #4 Are the inlets, outlets, and receiving stream protected from erosion (10 year storm)? Yee #11 Is there an 08M Agreement that complies with General MDC (11)a Yee #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an 08M Plan that complies with General MDC (12)1 Yee #6 What is the method for derwalering the SCM for maintenance? Pump (preferred) #13 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM M_ DC FROM 02H .1051 #1 SHWT elevation (fms) 14.1 f1 q5 Length tt 100.Ofl #1 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes #5 Width (ft) 48.It #1 Soil infiltration rate finlhr) 2,761Nhr #5 Depth/Height (ft) 1.20fl #1 Brady Describe the hydraulic properties and characteristics of the soil profile'. #5 Surface area of fire bottom of me infiltration system (sq feel) 2984 of Sandy soil #5 Pending depth of the design volume (in) 14.4 In #5 Estimated dowatering time (hours) 9.0 his #5 For trenches only: Perforated pipe diameter, if applicable (inches) #2 SHW T elevaton(fms) 14.0 ft #5 For Venches only: Number of laterals #2 Bottom of the Infiltration system (frost) 20.6 ft #5 For Venches only. Stone type, if applicable 02 Is a detailed hytlmgeologic study attached if the separation is between 1 and 2 feel? q5 For trenches only: Stone void ratio (%) #3 Proposed slope of Me subgrade surface (%) 0% #5 For conches only. Is stone free of fines? #3 Are terraces or baffles provided? No #5 For trenches only: Is the stone wrapped in goatskins fabric? #4 Describe the pretreatment that will be provided #6 Is the infiltration system located underground? No Grass channel, sump and gravel dlaphrogm #6 If so, has at least one infiltration port been provided? ADDITIONAL INFORMATION Please use this space to provide any information about this infiltration system that you think Is relevant to the review: Also includes dumpster pad and service area. 1 OCT 10 2019 8Y.•_ _ In(ilratio n 5:09 PM 10/10/2019 SUPPLEMENT-EZ FORM COVER PAGE ualryo r^"vo!"' Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System 1 Drainage Area 3 - Adjacent to Dumpster Pad Bioretention Cell Wet Pond Stormwater Wetland Permeable Pavement Sand Filler Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer Information for this project: Name and Title: Anna Lee Bamforth, P.E., L.S., President Organization: Bamforth Engineers + Surveyors Street address: 2207 Hampton Boulevard City, State, Zip: Norfolk, VA 23517 Phone number(s): 757-627-7079 Email: alb@bamforth.com Designer C ARG(���� i ��� •pFESS/�yi9� a SEAL 029841 I�d�1111 Signature of Designer tl/1e/1-1 ECEIVE DEC 0 6 20V ®Y: Applicant: Project Name: P4040 FenchCreek m u atory Care Clinic Addition/Alteration Address MCB Camp Lejeune, H. M. Smith Boulevard City / Town Jacksonville, NC Company: Commanding Officer, Marine Corps Base, Camp Lejeune Contact: Neal Paul, Deputy Public Works Officer Building 1006 Michael Road Mailing Address: City, State, Zip: MCB Camp Lejeune, NC 28547 Phone number(s): 910-451-2213 Email: neal.paul@usmc.mil Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 4:28 PM 11/27/2017 • 1 iM iC r''� • i>E?Sir INFILTRATION SYSTEMS P4040 Fench Creek Ambulatory Care Clinic Addition/Alteration TH j--05911TAGE AREA 1 Dranage area number 3 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (I it) - Parking / driveway (sq it) 22364 sf Total surface water area (sq it) - Sidewalk (sq ft) 1446 sf Total drainage area (sq fl) 54300 sf - Roof (so ft) BUA associated with existing development (so ft) 9164 sf - Roadway (sq fl) 6890 sf Proposed new BUA (sq ft) 21536 at - Other, please specify in the comment box below (sq ff) Percent BUA of drainage area 57 % Total BUA lag ft) 30700 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater programs) that apply (please specify): IDesigh rainfall depth (in) 1.50 in Coastal, SC Waters Minimum volume required (cu ft) 3821 ct Design volume of SCM (cu ft) 4327 cf GENERAL MDC FROM 02H .1050 M1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 07 If applicable, with the SCM be cleaned am after construction? / k2 Is the SCM located on or near contaminated soils? No 118 Does the maintenance access comply with General MDC (8)? Yes k3 What are the side slopes of the SCM (H:V)? 3:1 »9 Does the drainage easement comply with General MDC (9)? U/1ee k3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 It the SCM is on a single family lot, does the plat comply with General MDC (10)? N/rf k4 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes k5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an 08M Plan that complies with General MDC (12)? Yes k6 What is the method for dewatering the SCM for maintenance? Pump (preferred) #13 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM MDC FROM 02H .3051 ki SHWT elevation (fmsl) 14.0 ft N5 Length (ft) 80.0 If k1 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes k5 Width (h) 40.1 N1 Sail infiltration rate (in/hr) 2.75 in/hr k5 Depth/Height (it) 1.50 it ki Briefly describe the hydraulic properties and characteristics of the sail profile: k5 Surface area of the bottom of the infiltration system (sq feet) 2800 sf Sandy soil k5 Pending depth of the design volume (in) 14.4 in N5 Estimated dewatering time (hours) 9.0 his n5 For trenches only: Perforated pipe diameter, if applicable (inches) k2 SHWT elevation (fmsl) 14.0 it N5 For trenches only: Number of laterals N2 Bottom of the Infiltration system Ifni 20.6 it k5 For trenches only: Stone type, if applicable N2 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? NtA N5 For trenches only: Stone void ratio (%) N3 Proposed slope of the subgrade surface (%) 0% q5 For trenches only: Is stone free of fines? N3 Are terraces or baffles provided? No k5 For trenches only: Is the stone wrapped in geotexlile fabric? k4 Describe the pretreatment that will be provided: 86 Is the infiltration system located underground? No Grass channel, sump and gravel diaphragm p6 If so, has at least one infiltration porl been provided? ADDITIONAL INFORMATION Please use this space to provide any information about this infiltration system that you think is relevant to the review: Also includes dumpster pad and service area Infiltration 1 2:30 PM 12/29/2017 Perm it No.����j✓`� no be irovided by DWO) ®�� 02��0....FW�AT f;,?? NCDENR o Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This fomr must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. IA P.ROJECTi1NF.ORMATION Project name ! - Construct Parking .Lots, Hadnot Point B French Creek, Building FC-308 Contact person Joseph.C. Avofs,.RE. Phone number '252-633-0068 Date '8-Aug-13 . Drainage area number i1. 11.9DESIGNIINF,ORMATION Site Characteristics Drainage area Impervious area, post -development h impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Form SW401-Wet Detention 9asin-Rev.94/18/12 I 508ryv 19,784''e 55.72 i 1i51in 2,460;ft3 3,2801ft3 I - ! OK, volume provided is equal to or in excess of volume required. •ft3 �!(Y or N) 3.Tin 0.15!(unidess) O.66i(unitless) ! 0.151inlhr Insufficient. Check intensity calculation. �K 0.02 ft3lsec 0.08 ft3lsec 0.06 ft3/sec 19.701fmsl i 19.0w hr sl 19.00ifinsl 19.50;fmsl 18.50jfmsl 14.00' fmsl '-13.00;fmsl 1.00 It 'Y j(Y or N) I 1 19.71fmsl OK SEP i 1 2013 J BY: Parts I. b II. Design Summary, Page 1 of Permit (to be provided by DWQ) II.ADESIGNIINF,ORMATION=' Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ap,,,,_, a Area, bottom of 10ft vegetated shelf, A, ,i„ n Area, sediment cleanoul top elevation (bottom of pond), Ay ,.rt Volumes Volume, temporary pool Volume, permanent pool, Vr, -,, Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vr,,,, Area provided, permanent pool, Ar,,,,,� Average depth calculated Average depth used in SAIDA, dam„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A,,,. Area, bottom of 10ft vegetated shelf, A vLmer Area, sediment cleanoul, top elevation (bottom of pond), A,i m ....-5,371if1z 2,273 fe 6.40I(unitless) 3,675je OK 2.375,ft` 378,,e _ 3,280,ft' OK 7,254fts 1,452fts 20.0% % OK �90p % Y i(Y or N) N ',(Y or N) 6.40 (unitless) N VorN) 7,254 ft' 3,675 It` I Ift i Y. i(Y or N) 3,675 fl 2,375 ft 378 ftz 'Depth' (distance bIw bottom of 10ft shelf and top of sediment) 4.50 ft Average depth calculated - 3.01ft Average depth used in SAIDA, d.., (Round to down to nearest 0.5ft) 3.0;ft Dmwdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width rafio Trash rack for overflow & orifice? Freeboard provided Vegetated filler provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Forth SW401-Wet Detention Basin-Rev.94I18/12 ift 0.02Y/sec 0.02 fta/sec j 0.01 fta/sec I 2.60days Need 3 fit min. OK OK Of, draws down in 2-5 days. OK 101:1 OK t.. 10.01ft OK 3 :1 OK SEP 11 2013 ;� d IL EY: Parts 1.611. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED.ITEMS CHECKLIST = :- " = -- Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. 11� G( (P 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and �j �� - Filter strip. rA%f'I L' L4P 3. Section view of the wet detention basin (1" = 20' or larger) shoving: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. /_ CJ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified /_ on the plans prior to use as a wet detention basin. GIB 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, 6r to verify volume provided. A CS 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. n AgAC ZO 7. The supporting calculations. {�iJa `Ff1C7 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. (J� 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 r1i SEP20♦� a Part III. Required Items Checklist, Page 1 of 1 J RY:___.._—