Loading...
HomeMy WebLinkAboutSW8110906_HISTORICAL FILE_20130131STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 � \OG\OU DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20\")W1 >1 YYYYMMDD NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, III Governor Director Secretary January 31, 2013 Commanding Officer USMCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28457-2539 Subject: State Stormwater Management Permit No. SW8 110906 2D Anglico and 2N BN OPS Complexes High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for 2D Anglico and 2N OPS Complexes on January 23, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding modified Permit No. SW8 110906 dated January 31, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. The modifications covered by this permit include: 1. A previously approved gravel entrance road off of Holcomb Boulevard is being relocated 700 feet south of Its permitted location. The new location was outside of the project limits, so the project limits are being revised such that the project area is reduced from 150.74 acres to 150.31 acres, to include the new road location. The new road location is not within the drainage area of any of the previously permitted BMP's. None of the high density drainage areas or built -upon areas are changing - only the overall project area and maximum allowed amount of built -upon area to maintain low density are changing. 2. New approved plan sheets have been provided. Please replace sheets "PL", CE101, CE103, CE104, and drainage area sheets 1 of 2 and 2 of 2 with the new ones, attached. This permit shall be effective from the date of issuance until April 30, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). Per NCGS 143-215(e), the written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 NorthCarolina Internet: v .ncvaterquality.org a'�` s 1�Nn//� An Eoual OnnntlmlN 1 Affirmative Action Emolover � �/ M State Stormwater Management Systems Permit No. SW8 110906 Mod. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, L� - harles Wakild, P.E., Director Division of Water Quality GDS/ arl: S:\WQS\Stormwater\Permits & Projects\201 1 \1 10906 HD\2013 01 permit 110906 cc: Howard Resnik, P.E., Coastal Site Design Wilmington Regional Office Stormwater File Page 2 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer USMCB Camp Lejeune 2D Anglico and 2N OPS Complexes Off Holcomb Boulevard, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of four (4) wet detention ponds and a 24% overall low density project in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 30, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The overall density within the 150.31 acre project area is limited to 24%. The 150.31 acre project area is limited to a maximum of 1,571,386 squpre feet of impervious area. Thisaroject currently proposes a total of 1,339,406 ft of built -upon area and 231,980 ft of future impervious area. Within the 150.31 acre project area, 188,785 ft2 of impervious area is not being picked up or treated. The runoff from the remainder of the project's built -upon area must be collected and treated in one of the four wet detention ponds covered by this permit. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater cq�ntrols labeled A, B, C ar�d D, have been �esigned to handle the runoff from 601,894 ft , 252,148 ft , 133,601 ft , and 394,958 ft of built -upon area, respectively. 4. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 5. The tract will be limited to the amount of built -upon area indicated in this permit, and per approved plans. The built -upon area for the future devejopment within the drainage areas of BMP A, B, C and D is limited to 90,000 ft , 10,000 ft , 10,000 ft2 and 10,000 ft2 , respectively. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. 7 91 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. The following design criteria have been provided in the four wet detention ponds and must be maintained at design condition: C. d. e. f. 9 h. i. j. k. I. M. n. o. P. q r. Drainage Area, acres: Onsite, ft2: Offsite, ft2: Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: Design Storm, inches: Average Pond Design Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL: Permanent Pool Surface Area, ft2: Permitted Storage Volume, ft3: Temporary Storage Elevation, FMSL: Pre-dev. 1 yr-24 hr. discharge rate, cfs: Controlling Orifice, 0 pipe, inches: Orifice flowrate, cfs: Permanent Pool Volume, ft3: Permitted Forebay Volume, ft3: Fountain Horsepower Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE Pond A Pond B Pond C Pond D 22.48 11.42 5.25 18.52 979,361 497,272 228,797 806,844 0 0 0 0 601,894 252,148 133,601 394,958 601,894 252,148 133,601 394,958 0 0 0 0 1.5 1.5 1.5 1.5 4.0 3.5 3.5 3.5 90% 90% 90% 90% 13.0 12.0 12.0 10.0 57,953 29,496 22,626 48,499 76,991 35,871 19,797 54,145 14.2 13.1 12.8 11.0 0.89 0.45 0.21 0.73 4.0 2.75 2.50 3.50 0.26 0.12 0.09 0.18 219,464 93,377 70,586 145,008 42,721 18,946 14,325 31,154 % 1/3 '/. 1/2 Wallace Creek / WOK02 19-20 "SB NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The fountain must not be placed into the forebay. d. The falling water from the fountain must be centered in the main pond, away from the shoreline. e. The maximum horsepower for a fountain in any of these ponds is as listed in Section 1.8 (o) of this permit. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 14. The Base is required to keep track of the approved project limits to assure that the approved low density project area is not double -counted as project area in another low density project located on MCB Camp Lejeune. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to the enforcement procedures as set forth in G.S. 143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 31 st day of January 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. 2D Anglico and 2N OPS Complexes Stormwater Permit No. SW8 110906 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 110906 Mod. Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office " DWQ USE ONLY - Dat Recew d Fee Paid ermit Number Applicable ules: ❑ Coastal SW -1 5 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina ECEIVE Department of Environment and Natural Resources JAN 2 3 2013 Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forin may be photocopied for use as an original I. GENERAL INFORMATION 1.. Project Name (subdivision, facility, or establishment name- should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2D ANGLICO AND 2N BN OPS COMPLEXES ,2. Location of Project (street address): City:Camp Lejeune County:Onlsow Zip:28547-2539 3. Directions to project (from nearest major intersection): Intersection of US 17 and NC 24. Take NC 24 East to Holcomb Blvd. Turn right onto Holcomb Blvd. Travel approximately 2.8 miles Turn right onto gravel road that's located approximatley 0.28 miles past the bridge over Wallace Creek. 4. Latitude:34° 41' 28" N Longitude:77° 19' 53" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): [-]New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8110906 its issue date (if known)April 30 2012 and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density []High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer, Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: _ ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101. Version 07July2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:MARINE CORPS BASE, CAMP LETEUNE Signing Official & Title:Neal Paul,Deputy Public Works Officer b. Contact information for person listed in item la above: Street Address:BLDG 1005 MICHAEL ROAD City:MCB CAMP LETEUNE Mailing Address (if applicable): City: Phone: (910 ) 451-2213 Email:nea l: pau IQusmc. mil State:NC Zip:28542 Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official &'Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): Phone: Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organiza Signing Official & b.Contact information for person listed in item 3a above: Mailing Address: Zip: Phone: ( ) Fax: 4. Local jurisdiction for building permits: Point of Contact: Phone #: Form SWU-101 Version 07July2009 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, bri6fly summarize how the stormwater runoff will be treated. The low densitv areas will sheet flow and areas of high density will be treated with wet ponds designed for 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 150.31 acres 5. Total Coastal Wetlands Area: n/a acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:150.31 acres Total project area shall be calculated to exclude thefollowing: the nornial pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHIM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MH[M line ntay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area Drainage Area Drainage Area Drainage Area Receiving Stream Name Stream Class * - Stream Index Number Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Pro osed Impervious Area** s Impervious Area** total Impervious— Surface Area Drainage Area Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so On -site Streets (sf) On -site Parking (sf) On -site Sidewalks (so Other on -site (so Future (so d Off -site (so In. AN 7 3 2013 Existing BUA*** (sf) Total (so: * Stream Class and Index Number can be detennined at: http://`h2o.enr.state.ne.uslbints/reportslreportswB.litnul " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07July2009 Page 3 of 6 2D ANGLICO AND 2N EIN OPS COMPLEXES Basin Information Receiving Stream Class, Stream Index Number Drainage area Existing Impervious' Area Proposed Impervious' Area % Impervious' Area (total) On -site Streets & Curbing On -site Parking On -site Sidewalks Other on -site (future impervious) Off -site Existing BUA - Total: 1,571,386 sf or 36.07 acres Total SB NSW 19-20 6,547,442 sf or 150.31 acres - sf or - acres 1,571,386 sf or 36.07 acres 24.0% 13u,zb3 si or b.19 acres 244,151 sf or 5.60 acres 823,644 sf or 18.91 acres 41,348 sf or 0.95 acres 231,980 sf or 5.33 acres Drainage Area B Basin Untreated Area Outside of Pond DA's SB NSW 19-20 4,035,168 sf or 92.63 acres 0 sf or - acres 188,785 sf or 4.33 acres 4.7% u st or - acres 48,224 sf or 1.11 acres 8,818 sf or 0.20 acres 19,763 sf or 0.45 acres 111,980 sf or 2.57 acres 188,785 sf or 4.33 acres Drainage Area C Drainage Area A POND A SB NSW V 19-20 979,361 sf or 22.48 acres 0 sf or 0.00 acres 601,894 sf or 13.82 acres 61.5% 69,3tb st or 'L.ub acres 130,913 sf or 3.01 acres 280,810 sf or 6.45 acres 10,793 sf or 0.25 acres 90,000 sf or 2.07 acres 601,894 sf or 13.82 acres Drainage Area D . ,......,. „y ..,,....,,,,...,,,.. ­.- .. l­ Receiving Stream Class SB NSW SB NSW SB NSW Stream Index Number 19-20 19-20 19-20 Drainage area 497,272 sf or 11.42 acres 228,797 sf or 5.25 acres 806,844 sf or 18.52 acres Existing Impervious` Area 0 sf or - acres 0 sf or - acres 0 sf or 0.00 acres Proposed Impervious' Area 252,148 sf or 5.79 acres 133,601 sf or 3.07 acres 394,958 sf or 9.07 acres % Impervious' Area (total) 50.7 % 58.4% 49.0% Impervious* Surface Area On -site Streets & Curbing On -site Parking On -site Sidewalks Other on -site (future impervious) Off -site Existing BUA Total: 113,512 sf or 2.61 acres 65,014 sf or 1.49 acres 52,830 sf or 1.21 acres 10,792 sf or 0.25 acres 10,000 sf or 0.23 acres 252,148 sf or 5.79 acres 6,278 sf or 0.14 acres sf or - acres 117,323 sf or 2.69 acres sf or - acres 10,000 sf or 0.23 acres 133,601 sf or 3.07 acres 21,095, sf or 0.48 acres 0 sf or 0.00 acres 363,863 sf or 8.35 acres 0 sf or 0.00 acres 10,000 sf or 0.23 acres 394,958 sf or 9.07 acres ECEIVE JAN 2 3 2013 BY: COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttr)://h2o.enr.state-nc.us/su/bmo forms.htm. VI. ' SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from httpt ://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map athttp://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envheig.org/_pages/onestopexl2ress.htmi for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information; item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the lh mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g: Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impound d structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waDEV) i. Dimensioned property/project-boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. ' _ JAN k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control mea�.es. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Initials Aa 11,121 #4 #,/f. K tt. F—O V`/ E 23 2013 Form SWU-101 Version 07July2009 Page 4 of 6 o. Drainage areas delineated (included in the main set -of plans, not as a separate document). p. Vegetated buffers (where.required): 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration' rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWP prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretarV.state.nc.us/Corporations/­CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://h2o.enr.state.nc.us/su/bmo forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting. Engineer:Howard Resnik, PE Consulting Firm: Coastal Site Design, PC Mailing Address:Po BOX 4041 City:Wilmington State:NC . Zip:28406 Phone: (910 ) 7914441 Email:howard@coastaIsitedesign.com Fax: (910 ) 791-1501 . IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. _ _ r no p=n JAN 2'3 2013 Form SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated .agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL F—CE QVE JAN 2 3 2013 My commission expires BY:-- X. APPLICANT'S CERTIFICATION I, (print or h/pe name of person listed in Contact biformation, item 2) Neal Paul certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cove is will be recorded, and that the proposed project complies with the requirements of the applicable storm ter les under 1 NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date: `I I, 4W `lt I l aRXXkNN00 a , otary Pnblioor the State of N04Mro nity of I—IU\` )1 U V do hereby certify that I'JV U-t %�U ` personally appeared before me this A day of 2 p V 1 ) and ack owle eL�� tie ap < a stormwater permit. Witne s my hand and offici sea , SEAL KELL < ,.<_ .. fERING ATE OF Nf. 1T" ` 'n' `" My commission expires wv KELLEY VANDECOEVERING NOTARY PUBIC ONSLOW COUNTY STATE OF NORTH vARO.,�0. , Form S WU-101 Version 07July2009 Page 6 of 6 i}J'' i�liil�'• r' I�. COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License 4 C-2710 January 23, 2013 Linda Lewis North Carolina Department of Environment and Natural Resources Express Storm Water 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Express Storm Water SW8 110906 Onslow County CSD Project No. 11-0253 Dear Linda: Enclosed please find: - two (2) copies of the revised sheets in stormwater set - one (1) copy of the stormwater calculations - stormwater application - low density supplement $1,000 check Project limits map impervious dimension and drainage area map Please call if you have any questions. Very truly yours, kUAP Rodney Wright Encl.: As noted above ECEIVE JAN 2 3 2013 �rl --- - Ev .�.... 1' : `..-1 STORMWATER MANAGEMENT CALCULATIONS For 2D ANGLICO AND 2N BN OPS COMPLEXES PREPARED FOR Deputy Public Works Officer 1005 Michael Road MCB Camp Lejeune 28547 Prepared by: COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 7914441 Fax: 910 791-1501 Llcense k C-2710 \\\\\MCA r CEIVE AN 2 3 2013 BY: \�oa�.FESS�o'`.�ti ; ECEI iI/En 'k ' SEAL -7= a JAN 2 = 025483 y0, 4, I NEt? BY:��� SSS Howard Resnik, P.E. 4&lfZ JC2u, I (lil 11.�' DWO LOW DENSITY CALCULATIONS Allowable Impervious 6,547,442 sf x 0.24 = 1,571,386 sf Proposed Impervious 1,571,386 sf 1,571,386 / 6,547,442 = 0.239 or 24% PROJECT DATA: Total Site Existing Site Data (areas within project limits): wetland area 2,109,279 sf (48.42 acres) upland area 4,438,163 sf (101.88 acres) Total site area 6,547,442 sf (150.31 acres) Proposed Site Data: Proposed building 230,263 sf (5.29 acres) proposed streets 244,151 sf (5.60 acres) proposed parking 823,644 sf (18.91 acres) proposed sidewalks 41,348 sf (0.95 acres) future 231,980 sf (5.33 acres) Total proposed impervious area 1,571,386 sf (36.07 acres) COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 Ucense k C-2710 FOR STORMWATER EXPRESS REVIEW January 8, 2013 EOEIVE JAN 2 3 2013 PROJECT NAME: 2D ANGLICO AND 2N BN OPS COMPLEXES SW8 110906 BY:----- MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: This submittal is for a modification to the existing low density stormwater permit for this project. The approved plans for this project show an existing gravel road that connects to Holcomb Blvd being improved from 12 ft to 24 to allow access to the site. The BASE has instructed the contractors to install a new entry road off Holcomb which will connect approximately 700 ft south of the existing gravel road. A portion of the proposed location of the new road is outside of the current project limits for this permit. This modification will be changing the project limits to include the area where the new entrance road will be located. Part of this permit includes 4 pockets of high density that are treated with wet basins. The proposed change to the project limits doesn't affect the drainage areas or impervious numbers for the basins it only changes the overall area and the allowable impervious located outside of the pocket of high density drainage areas. The new location for the road will have a 24 ft asphalt road installed. The grading for new entrance road will be performed so the runoff will sheet flow along the natural topography. PROJECT BMP: low density with areas of high density STORMWATER ENGIlYEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 7914441 office 910 791 1501 fax to go co North Carolina Department of Environment and A Natural Resources NC®ENR Request for Express Permit Review For DENRUse ONLY Reviewer' L L Submit 11— 2 .) w ed Time: I \ 90, Confirm: t —1, FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(d)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leeng ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan(g ncmaiLnet • Washington Region -Lyn Hardison 252.946-9215 or Iyn.hardison(gincmail.net • Wilmington Region -Janet Russell 910-350.2004 or janet.russell(ilncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: 2D ANGLICO AND 2N BN OPS COMPLEX County: ONSLOW Applicant: NEAL PAUL Company: MARINE CORPS BASE, CAMP LEJEUNE Enter Related SW Permits of request SW 110906 Sw SW SW SW NsN P. bAse. has Address: BLDG 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: neaLpaul@usmc.mil Physical Location:4.0 MILES SOUTH ON HOLCOMB FROM INTERSECTION OFNC 24 Project Drains into SB:NSW waters — Water classification 1919 20 (for classification see-hft ://h2o.enr.state.nc.uslbims/re orts/re ortsWB.h Project Located in WHITE OAK River Basin. Is project draining to class ORIN waters? N , within Y2 mile and draining to class SA waters N or within 1, mile and draining to class HQW waters? N Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN. PC j C Y; _V D Address: PO BOX 4041 City: WILMINGTON, State: NC Zip: 28406-_ Phone: 910-791-4441, Fax: 910-791-1501, Email: HOWARD@COASTALSITEDESIGN.COM JAN 0 9 RECD SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ;a 2ot3 SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear If or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond 0 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ElHigh Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scovina and express meetina reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ® Yes ❑ No a++arrrsauaaaaaaanaarrr+++++++++aaarrrsaaaaaraassraaarFOr DENR use Oulyrrrrr+aaarruaraaasauaana+r+++++++a+++aa»++rra++aara++arr Fee Split for multiple permits: (Check It I Total Fee Amount S SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401, $ LQS $ Stream Deter— $ NCDENR EXPRESS March 2009 O A N N � m N gc g A €� �n HE Q F € m a g, R--Y O O O O O O O O O O To a ? o i^ as "a " 8 mac= € g$€ o5a 8$"o m oma fi mg €mg8g UP.., >m oa �naii >�"��E ��°�m °uP � �"��6" :tag :9£zm $&'��o' 9yo7A �m m°: SBy�.q$ $2 xs m,� =mm} o mg £NBm� °im �' smym$g^� o�x=gomo=��kF^ pg"gymg °» c45y r £ 2 - ] �:£Y9 COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 FOR STORMWATER EXPRESS REVIEW January 8, 2013 PROJECT NAME: 2D ANGLICO AND 2N BN OPS COMPLEXES SW8 110906 MCB Camp Lejeune, NC Onslow County PROJECT DESCRIPTION: This submittal is for a modification to the existing low density stormwater permit for this project. The approved plans for this project show an existing gravel road that connects to I-Iolcomb Blvd being improved from 12 ft to 24 to allow access to the site. The BASE has instructed the contractors to install a new entry road off Holcomb which will connect approximately 700 ft south of the existing gravel road. A portion of the proposed location of the new road is outside of the current project limits for this permit. This modification will be changing the project limits to include the area where the new entrance road will be located. Part of this permit includes 4 pockets of high density that are treated with wet basins. The proposed change to the project limits doesn't affect the drainage areas or impervious numbers for the basins it only changes the overall area and the allowable impervious located outside of the pocket of high density drainage areas. The new location for the road will have a 24 ft asphalt road installed. The grading for new entrance road will be performed so the runoff will sheet flow along the natural topography. PROJECT BMP: low density with areas of high density STORMWATER ENGINEER/CONSULTANT: Coastal Site Design, PC PO Box 4041 Wilmington, NC 28406 Rodney Wright rodney@coastalsitedesign.com 910 7914441 office 910 791 1501 fax