Loading...
HomeMy WebLinkAboutSW8110715_CURRENT PERMIT_20210525STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 M-AVS DOC TYPE. $ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 202\0526� YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIM WRENN DUraor May 25, 2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1500 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Eavvonmea ral Quality Subject: Permit Renewal State Stormwater Management Permit No. SW8 110715 Electric Supply Substation Onslow County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 110715 has been renewed on May 25, 2021, and shall be effective until August 12, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terns to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on August 12, 2011 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, w C Brian Wrenn, Director Division of Energy, Mineral and Land Resources ®� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.796.7215 .omMrvraivn State Stormwater Permit No. SW8 110326 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2021\1 10715 HD\2021 05 permit 110715 cc: NCDEQ-DEMLR Wilmington Regional Office North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Eirtenslon I Wilmington, North Carolina 28405 910.796.7215 State Stormwater Management Systems Permit No. SW8 110715 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune USMCB Camp Lejeune, Electric Supply Substation McHugh Blvd., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 2 infiltration basins in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until August 12, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 95,621square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 on page 3 of this permit, and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: Page 1 of 6 State Stormwater Management Systems Permit No. SW8 110715 Infiltration Basin #1 Infiltration Basin #2 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 2.67 116,305 N/A 1.59 69,260 N/A b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2 50,210 50,210 N/A 45,411 45,411 N/A C. Design Storm, inches: 3.7 3.7 d. Basin Depth, feet: 4 3 e. Bottom Elevation, FMSL: 25 28 f. Bottom Surface Area, ft2: 2,520 3,300 g. Bypass Weir Elevation, FMLS: 29 31 h. Permitted Storage Volume, ft3: 16,704 14,166 i. I Pre-dev. 1 r-24 hr. discharge rate, cfs: 0.04 0.02 J. Post-dev. 1 r-24 hr. discharge rate, cfs: 4.02 4.45 k. Type of Soil: Ba meade Ba meade I. Expected Infiltration rate: 2.74 1.76 M. Seasonal High Water Table, FMSL: 22 25.33 n. Time to Draw Down, hours 29 29 o. Receiving Stream/River Basin: Cowhead Creek/White Oak p. Stream Index Number: 19-24-2 q. Classification of Water Body: SC,NSW 11. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 110715 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12, Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 3 of 6 State Stormwater Management Systems Permit No. SW8 110715 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants, b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; C. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121; 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project, C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H. 1 045(3). Permit renewed, updated and reissued this the 25 day of May 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C.Q RU Brian Wrenn, Uirectcw Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Management Systems Permit No. SW8 110715 USMCB Camp Lejeune, Electric Supply Substation Stormwater Permit No. SW8 110715 Onslow County Designer's Certification Attachment A as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for _(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and, specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Management Systems Permit No. SW8 110715 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Page 6 of 6 Attachment C - Permitting History Electrical Supply Camp Lejeune Permit No. SW8 110715 Approval Date Permit Action BIMS Version Description of the Changes 8/12/2011 Original Approval 1.0 5/25/2021 Renewal 2.0 DEMLH USE ONLY Date R' ceiv d Fee Paid Permit Number 1-7 IA) (t)' Ff SO "� serfs I10 1 ?—AC - nnic--I ranSre( NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: rm, 7�� IVEN PERMIT RENEWAL APPLICATION FORM <n? In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 18( prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 110715 2. Project name: USMCB Camp Leieune. Electric Supply Substation High Density Commercial Infiltration 3. Project street address: City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energv- mi ne ral-land-resou rces/ene rgy-mineral-land-rules/stormwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at., https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: 6. Phone: (910) 451-2213 Email: neal.paul®usmc.mil ZIP : MAY 17 2021 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 I., C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration MAY 17 2021' Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, Qy a. , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit p er forms to modify or transfer the permit prior to any changes to the project, SCM ownership. inform tion provided on this permit renewal application is, to the best of my knowledge, orre nd c mp te. i Signature: Date: S 'zl NOTARIZATION: that a Notary Public for the State of County of (MG(bw , do hereby certify personally appeared before me this the Li day of M PW , 2QJ-1 and acknowledge the due ha execution of the forgoing instrument. Witness my d and official seal, (Notary Seal) Notary Signature: My commission e> MAY 17 2021 r Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 5 Iv/ Permit 141 (to be provided by DWQ) 'V STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Date Drainage Area Number I0DESIGN WFORMATION:°She Characteristics Characteristics USMCB Camp Lejeune, Electric Supply Substation Andrew B. Wilson, EIT 919-854-6252 7012011 Drainage area 116,305.00 h' Impervious area 50,210.00 1t2 Percent impervious 0.43 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.70 in 1-yr, 24-hr intensity 0.90 inlhr Pre -development 1-yr, 24-hr discharge 0.04 ft'Isec Post -development 1-yr, 24-hr discharge 4.02 ft'Isec Pre/Post 1-yr, 24-hr peak flow control 3.98 ft3lsec Storage Volume: Non -SA Waters Minimum design volume required 6,376.00 tt' Design volume provided 16,704.00 h' OK for non -SA waters Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume tt' Post -development 1-yr, 24-hr runoff volume g' Minimum required volume (t' Volume provided to Soils Report Summary Soil type Beaymeade Fine Sand Infiltration rate 2.74 Whir SHWT elevation 22.00 -fmsl Basin Design Parameters Drawdown time 1.21 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 25.00 fmsl OK Storage elevation - 29.00 fmsl Storage Surface Area 5,832.00 li Top elevation 29.00 fmsl Basin Bottom Dimensions Basin length 84.00 ft Basin width 30.00 it Bottom Surface Area 2,520.00 ft rBY rcEIVForm SW401-Infinralion Basin-Rev.4 AUG 02 2011 : �2pF WAtf, 0 Parts I. 811, Design Summary, Page 1 of 2 Additional Information Maximum runoff to each inlet to the basin? 1.76 ac-in OK Length of vegetative filter for overflow NA -.ft OK Distance to structure 60.00 ft OK Distance from surface waters 950.00 ft OK Distance from water supply well(s) NA It OK Separation from impervious soil layer NA ft OK Naturally occming soil above shwt 7.00 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? NA (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? NA (Y or N) OK Pretreatment device provided Grassed Swales Fonn SW401-Infiitraboa Basin-Rev.4 AUG U 2 2011 Permit No. (to be provided by DWO) Pans L & I. Design Summa, Page 2 012 Permit (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Pagel Plan Initi Sheet No. C to-U,to11. Plans (1"- 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and LGtot -66101 - Boundaries of drainage easement. 5 50'c 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. Li �i02 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. - 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. AltALAD 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils CC 10 t investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. AZACAO 7. The supporting calculations. Ztk(AE ) 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). RECEIVEL AUG 0 2 2011 BY:_--- Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 Permit Number:-'- ')"5-// //-�' (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 RECEIVED Page 1 of 3 0 2 2011 �---- BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Brain. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 RY I V LL Page 2 of 3 AUG 0 2 2011 BY:_--- Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Camp Leleune, Electric Supply Substation BMP drainage area number: I Print name: Titic:Deputy Public Works Officer Address:Bldg. 1005 Michael Rd., Camp Leieune NC 28547-2521 Phone:9100-45,1,,2213 A Date: !p—o211—/I Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a— O C C 1S a Notary Public for the State of Mr-&) C-41Xc I Ivla, , County of 0 y\s� OvJ do hereby certify that —COS ( 6 0. p r personally appeared before me this aQ-A� day of 3U �\e o�� (�and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, NQ MY COMMISSION EXPIRES �7A's SEAL My commission expires �O/$ RECEIVE Form SW401-Infiltration Basin O&M-Rev.3 AUG 0 2 2011 Page 3 of 3 BY: llt) //D /15' Permit No.— / (to he provided by Di ®�A O?�f WnTFgO'. `s STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM o�C INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with all of the required information. I..4P,ROJECTIINFORMATIONRA Project Name USMCB Camp Lejeune, Electric Supply Substation Contact Person Andrew B. Wilson, EIT Phone Number 919-854-6252 Date 4rr/2011 Drainage Area Number 2 LL DESIGN INECIRMATION ' +1- -,T• nh .::" ,,Kkr?A�- .•,rx ar.' ... •-.." : ^s shE,-wd;,1k# z-=:d` �i.�? Site Characteristics Drainage area 69,260.00 flz Impervious area 45,411.00 ftz Percent impervious 0.66 Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr mnoff volume Post -development 1-yr, 24-hr mnoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.70 in 0.90 inlhr 0.02 ft3/sec 4.45 ft3/sec 4.43 ft3lsec 5,573.00 ft3 14,166.00 ft3 OK for non -SA waters ft3 ft3 ft3 ft3 ft3 Beaymeade Fine Sand 1.76 inthr 25.33 fmsl 1.22 days OK 3.00 :1 OK 28.00 fmsl OK 31.00 fmsl 6,144.00 Yiz 31.00 fmsl 110.00 ft 30.00 It 3,300.00 f? Form SW401-Infiltration Basin-RevA - Parts I. a 11. Design Summary, Page 1 of 2 AUG 0 2 2011 Permit Additional Information Maximum runoff to each inlet to the basin? 1.54 ac-in OK Length of vegetative filter for overflow NA It OK Distance to structure 60.00 Yt OK Distance from surface waters - 650.00 ft OK Distance from water supply well(s) NA It OK Separation from impervious soil layer NA ft OK Naturally occuring soil above shwt 5.67 'ft OK Bottom covered with 4-in of dean sand? Y (Y or N) OK Proposed drainage easement provided? NA (Y or N) OK Capures all runoff at ultimate buildout? Y ''.(Y or N) OK Bypass provided for larger storms? NA (Y or N) OK Pretreatment device provided Grassed Swales Form SW401-Infiltration Basin-Rev.4 RECEIVED L0 2 2011 ---- nobs provided by DWO) Parts I. & 11. Design summary, Page 2 of 2 Permit III�REQUIRED ITEMMM�GNECKLTIST (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Pagel Plan Ini ial Sheet No. 10 -C1021. Plans (1"- 50' or larger) of the entire site showing: Design at ultimate build -out, OH -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and Coe%- i r6 WL - Boundaries of drainage easement. L v2 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanoul, - Flow distribution detail for inflow, - Vegetated filter, and Pretreatment device. 3. Section view of the infiltration basin 0" = 20' or larger) showing: - Pretreatment and treatment areas, and -Inlet and outlet structures. c SSpz 4. A table of elevations, areas, incremental volumes &accumulated volumes to verify the volume provided. ARl,cNf D 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. Coal 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. ATt ccr ) 7. The supporting calculations. AN kc A D 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). FRFCEIVED AUG 0 2 2011 Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 f//l1 ///� Permit Number. 'L�/ ) (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 RECEIVED Page I of 3 AUG 0 2 2011 BY: BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to erow on the embankment. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs or trees immediatelv. An annual inspection by an Make all needed repairs appropriate professional shows that the embankment The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Fonn SW401-Infiltration Basin O&M-Rcv.3 RECEIVE AUG 0 2 2011 BY: Page Permit (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Camp Leieune, Electric Supply Substation BMP drainage area Print name:Carl Baker Title:Deputy Public Works Officer Address:Blde. 1005 Michael Rd., Camp Leicunc NC 28547-2521 Phone:9100-45 la213 Date: t — `D 2 — `I Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. CE' �O ((I S / a Notary Public for the State of NGfVhCc_r0k;na;,County ofy n's hVJ do hereby certify that personally appeared before me thiscNl— day of ✓120 It, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, EONSLOWCOUNTY. NOR'IS Y PUBLIC D(PIAES of 5 SEAL My commission expires c3 o2d�s Form SW401-Infiltration Basin O&M-Rev.3 RECEIVE; AUG 0 2 2011 BY:�_ Page 3 of 3