Loading...
HomeMy WebLinkAboutSW8120216_CURRENT PERMIT_20120222STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 \2 02 t �p DOC TYPE N] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2o►2 o222 YYYYMMDD A. NCDUMW North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakiki, P.E. Governor Director February 22, 2012 Mr. Edward Carey 25 W. Oxford Street Wrightsville Beach, NC 28480 Subject: EXEMPTION Stormwater Project No. SW8120216 Carey Residence Boatlift Project New Hanover County Dear Mr. Carey: Dee Freeman Secretary The Wilmington Regional Office of the Division of Water Quality received a copy of the CAMA Major Permit Application for the subject project on February 6, 2012. Staff review of the plans and specifications has determined that the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this letter, we are informing you that this project will not require a stormwater management permit If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed, whichever occurs first. Please note that the stormwater rules require the Division to permit the common plan of development, therefore, any future development of the property, regardless of whether or not a CAMA Major permit is required for that specific development, will require a Stormwater Management Permit application and permit issuance from the Division of Water Quality prior to any construction. If you have any questions or need additional information concerning this matter please contact Linda Lewis at (910) 796-7215, or e-mail her at linda.lewis@ncdenr.gov. Since ty 1EG �Di Charles Wa '' , P C Division of Water Quality GDS/ad: S:1WQS1StornwaterlPermits & Projects12012 X120216 Exemption12012 02 permit 120216 cc. Hohie Buffington; Boatzright, Inc. New Hanover County Building Inspections Robb Mairs/DCM-WIRO Doug Huggett, DCM Wilmington:Regional OfficeStormwater File - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington. North Carolina 28405 Ptgne: 910-7W72151 FAX 910,IW20D4 Internet www.nomatMuaGty.org An Equal Opportunity 1 Affirmative Action Employer N,��tt1Carotin