May 25, 2021
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1500 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Eavvonmea ral Quality
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 110715
Electric Supply Substation
Onslow County
Dear Mr. Paul:
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit
will now reference DEMLR as the Division responsible for issuance of the permit.
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 110715 has been renewed
on May 25, 2021, and shall be effective until August 12, 2029. For your records, please find enclosed a renewed,
updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please
note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of
the previous terns to provide you with a better understanding of your obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on August 12, 2011 will remain in
full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely, w C
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
®� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
910.796.7215
.omMrvraivn
State Stormwater Permit No. SW8 110326
Page 2 of 2
Enclosures: Attachment A — Designer's Certification Form
Attachment C — Permitting History
Renewal Application Documents
DES/ams: \\\Stormwater\Permits & Projects\2021\1 10715 HD\2021 05 permit 110715
cc: NCDEQ-DEMLR Wilmington Regional Office
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Eirtenslon I Wilmington, North Carolina 28405
910.796.7215
State Stormwater Management Systems
Permit No. SW8 110715
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
USMCB Camp Lejeune
USMCB Camp Lejeune, Electric Supply Substation
McHugh Blvd., Camp Lejeune, Onslow County
FOR THE
construction, operation and maintenance of 2 infiltration basins in compliance with the provisions of
Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as
the "stormwater rules') and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Energy, Mineral and
Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until August 12, 2029, and shall be subject to
the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to
handle the runoff from 95,621square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 on page 3 of
this permit, and as shown on the approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
5. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured
horizontally from and perpendicular to the normal pool of impounded structures, the top of
bank of both sides of streams and rivers, and the mean high water line of tidal waters.
6. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
7. The following design criteria have been permitted for the infiltration basin and must be
provided and maintained at design condition:
Page 1 of 6
State Stormwater Management Systems
Permit No. SW8 110715
Infiltration Basin #1
Infiltration Basin #2
a.
Drainage Area, acres:
Onsite, ft2:
Offsite, ft2
2.67
116,305
N/A
1.59
69,260
N/A
b.
Total Impervious Surfaces, ft2:
Onsite, ft2:
Offsite, ft2
50,210
50,210
N/A
45,411
45,411
N/A
C.
Design Storm, inches:
3.7
3.7
d.
Basin Depth, feet:
4
3
e.
Bottom Elevation, FMSL:
25
28
f.
Bottom Surface Area, ft2:
2,520
3,300
g.
Bypass Weir Elevation, FMLS:
29
31
h.
Permitted Storage Volume, ft3:
16,704
14,166
i.
I Pre-dev. 1 r-24 hr. discharge rate, cfs:
0.04
0.02
J.
Post-dev. 1 r-24 hr. discharge rate, cfs:
4.02
4.45
k.
Type of Soil:
Ba meade
Ba meade
I.
Expected Infiltration rate:
2.74
1.76
M.
Seasonal High Water Table, FMSL:
22
25.33
n.
Time to Draw Down, hours
29
29
o.
Receiving Stream/River Basin:
Cowhead Creek/White Oak
p.
Stream Index Number:
19-24-2
q.
Classification of Water Body:
SC,NSW
11. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition. The approved Operation
and Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader,
catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
4. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
5. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
6. A copy of the approved plans and specifications shall be maintained on file by the Permittee
for a minimum of ten years from the date of the completion of construction.
Records of maintenance activities must be kept for each permitted BMP. The reports will
indicate the date, activity, name of person performing the work and what actions were taken.
Page 2 of 6
State Stormwater Management Systems
Permit No. SW8 110715
Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
Access to the stormwater facilities shall be maintained via appropriate easements at all times.
10. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
11. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
12, Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
III. GENERAL CONDITIONS
1. Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as
required by any statutes, rules, regulations, or ordinances, which may be imposed by any
other Local, State or Federal government agency having jurisdiction. Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to
enforcement procedures pursuant to NCGS 143-215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems. These additional or
replacement measures shall receive a permit from the Division prior to construction.
Page 3 of 6
State Stormwater Management Systems
Permit No. SW8 110715
4. Permit Transfer: This permit is not transferable to any person or entity except after notice to
and approval by the Director. The permittee shall submit a completed and signed "Permit
Transfer Application Form" (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form, to the Division at least 60 days prior
to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants,
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08;
C. Bankruptcy,
d. Foreclosure, subject to the requirements of Session Law 2013-121;
5. Current Permittee Name or Address Changes: The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project,
C. A mailing address change of the permittee;
6. The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request. Neither the sale of the project, in whole or in part,
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit.
7. The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
8. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission; however, these actions do
not stay any permit conditions.
9. Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of this permit, application, supplements, operation
and maintenance agreement, and approved plans and specifications shall be maintained on
file by the permittee.
10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
11. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
12. A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit. The renewal request must include the appropriate application, documentation and
the processing fee as outlined in Title 15A NCAC 02H. 1 045(3).
Permit renewed, updated and reissued this the 25 day of May 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
C.Q RU
Brian Wrenn, Uirectcw
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 4 of 6
State Stormwater Management Systems
Permit No. SW8 110715
USMCB Camp Lejeune, Electric Supply Substation
Stormwater Permit No. SW8 110715
Onslow County
Designer's Certification
Attachment A
as a duly registered
in the State of North
Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for
_(Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and, specification:
Signature
Registration Number
Date
SEAL
Page 5 of 6
State Stormwater Management Systems
Permit No. SW8 110715
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains
to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting of the
system.
11. The permitted amounts of surface area and/or volume have been provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDEQ-DEMLR Wilmington Regional Office
Page 6 of 6
Attachment C - Permitting History
Electrical Supply Camp Lejeune
Permit No. SW8 110715
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
8/12/2011
Original
Approval
1.0
5/25/2021
Renewal
2.0
DEMLH USE ONLY
Date R'
ceiv
d
Fee Paid
Permit Number
1-7
IA) (t)' Ff SO "�
serfs I10 1
?—AC - nnic--I ranSre(
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER: rm,
7��
IVEN
PERMIT RENEWAL APPLICATION FORM <n?
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 18(
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 110715
2. Project name: USMCB Camp Leieune. Electric Supply Substation High Density Commercial Infiltration
3. Project street address:
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energv-
mi ne ral-land-resou rces/ene rgy-mineral-land-rules/stormwate r-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at., https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City: State:
6. Phone: (910) 451-2213 Email: neal.paul®usmc.mil
ZIP :
MAY 17 2021
BY:
Stormwater Permit Renewal Form
Page 1 of 3
May 11, 2018
I.,
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
HEB 1. A permit application processing fee of $505.00 payable to NCDEO.
HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
HEB 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
HEB 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/bv title/ Business Registration
MAY 17 2021'
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I, Qy a. , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit p er forms to modify or transfer the permit prior to any changes to the
project, SCM ownership. inform tion provided on this permit renewal application is, to the best of my
knowledge, orre nd c mp te.
i
Signature: Date: S 'zl
NOTARIZATION:
that
a Notary Public for the State of
County of (MG(bw , do hereby certify
personally appeared before me
this the Li day of M PW , 2QJ-1 and acknowledge the due
ha execution of the forgoing instrument. Witness my d and official seal,
(Notary Seal)
Notary Signature:
My commission e>
MAY 17 2021 r
Stormwater Permit Renewal Application Form
Page 3 of 3
May 11, 2018
5
Iv/
Permit 141
(to be provided by DWQ)
'V STORMWATER MANAGEMENT PERMIT APPLICATION FORM
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
Project Name
Contact Person
Phone Number
Date
Drainage Area Number
I0DESIGN WFORMATION:°She Characteristics
Characteristics
USMCB Camp Lejeune, Electric Supply Substation
Andrew B. Wilson, EIT
919-854-6252
7012011
Drainage area
116,305.00
h'
Impervious area
50,210.00
1t2
Percent impervious
0.43
%
Design rainfall depth
1.50
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
3.70
in
1-yr, 24-hr intensity
0.90
inlhr
Pre -development 1-yr, 24-hr discharge
0.04
ft'Isec
Post -development 1-yr, 24-hr discharge
4.02
ft'Isec
Pre/Post 1-yr, 24-hr peak flow control
3.98
ft3lsec
Storage Volume: Non -SA Waters
Minimum design volume required
6,376.00
tt'
Design volume provided
16,704.00
h' OK for non -SA waters
Storage Volume: SA Waters
1.5' runoff volume
ft3
Pre -development 1-yr, 24-hr runoff volume
tt'
Post -development 1-yr, 24-hr runoff volume
g'
Minimum required volume
(t'
Volume provided
to
Soils Report Summary
Soil type
Beaymeade Fine Sand
Infiltration rate
2.74
Whir
SHWT elevation
22.00
-fmsl
Basin Design Parameters
Drawdown time
1.21
days OK
Basin side slopes
3.00
:1 OK
Basin bottom elevation
25.00
fmsl OK
Storage elevation
- 29.00
fmsl
Storage Surface Area
5,832.00
li
Top elevation
29.00
fmsl
Basin Bottom Dimensions
Basin length
84.00
ft
Basin width
30.00
it
Bottom Surface Area
2,520.00
ft
rBY
rcEIVForm SW401-Infinralion Basin-Rev.4
AUG 02 2011
:
�2pF WAtf,
0
Parts I. 811, Design Summary, Page 1 of 2
Additional Information
Maximum runoff to each inlet to the basin?
1.76
ac-in
OK
Length of vegetative filter for overflow
NA
-.ft
OK
Distance to structure
60.00
ft
OK
Distance from surface waters
950.00
ft
OK
Distance from water supply well(s)
NA
It
OK
Separation from impervious soil layer
NA
ft
OK
Naturally occming soil above shwt
7.00
ft
OK
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
NA
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
NA
(Y or N)
OK
Pretreatment device provided
Grassed Swales
Fonn SW401-Infiitraboa Basin-Rev.4
AUG U 2 2011
Permit No.
(to be provided by DWO)
Pans L & I. Design Summa, Page 2 012
Permit
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan
Initi
Sheet No.
C to-U,to11. Plans (1"- 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
LGtot -66101
- Boundaries of drainage easement.
5 50'c
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
- Bypass structure,
- Maintenance access,
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.
Li �i02
3. Section view of the infiltration basin (1" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
-
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
AltALAD
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
CC 10 t
investigation request form. County soil maps are not an acceptable source of soils information.
6. A construction sequence that shows how the infiltration basin will be protected from sediment until the
entire drainage area is stabilized.
AZACAO
7. The supporting calculations.
Ztk(AE )
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
9. A copy of the deed restrictions (if required).
RECEIVEL
AUG 0 2 2011
BY:_---
Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1
Permit Number:-'- ')"5-// //-�'
(to be provided by DWQ)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How 1 will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the Swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 RECEIVED
Page 1 of 3
0 2 2011
�----
BMP element:
Potentialproblem:
How I will remediate theproblem:
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
Provide additional erosion
riprap is displaced.
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
Brain.
The main treatment area
A visible layer of sediment
Search for the source of the
has accumulated.
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Water is standing more than
Replace the top few inches of filter
5 days after a storm event.
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Weeds and noxious plants are
Remove the plants by hand or by
growing in the main
wiping them with pesticide (do not
treatment area.
spray).
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment.
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 RY I V LL Page 2 of 3
AUG 0 2 2011
BY:_---
Permit Number:
(to be provided by DWQ)
1 acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:USMCB Camp Leleune, Electric Supply Substation
BMP drainage area number: I
Print name:
Titic:Deputy Public Works Officer
Address:Bldg. 1005 Michael Rd., Camp Leieune NC 28547-2521
Phone:9100-45,1,,2213 A
Date: !p—o211—/I
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a— O C C 1S a Notary Public for the State of
Mr-&) C-41Xc I Ivla, , County of 0 y\s� OvJ do hereby certify that
—COS ( 6 0. p r personally appeared before me this aQ-A�
day of 3U �\e o�� (�and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
SYLVIA NORRIS
NOTARY PUBLIC
ONSLOW COUNTY, NQ
MY COMMISSION EXPIRES �7A's
SEAL
My commission expires �O/$
RECEIVE
Form SW401-Infiltration Basin O&M-Rev.3 AUG 0 2 2011 Page 3 of 3
BY:
llt) //D /15'
Permit No.— /
(to he provided by Di
®�A
O?�f WnTFgO'.
`s
STORMWATER
MANAGEMENT PERMIT APPLICATION FORM
NCDENR
401 CERTIFICATION APPLICATION FORM
o�C
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with all of
the required information.
I..4P,ROJECTIINFORMATIONRA
Project Name
USMCB Camp Lejeune, Electric Supply Substation
Contact Person
Andrew B. Wilson, EIT
Phone Number
919-854-6252
Date
4rr/2011
Drainage Area Number
2
LL DESIGN INECIRMATION ' +1- -,T• nh .::"
,,Kkr?A�- .•,rx ar.' ... •-.."
: ^s shE,-wd;,1k# z-=:d` �i.�?
Site Characteristics
Drainage area
69,260.00 flz
Impervious area
45,411.00 ftz
Percent impervious
0.66
Design rainfall depth
1.50 in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr discharge
Post -development 1-yr, 24-hr discharge
Pre/Post 1-yr, 24-hr peak flow control
Storage Volume: Non -SA Waters
Minimum design volume required
Design volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr mnoff volume
Post -development 1-yr, 24-hr mnoff volume
Minimum required volume
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Basin Design Parameters
Drawdown time
Basin side slopes
Basin bottom elevation
Storage elevation
Storage Surface Area
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom Surface Area
3.70
in
0.90
inlhr
0.02
ft3/sec
4.45
ft3/sec
4.43
ft3lsec
5,573.00 ft3
14,166.00 ft3 OK for non -SA waters
ft3
ft3
ft3
ft3
ft3
Beaymeade Fine Sand
1.76
inthr
25.33
fmsl
1.22
days OK
3.00
:1 OK
28.00
fmsl OK
31.00
fmsl
6,144.00
Yiz
31.00
fmsl
110.00
ft
30.00
It
3,300.00
f?
Form SW401-Infiltration Basin-RevA - Parts I. a 11. Design Summary, Page 1 of 2
AUG 0 2 2011
Permit
Additional Information
Maximum runoff to each inlet to the basin?
1.54
ac-in
OK
Length of vegetative filter for overflow
NA
It
OK
Distance to structure
60.00
Yt
OK
Distance from surface waters
- 650.00
ft
OK
Distance from water supply well(s)
NA
It
OK
Separation from impervious soil layer
NA
ft
OK
Naturally occuring soil above shwt
5.67
'ft
OK
Bottom covered with 4-in of dean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
NA
(Y or N)
OK
Capures all runoff at ultimate buildout?
Y
''.(Y or N)
OK
Bypass provided for larger storms?
NA
(Y or N)
OK
Pretreatment device provided
Grassed Swales
Form SW401-Infiltration Basin-Rev.4
RECEIVED
L0 2 2011
----
nobs provided by DWO)
Parts I. & 11. Design summary, Page 2 of 2
Permit
III�REQUIRED ITEMMM�GNECKLTIST
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan
Ini ial Sheet No.
10 -C1021. Plans (1"- 50' or larger) of the entire site showing:
Design at ultimate build -out,
OH -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
Coe%- i r6 WL - Boundaries of drainage easement.
L v2 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
- Bypass structure,
- Maintenance access,
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanoul,
- Flow distribution detail for inflow,
- Vegetated filter, and
Pretreatment device.
3. Section view of the infiltration basin 0" = 20' or larger) showing:
- Pretreatment and treatment areas, and
-Inlet and outlet structures.
c SSpz 4. A table of elevations, areas, incremental volumes &accumulated volumes to verify the volume provided.
ARl,cNf D 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWO, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
Coal 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
ATt ccr ) 7. The supporting calculations.
AN kc A D 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
9. A copy of the deed restrictions (if required).
FRFCEIVED
AUG 0 2 2011
Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1
f//l1 ///�
Permit Number. 'L�/ )
(to be provided by DWQ)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
Swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the Swale if necessary to
Swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 RECEIVED
Page I of 3
AUG 0 2 2011
BY:
BMP element: Potentialproblem: How I will remediate theproblem:
The forebay Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth. possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or Provide additional erosion
riprap is displaced. protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present. Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
The main treatment area A visible layer of sediment Search for the source of the
has accumulated. sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
Water is standing more than
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to erow on the embankment.
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
wiping them with pesticide (do not
spray).
Remove shrubs or trees
immediatelv.
An annual inspection by an Make all needed repairs
appropriate professional
shows that the embankment
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged Repair or replace the outlet device.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
Fonn SW401-Infiltration Basin O&M-Rcv.3
RECEIVE
AUG 0 2 2011
BY:
Page
Permit
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:USMCB Camp Leieune, Electric Supply Substation
BMP drainage area
Print name:Carl Baker
Title:Deputy Public Works Officer
Address:Blde. 1005 Michael Rd., Camp Leicunc NC 28547-2521
Phone:9100-45 la213
Date: t — `D 2 — `I
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
CE' �O ((I S / a Notary Public for the State of
NGfVhCc_r0k;na;,County ofy n's hVJ do hereby certify that
personally appeared before me thiscNl—
day of ✓120 It, and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
EONSLOWCOUNTY.
NOR'IS
Y PUBLIC
D(PIAES of 5
SEAL
My commission expires c3 o2d�s
Form SW401-Infiltration Basin O&M-Rev.3
RECEIVE;
AUG 0 2 2011
BY:�_
Page 3 of 3