Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8111207_HISTORICAL FILE_20111222
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Mlo-1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ?,CM 1 Z -L2.. YYYYMMDD WA �AV . NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Governor Director December 22. 2011 Commanding Officer MCB Camp Lejeune c/o Carl Baker, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 111207 Neuse Road Extension Overall Low Density with an Area of High Density Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Neuse Road Extension on December 22, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 111207 dated December 22, 2011, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until December 22, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sincerely, (r or CoIee Sullins, Director Division of Water Quality GDS/can: S:\WQS\Stormwater\Permits & Projects\2011\111207 HD\2011 12 permit 111207 cc: Howard Resnik, Coastal Site Design Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, Norm Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-2004 \ Customer Service: 1-877623 6748 NorthCarolina Internet: htlp://portaln`odenr.org , cTN Naturally Jf♦ atually State Stormwater Management Systems Permit No. SW8 111207 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY WITH AN AREA OF HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Camp Lejeune Marine Corp Base Neuse Road Extension Neuse Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of an overall 24% low density development with one (1) wet detention pond used to treat an area of high density in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 22, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The overall tract built -upon area percentage for the project must be maintained at no more than 24%, as required by the stormwater rules. 3. This permit covers the construction of a total of 104,376 square feet of built -upon area, which includes 93,779 square feet of proposed BUA, 3,650 square feet of future BUA allocation and 6,947 square feet of existing BUA. The stormwater system for the designated area of high density has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. Of the 104,376 square feet of built -upon area covered by this permit, the stormwater control has been designed to handle the runoff from 51,427, square feet of built -upon area. 4. Outside of the designated area of high density, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 5. Outside of the designated area of high density, no piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 111207 6. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 7. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. 8. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 3,650 square feet. 9. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 10. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 11. All runoff directed into wetlands shall flow into and through the wetlands at a non - erosive velocity of 2 feet per second or less. 12. All runoff directed into and through the vegetative buffer must flow through the buffer in a diffuse manner. 13. The runoff from the higher density area within this overall low density project is being collected and treated in a wet detention pond. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, Acres: Onsite, ft : Offsite, ftz: b. Total Impervious Surfaces, ftz: Onsite, ft : Offsite, ftz: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSy g. Permanent Pool Surface Ares, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permanent Pool Volume, ft3: n. Forebay Volume, ft3: o. Fountain Horsepower P. Receiving Stream/River Basin: q. Stream Index Number: r. Classification of Water Body: 2.02 88,000 none 51,427 51,427 none 1.5 3.5 90% 15.5 6,411 6,909 16.4 2.53 1.5" 0 pipe 0.03 16,555 3,340 n/a Northeast Creek / White Oak 19-16-(4.5) "Sc-NSW" Page 3 of 8 State Stormwater Management Systems Permit No. SW8 111207 It. SCHEDULE OF COMPLIANCE 1. The permittee shall not allow any person, including the permittee, to alter any part of the approved stormwater management system or fill in, alter, or pipe any of the vegetated conveyances shown on the approved plans, except for minimum driveway crossings, unless and until the permittee shall have submitted a modification to the permit and received approval from the Division of Water Quality. 2. The permittee is responsible for monitoring the project on a routine basis and verifying that the proposed built -upon area does not exceed the allowable built -upon area. 3. Swales, vegetated conveyances, and the stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 5. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 7. Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30,000 cubic feet. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 111207 12. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. Construction of any designated future development areas. 13. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. Approved plans, application, supplements, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. Any activities undertaken at this site prior to receipt of the necessary permits or approvals to do so is considered a violation of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 111207 In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143- 215.1 et. al. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 22nd day of December, 2011. NQRTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 MEMORY TRANSMISSION REPORT FILE NO. 741 DATE 12.22 14:52 TO : 8 919104512927 DOCUMENT PAGES 9 START TIME 12.22 14:52 END TIME 12.22 14:54 PAGES SENT 9 STATUS OR *** SUCCESSFUL TX NOTICE TIME :12-22-'ll 14:54 FAX NO.1 :910-350-2004 NAME :DENR Wilmington *** 127 Cardinal Dr. Exl. Wilmington, NC 28405 91 0-796-7215 910-350-2004 FM To: Fau: Phone: Re: From: ' I5 0 1 Pages: Date: cc: 2-.-22 ❑ Urgent ❑ For Review O Please Comment ❑ Please Reply O Please Recycle o Comments: �ow�-ra Spa � J`�Sfi ��oP t:ts coP� In S�e ks J, _ � . �SSue Cy STORMWATER MANAGEMENT CALCULATIONS For CAMP JOHNSON NEUSE ROAD EXTENSION PREPARED FOR Deputy Public Works Officer 1005 Michael Road MCB Camp Lejeune 28547 Prepared by: COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License R C-2710 1CAR0��'� �Q-.�Egs�ol�y SEAL r ; a 025483 INE Howard Resnik, P.E. I?, fol if P44 l i%/zz f ll RECEIVED DEC 2 2 2011 BY:___ COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 FOR STORMWATER EXPRESS REVIEW December 13, 2011 PROJECT NAME: P1319 Neuse Road Ext. MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: This project is for the construction of a parking lot, sidewalk and a roadway extension to be located at Camp Johnson at Camp Lejeune. Land disturbance associated with the improvements will be approximately 6.0 acres. The owner is the United States Marine Corps. There are no wetlands located within the area of the development. Stormwater from the site will drain to SC;NSW waters located in the White Oak River Basin (Index # 19-16-4 .5). The project will be low density utilizing sheet flow to natural ground. There is a pocket of high density associated with the parking lot. The runoff from the parking lot and part of the road way extension will be conveyed to a pond designed for 90% TSS using an underground stormwater collection system and open swales. Proposed impervious for the site is 24%. The project will have direct access onto Hoover Road and Neuse Road. The roadway extension will extend Neuse Road till it intersects with Hoover Drive. an 4cfc. PROJECT BMP: low density with.#eeket-of high density STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 7914441 office 910 791 1501 fax RECEIVED DEC 2 2 .Z011 BY: DWO LOW DENSITY CALCULATIONS Allowable Impervious 434,901 sf x 0.24 = 104,376 sf Proposed Impervious 104,376 sf 104,376 / 434,901 = 0.239 or 24% PROJECT DATA: Total Site Existing Site Data (areas within property boundary): wetland area upland area Total site area Proposed Site Data: Proposed asphalt sidewalks existing future Total proposed impervious area RECEIVED DEC 2 2 .2011 BY:_____ 0.00 sf (0.00 acres) 434,901 sf (9.98 acres) 434,901 sf (9.98 acres) 77,508 sf (1.78 acres) 16,271 sf (0.37 acres) 6,947 sf (0.16 acres) 3,650 sf (0.08 acres) 104,376 sf (2.39 acres) 4ACoastal Sho Design, PC P.O. Box 4041 WTmiVoq NC 280 PROJECT DATA: Pond B Existing Site Data (areas within property boundary): wetland area 0.00 sf (0.00 acres) upland area 88,000 sf (2.02 acres) Total site area 88,000 sf (2.02 acres) Proposed Site Data: Proposed asphalt 48,473 sf (1.11 acres) sidewalks 2,954 sf (0.07 acres) Total proposed impervious area 51,427 sf (1.18 acres) Soil Types: Abbreviation Type and Description Hydrologic Group Area Bmb Baymeade A 2.02 ac (See attached soils map and pages 132-134 of Table 15, "Physical and Chemical Properties of the Soils") RECEIVED DEC 2 2 1011 BY: Coastal Site Design, PC P.O. Box 4041 Wilmington, NC 28408 POND B CALCULATIONS Pre-dev. Value of Runoff Coefficient (c) for Rational Formula = 0.20 Area = 88,000 sf or 2.02 acres Qmax for pre-dev 1-yr storm = 2.53 cfs Post Dev Value of Runoff Coefficient (c) for Rational Formula = 0.64 Area = 88,000 sf or.2.02 acres ((51,427 x 0.95) + (36,573 x 0.20)) / 88,000 = 0.6380 or 0.64 Qmax for post-dev 1-yr storm = 8.09 cfs Routed site — areas draining to pond routed through pond (see hydrograph summary & reports): Qmax for post route 1-yr storm = 0.03 cfs Summary Qmax for routed post dev 1-yr/24-hr storm = 0..03 cfs < 2.53 cfs.... 0.K. RECEIVED DEC 2 2 .2011 BY: Coastal Site Design, PC P.O. Box 4041 Wihninoon, NC 28408 WET DETENTION BASIN CALCULATIONS NEUSE ROAD EXT. Pond B DETERMINE IMPERVIOUS PERCENTAGE area to basin = 88,000 at 2.02 acres buildings = - at - acres paved parking areas = 48,473 sf 1.11 acres sidewalks = 2,954 sf 0.07 acres fire road = - sf - acres future = sf - acres roads existing = - at - acres total impervious surface= 51,427 at 1.18 acres total non -impervious surface = 36,573 sf 0.84 acres percent imp. = 58.4 % DETERMINE REQUIRED SURFACE AREA from 90°h TSS Removal Chart: ® depth = 3.5 it imp % SA/DA 50 5 58.4 x 60 6 x = 5.84 minimum surface area = 0.0584 x = 5,143 at surface area provided = 6,411 st 6f elevation 15 1.5" VOLUME DETERMINATION: DETERMINE RUNOFF COEFFICIENT (Rv) I = 58.4 percent impervious Rv = ? (runoff coefficient, inches per inch) Rv= 0.05 + 0.009 (1) Rv = 0.58 in/in DETERMINE VOLUME design storm = 1.5 inch Rv = 0.58 in/in drainage area = 2.02 acres volume = ? volume = (design storm)(Rv)(drainage area) volume = 0.1 acre-ft volume = 6,336 cf of required storage volume r ar f-Z=CEIVED DEC 2 2 .2011 BY:__ COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 WET DETENTION BASIN STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 11 2058 - 12 2,694 2,376 13 3,387 3,041 - 14 4,136 3,762 Bottom Shelf 15 4,942 4,539 - PP 15.5 6,411 2,838 2,838 Top Shelf 16 8,037 3,612 3,612 State Storage 16.4 8,450 3,297 6,909 17 9,085 5,261 12,170 17.5 9,634 4,680 16,850 volume at permanent pool (elev. 15.5) = 16,555 cf 1.5" storage volume provided (elev. 16.4) = 6,909 of total volume of basin = 33,405 cf surface area at bottom of 10:1 shelf (15.0) = 4,942 at volume at bottom of 10:1 shelf = 13,717 cf surface area at top of 10:1 shelf (16.0) = 8,037 of volume at top of 10:1 shelf = 20,167 cf minimum forebay volume = 3,311 cf AVERAGE POND DEPTH AREA BOTTOM SHELF (ABS) = 4,942 SF AREA PP (APP) = 6,411 SF AREA BOTTOM POND (ABP) = 2,058 SF DEPTH = 15-11 = 411 [0.25 X (1 + (ABS/APP))]+[((ABS+ABP)/2) X (DEPTH/ABS)] AVERAGE DEPTH = 3.28 ft FOREBAY A STAGE -STORAGE TABLE: INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 12 312 - 13 627 470 470 14 1,020 824 1,293 15 1,475 1,248 2.541 15.5 1,724 800 3,340 forebay volume provided = 3,340 cf FFCEIVED DEC 2 2 .2011 BY: COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 STAGE - DISCHARGE TABLE: size of orifice (in) = 1.50 crest length of weir cut (ft) = 0.00 crest length of grates (sf) = 4.0 crest length of spillway (ft) = 20.0 ELEVATION 1.5" PVC WEIR (ft) (cfs) (ifs) 15.5 0.00 16 0.04 16.4 0.06 no weir cut 17 0.07 no weir cut 17.5 0.08 no weir cut PVC DRAW DOWN Orifice size = 1.50 in Normal Pool Storage Elev. = 15.50 1.5" storage Elev. = 16.4 elevation of orifice = 15.50 elevation of weir cut = 0.0 elevation of grates = 16.4 elevation of spillway = 17.0 GRATES SPILLWAY TOTAL Me) (cfs) (cfs) 0.00 0.00 6.13 0.00 15.23 21.21 Orifice coefficient (C) = 0.6 Average head from 1.5" storage to orifice (h) = (16.4 - 15.5) /3 = 0.30 It Orifice cross sectional area (A) = pi x r^2 = 3.14 x (r/12)A2 = 0.01227 sf Acceleration due to gravity (g) = 32.2 fVs^2 Q=CA (2gh)A1/2 = 0.6 x 0.01227 x (2x32.2x0.30)A1/2 = 0.03235 cfs 6,909 / 0.03235 = 213,597 seconds = 2.47 days 0.04 0.06 6.21 36.53 RECEIVED DEC 2 2 .2011 BY: COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 Hydrograph Summary Reporlydraflow Hydrographs Extension for AutoCAD® Civil 3DO2012 by Autodesk, Inc. v9 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (CIS) (min) (min) (cult) (ft) (cuft) 1 Rational 2.529 1 5 759 Pre-Dev 2 Rational 8.092 1 5 2,428 — -- — Post-Dev 3 Reservoir 0.028 1 10 2,113 2 15.84 2.419 Routed RECEIVED DEC 2 2 2011 BY: oastal Site Design, PC a .0. Boz 4041 lmington, NC 28408 CJ_NEUSE_RD_POND_B.gpw Return Period: 1 Year Monday, 00 12, 2011 Hydrograph Report Hydranow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Hyd. No. 1 Pre-Dev Hydrograph type = Rational Peak discharge Storm frequency = 1 yrs Time to peak Time interval . = 1 min Hyd. volume Drainage area = 2.020 ac Runoff coeff. Intensity = 6.259 in/hr Tc by User IDF Curve = wilmington_2008.IDF Asc/Rec limb fact Q (cfs) 2.00 1.00 iM Pre-Dev Hyd. No. 1 -- 1 Year 0 1 2 3 4 5 Hyd No. 1 RECEIVEY� DEC 2 2 .2011 BY: 9 Monday, 00 12, 2011 = 2.529 cfs = 5 min = 759 cuft = 0.2 = 5.00 min = 1/1 Q (cfs) 3.00 2.00 1.00 3 0.00 7 8 9 10 Time (min) tACoastal Site Design, PC P.O. Box 4041 Wilmington, NC 28408 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31382012 by Autodesk, Inc. v9 Monday, 00 12, 2011 Hyd. No. 2 Post-Dev Hydrograph type = Rational Peak discharge = 8.092 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,428 cult Drainage area = 2.020 ac Runoff coeff. = 0.64* Intensity = 6.259 in/hr Tc by User = 5.00 min IDF Curve = wilmington_2008.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.180 x 0.95) + (0.840 x 0.20)] / 2.020 Q (cfs) 10.00 aM 4.00 r ", 0.00 if 0 1 — Hyd No. 2 Post-Dev Hyd. No. 2 — 1 Year 2 3 4 5 RECEIVED DEC 2 2 .Z011 BY: r, Q (cfs) 10.00 M MI 4.00 2.00 ' x 0.00 7 8 9 10 Coastal Slte Deslgnr PC Time (min) a P.O. Box 40411 Wilmington, NC 2W6 Hydrograph Report Hydranow Hydrographs Extension for AutoCAD® Civil 3002012 by Autodesk, Inc. A Hyd. No. 3 Routed Hydrograph type Storm frequency Time interval Inflow hyd. No. Reservoir name Storage Indication method used. Q (cfs) 10.00 :m . M 4.00 2.00 = Reservoir = 1 yrs = 1 min = 2 - Post-Dev = Pond B 0 300 600 — Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Routed Hyd. No. 3 — 1 Year Monday, 00 12, 2011 = 0.028 cfs = 10 min = 2,113 cuft = 15.84 ft = 2,419 cuft Q (Cfs) 10.00 � 4.00 2.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 — Hyd No. 2 I [f.I. I I j_Total storage us 2,4 c Time (min) RECEIVED 882EUSlte Design, PC P.O. Box 4041 DEC 2 2 .2 01 t WbinOon, NC 2XIS RV. Hydrograph Summary Repo rldraflow Hydrographs Extension for AutoCAD® Civil 3D®2012 by Autodesk, Inc. v9 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 3.914 1 5 1,174 Pre-Dev 2 Rational 12.52 1 5 3,757 Post-Dev 3 Reservoir 0.037 1 10 3,312 2 16.02 3,745 Routed RECEIVED 2 2 .Z'tt LDEC BY:_- -- -- - Coastal Site Design, PC P.O. Box 4041 e Wilmington, NC 28406 CJ_NEUSE_RD_POND_B.gpvv Return Period: 10 Year Monday, 00 12, 2011 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. A Hyd. No. 1 Pre-Dev Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 2.020 ac Runoff coeff. Intensity = 9.688 in/hr Tc by User IDF Curve = wilmington_2008.IDF Asc/Rec limb fact Q (cfs) 4.00 3.00 r M 1.00 0.00 -y 0 1 Hyd No. 1 Pre-Dev Hyd. No. 1 -- 10 Year 2 . 3 4 5 RECEIVED DEC 2 2 .2011 BY: Monday, 00 12, 2011 = 3.914 cfs = 5 min = 1,174 cuft = 0.2 = 5.00 min = 1/1 6 7 . 8 Coastal Site Desl9n, PC r P.O. Box 4041 Wilmington, NC 28406 1 Q (cfs) 4.00 3.00 2.00 1.00 ---N- 0.00 10 Time (min) Hydrograph Report Hydranow Hydrographs Extension for AutoCAD® Civil 3138 2012 by Autodesk, Inc. v9 Hyd. No. 2 Post-Dev Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 2.020 ac Runoff coeff. Intensity = 9.688 in/hr Tc by User OF Curve = wilmington_2008.IDF Asc/Rec limb fact Composite (Area/C) = [(1.180 x 0.95) + (0.840 x 0.20)j / 2.020 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 1 — Hyd No. 2 Post-Dev Hyd. No. 2 -- 10 Year 2 3 4 5 RECEIVED DEC 2 2 .n2011 BY: 0 Monday, 00 12, 2011 = 12.52 cfs = 5 min = 3,757 cult = 0.64' = 5.00 min = 1/1 Q (Cfs) 14.00 12.00 10.00 le . & 4.00 2.00 r 0.00 7 8 9 10 ' Coastal Site Design, PC Time (min) e, P.O. Box4041 Wilmington, NC 28406 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 00 12, 2011 Hyd. No. 3 Routed Hydrograph type = Reservoir Peak discharge = 0.037 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,312 cuft Inflow hyd. No. = 2 - Post-Dev Max. Elevation = 16.02 ft Reservoir name = Pond B Max. Storage = 3,745 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 Om 4.00 2.00 0.00 0 300 — Hyd No. 3 Routed Hyd. No. 3 — 10 Year 600 900 1200 1500 1800 2100 2400 2700 H o I[. [ [ I I❑ Total storage used = 3,745 cuft 2ECEIVE� Coastal Site Design, PC DEC 2 2 ,2011 , P.O,Box 4041 Wilmington, NC 28408 BY: Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 — 1 0.00 3000 Time (min) Pond Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2012 by Autodesk, Inc. v9 Pond No. 1 - Pond B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 15.50 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 15.50 6,411 - 0 0 0.50 16.00 8,037 3,604 3,604 0.90 16.40 8,450 3,297 6,901 1.50 17.00 9,085 5,259 12,160 2.00 17.50 9,634 4,679 16,838 Monday, 00 12, 2011 Culvert / Orifice Structures Weir Structures [A] [B] IC[ [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.50 0.00 0.00 Crest Len (ft) = 4.00 0.00 20.00 0.00 Span (in) = 15.00 1.50 0.00 0.00 Crest El. (ft) = 16.40 0.00 17.00 0.00 No. Barrels = 1 1 0 0 Weir Coeft. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 15.50 15.50 0.00 0.00 Welr Type = 1 Rect Broad - Length (ft) = 22.00 1.00 0.00 0.00 Multstage = Yes Yes No No Slope(%) = 0.10 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(in/hr) = 0.000 (by Contour) Multistage = n/a Yes No No TIN Elev. (ft) = 0.00 v Note'. Culvem0fdlce ouMlows are analyzed under inlet (ic)end outlet (ac)control, Weir dseni checked for oatoe conditions(ic) and suCmergn (a). Stage (ft) Stage / Discharge Elev (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 17.50 17.30 17.10 16.90 16.70 16.50 16.30 16.10 15.90 15.70 15.50 0.00 2.00 4.00 6.00 8.007DEC - &00-14A0 16.00 18.00 20.00 22.00 24.00 26.00 CAVED Coastal Site Deslgn, PC Discharge (cfs) Total O 2 2 .M1 . P.O. Box4041 Wilmington, NC 28400 . Hydraflow Storm Sewers Extension for AutoCAD® Civil 3D® 2011 Plan EW-20 4 Outlatl Ouda 14 M" MiL5 11 EW-32 -33 OWY 1 OWY OLd" O hT�l 2] d c-1 2 LIM c m N N C y C3 V ss �Projecfflle: OJ-STORM_NEUSE.stm Number of lines: 14 pate: 12/82011 s� s...,.a.os Storm Sewer Summary Report Pape 1 Line No. Line ID Flow Una Una Una Invert Invert Line HGL HGL minor HGL Dro Junction rate Size shape length EL Do EL Up Slope Down Up loss Jund Line Type (cts) (in) (it) (n) (n) N (rt) IRI (rt) (ttl No. 1 SD-46 6.30 15 Cir 131.890 15.79 16.12 0.250 16.79' 18.22' 0.20 18.42 End Generic 2 SD-45 (1) 3.80 15 Cir 92.799 16.22 16.45 0.248 18.42' 18.74' 0.07 18.82 1 Generic 3 SD46 1.80 15 C's 97.146 16.55 16.79 0.247 18.82' 18.89' 0.03 18.93 2 Generic 4 SD-24 EW A 2.80 15 Cir 84.042 16.51 16.93 0.500 17.18 1Z61 0.27 17.87 End OpenHeadwall 5 SD42 9.70 18 Cir 56.419 13.09 13.37 0.496 15.50' 15.98' 0.37 16.35 End Manhole 6 SD41 8.10 18 Cir 79.827 13.47 14.03 0.702 18.35' 16.82' 0.08 16.90 5 Manhole 7 SD-40(1) 8.10 18 Cir 115.672 14.13 15.29 1.003 16.90' 17.59' 0.30 17.89 6 Manhole 8 SD40 7.80 15 Cir 22.680 15.54 15.77 1.014 17.89' 1822' 0.63 18.85 7 OpenHeadwall 9 SD-51 0.30 15 Cir 52.123 15.54 15.72 0.345 17.89' 17.89' 0.00 17.89 7 Grate 10 SD-39 1.00 15 Cir 65.104 15.11 15.36 0.364 15.51 15.77 0.12 15.90 End OpenHeadwall 11 SD-27 EIJih-EU -I 2.80 15 Gr 41.399 14.43 14.66 0.556 15.10 15.36 0.25 15.60 End OpenHeadwall 12 SD44 EW16-EW;!0 8.80 15 Cir 25.528 14.28 14.41 0.509 15.32' 15.72' 0.48 16.20 End OpenHeadwall 13 SD-69 GQ.-;,o G1a O.O 0.90 15 Cir 64.598 13.90 14.06 0.248 14.28 14.56 0.06 14.62 End Combination 14 SD-25 1.60 15 Cir 39.515 13.72 13.92 0.506 16.35' 16.37' 0.03 16.40 5 Generic n v n 0 0 d x y A a V) J C3 DEC Y� 2 2 .2011 BY: Project File: CJSTORM_NEUSE.stm Number of lines: 14 Run Date: 12/82011 NOTES: Realm period - 10 Yrs. ; 'Surcharged (HGL above crown). S� 5... .m Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. Monday, Dec 12 2011 DP-0S2A CULVERT (EW-29) jE U )I — Z�,1-60 Hydrograph type = Rational Peak discharge (cfs) = 24.73 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 7.290 Runoff coeff. (C) = 0.55 Rainfall Inten (in/hr) = 6.169 Tc by User (min) = 16 OF Curve = Camp LeJeune.IDF Rec limb factor = 1.00 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Me, 4.00 0.00 -X 0 5 10 — Runoff Hyd - Qp = 24.73 (cfs) Hydrograph Volume = 23,744 (cult); 0.545 (acfl) Runoff Hydrograph 1 0-yr frequency 15 20 25 30 RECEIVED W Coastal Site Design, PC P,O. Box 4041 DEC 2 2 .2011 / Wilmington, NC26406 BY;__�_ Q(Cfs) 28.00 24.00 20.00 16.00 12.00 : 11 4.00 1 0.00 35 Time (min) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. Monday, Dec 12 2011 DP-0S2A CULVERT (EW-29) Invert Elev Dn (ft) = 14.11 Calculations Pipe Length (ft) = 83.92 Qmin (cfs) = 23.70 Slope (%) = 0.32 Qmax (cfs) = 23.70 Invert Elev Up (ft) = 14.38 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Cir Highlighted Span (in) = 18.0 Qtotal (cfs) = 23.70 No. Barrels = 2 Qpipe (cfs) = 23.70 n-Value = 0.013 Qovertop (cfs) = 0.00 Inlet Edge = 0 Veloc Dn (ft/s) = 6.89 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Veloc Up (ft/s) = 6.71 HGL Dn (ft) = 15.52 Embankment HGL Up (ft) = 16.55 Top Elevation (ft) = 17.30 Hw Elev (ft) = 17.17 Top Width (ft) = 60.00 Hw/D (ft) = 1.86 Crest Width (ft) = 50.00 Flow Regime = Inlet Control El" (1n 18.017 17.0C 16.00 15.00 14.00 13.00 DP-0S2A CULVERT (EW-79) Hw Depth (n) 3.62 2.e2 1.62 0.62 .0.38 .1.38 Hydrology Report lydraffow Express Extension for AutoCAD® CIAI 3138 2011 by Autodesk, Inc. DP-32 CULVERT (EW-32) EW3I -t IJ 37, Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 12.00 iDxQr1 M. . �r 4.00 2.00 m = Rational =10 = 1.860 = 9.693 = Camp LeJeune.IDF Peak discharge (cfs) Time interval (min) Runoff coeff.(C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yrfrequency Monday, Dec 12 2011 = 11.36 =1 = 0.63 =5 = 1.00 Hydrograph Volume = 3,407 (cult); 0.078 (acft) 5 Runoff Hyd - Qp = 11.36 (cfs) RECEIVED Coastal Site Design, PC DEC 2 2 .2011 e P.O. Box4041 Wilmington, NC 28406 Q (cfs) 12.00 10.00 M 4.00 r tt '- 0.00 10 Time (min) Culvert Report Hydraftow Express Extension for AutOCAD®CIA13D82011 by Autodesk, Inc. Monday, Dec 12 2011 DP-32 CULVERT (EW-32) EW31--EW�1- Invert Elev Dn (ft) = 15.11 Calculations Pipe Length (ft) = 65.10 Qmin (cfs) = 11.40 Slope (%) = 0.38 Qmax (cfs) = 11.40 Invert Elev Up (ft) = 15.36 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Cir Highlighted Span (in) = 18.0 Qtotal (cfs) = 11.40 No. Barrels = 1 Qpipe (cfs) = 11.40 n-Value = 0.013 Qovertop (cfs) = 0.00 Inlet Edge = 0 Veloc Dn (ft/s) = 6.66 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Veloc Up (ft/s) = 6.45 HGL Dn (ft) = 16.51 Embankment HGL Up (ft) = 17.26 Top Elevation (ft) = 18.54 Hw Elev (ft) = 18.02 Top Width (ft) = 60.00 Hw/D (ft) = 1.77 Crest Width (ft) = 25.00 Flow Regime = Inlet Control ow (s) DP-32 CULVERT (EWa2) -elf culval HOL - F�nWnM RECEIVED DEC 2 2 .2011 BY: Hr Oepth (n) Coastal Site Design, FC P.O. BOX 4041 Wilmington, NC 28408 -I.b Hydrology Report Hydmflow Express Extension for AutoCAD® Civil 3DO 2011 by Autodesk, Inc. Sunday, Dec 112011 NEUSE CROSSING - BASIN OS2 EW aa' EW a�S Hydrograph type = Rational Peak discharge (cfs) = 17.46 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 7.090 Runoff coeff. (C) = 0.44 Rainfall Inten (in/hr) = 5.596 Tc by User (min) = 19 OF Curve = Camp LeJeune.IDF Rec limb factor = 1.00 Q (cfs) 18.00 15.00 IM11111 • r1 3.00 0.00 I/ I I 0 5 10 Runoff Hyd - Qp = 17.46 (cfs) Hydrograph Volume = 19,903 (cuff); 0.457 (aolt) Runoff Hydrograph 10-yr frequency 15 20 25 30 35 RECEIVED DEC 2 2 1011 Coastal Slte Design, PC e. P,O. Box 4041 BY: Wilmington, NC 28408 Q (cfs) 18.00 15.00 12.00 • rr we] 3.00 - 0.00 40 Time (min) Culvert Report Hydraftow Express Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. NEUSE CROSSING -BASIN OS2 Invert Elev Dn (ft) Pipe Length (ft) Slope (%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Inlet Edge Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) a. to, = 13.88 = 85.85 = 0.54 = 14.34 = 15.0 = Cir = 15.0 =2 = 0.013 = 0 = 0.0098, 2, 0.0398, 0.67, 0.5 = 17.83 = 65.00 = 50.00 NEUSE CROSSING. BASIN 052 u.,.w�, Ipl GnOnY Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (f 1s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Friday, Nov 112011 = 18.60 = 18.60 = (dc+D)/2 = 18.60 = 18.60 = 0.00 = 7.66 = 7.58 15.09 = 16.78 = 17.46 = 2.50 = Inlet Control I OIOO M JM ib tb ON -0Y .IN Y ANa1N RECEIVED Coastal Site Design, PC DEC 2 2 .2 011 o P.O, Box 4041 Wilmington, NC 26406 BY: Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3002012 by Autodesk, Inc. Swale NR1 Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 0.520 Rainfall Inten (in/hr) = 9.688 OF Curve = wilmington_2008.IDF Q (cfs) 4.00 3.00 1.00 Peak discharge (cfs) Time interval (min) Runoff coeff.(C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yrfrequency Wednesday, Dec 212011 = 3.123 =1 = 0.62 =5 = 1.00 Hydrograph Volume = 937 (cuft); 0.022 (acft) Q (cfs) 4.00 3.00 2.00 1.00 0.00 " I N- 0.00 0 5 10 RECE7VFT) Time (min) Runoff Hyd - Op = 3.12 (cfs) DEC 2 2 .2011 Coastal Site Design, PC BY: P.O. Box *1 a Wilmingian, NC 2e408 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR1 BARE EARTH Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 14.66 Slope (%) = 0.80 N-Value = 0.022 Calculations Compute by: Known Q Known Q (cfs) = 3.12 Elev (ft) Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 21 2011 = 0.39 = 3.120 = 1.24 = 2.52 = 4.47 = 0.36 = 4.34 = 0.49 RECEIVED DEC 2 2 .2011 BY: Depth (ft) 17.00 234 16.50 16.00 15.50 15.00 14.50 14.00 Section 1.84 1.34 0.84 0.34 -0.16 n as 0 2 4 6 8 10 Reach (ft) 12 4 Coastal Vx Design, R a P.O. Box 4041 Wilmington, NC 26406 Channel Report Hydraflow Express Extension for AutoCAD® Civil 304D 2012 by Autodesk, Inc. Swale NR1 GRASSED LINED Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.66 Velocity (ft/s) Slope (%) = 0.80 Wetted Perim (ft) N-Value = 0.030 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 3.12 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 Section Wednesday, Dec 21 2011 = 0.46 = 3.120 = 1.55 = 2.01 = 4.91 = 0.36 = 4.76 = 0.52 RECEIVEDI DEC 2 2 .2011 BY: Depth (ft) Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR2 Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 0.120 Rainfall Inten (in/hr) = 9.688 OF Curve = wilmington_2008.IDF Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 — Runoff Hyd - Qp = 0.78 (cfs) Wednesday, Dec 212011 Peak discharge (cfs) = 0.779 Time interval (min) = 1 Runoff coeff. (C) = 0.67 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 10-yr frequency 5 RECEIVED DEC 2 2 .2011 BY:�_ Hydrograph Volume = 234 (cult); 0.005 (acft) Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 10 Time (min) ACoastal site Gealgn, PC P.O. Box 4041 Wilmington, NC 28406 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR2 BARE EARTH Trapezoidal Highlighted Bottom Width (ft) = 2.00. Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.66 Velocity (ft/s) Slope (%) = 0.70 Wetted Perim (ft) N-Value = 0.022 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL.(ft) Compute by: Known Q Known Q (cfs) = 0.78 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 Section Wednesday, Dec 212011 = 0.19 = 0.780 = 0.49 = 1.60 = 3.20 = 0.16 = 3.14 = 0.23 RECEIVED DEC 2 2 .2011 BY:-_ Depth (ft) Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR2 GRASSED LINED Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.66 Velocity (fUs) Slope (%) = 0.70 Wetted Perim (ft) N-Value = 0.030 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 0.78 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 Section Wednesday, Dec 212011 = 0.23 = 0.780 = 0.62 = 1.26 = 3.45 = 0.16 = 3.38 = 0.25 RECEIVED DEC 2 2 .2011 BY:�_ Depth (ft) 2.34 1.84 1.34 0.84 rim -0.16 Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale NR3 Hydrograph type Storm frequency (yrs) Drainage area (ac) Rainfall Inten (in/hr) OF Curve Q (cfs) 4.00 3.00 2.00 1.00 = Rational =10 = 0.540 = 9.688 = wilmington_2008.IDF Runoff Hyd - Qp = 3.19 (cfs) Peak discharge (cfs) Time interval (min) Runoff coeff.(C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yrfrequency 5 RECEIVED DEC 2 2 .2011 BY:_____ Wednesday, Dec 212011 = 3.191 =1 = 0.61 =5 = 1.00 Hydrograph Volume = 957 (cuft); 0.022 (acft) Q (cfs) 4.00 3.00 2.00 1.00 0.00 10 Time (min) Coastal Site Design, PC r P.O. Box 4041 Wilmington, NO 28406 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR3 GRASSED LINED Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 14.43 Slope (%) = 0.80 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 3.19 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 13.50 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 212011 = 0.46 = 3.190 = 1.55 = 2.05 = 4.91 = 0.36 = 4.76 = 0.53 rz?_P CEIVED DEC 2 2 .2011 iBY:_ Depth (ft) 2.57 2.07 1.57 1.07 0.57 0.07 -0.43 -0.93 - Wilmington; NC 28406 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale NR3 BARE EARTH Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 14.43 Slope (%) = 0.80 N-Value = 0.022 Calculations Compute by: Known Q Known Q (cfs) = 3.19 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 13.50 Section Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 21 2011 = 0.40 = 3.190 = 1.28 = 2.49 = 4.53 = 0.36 = 4.40 = 0.50 RECEIVED DEC 2 2 1011 BY: Depth (ft) 2.57 2.07 1.57 1.07 0.57 0.07 -0.43 -0.93 Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR4 Hydrograph type Storm frequency (yrs) Drainage area (ad) Rainfall Inten (in/hr) OF Curve Q (cfs) 2.00 1.00 1 M 0 = Rational =10 = 0.260 = 9.688 = wilmington_2008.IDF Peak discharge (cfs) Time interval (min) Runoff coeff.(C) Tc by User (min) Rec limb factor Runoff Hydrograph 10-yr frequency 5 Wednesday, Dec 212011 = 1.587 =1 = 0.63 =5 = 1.00 Hydrograph Volume = 476 (cuft); 0.011 (acft) Runoff Hyd - Qp = 1.59 (cfs) =BY: Coastal Slte Declgn, PC o P.0,Box4041 Wilmington, NC 28406 Q (cfs) 2.00 1.00 '- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for AutcCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR4 GRASSED LINED Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (Cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.43 Velocity (fUs) Slope (%) = 1.10 Wetted Perim (ft) N-Value = 0.030 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 1.59 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 13.50 Section Keacn (tt) Wednesday, Dec 212011 = 0.30 = 1.590 = 0.87 = 1.83 = 3.90 = 0.24 = 3.80 = 0.35 RECEIVED DEC 2 2 .2011 BY: Depth (ft) 2.57 2.07 1.57 MIYA 0.57 0.07 -0.43 -0.93 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale NR4 BARE EARTH Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 14.43 Velocity (fUs) Slope (%) = 1.10 Wetted Perim (ft) N-Value = 0.022 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 1.59 Elev (ft) 17.00 16.50 16.00 15.50 15.00 14.50 14.00 13.50 Section Wednesday, Dec 21 2011 = 0.25 = 1.590 = 0.69 = 2.31 = 3.58 = 0.24 = 3.50 = 0.33 RECEI��D DEC 2 2 BY: Depth (ft) 2.57 2.07 1.57 1.07 0.57 0.07 -0.43 -0.93 C Reach (ft) Hydrology Report Hydranow Express Extension for AutoCAD® Civil 300 2012 by Autodesk, Inc. Swale NR5 Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 0.140 Rainfall Inten (in/hr) = 9.688 OF Curve = wilmington_2008.IDF Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 r 0 — Runoff Hyd - Qp = 0.96 (cfs) Wednesday, Dec 212011 Peak discharge (cfs) = 0.963 Time interval (min) = 1 Runoff coeff. (C) = 0.71 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 10-yr frequency 5 RECEIVED DEC 2 2 .2011 BY: Hydrograph Volume = 289 (cult); 0.007 (acit) Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 10 Time (min) Coastal Site Design, PC e PO. Box 4041 Wilmington, NC28406 Channel Report HydraOaw Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale NR5 GRASSED LINED Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (cfs) Total Depth (ft) = 1.00 Area (sqft) Invert Elev (ft) = 16.30 Velocity (ft/s) Slope (%) = 1.30 Wetted Perim (ft) N-Value = 0.030 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 0.96 Elev (ft) 18.00 17.50 17.00 16.50 16.00 15.50 Section Wednesday, Dec 21 2011 = 0.22 = 0.960 = 0.59 = 1.64 = 3.39 = 0.18 = 3.32 = 0.26 RECEIVED DEC 2 2 .1111 BY: Depth (ft) Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D®2012 by Autodesk, Inc. Swale NR5 BARE EARTH Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 3.00, 3.00 Q (Cfs) Total Depth (ft) = 1.00 Area (sqft) Invert Elev (ft) = 16.30 Velocity (ft/s) Slope (%) = 1.30 Wetted Perim (ft) N-Value = 0.022 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 0.96 Elev (ft) 18.00 17.50 17.00 16.50 16.00 15.50 Section Wednesday, Dec 21 2011 = 0.18 = 0.960 = 0.46 = 2.10 = 3.14 = 0.18 = 3.08 = 0.25 FZECEIVED DEC 2 2 .2011 BY: y, ,, iw co4uo Depth (ft) Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Monday, Dee 12 2011 Swale C Hydrograph type = Rational Peak discharge (cfs) = 8.709 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 1.450 Runoff coeff. (C) = 0.62 Rainfall Inten (inthr) = 9.688 Tc by User (min) = 5 OF Curve = wilmington_2OO8.IDF Rec limb factor = 1.00 Q (cfs) 10.00 45 4.00 2.00 0.00 -y 0 — Runoff Hyd - Qp = 8.71 (cfs) Runoff Hydrograph 10-yrfrequency 5 Hydrograph Volume - 2,613 (tuft); 0.060 (acft) l�CEI V ED DEC 2 2 .2011 BY:__ Q (cfs) —T 10.00 4.00 2.00 0.00 10 Time (min) Coastal Site Design, PC "o P.O. Box 4041 Wilmington, NC 28406 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Auiodesk, Inc. Swale C BARE EARTH Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 5.00, 5.00 Q (cfs) Total Depth (ft) = 2.00 Area (sgft) Invert Elev (ft) = 13.50 Velocity (ft/s) Slope (%) = 0.70 Wetted Perim (ft) N-Value = 0.022 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 8.71 Elev (ft) 16.00 15.50 15.00 14.50 14.00 13.50 13.00 Section Wednesday, Dec 212011 = 0.60 = 8.710 = 3.00 = 2.90 = 8.12 = 0.55 = 8.00 = 0.73 L22,2011 DE BY:� Depth (ft) 2.50 .........y.., q nv cv+W 2.00 1.50 1.00 i M -0.50 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale C GRASSED LINED Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) Side Slopes (z:1) = 5.00, 5.00 Q (cfs) Total Depth (ft) = 2.00 Area (sqft) Invert Elev (ft) = 13.50 Velocity (ft/s) Slope (%) = 0.70 Wetted Perim (ft) N-Value = 0.030 Crit Depth, Yc (ft) Top Width (ft) Calculations EGL (ft) Compute by: Known Q Known Q (cfs) = 8.71 Elev (ft) 1s.00 15.50 15.00 14.50 14.00 13.50 13.00 Section Wednesday, Dec 212011 = 0.70 = 8.710 = 3.85 = 2.26 = 9.14 = 0.55 = 9.00 = 0.78 RECEIVED DEC 2 2 .ZU11 BY: Depth (ft) 2.50 2.00 1.50 1.00 0.50 o 1, -0.50 Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Swale D Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 0.140 Rainfall Inten (in/hr) = 9.688 OF Curve = wilmington_2008.IDF Monday, Dec 12 2011 Peak discharge (cfs) = 0.949 Time interval (min) = 1 Runoff coeff. (C) = 0.7 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph Q (cfs) 10-yr frequency 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 — Runoff Hyd - Qp = 0.95 (cfs) 5 Hydrograph Volume = 285 (cuft); 0.007 (acft) rZ `CEIVED LBYOEC 2 2,?Oil :�_ Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 10 Time (min) Coastal Site Design, PC P.O. Box4041 Wilmington, NC 28406 Channel Report Hydraflow Express Extension for AutoCAD® Civil XM 2012 by Autodesk, Inc. Swale D BARE EARTH Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 13.60 Slope (%) = 0.30 N-Value = 0.022 Calculations Compute by: Known Q Known Q (cfs) = 0.95 Elev (ft) 16.00 15.50 15.00 14.50 14.00 13.50 13.00 Section Highlighted Depth (ft) Q (Cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 212011 = 0.25 = 0.950 = 0.81 = 1.17 = 4.55 = 0.17 = 4.50 = 0.27 DEC 2 2 .2011 Y: 2.40 1.90 1.40 M 0.40 -0.10 )c -0.60 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3102012 by Autodesk, Inc. Swale D GRASSED LINED Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 13.60 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 0.95 Elev (ft) 1 D.00 15.50 15.00 14.50 14.00 13.50 13.00 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 212011 = 0.30 = 0.950 = 1.05 = 0.90 = 5.06 = 0.17 = 5.00 = 0.31 RECEIVED DEC 2 2 .2011 BY: Depth (ft) 2.40 1.40 r I•1 0.40 -0.10 F . O, Reach (ft) Hydrology Report Hydraflow Express Extension for AutoCADV Civil 30® 2012 by Autodesk, Inc. Swale E Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 7.450 Rainfall Inten (in/hr) = 7.914 OF Curve = wilmington_2008.IDF Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 Monday, Dec 12 2011 Peak discharge (cfs) = 26.53 Time interval (min) = 1 Runoff coeff. (C) = 0.45 Tc by User (min) = 10 Rec limb factor = 1.00 Runoff Hydrograph 1 0-yr frequency Hydrograph Volume = 15,919 (cuR); 0.365 (acR) 0.00 if I I I 0 5 15 RECEIVED — Runoff Hyd - Qp = 26.53 (cfs) DEC 2 2 .2011 BY:___ . $ Q (cfs) 28.00 24.00 20.00 16.00 12.00 M �- 0.00 20 Coastal Slte Dasign, PC Time (min) P.O. Box 4041 Wilmington, NC 28406 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale E BARE EARTH Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 13.40 Slope (%) = 0.30 N-Value = 0.022 Calculations Compute by: Known Q Known Q (cfs) = 26.53 15.50 15.00 14.50 14.00 13.50 13.00 12.50 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 212011 = 1.38 = 26.53 = 8.47 = 3.13 = 10.73 = 1.09 = 10.28 = 1.53 RECEIVED DEC 2 2 .2011 BY: Depth (ft) 2.60 2.10 1.60 1.10 -16 0.10 -0.40 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2012 by Autodesk, Inc. Swale E GRASSED LINED Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 13.40 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 26.53 Elev 16.00 15.50 15.00 14.50 14.00 13.50 13.00 12.50 (ft) Section Wednesday, Dec 212011 Highlighted Depth (ft) = 1.58 Q (cfs) = 26.53 Area (sqft) = 10.65 Velocity (ft/s) = 2.49 Wetted Perim (ft) = 11.99 Crit Depth, Yc (ft) = 1.09 Top Width (ft) = 11.48 EGL (ft) = 1.68 fzgCEIVEi� DEC 2 2 .2011 BY: Depth (ft) M=��M I E 12 vo 2.60 2.10 1.60 1.10 0.60 0.10 -0.40 W.rra 2 4 6 8 10 12 Reach (ft) 14 16 18 - - REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS P-1319 CAMP JOHNSON BEGS MCB CAMP JOHNSON; ONSLOW COUNTY, NORTH CAROLINA PREPARED FOR: MR. DUANE MOCKUS. ANDALE/SUNDT JOINT VENTURE FEDERAL DIVISION 2626 SOUTH 68m STREET TEMPE, AkWNA 88284 PREPARED BY: ECS CAROLINAS, LLP 7211 OLDEN BUSINESS PARK SURE 201 VALMINGTON, NORTH CAROLINA 28411 ECS CAROLJNA8, LLP PROJECT NO.: 22.18M FIRM NO. F-1087 :4 SEAL 0g3 51 N � _r 033751 SEPTEMBER 28, 2011 RECEIVED DEC 2 2 .2011 BY.. _______ Report of &Omfeoe Expbredw and Geotschnlcel EnpN mtv Analysis P-1319 Camp Johnson aEGs MCB Camp Jatusm. Ondow Cowry. North Carolina ECB Project No.: 71.16850 Based on observations In the hand auger boring, the seasonal high water level Is estimated to be at the surrace at the locations tested. The results of the hand auger boring are summarized below: Location SHWL (in) Ground Water n Infiltration Test Depth n Infiltration Rate Inthr . 1-1 12 32 10 _ 1.11 1-2 10 30 10 0.44 I-3 2CY 30 10 5.9 . 1-4 30:. 80 10 1.8 1-6 30 80 10, 3.3 1-8 24_ 80 10 - 4.0. 1-7 30, 80 10 3.4 1-8 38 60 12 2.4 1-9 38 80 12 1.1 1-10 38. 80 12 0.46 For detailed Information, see the Intiibatlon testing form in Appendbx C. 4.0 Laboratory Test Results' Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary• the tested samples had In -situ moisture contents of 13.3 to 35.6. The Atterberg limb analysis of the tested sample indicated liquid limits of 22 to 47, plastic limits of 15 to 21 and plasticity Indices of 3 to 26. The grain strs analyses of the tested samples Indicated that the tested materials had 5.5 and 30.9 percent fines passing the number 200 slave. Spedfic laboratory test results are provided In the Laboratory Testing Summary In Appendix D of this report RECEIVED DEC 2 2 .2011 BY: Infiltration Testing Form P1319 Camp Johnson BEQ Site Jacksonville, Onslow County, North Carolina ECS Project No. 22.16856 August 18, 2011 Location D. eDth Soli Description I-1 0-10' Gray silty SAND 10'-36' Tan fine SAND w/silt Seasonal High Water Table was estimated to be at 12 Inches below the existing grade elevation. Infiltration Rate: 1.1 Inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 32 inches below the existing grade elevation. Location Depth Soil Description 1-2 0-36° Black silty SAND 360-600 Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 10 inches below the existing grade elevation. Infiltration Rate: 0.44 Inches per hour . Test was conducted at 10 Inches below existing grade elevation Groundwater was encountered at 30 inches below the existing grade elevation. Locatioo Depth Soil Description 1-3 0-W Gray fine SAND 6°-18° Tan fine SAND 18'-36' Orange fine SAND w/clay Seasonal High Water Table was estimated to be at 20 inches below the existing grade elevation. Infiltration Rate: 5.9 inches per hour Test was conducted at 10 Inches below exlsting grade elevation Groundwater was encountered at 30 inches below the existing grade elevation. =RECEIVED Infiltration Testing Form P1319 Camp Johnson BEQ Site Jacksonville, Onslow County, North Carolina ECS Project No. 22.16856 August 18, 2011 Location DeDth Soil Description 1-4 0-12' Black silty SAND 12"-50' Tan fine SAND ar-eo" Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 30 Inches below the existing grade elevation. Infiltration Rate: 1.8 inches per hour Test was conducted at 10 Inches below existing grade elevation Groundwater was encountered at 60 Inches below the existing grade elevation. Location Depth Soil Description 1-5 0-60' Tan/orange fine SAND Seasonal High Water Table was estimated to be at 30 Inches below the existing grade elevation. Infiltration Rate: 3.3 Inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. Location Deoth Soil Description 1-6 0-12' Gray silty SAND 12"-36" Tan/gray fine SAND 36"-60" Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 4.0 Inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. RECEd VED DEC 2 2 .2011 BY:��_ Infiltration Testing Form P1319 Camp Johnson BEQ Site Jacksonville, Onslow County, North Carolina ECS Project No. 22.16856 Location DeDth 1-7 0-6" 6"-36" 36"-60" August 18, 2011 Soil Description Tantorange fine SAND Tan/gray fine SAND Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 30 Inches below the existing grade elevation. Infiltration Rate: 3.4 inches per hour Test was conducted at 10 Inches below existing grade elevation Groundwater was encountered at 60 Inches below the existing grade elevation. Location DeDth Soil Description 1-8 0-6" Tan/orange CLAY (fill) 6'-55" Gray/brown fine SAND w/silt (fill) 55"-60" Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 2.4 inches per hour Test was conducted at 12 inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. Location DeDth Soil Description 1-9 0-6" Gray silty SAND 6'-24° Tan fine SAND 24"-60' Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 1.1 inches per hour Test was conducted at 12 inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. RECEIVEi� DEC 2 21011 BY: Infiltration Testing Form P1319 Camp Johnson BEQ Site Jacksonville, Onslow County, North Carolina ECS Project No. 22.16856 August 18, 2011 Location DeDth Soil Description 1-10 0-60 Gray sllty SAND 6'-24" Tan fine SAND 24°-60" Tan/Orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Inflltratlon Rate: 0.46 inches per hour Test was conducted at 12 Inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. RECEIVED DEC 2 2 .2011 BY:__ ____ t 8� Table 8.03a Value of Runoff Coefficient (C) for Rational Formula Land Use Business: Downtown areas Neighborhood areas Residential: Single-family areas Mufti units, detached Mufti units, attached Suburban Industrial: Light areas Heavy areas Parks, cemeteries Playgrounds Railroad yard areas Unimproved areas I* 0.70-0.95 0.50-0.70 0.30-0.50 0.40-0.60 0.60-0.75 0.2510.40 0.50-0.80 0.60-0.90 0.10-0.25 0.20-0.35 0.20-0.40 0.10-0.30 Streets: Asphalt 0.70-0.95 Concrete 0 80-095 Brick 0.70-0.85 Drives and walks 0.75-0.85 Roofs 0.75-o.85 Land Use Lawns: Sandy soil, flat, 2 % Sandy soil, ave., 2-7% Sandy soil, steep, 7% Heavy soil, flat, 2% Heavy soil, ave., 2-7% Heavy soil, steep, 7% Agricultural land: Bare packed soil Smooth Rough Cultivated rows Heavy soil no crop Heavy soil with crop Sandy soil no crop Sandy soil with crop Pasture Heavy soil Sandy soil Woodlands C O.OS-0.10 0.10-0.15 0.15-0.20 0.13-0.17 0.18-0'22 0.25-0.35 0.30-0.60 0.20-0.50 0.30-0.60 0.20-0.50 0.20-0.40 0.10-0.25 0.15-0.45 0.05-0.25 0.05-0,25 NOTE: The designer must use judgment to select the appropriate C value within the range for the appropriate land use. Generally, larger areas with permeable soils, flat slopes, and dense vegetation should have lowest C values. Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values. Source: American Society of Civil Engineers The overland flow portion of flow rime may be determined from Figure 8.03a. The flow time (in minutes) in the channel can be estimated by calculating the average velocity. average velocity in feet per minute and dividing the length (in feet) by the Step4. Determine the rainfall intensity,frequency, and duration (Figures 8.03b through 8.039—source: North Carolina State Highway Commission; Jan. "ducat Select the chart for the locality closest to your location. Enter the "duration" axis of the chart with the calculated time of concentration, Te. Move vertically until you intersect the curve of the appropriate design storm, then move horizontally to read the rainfall intensity factor, i, in inches per hour. Step S. Determine peak discharge, O 00/sec); by multiplying the previously determined factors using the rational formula (Sample problem 8,03a). RECEIVED DEC 2 2 Z011 BY: M>r Coastal Site Design, pC m a, P.O. Box 4041 Wilmington, NC 28406 8.03.2 APR-09-1996 16:15 FROM EHNR WILM REG OFFICE TO 97624201 P.02 85% TSS REMOVAL 30 FOOT VEGETATED FII,TER REQUnaD DE YM 3' 3.5' 4,0' 4.5' 5,0' 5.5' 6.0' 6.5' 7.0' 7.5' IIdp % % .9 .8 .7 .6 .5 0 0 0 0 0 % [40% 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6. 5 % 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 .3 3.0 2,7 2.4 2.1 1.8 1.5 1.3 .8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 [1--- 5 m 4.1 3.7 3.1 2.9 2.5 2.1 1 8 2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 RECEIVED 90% TSS REMOVAL DEC 2 2 .2011 NO VEGETATED FILTER REQVUW BY: DIEM 3' 3.5' 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' w % 10% 1.3 1.0 .8 .7 .6 .5 .4 3 .2 1 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 :8 a 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 ' 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 u, 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3. 0 F U 2 s 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 ; 90 %, 10.7 9.0 7.9 7.2 6.5 3.9 5.2 4.6 3.9 3.3 100 % 12.0 10.0 S. 8.1 7.3 6.6 5.8 5.1 4.3 3.6 El Table 8.05a Maximum Allowable Design Velocities' for Vegetated Channels Typical Soil Channel Slope Characteristicsz Grass Llning Permissible Veloclty3 Application for Established Grass Lining (ft/sec) 0-5% Easily Erodible Non -plastic Bermudagrass 5.0 (Sands & Sifts) Tall fescue Bahiagrass 4.5 Kentucky bluegrass 4.5 4.5 Grass -legume mixture 3.5 Erosion Resistant Plastic Bermudagrass 6.0 (Clay mixes) Tall fescue Bahiagrass 5.5 Kentucky bluegrass 5.5 5.5 Grass -legume mixture 4.5 5-10% Easily Erodible Non -plastic Bermudagrass 4.5 (Sands &Silts) Tali fescue Bahiagrass 4.0 Kentuckybluegrass 4.0 4.0 Grass -legume mixture 3.0 Erosion Resistant Plastic Bermudagrass 5.5 (Clay Mixes) Tall fescue Bahiagrass 5.0 Kentucky bluegrass 5.0 Grass -legume mixture 3.5 >10% Easily Erodible Non -plastic Bermudagrass 3.5 (Sands & Sifts) \ Tall fescue Bahiagrass 2.5 Kentucky bluegrass 2.5 Erosion Resistant Plastic Bermudagrass 4.5 (Clay Mixes) Tall fescue Bahiagrass 3.5 Kentucky bluegrass 3.5 3.5 Source: USDA-SCS Modified NOTE: 'Permissible Velocity based on 10-yr storm peak runoff Soil erodibility based on resistance to soil movement from concentrated flowing water. 3Before grass is established, permissible velocity is determined by the type of temporary liner used. Selecting Channel To calculate the required size of an open channel, assume the design flow is uniform and does not vary with time. Since actual flow conditions change Cross -Section throughout the length of a channel, subdivide the channel into design reaches, Geometry and design each reach to carry the appropriate capacity. The three most commonly used channel cross -sections are "W-shaped, par- abolic, and trapezoidal. Figure 8.05b gives mathematical formulas for the ar, hydraulic radius and top width of each of these shapes. ea RECEIVED r Coastal Sit BY:—___.__ e Design, PC DEC 2 2 .2011 r, P.O.Z4041 8.05.4 Wilmington, NC 28406 r POINT PRECIPITATION /' FREQUENCY ESTIMATES FROM NOAA ATLAS 14NMI WUMINGTON SO AIRPORT, NORTH CAROLINA (31-d,14, VolI 3 N 77.3 W 26 feet dom oo-Re9omoY Ad,oftlm OmimdaVb ,Ky ,,,, d Volume 1, Vmlpe ONG HmN D.Mntm,a. f.*TT.PSUM k,MYA[geod D.OD4 NOAA, Natimel WeelherSa�ia, SDra SprmE, Alnylmd 20fM ' Foomeomd. Mae Feb { 2" m II, h.11 < e:_ II 1& N Th-le-OmdunEegwrY,Onel,nbond one NftAUb1fi11kL A101,toA Pee, mlern he 4ME WbdXfwF)DF§kftmW1W NOTE FmnmOV lac, of , normobappear,mo. • Upper Pr011tation bound of the 90% confidence Intensity Estimates interval (in/hr) ARI20 euae) min min 6.73 mia min min lmin hr In, hr hr hr da da da da da da 537 7.97 637 4.46 .07 ].91 5.34 3.69 2.31 1.15 0.82 OSl 0.30 0.16 139 0.99 0.62 0.36 022 0.10 0.06 0.04 0.03 0.02 0.0210501 0.01 0.13 0.07 0.05 C� 9.32 7.46 F 30 1039 8.32 630 .47 2 87 7.01 5.08 3.31 1.78 127 0.79 0.46 om- 2.10 1.51 0.94 0.56 0.33 0.04 0.02 0.02 0.02 0.01 0.16 0.09 0.06 0.04 0.03 0.02 0.02 0.02 0.19 0.11 0.07 0.05 0.03 0.03 0.02 0.02 C� 11.72 9.34 05564537 7.89 5.64 3.89 .57 1.87 1.17 0.69 0.42 0 22 R0.13 0.08 0.06 0.04 0.03 0.02 0.02 02.74 o 15 0 07 0.00 3 003 0.02 100 13.79 10.96 200 14.84 I1.76 9.23 7.07 .87 9.89 7.70 5.40 3.42 .54' 1.60 0.96 0.58 3.90 2.93 1.85 1.12 0.68 0.33 0.18 0.11 0.08 0.05 0.04 0.03 0.03 039 0.20 0.12 0.09 0.06 0.04 0.03 0.03 ® 16.22 I2.83 1000 17.33 13.64 ]0.77 8.57 6.14 11.42 924 6.75 ®3.54 215 1.38 0.84 5.29 .08 ®1.60 0.98 0.47 0.24 0.15' 0.11 0.07 0.05 0.04 0.03 0.55 10.2810ri710r I2 I nr�ln ndln�" Ind 'ine wwommctaem miEdmumWN ntO%aellMnm 1,116 Em vdue edddieX afEr ehmb,d `•�JuuTu:JL:JLJ �.�piebp�lm M1syenry epanelse nbaOom�ARIYE, Arnge Reeumno�neeveL TaeE�Eequwrcyn Oen, Emu. dDru¢ hnlae Yimmelm. NOTE Fameft pm,ib as neermmneppeeromn • Lower bound itaflan of the Intensi 90% confidence interval Estimates bl/hr ARIPr (Yeah*) min 5.86 'I mia EEda EDIn mla hr hr 1U hr hr da de da d, da d, da 0� L.-'I8.14 6.95 .68 5.55 6.51 3. 00 .67 4.65 3.21 5.49 3.90 1.67 2.02 2.50 0.97 1.18 1.51 0.69 ®0.52 1.08 0.43 0.67 0.25 0.15 0:09 0.05 0.30 0.18 0.10 0.06 0.39 0.23 0.13 0.07 0.03 0,03 0.04 0.03 0.05 004 0.02 0.01 0.01 0.01 0.02 0.02 0.01 0.01 0.03 .10 255 9.02 10.16 8.09 6.09 .41 6.84 5.07 2.87 3.37 1.78 2.16 1.28 1.57 0.80 0.99. 0.47 0.27 0.16 0.09 0.58 0.34 0.20 0.11 06 0.04 0.07 0.05 0.02 0.02 0.01 0.03 0.02 0.02 0.02 0.03 OF031 0.02 0.02 5010.98 100 11.82 8.75 9.40 7.38 5.56 7.92 6.06 Eff] .17 2.50 2.85 1.83 2.12 1.15 IF347 0.68 0.40 0.23 .12 0.79 0.46 0.26 0.14 0.08 0.06 0.09 0.07 0.04 0.03 0.02 0.02 0.04 0.03 0.03 0.02 200 1261 10.00 8.41 6.55 .59 3.24 2.43 1.53 0.92 0.53 0.30 0.16 0.10 0.08 0.05 0.04 0.03 0.02 RECEIVED DEC 2 2 .2011 BY: JACKSONVILLE SOUTH QUADRANGLE NORTH CAROLINA-ONSLOW CO. '76 25' '79 I 7.5-MINUTE SERIES (TOPOGRAPHIC) r , 1 ro9 • � •� 'W • � •/$ 757500 �°p •� 11 METERS 77022'• ' Field J Ath •/ '4 2 246 In 's �/ 11' �,� Tr nt (C) �5 Mobite-H " o ° • •� ••• 110 1i rr a _ ro° P Par ° ME - e, �1 ��CPieki it r_g I9ti r / I 01 z 11 _ ter 1 — - `.Ruins "8a° ° - M 2 Piling C \\\ 6 J j 9 Foul \ •45 Bh (C)�\� lo�� $ 1 3 \\�\ Mumf rd e \\ Pt °x \\d' \$01 0 �.. �• av colt se u p 0 e ' \\NLi t �`� "20 °Q 2' ' ;� ParaAYY /2e �n lea \IC) a .e e0U VA '44 Paradl a FIRE TER`Got Course \\`\` •.°. Tank leO �r / Paradise ccent z Pie r a43 � - RE t AEI VED Coastal Site 08Sig � `` 2 2 Pe, P.O. BOX4041 `. .2011 1Ylmin0on, NC 28406 "` a 9 ldpt) /0 to, 34.45' 000 ERS COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 December 22, 2011 Christine Nelson Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Express Stormwater Submittal Request for Additional Information (SW8 111207) Neuse Road Extension Onslow County CSD Project No. 11-0239 Dear Christine: REC,� DEC 2 2 2011 Thank you for your comments on the Neuse Road submittal. I've noted below our responses or actions regarding your comments for the referenced project. Enclosed with this submittal, please find the following items. - One (1) copy of the revised stormwater calcuations - two (2) copies of sheets C-131 & C-506 - original revised page 2 of low density supplement Items addressed: 1. added chart on sheet C-131 with structures and inverts for Stormwater pipes. 2. relocated outlet structure further south and showed a forebay berm cut to force flow along a 3:1 travel path. 3. the forebay cut is at elevation 15.5, not 15.0. However, we added a peninsula 16.0 contour to force water along a longer flow path over the 15.5 cut. 4. low density supplement has been updated with Swales NR I through NR5. Conveyance Swale "E" remains omitted from the supplement, as it only conveys already treated Stormwater from Wetbasin B in addition to runoff from the existing Montford Landing roadside swale system. 5. updated swale calculations with composite C values which match low density supplement. Please call if you have any questions. Sincerely, Howard Resnik, PE Encl.: As noted above RECEIVED DEC 2 2 2011 BY: cc: Calibre Engineering A V& MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director December 20, 2011 Commanding Officer MCB Camp Lejeune c/o Carl Baker, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 111207 Neuse Road Extension Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for the Neuse Road Extension on December 14, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please include, on the plans, the inverts of the stormwater pipes. 2. Please demonstrate that the pond meets the 3:1 flow path length as indicated on the wet detention pond supplement. If necessary, consider relocating the outlet structure to the southern -most side of the pond. 3. Please clarify if the elevation of the forebay berm is at 15 or 15.5 as both are indicated on the wet detention basin detail (C-506). 4. Please complete Section III of the Low Density Supplement for all swales proposed within the low density area of this project. 5. The express additional information fee has been waived for this request for additional information. 6. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 23, 2011, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. I Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-35020041 Customer Service: 1-877-623-6748 NorthCarolina Internet: http:llportal.ncdenr.org Na try it // An Equal Opportunity\ Affirmative Action Employer v/�/[i` {K" � Carl Baker December 20. 2011 Stormwater Application No. SW8 111207 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, C - . ()2� Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\201 1\1 11207 HD\2011 12 addinfo 111207 cc: Howard Resnik, Coastal Site Design Christine Nelson Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Tuesday, December 20, 2011 1:17 PM To: 'howard@coastalsitedesign.com'; Wright, Rodney; (Thomas. bradshaw@usmc.mil)' Cc: Russell, Janet Subject: request for additional info - Neuse Rd Ext. Attachments: 2011 12 addinfo 111207.pdf Gentlemen, I've attached a pdf of Please be aware that I will be out of the office letter will also be sent Fi the mail! Please let me know if you have any questions. Thanks! Christine Christine Nelson Environmental Engineer NC DWQ - Stormwater Program Wilmington Regional Office 910-796-7323 'Towler CIV David W'; 'Thomas Bradshaw Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 December 13, 2011 Christine Nelson Express Review Permitting N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Express Stormwater Submittal Neuse Road Extension Onslow County CSD Project No. 11-0239 Dear Christine: Enclosed please find the following items. - one (1 copy of the Stormwater Management Calculations. - two (2) copies of sheets C-131, C-506-508 - two (2) copies project limits, impervious dimensions and drainage area maps - Original Stormwater application - Original O & M for wet basin B - Check for $4,000 check # 1014 - wet basin supplements for pond B - two (2) copies of the grading sheets - low density supplement Please call if you have any questions. Very truly yours, Y I Rodney Wright Encl.: As noted above FiVED DEC 14 Z011 cc: Calibre Engineering '. 1 , � � ^ �\S •t For DENR UseONLY-;V � Z'� 1� Reviewer: 4 ©, North Carolina Department of Environment and Submit: 12-0 Natural Resources ; 06 NCDENR Request for Express Permit Review me Confirm'. FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(a.ncmail.net • Fayetteville or Raleigh Region -David lee 919-791.4203; david.lee(d,)ncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(),,ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(g).ncmail.net • Wilmington Region -Janet Russell 910-350.2004 or ianet.russell(7g ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SIN - Permits of request SW SW SW SW SW Project Name: P1319 NEUSE ROAD EXT County: ONSLOW Applicant: CARL BAKER Company: MARINE CORPS BASE, CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: cad.h.baker@usmc.mil Physical Location: INTERSECTION OF NEUSE AND ROANOKE ROAD Project Drains into SC:NSW waters — Water classification 19-16-4.5 (for classification see-http://h2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within'/2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N �T}�;1('�, Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN, PC 7R',Cd.:.rL V ll] DAddress: PO BOX4041 City: WILMINGTON, State: NC Zip: 28406-_Phone: 910-791-4441, Fax: 910-791-1501, Email: HOWARD@COASTALSITEDESIGN,COM OV 2 8 2011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond 0 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 6 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No ++++++++++n+ne++++++++++a:++•a++•.++++++++++r.++++++++.++++l:tr DENR use onh'+++++++++++++++++++n+++++ennsr:+++++++n++++n++nn++++n+n nrn++ Fee Split for multiple permits: (Check# ) Total Fee Amount $ SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDENR EXPRESS March 2009 ---------IE5�� ►-APE =ol�_ _ --- - -- - - --- - ---- --_ _ _._ - - - - -- ----- - - -------f----- .. -- - r --- � I- - -- -- -- I - -- - - -- - ---- - --- - - __--- - -- _ _. _ _ -- _ - -- - - -- - ----f _ - -- _ _ i - - - - i t - t- - _ 1 � _ -_ __. __ _._ __ __ -_.. _ .. _ __ _ ___ _ _ _ _. _ _ __ _ - __. _.__ _. _ _. _ _ .. _ _ _. _ _ _. _ .. _ _ _ _ _ _ _ _ .. __ ._. ___ _y - .. _ _ I _ _- .- .___ _. II _ _. _. __ __. I _ __ _ COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 FOR STORMWATER EXPRESS REVIEW November 2011 PROJECT NAME: P1319 Neuse Road Ext. MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: This project is for the construction of a parking lot, sidewalk and a roadway extension to be located at Camp Johnson at Camp Lejeune. Land disturbance associated with the improvements will be approximately 5.9 acres. The owner is the United States Marine Corps. There are no wetlands located within the area of the development. Stormwater from the site will drain to SC;NSW waters located in the White Oak River Basin (Index # 19-I6-4 .5). The project will be low density utilizing sheet flow to natural ground. There is a pocket of high density associated with the parking lot. The runoff from the parking lot and part of the road way extension will be conveyed to a pond designed for 90% TSS using an underground stormwater collection system and open swales. Proposed impervious for the site is 24%. The project will have direct access onto Hoover Road and Neuse Road. The roadway extension will extend Neuse Road till it intersects with Hoover Drive. PROJECT BMP: low density with pocket of high density STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 791 4441 office 910 791 1501 fax NOV 2 8 Z011