HomeMy WebLinkAboutSW8120216_CURRENT PERMIT_20120222STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 \2 02 t �p
DOC TYPE
N] CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2o►2 o222
YYYYMMDD
A.
NCDUMW
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakiki, P.E.
Governor Director
February 22, 2012
Mr. Edward Carey
25 W. Oxford Street
Wrightsville Beach, NC 28480
Subject: EXEMPTION
Stormwater Project No. SW8120216
Carey Residence Boatlift Project
New Hanover County
Dear Mr. Carey:
Dee Freeman
Secretary
The Wilmington Regional Office of the Division of Water Quality received a copy of the CAMA Major Permit Application for the
subject project on February 6, 2012. Staff review of the plans and specifications has determined that the development activities
proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that
projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not
be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this
letter, we are informing you that this project will not require a stormwater management permit
If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to
the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an
NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the
construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed,
whichever occurs first.
Please note that the stormwater rules require the Division to permit the common plan of development, therefore, any future
development of the property, regardless of whether or not a CAMA Major permit is required for that specific development, will
require a Stormwater Management Permit application and permit issuance from the Division of Water Quality prior to any
construction.
If you have any questions or need additional information concerning this matter please contact Linda Lewis at (910) 796-7215,
or e-mail her at linda.lewis@ncdenr.gov.
Since ty
1EG �Di
Charles Wa '' , P
C
Division of Water Quality
GDS/ad: S:1WQS1StornwaterlPermits & Projects12012 X120216 Exemption12012 02 permit 120216
cc. Hohie Buffington; Boatzright, Inc.
New Hanover County Building Inspections
Robb Mairs/DCM-WIRO
Doug Huggett, DCM
Wilmington:Regional OfficeStormwater File -
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington. North Carolina 28405
Ptgne: 910-7W72151 FAX 910,IW20D4
Internet www.nomatMuaGty.org
An Equal Opportunity 1 Affirmative Action Employer
N,��tt1Carotin