Loading...
HomeMy WebLinkAboutSW8120217_COMPLIANCE_20120402STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 12 02.1'1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE 20►20402. YYYYMMDD Permit: SW8900431 County: Onslow Region: Wilmington Compliance Inspection Report _ 7 - 7'4 o7q7silP eon / Effective: 08/03/90 Expiration: Contact Person: William Bodenhamer Title: Directions to Project: Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 -(Northeast Creek) (03-05-02) ( SC;NSW) On -Site Representative(s): Owner: William Bodenhamer' Project: Northeast Office Park Country Club Rd Jacksonville NC 28546 Phone: Related Permits: SW8091107 William Bodenhamer - Lot 20 Northeast Office Park Section II Inspection Date: 04/02/2012 Entry Time: 02:40 PM Exit Time: 03:00 PM Primary Inspector: Alida R Lewis Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: M State Stormwater (See attachment summary) Phone: 910-796-7215 Inspection Type: Compliance Evaluation 6; Page:1 Permit: SW8900431 Owner - Project: William Bodenhamer Inspection Date: 04/02/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The outlet structures in both ponds need to be maintained. Both are blocked by trash and sediment accumulation. Please provide the emergency maintenance now for the outlet structures and the routine maintenance necessary to comply with your permit. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Yes No NA NE ■❑❑❑ ■ ❑ ❑ ❑ ■ ❑ ❑ Cl ■❑❑❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ® O ❑ ❑ Yes No NA NE ■ ❑ ❑ Cl ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑ e ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑ ❑ ■ upon request? Comment: The outlet structures in both ponds need attention. The trash rack on the pond behind Josh Court is completely covered by trash accumulation - no overflow can occur from this pond in its current condition. The entire outlet structure for the pond behind Cliff Court is filled with trash and sediment and is completely blocked off. There is no orifice flow or overflow possbile from this pond in it's current condition. Page: 2