Loading...
HomeMy WebLinkAboutSW8110611_HISTORICAL FILE_20171013STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ki CAD 11 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 1.0\1 \0 13 YYYYMMDD t t-. F- lit, Energy. Mineral & Land Resources ENVIRONMENTAL QUALITY October 13. 2017 ROY COOPER Gorernor MICHAEL S. REGAN Sect ernq Commanding Officer MCB Camp Lejeune c/o Thomas Bradshaw, Public Works Division 1005 Michael Road Camp I.ejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 I t061I Mobile MOUT Training Area Overall Low Density with areas of Nigher Density (SA waters) Onslow County Dear Commander: TRACY DAVIS Direcror Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEN41,R). All previous references to DWQ will remain in older Stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this modified permit novv references DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete, modified express Stormwater Management Permit Application for the Nlobile 1v10UT Training Area on September 14, 2017. Staff review of the modified plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in "Title 15A NCAC 21-1.1000 and Session Law 2008-211. We are 'forwarding modified Permit No. SW8 110611 dated October 13, 2017, for the construction, operation and maintenance of the BivlP's and built -upon areas associated with the subject project. This permit covers those modifications as listed on Attachment B to this permit. This permit shall be effective from the date of issuance until September 16, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Naintenance of the 13N1P(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 15013 of the North Carolina General Statutes, and must be filed with the OAIJ within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAI-I.com. Unless such demands are made this permit shall be final and binding. State of Nonh Cal'olina I Environmental Quality I Energy. Mineral and Land Resources N'ilmington Regional Office 1 127 Cardinal Drive Extension I NJmington., NC 28405 910 796 7215 Slate Stormwaler Permit No. SWS 110611 Page 2 of 2 If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7301. Sincerely. yo: Tracy Davis, P.L., Director Division of Energy, Mineral and Land Resources GDS/arl: G:A\\StomnyaterAPennits S,, 1'rojects\2011\110611 HD\2017 10 permit 110611 cc: Robin Austin, P.E, Catlin Engineers & Scientists Wilmington Regional Office StormwaterFile Statanf North Carolina I Frm,r,nmemal Qualhy ILncryy. Mine��l and Lend Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 State Stormwater Management Permit No. SW8 110611 October 13. 2017 �'il/nri �i73►C�7ii:[�7_\ZsI�I►1_1 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY WITH AREAS OF HIGHER DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer US MCB Camp Lejeune Mobile MOUT Training Area Range Road, Camp Lejeune; Onslow County FOR THE construction, operation and maintenance of an overall 12% low density project with three (3) infiltration basins and one (1) wet detention pond to treat the areas of higher density, within '/z mile of and draining to SA waters, in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (DEMLR or Division) and considered a part of this permit. The facilities shall be constructed, operated and maintained in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data attached to and on file with the Division. This permit shall be effective from the date of issuance until September 16, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.9, 1.10 and 1.11 of this permit. The stormwater controls labeled BMP 1, BMP 2, BMP 3 and BMP 4 are designed to handle the runoff from 193,072 ft2, 67,082 ft2, 33,977 ft2 and 26,572 ft2, respectively, of impervious area. 3. The overall project shall be maintained at or below a maximum density level of 12%. The project is a "mobile' training area, meaning that the built -upon area will be relocated within the project area as training demands. The maximum allowable amount of built -upon area for the entire 1,038 acre project area is 5,425,834 square feet. With this modified permit, a total of 1,347,932 sf of impervious area is permitted. Of this amount, 1,197,034 sf is existing previously permitted BUA prior to consolidation, 34,823 sf was added with the February 2012 modification; and, 116,075 sf is proposed new BUA for P1479. A total of 4,077,902 sf of impervious area is available for future development. Page 1 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 7 1.1 a The P1479 project utilizes sheet flow and vegetated conveyances to convey runoff to a level spreader (Subbasin DA's 3, 4, 9, 10 & 14) which has been designed to handle the peak flow from the 1 inch per hour storm and to achieve diffuse flow. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and. perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. For each permitted BMP, the runoff in excess of the design storm must flow overland through a 50' vegetated filter designed to pass the peak flow from the 10 year storm in a non -erosive manner. The overall tract and each drainage area will be limited to the amount of built - upon area indicated in Sections 1.2, 1.3, 1.9, 1. 10, and 1.11 of this permit, and per approved plans. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. The following design criteria have been provided in the wet_detention pond BMP #1, and must be maintained at design condition: a. Drainage Area, acres: 14.06 Onsite, ft' : 612,393 Offsite, ftz: 0 b. Total Impervious Surfaces, ftz: 193,072 Onsite, ftz: 193,072 Offsite, ftz: 0 C. Design Storm, inches: 3.65 (1 year 24 hour) d. Average Pond Design Depth, feet: 4.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 21.50 g. Permanent Pool Surface Area, ftz: 20,048 h. Permitted Storage Volume, ft3: 47,452 i. Temporary Storage Elevation, FMSL: 23.45 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 0.39 k. Controlling Orifice: 1.27" 0 pipe I. Orifice flowrate, cfs: 0.17 M. Permitted Forebay Volume, W: 15,088 n. Fountain Horsepower: 1/4 HP o. Receiving Stream/River Basin: Bear Creek / WOK01 p. Stream Index Number: 19-41-11 q. Classification of Water Body: "SA HOW" 10. A secondary BMP in series with wet pond BMP #1 is provided to treat the design storm discharged from the pond. The secondary BMP is a level spreader and 50-foot vegetated filter strip designed to effectively infiltrate the design storm, as described in Section 1.9 of this permit, and must be maintained at design condition: a. Peak Discharge Design Storm, cfs: 0.167 Peak flow 10-yr Storm, cfs: 2.33 b. Length of Level Spreader, ft: 50 C. Width of Vegetated Filter Strip, ft: 55 d. Slope of Vegetated Filter Strip: 0.73% Page 2 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 11. The following design criteria is permitted for the three (3) infiltration basins and must be provided in the system and maintained at design condition: BMP #2 BMP #3 BMP #4 a. Drainage Area: acres -Onsite, ft2: -Offsite, ft2: 4.84 210,960 0 3.53 153,767 0 2.11 91,912 0 b: Total Impervious Suriaces, ft2: 67,082 33,977 26,572 c. Design Storm, in. 3.7 3.7 3.7 �d. Basin Depth, ft: 1.8 2.8 1.8 fie. Bottom Elev., FMSL: 24 28 37 f. Bottom Surface Area. ft2: 9,300 4,420 8,940 g. Bypass Weir Elevation, FMSL, 25,77 29.78 37.79 h. Permitted Storage Volume, ft': 19,096 9,486 7,456 I. Type of Soil: BaB,MaC BaB,MaC BaB j. Expected Infiltration Rate, in/hr: 3.7 6.7 4.1 k. Seasonal High Water Table, FMSL: 21.5 I 26 35 I. Draw Down Time, hrs: 48 48 48 m. Receiving Stream / River Basin Bear Creek / WOK 01 n. Stream Index Number 1 19-41-11 o. Water Body Classification: "SA HOW" 11. SCHEDULE OF COMPLIANCE The stormwater management system shall be entirely constructed, vegetated and operational for its permitted use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with the permit conditions, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification (See Attachment A). A modification may be required for those deviations. 4. If the permanent pool volume in the wet detention pond is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in BMP #1 is 1/4 horsepower. Page 3 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 5. The permittee shall at all times provide and perform the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency as listed in the approved Operation and Maintenance Agreement. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEC. The records will indicate the date, activity, name of person performing the work and what actions were taken. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area as reported on the supporting documentation. d. Filling in, altering, piping, relocating, resizing, redirecting, removing, or regrading of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application, f. The construction of any areas of #57 stone, permeable pavement or landscape materials to be considered for BUA credit. 10. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Permit Transfer Application Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions, b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256, c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2- 01(e) and NCGS 57D-6-07; Page 4 of 8 State Stormwater Management Permit No. SW8 110611 October 13, 2017 The permittee shall submit a competed Permit Update Form to the Division within 30 days of any one or more of the following events: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the current permittee; 3. The submission of a request to transfer the permit does not stay any permit condition. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 4. Any person or entity found to be in noncompliance with a stormwater management permit or the requirements of the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. If the facilities fail to perform satisfactorily the Permittee shall take immediate . corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants Division staff permission to enter the property during normal business hours to inspect all components of the permitted stormwater management facility. 8. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. Approved plans, specifications, application forms, and design calculations for this project are incorporated by reference and are enforceable parts of the permit. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified, updated and reissued this the 13'h day of October 2017. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,'4z i racy ua s, t'.t., uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 Attachment A — Designers Certification MOUT Training Area Stormwater Permit No. SW8 110611 Onslow County I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes above permanent pool are grassed with permanent vegetation. 9. Vegetated slopes above permanent pool are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, a vegetated filter, level spreader and a secondary BMP. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Regional Office Page 7 of 8 State Stormwater Management Permit No. SW8 110611 October 13. 2017 Attachment B — List of modifications October 13, 2017 Adds 116,075 sf of new built -upon area for 1'1479 Outdoor Infantry Immersion Trainer. No changes to any ofthe previously permitted 13NIP's. Reduces the future 13UA amount available to 4,077,902 sf. Adds a new level spreader (Subbasin lWs 3, 4, 9, 10 and 14) to meet the dispersed flow requirement for this overall 12% low density project. February 22.2012 I. Consolidates 4 permits into one: SW8 051145, SW8 060301, SWS 090330 and SW8 110611. "file built -upon areas and 13N1P's previously approved under these permits have been consolidated into one permit. SW8 110611. 2. Approves a total of 34,823 sf of new 13UA for Training Areas A, 13 and C. Page 8 of 8 DEMLR USE ONLY ' D to RectiveSI mit No r Applicab] Coastal SW — ❑ Coastal SW — 2008 ❑ Ph 11 - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): F-3 Range Road City:Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): From the intersection of Hwv 172 and Lyman Road, travel north along Hwy 172 and turn left onto F-3 Range Road. Proposed entrance to the proiect site is on the right before the MMOUT tower. 4. Latitude:34° 40' 13.57" N Longitude:-770 14' 29.73" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modification' lReneeuals eoith inodificalions also requires SWU-102 — Renetnal Application Foon b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 110611 , its issue date (if known)_02/22/2012 , and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density JgHigh Density ❑Drains to an Offsite Stormwater System ❑Other C Hyhrf 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 10 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: ov5. Is the project located within 5 miles of a public airport? ®No ❑Ye If yes, see S.L. 2012-200, Part Vl: http://12ortal.nedenr.org/web/Ir/rules-and-regulations SEP I i 2017 Norm SWU-101 Version Oct. 31, 2013 Page I of 6 Il'I'. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/Organization: US MCB Camp Lejeune Signing Official & Title:Neal Paul, Deputy Public Works Officer b.Contact information for person listed in item la above: Street Address: Building 1005 Michael Rd City:Camp Lejeune State:NC Zip28547 Mailing Address (if applicable): Bldg 1005 Michael Rd City:Camp Lejeune State:NC Zip28547 Phone: (910 ) 451-3034 Fax: (910 ) 451-3300 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organizationsame as above Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address:n/a City: State: Mailing Address (if applicable): City: State: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Thomas C. Bradshaw Signing Official & Title:Public Works Design, Civil Branch b.Contact information for person listed in item 3a above: Mailing Address:Bldg 1005 Michael Rd City:Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-3238 ext 3285 Fax: ( ) Email: 4. Local jurisdiction for building permits: Point of Contact: Phone #: ECENUFR SEP 14 2017 BY: Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION I. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff from the site will utilize dispersed (low and vegetated conveyances for treatment of stormwater runoff maintaining an overall 12%low density. with three (3) infiltration basins and one (1) wet detention pond to treat the areas of higher density. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.lf claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW — 1995 ❑ Ph 11 — Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 1,038 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Properly Area (4) — Total Coastal Wetlands Area (5) —Total Surface Water Area (6) = "Total Project Area-: 1 038acres Total project area shall be calculated to exclude the following: the normal pool of impounded structiv es, the area between the banks ofso eams and rivers, the area below the Normal High lVater (NHq') line or d-lean High Water (MHI P) line, and coastal wetlands lanrhward j om the A1111V (or d-/H11%) line. The resu ha i project area is used to calculate overall percent built upon area (BUt). Non -coastal wetlands lande,ard of the NHII%(or d4HA%) line may be included in the total project at ea. 8. 1'roject percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 12 9. 1 low many drainage areas does the project have? I (For high density, count I for each proposed engineered s'tormwoun 8d4P. For low density and other projects, use 1 for the whole property a ea) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same formal as below. overe I I. .00 —wo5 Qv — ooZ& oG —cvz / Basin Information Drainage Area I DrainageAreaA Draina e Area o Drainage Area _ Receiving Stream Name Bear Creek Stream Class * SA; I IQW Stream Index Number * 19-41-11 Total Drainage Area (sf) 42,215,280 9�jU OO gq' On -site Drainage Area (so 42,215,280 (J aaD 5 70ff-site Drainage Area (so 0 (' (� Pro oscd Impervious Area** (so 116,075 41171 3311 % Impervious Area** (total) 12% 1so-Tyo I q, 3 0 1 33. &y0 Im ervious" Surface Area Drainage Area 1 Drainage Aread Drainage Area J5 Drainage Area On -site Buildings/Lots (sl) 53,643 On -site Streets (sf) 64,453 On -site Parking (sl) 31,343 On-siteSidewalks(sf) 1,459 Other on -site (so Future (so 4,077.902 OCT 0 1 M7 1+ Off -site (SO Existing BUA*** (sf) I,197,034 49 3 Total (so: 5,425,834 7Z ?jl 799 3311 * Stream Class and Index A'umber can be determined at: hut):'%nortal nedenr. or�dn•eb%myjzs%cca%lascific•otions * * Impervious in ea is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel m eas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. Flow was the off -site impervious area listed above determined? Provide documentation. n/a Form SWIJ-101 Version Oct. 31, 2013 . Page 3 of 6 SNN'S 110611 Basin Information Existing BMP I Existing BMP 2 Basin 91 Existing BMP 3 Basin 42 Existing BMP 4 Basin #3 Receiving Stream Name Bear Creek Bear Creek Bear Creek Bear Creek Stream Class * SA; IiQW SA; IiQW SA; I-IQW SA; IiQW Stream Index Number* 19-41-11 19-41-11 19-41-11 19-41-11 'Dotal Drainage Area (so 612,393 210,960 153,767 91,912 On -site Drainage Area (so 612393 210,960 153,767 91,912 Off -site Drainage Area (so 0 0 0 ]'reposed Impervious Area" (so 101 0.7Z (p on- 3 q I Z % ]mpervious Area** (total) 31.53 31.80 22.10 28.91 Impervious" Surface Area CTF Training P-1063 P-1063 P-1063 On -site Buildings/Lots (so 0 39,621 13,068 14,374 On-sile Streets (so 40,173 22,596 7,296 7,430 On -site Parking (so 111699 0 0 0 On -site Sidewalks (so 0 0 0 0 Other on -site (sn 0 0 0 0 Flnnre (sf) 20,000 0 0 0 Off -site (SO 0 0 0 0 Existing BUA***(so 20.200 4,875 13,613 4,768 Total (so: 193,072 67,082 33.977 26,572 ' ECEI Vd E OCT 0 2 2017 BY: 11: How was the off -site impervious area listed above determined? Provide documentation. n/a Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornnaater requirements as per 15A NCAC 028 .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from httl2://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at htto://portal.ncdenr.org/web/wq/ws/su/mates.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromhttp://portalmcdennorg/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N A - Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M N IF agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to htto://www.envhelp.orgZpages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for MRA� the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the Mf 74or— receiving stream drains to class SA waters within rh mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). MRA-' 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: MIS a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal rs�s. CEI V E i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. EP k. Existing contours, proposed contours, spot elevations, finished floor elevations.B 1 a Zo" 1. Details of roads, drainage features, collection systems, and stormwater control m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by.a qualified person. Provide documentation of qualifications and identify the person wFo -- made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify MIS elevations in addition to depths) as well as a map of the boring locations with the existing 15-too - 5-0 skis elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visil for DEMLR to Verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: hl ot 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Vt A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htto: / / ww",.secretary. state.nc. us /Corporations /CSearch.asi2x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htty://12orta1.ncdenr.01'9hveb/Ir/state-stormnvater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:M. Robin Austin, P.H. Consulting Firm: CATLIN Engineers and Scientists Mailing Address:220 Old Dairy Rd City: W ilmington Phone: (910 ) 452-5861 Email: rOb'ty' 0., 'vbvl&C,a}tiy%u50. corrt State:NC Zip:28405 Fax: (910 ) 452-7563 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, cmnplete this section) 1, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the .party responsible for the operation and maintenance of the stormwater system. ECEIVE SEP 14 2017 13Y:_ Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 Rs the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: 1, a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Thomas Bradsha7u certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the vrowsed project complies with the requirements of the applicable stormwat les under 15A N C 2H .1 d any other applicable state stormwater requirements. Signature: p��, ,`Date: 9/�;/117 a Notary Public for the State of IVC'ly 11 NVr11G County of O&S) do hereby certify that cy�� ��1�1j��1) personally appeared before me this � day of �`and aSVnowledge the due execution of the application for a stormwater permit. Witness my hand and official seal R. Nolory Public Onslow County Commission Expit, 05/26/2019 P OgtH CAR0\0:. SEAL My commission expires lJC-- L' p a� i y ECE E SEP 14 2017 BY. Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 •AOL ti upir 0 YNI MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 536 10.17 10:36 a 919104513300 10 10.17 10:36 10.17 10:39 10 OK TIME :10-17-2017 10:39 FAX NO.1 :9103502004 NAME :Mainfax MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 537 10.17 10:36 rt 919104527563 10 10.17 10:39 10.17 10:47 0 0050 TIME :10-17-2017 10:47 FAX NO.1 :9103502004 NAME :Mainfax 5' ,? //0 Col / NAVIjAC# S.F. TITLE IIT VILLAGE - AAR - MODULAR BUILDING 4875 AAR BUILDING IIT VILLAGE BUILDINGS 1250 BUILDING 3 1858 BUILDING 4 630 BUILDING 5 667 BUILDING 6 935 BUILDING 7 1000 BUILDING 8 310 BUILDING 9 117 BUILDING 10 201 BUILDING 11 320 BUILDING 12 159 BUILDING 13 1860 BUILDING 14 295 BUILDING 17 159 BUILDING 18 159 BUILDING 19 208 BUILDING 20 375 BUILDING 21 320 BUILDING 22 518 BUILDING 23 295 BUILDING 24 295 BUILDING 25 159 BUILDING 26 320 BUILDING 27 159 BUILDING 28 159 BUILDING 29 1000 BUILDING 30 238 BUILDING 32 667 BUILDING 33 616 BUILDING 34 159 BUILDING 35 159 BUILDINGS 36 320 BUILDINGS 37 A 00E)nX ICTi 10 NORTH CAROLINA ENVIRONMENTAL, MANAGEMENT COMMISSION (3-0GT--ZG(? NAVFfAC# S.F. TITLE 489 BUILDING 38 159 BUILDING 39 117 BUILDING 40 667 BUILDING 41 159 BUILDING 42 320 BUILDING 43 320 BUILDING 44 320 BUILDING 45 159 BUILDING 46 320 BUILDING 47 159 BUILDING 48 517 BUILDING 49 159 BUILDINGS 50 320 BUILDING 51 517 BUILDING 52 755 BUILDING 53 201 BUILDING 54 238 BUILDING 55 230 BUILDING 56 434 BUILDING 57 481 BUILDING 58 398 BUILDING 59 310 BUILDING 60 710 BUILDING 61 940 BUILDING 63 953 BUILDING 64 953 BUILDING 64 238 BUILDING 66 667 BUILDING 67 518 BUILDINGS 68 1985 BUILDING 69 217 BUILDING 70 320 BUILDING 71 434 BUILDING 72 295 BUILDING 73 295 BUILDING 74 NAV, AC# S.F. TITLE 518 BUILDING 75 320 BUILDING 76 159 BUILDING 77 159 BUILDING 78 320 BUILDING 79 320 BUILDING 80 159 BUILDING 81 159 BUILDING 82 230 BUILDING 83 159 BUILDING 84 295 BUILDING 85 320 BUILDING 87 1000 BUILDING 89 320 BUILDING 90 320 BUILDING 91 41794 % oT,4L AI LIN Engineers and Scientists TRANSMITTAL TO:, NCDEQ 127 Cardinal Drive Extension Wilmington, NC 28405 910-796-7215 Attn: Linda Lewis We Are Transmitting Herewith The Following: ITEM 2 Drawings Specifications Shop Drawings Contract Documents Correspondence Reports ACTION 220 Old Dairy Road Wilmington, NC 28405 Telephone: (910) 452-5861 Fax: (910) 452-7563 DATE: 10-11-2017 RE: P1479 Outdoor IIT Express State SW CATLIN Project No. 1. For Your Use 2. For Review 3. Please Comment 4. Reply ASAP 5. Urgent 6. Returned 216111 TRANSMITTED BY US Mail ,,z- Messenger Next Day Service Other NO. OF COPIES DESCRIPTION ACTION CODE 2 Revised CG101 full size 2 .COMMENTS: COPY TO: www.catlinusa.com Lewis,Linda From: Lewis,Linda Sent: Friday, September 29, 2017 5:50 PM To: 'Robin Austin' Cc: 'thomas.bradshaw@usmc.mil' Subject: RE: SW8 110611 Mod. Robin - I don't know why my hand -calculated building total varied so much from the actual total. I probably need new contacts. I did notice that the formula for summing the numbers did not include the 4875 sf AAR Modular Building. Is there a reason for that? Regardless, if you are now adding 41,794 sf (or more) of new buildings to a site that already proposed 11,101 sf of buildings in 2012, the building total to be reported on the 2017 application should be 52,895 sf (or more). The 2017 application has to reflect what was previously permitted and approved as building, street, parking, etc. in 2012 plus what you are proposing now. Any buildings, streets, parking etc., that are added to the project with the 2017 application will need to be added to the 2012 totals. The previous BUA amounts on the 2012 application for building (11101) street (9528) and parking (14197) do NOT get added to the 1,197,034 to make a new "previously permitted" amount for 2017. The 1,197,034 of previously permitted BUA was a one-time'deal when the 4 permits were consolidated. All applications from this point forward will always have 1,197,034 sf of existing BUA reported and the other categories of BUA will just be increased or decreased according to what is proposed at the time. Whatever amounts of building, parking, sidewalk, other, etc. you are proposing for 2017 should be added to the 2012 amounts for building, parking, street, other, etc. I'm sorry, I did not remember that you had counted all the roads as BUA. You still need a supplement form and a signed O&M for any proposed level spreader. The level spreader is an integral part of how this project will meet the low density MDC in .1003(2)(b) to provide dispersed flow and must be maintained that way. My concern with the current supplement is in regard to the DA numbering shown at the top of that supplement. You are adding to a project that already has existing BMP numbers and I'm trying to avoid confusion over which LS goes with which BMP. The "EZ" program has nothing to do with whether you need to submit an O&M agreement or not. The O&M EZ is not required or applicable only to StormEZ projects. The EZ in this case refers to the fact that we made it easier to deal with O&M agreements. Instead of signing 4 different O&M agreements, we created the O&M EZ which allows you to sign just one cover document and attach and print all the required O&M agreements for each type of SCM proposed for the project. There is a similar document for supplements called supplement EZ. I apologize for the late Friday afternoon reply to your email. It's been one of those weeks. I hope you had a great weekend. Linda From: Robin Austin[mailto:robin.austin@catlinusa.com] Sent: Thursday, September 28, 2017 5:02 PM .Pro: Lewis,Linda <linda.lewis@ncdenr.gov> Cc:'thomas.bradshaw@usmc.mil' <thomas.bradshaw@usmc.mil>; Jeff Roney <jeff.roney@catlinusa.com> Subject: RE: SW8 110611 Mod. Linda, See responses below in red. Please let me know if I've answered your questions. Thanks, Robin From: Lewis,Linda [maiIto: linda.lewis@ncdenr.gov] Sent: Tuesday, September 26, 2017 4:04 PM To: Robin Austin <robin.austin(Dcatlinusa.com> Cc:'thomas.bradshaw@usmc.mil' <thomas.bradshaw@usmc.mil> Subject: SW8 110611 Mod. Robin I am reviewing the express application for the subject project received on September 14, 2017 and have the following questions: 1. The amount of existing (previously permitted) BUA listed on the Feb. 2012 consolidated application is 1,197,034 sf. The amount listed on the 2017 application is 1,231,857 sf, which is an increase of 34,823 sf. However, to my knowledge, we have not approved any additions to this site since 2012, therefore, the amount of existing BUA on the 2017 application should be the same as was on the 2012 application. Has there been an addition of 34,823 sf of BUA since 2012 that was previously unapproved and is now being accounted for? If so, please address the locations of these increases in detail on the plans and in the narrative. Since the area proposed for development was already part of the project area covered by 110611, all existing BUA within the project area should have been accounted for in the 1,197,034 sf total. The existing BUA amount should not be changing at all with subsequent modifications and plan revisions. All BUA added to the project from 2012 forward must be categorized as something other than existing. Yes, in the 2012 permit, it reads "this permit covers the following modifications:" and 42 listed under there reads "Approves a total of 34,823 sf of new BUA for Training Areas A, B, and C. See attached spreadsheet (Existing Permit to Mod Permit) for how I've taken the 2012 permit information you sent me and I've gone through the steps (see my methods in red) to reach the numbers I'm showing now. 2. The amount of buildings BUA increased by only 31,441 sf, but the list of building BUA's that was provided totals up to 35,966 sf. Why didn't the building BUA increase by 35,966 sf to 47,067 sf? If you total the building square footage provided, it is 41,794 sf. See attached copy of HIT building SF. The 42,542 sf shown in the permit mod was calculated using the layout in CAD and includes the courtyard walls. 3. Please note that changing a gravel road to a dirt road does not gain any BUA credit. Like I stated in the permit meeting, all roads have been included in the proposed BUA regardless of whether they're shown on the plans as gravel or dirt. 4. An LSNFS supplement form was provided for DA's 3, 4, 9, 10 and 14. DA's 3 & 4 already have a separate level spreader that was previously permitted and there is no DA 9, 10 or 14 listed on the application. Are you referring to the swale DA's? If you are, please make that clear on the supplement. It gets a bit confusing when the BMP DA's are numbered the same as the swale DA's. The only reason the supplement form was provided was to show that we were providing the necessary length of LS. The drainage swale upstream of the LS will hold the 10-yr storm event, so we are not adding the LS as a E structural BMP. It's solely there to disperse flow from the drainage swale. Subbasins 3, 4, 9, 10, and 14 indicated on the Drainage Basin Map flow to the swale. Would it be easier/better if we just provided a hand calculation to replace the LS supplement form? See attached. 5. Please provide a signed LSNFS O&M document for the proposed LS. Under low density we are trying to promote dispersed flow, hence the LS and VFS. Had hoped not to add the LS as a structural BMP. Also, it doesn't appear on the state's webpage that an O&M supplement is required unless we're under the EZ program. Is that incorrect? LMK, we can certainly provide. 6. How is runoff getting from the central swale into the proposed level spreader? The swale appears to end with an invert of 31.5, but the bottom of the blind swale behind the level spreader is at elevation 33.5. Are you attempting to allow the runoff in the swale to back up and overflow into the level spreader? Once the water elevation of the Swale reaches the elevation of the blind swale at 33.50, it will direct water to the LS where it will overflow once the elevation reaches 35. Yes, water will back up in the Swale until it overflows the LS. 7. Please check the grading of the 2 swales in the area of the culvert on Sheet CG101 noted under Key Note #6. There is a 35-contour connecting the 2 swales, but it crosses over itself at the culvert. The grades have been corrected. Thanks Please provide the requested information by October 3, 2017. Linda Lewis, E.I. Environmental Engineer III Division of Energy, Mineral and Land Resources Department of Environmental Quality 910-796-7215 Office linda.lewis(o)ncdenr.gov Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Nothing Compares,-, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Lewis,Linda From: Lewis,Linda Sent: Thursday, September 21, 2017 3:33 PM To: Irobin.austin@catlinusa.com' Cc: 'thomas.bradshaw@usmc.mil' Subject: SW8 110611 Minor Mod Attachments: 110611 DA appscan.pdf, 2012 02 permit 110611.docx Robin The revised page 3 of the SWU-101 application form is not right. It looks like you only captured the BUA associated with Training Areas A, B and that was added in 2012 as part of the permit consolidation, but not any of the four permitted BMP's. I attach a scanned copy of the DA column pages from the 2012 permit. Areas A, B and C are not permitted BMP's, they are just areas of added BUA under the overall low density umbrella. The permit is issued for one wet detention pond (BMP #1) and three infiltration basins (BMP's 2, 3 and 4). 1 also attach a copy of the February 2012 permit. Linda Lewis, E.I. Environmental Engineer III Division of Energy, Mineral and Land Resources Department of Environmental Quality 910-796-7215 Office linda.lewis(a)ncdenr.00v Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Nothing Compares.--,,. Snail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. P1479 OUTDOOR INFANTRY IMMERSION TRAINER (IIT) CAMP LEJEUNE, NC STORMWATER NARRATIVE The P1479 Outdoor IIT project site is located north of the Mobile MOUT P-1063 site, north of Lyman Road and west of Hwy 172, east of the New River at Camp Lejeune, in Onslow County North Carolina. Latitude and Longitude are 34.67, -77.25 respectively. The area currently consists of a former tree farm, with no built -upon area. The project site is located within the White Oak river basin. It is located outside the '/2 mile and draining to Bear Creek, an SA water; however, an existing active state stormwater permit (SW8 110611) encompasses the proposed site, and therefore, for permitting purposes, it is assumed to be considered within a'/z mile and draining to SA waters. The site is generally flat with elevations ranging from 35' to 37' per the vertical NAVD 1988 datum. No part of the project site is within the 100 year flood per Flood Insurance Rate Map (FIRM) 3720532200J, effective 11/3/2005. Generally, drainage from the site sheet flows south and eventually flows to unnamed tributary to Bear Creek, classified as an SA, HQW water by the State. No wetlands fall within the proposed project limits. There is a small isolated wetland to the north that was identified by a previous wetland delineation; however, the project limits are not within 50 feet of this isolated wetland. The US Department of Agriculture (USDA) Natural Resource Conservation Services soil mapping indicates the majority of the site contains Onslow loamy fine sandy (64%), with some Baymeade fine sand (36%). Generally, Onslow loamy fine sands have a depth to water table of 18 to 36 inches while Baymeade fine sands have a depth to water table of 48 to 60 inches. However, groundwater may be much shallower based upon observations of the site. The existing stormwater permit SW8 110611 is for overall low density with areas of higher density. According to 15A NCAC 02H.1003, projects may be considered to have both high and low density areas based on one or more of the following criteria: natural drainage area boundaries; variations in land use throughout the project; and construction phasing. The Outdoor IIT shares a natural drainage boundary with the mobile MOUT and the north half of the designated 1,083 acres for low density, approximately 600 acres. There are no variations in land use, as the areas within the 1,083 acre permit boundary are all being used for training. There is no construction phasing associated with this project; the Outdoor IF will be constructed all at one time as a single project. One of the objectives of the Outdoor IIT is to have completely relocatable facilities, meaning all buildings, wall, etc. can be moved around within the project boundary. A proposed dry streambed across the middle of the site will serve two purposes: 1) to provide a training obstacle for soldiers and (2) to collect runoff from the site and convey it away from the training area. Generally, there will be two outfalls for the site; one on the west end of the dry streambed and one of the east end. Runoff from most of the proposed structures will sheet flow across grass and gravel to the.streambed; structures along the outskirts of the project will continue to follow existing drainage patterns. A low density maximum BUA of < 12% will be maintained. Vegetative conveyances will be used to the maximum extent practicable, with no discrete collection system. Project Site The project is in its conceptual design phase. Currently, the proposed BUA is approximately 4.2 acres; however, it is very likely that after the 35% design review, BUA will get reduced to less than 3 acres due to MILCON funding available for this project. The existing state stormwater permit is for the 1,083 acre drainage area, with 28.8 acres of existing BUA and 95.48 acres of future allocated BUA. The addition of 3 — 4.2 acres of.BUA with the Outdoor IIT project maintains the low density of the permit. ENGINEERING CALCULATION COVER SHEET PROJECT NAME: P1479 OUTDOOR IIT PROJECT NO. CALC NO. SHEET 216111 1 1 OF1 SUBJECT CLIENT DESIGN CALCULATIONS FOR STATE STORMWATER NAVFAC COMPUTER PROGRAM NAME - VERSION/RELEASE NO. HYDRAFLOW HYDROGRAPHS EXT FOR AUTOCAD CIVIL 3D 2013 V10 HYDRAFLOW STORM SEWERS EXT FOR AUTOCAD CIVIL 3D 2013 SUMMARY AND OBJECTIVE DETERMINE PEAK FLOW FOR 2- AND 10-YEAR STORM EVENTS AND CALCULATE Tc ANALYZE THE PROPOSED SWALES FOR THE 2- AND 10-YEAR STORM EVENTS; \�\\0%CAR0�7j/Z SIZE THE PROPOSED CROSS PIPES FOR UNDER THE ROADS; CK PIPE COVER; SIZE RIPRAP OUTLET PROTECTION (DISSIPATERS) AT PIPE OUTLETS; 2�.'pFESA r CHECK LEVEL SPREADER SIZE; AND VERIFY PROPOSED CENTRAL SWALE TO LEVEL SPREADER CAN STORE THE 10-YR. NIB" REFERENCES 1 15NCAC 02H.1005 (REV 2013) PERTAINING TO LOW DENSITY OPTION (BUA OF 12 % OR LESS; SW RUNOFF IS TO BE CONVEYED PRIMARILY IN VEGETATIVE CONVEYANCES. NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING & DESIGN MANUAL (REV 3/09, UPDATED 5/13) ASSUMPTIONS WITHIN A'/2 MILE AND DRAINING TO SA; LOW DENSITY WITH BUA < 12%; MODIFYING AN EXISTING LOW DENSITY PERMIT. EXISTING PERMIT INCLUDED FUTURE BUA ALLOCATION. CONCLUSIONS yy--.� DESIGN MEETS STATE STORMWATER REQUIREMENTS ECEI ®`, E 20117 ATTACHMENTS DESIGN CALCULATIONS BY: ORIGINATOR CHECKER J. RONEY R. AUSTIN REV NO. .REASON FOR REVISION / NOTES ORIGINATOR CHECKER DATE RECORD OF REVISIONS 11-/ 7 7■ an D 'D N \ m ry,�,5, '} •xn !.� g� �yMY LJ pWill4 '''j'�II �Y�~��. PiI III .•'r ,_,_'-''�''/�,' ,1 / / \ ___ - � Ij�I ;I it Ii � r/rC'Y,. e]I•? '1 5 "I ' S 03 ' V J H_i`�� I 1 , Zip gL 00 II,I IT - I; 4 ADD Oy .� 38-37�-��, 1 /. co t r ..1 1 2' J o ' u "O __ v `E, I I I e e _NN ab e \ 0 i � ey ( r 11PATMEXT OE THE NAW XPVPL, iHCILII [S tHGlrv[[xivG CVuuPnV F p F �• �" ' G4 .v y n a NAVAL FACILITIES ENGINEERING COMMAND — MIDATLANTIC pp 1 a 8 A wxxc wms m x rP, MP I EUNE .!. p°� c c F U.S. MARINE CORPS CAMP IEJEUNE. N.C. 6 4 o m 0 m OUTDOOR INFANTRY IMMERSION TRAINER N c f DRAINAGE BASIN MAP e f '/ON V 4? T Drainage Calculations Sub -Basin 1 Area (SF) Area (Ac) Total Sub -Basin Area 6289.40 0.14 Cover Description C Buildings 1,884.00 0.98 Gravel Roads / Trails 504.00 0.75 Soil Roads / Trails - 0.75 Concrete Walks, pad, etc. - 0.98 Grass/Landscape 3,901.40 0.20 Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape WtC= Tc (MIN) _ 1= 0 (cfs)= 8266.50 0.19 2,301.00 643.00 5,322.50 C 0.98 0.75 0.75 0.98 0.20 WtC= Tc (MIN) _ 1= 0 (cfs)= 32801.80 0.75 5,297.00 3,718.00 20.00 23, 766.80 C 0.98 0.75 0.75 0.98 0.20 WtC= Tc (MIN) _ 1= 0 (cfs)= 1,846.3 378.0 780.3 3,004.6 10 year 0.48 5.00 9.0� 0.62 2,255.0 482.3 1,064.5 3,801.7 10 year 0.46 5.00 9.0� 0.79 5,191.1 2,788.5 19.6 4,753.4 2,752.5 10 year 0.39 5.00 9.0Z 2.65 M,U 0.61 2.03 Drainaae Calculations Sub -Basin 4 Area (SF) Area (Ac) Total Sub -Basin Area 39272.70 0.90 Cover Description C Buildings 1,256.00 0.98 1,230.9 Gravel Roads / Trails 4,112.00 0.75 3,084.0 Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 33,904.70 0.20 6,780.9 11,095.8 10 year 2 year Wt C = 0.28 Tc (MIN) = 5.00 1 = 9.04 6.95 Q (cfs)= 2.30 1.77 Sub -Basin 5 Area (SF) Area (Ac) Total Sub -Basin Area 14139.70 0.32 Cover Description C Buildings - 0.98 - Gravel Roads / Trails - 0.75 - Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 14,139.70 0.20 2,827.9 2,827.9 10 year706455 Wt C = 0.20 Tc (MIN) = 5.00 1 = 9.04 Q (cfs)= 0.59 Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape 4108.80 0.09 C - 0.98 - 2,225.00 0.75 1,668.8 - 0.75 - - 0.98 - 1,883.80 0.20 376.8 2,045.5 10 year Wt C = 0.50 Tc (MIN) = 5.00 FO935 1 = 9.04Q (cfs)= 0.42 Drainaae Calculations Sub -Basin 7 Area (SF) Area (Ac) Total Sub -Basin Area 47115.00 1.08 Cover Description C Buildings - 0.98 Gravel Roads / Trails 1,934.00 0.75 1,450.5 Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 45,181.00 0.20 9,036.2 10,486.7 10 year:538 ear W t C = 0.22 Tc (MIN) = 11.00 1 = 7.00Q (cfs)= 1.69.30 Sub -Basin 8 Area (SF) Area (Ac) Total Sub -Basin Area 27596.50 0.63 Cover Description C Buildings 630.00 0.98 617.4 Gravel Roads / Trails 614.00 0.75 460.5 Soil Roads / Trails 7,149.00 0.75 5,361.8 Concrete Walks, pad, etc. 40.00 0.98 39.2 Grass/Landscape 19,163.50 0.20 3,832.7 10,311.6 10 year Wt C = 0.37 Tc (MIN) = 5.00 7155 1 = 9.04Q (cfs)= 2.14 Total Sub -Basin Area 16651.80 0.38 Cover Description C Buildings 2,955.00 0.98 2,895.9 Gravel Roads / Trails 2,088.00 0.75 1,566.0 Soil Roads / Trails 522.00 0.75 391.5 Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 11,086.80 0.20 2,217.4 7,070.8 10 year Wt C = 0.42 Tc (MIN) = 5.00 F16�9� 1 = 9.04Q (cfs)= 1.47 Drainage Calculations Sub -Basin 10 Area (SF) Total Sub -Basin Area 42389.80 Cover Description Buildings 10,485.00 Gravel Roads / Trails 2,551.00 Soil Roads / Trails 1,208.00 Concrete Walks, pad, etc. 20.00 Grass/Landscape 28,125.80 Sub -Basin 11 Area (SF Total Sub -Basin Area 3985.80 Cover Description Buildings 693.00 Gravel Roads / Trails - Soil Roads / Trails - Concrete Walks, pad, etc. (Well) 60.00 Grass/Landscape 3,232.80 Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape 0.97 C 0.98 0.75 0.75 0.98 0.20 WtC= Tc (MIN) _ 1= 0 (cfs)= Area (Ac) 0.09 C 0.98 0.75 0.75 0.98 0.20 WtC= Tc (MIN) _ 1= 0 (cfs)= 7898.40 0.18 2,233.00 381.00 5,284.40 C 0.98 0.75 0.75 0.98 0.20 WtC= Tc (MIN) _ 1= 0 (cfs)= 10, 275.3 1,913.3 906.0 19.6 5.625.2 10 year 0.44 5.00 9.04 3.89 679.1 58.8 646.6 1,384.5 10 year 0.35 5.00 9.0Z 0.29 2,188.3 285.8 1,056.9 3,531.0 10 year 0.45 5.00 9.04 0.73 6.9! 2.99 0.22 6.95 0.56 Drainage Calculations Sub -Basin 13 Area (SF) Area (Ac) Total Sub -Basin Area 9571.20 0.22 Cover Description C Buildings 2,193.00 0.98 2,149.1 Gravel Roads / Trails - 0.75 - Soil Roads / Trails 0.75 Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 7,378.20 0.20 1,475.6 3,624.8 10 year Wt C = 0.38 Tc (MIN) = 5.00 1 = 9.04 0 (cfs)= 0.75 Sub -Basin 14 Area (SF) Area (Ac) Total Sub -Basin Area 36340.40 0.83 Cover Description C Buildings 5,852.00 0.98 5,735.0 Gravel Roads / Trails 3,237.00 0.75 2,427.8 Soil Roads / Trails 732.00 0.75 549.0 Concrete Walks, pad, etc. 20.00 0.98 19.6 Grass/Landscape 26,499.40 0.20 5,299.9 Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape Jm 10 year 1 2 year Wt C = 0.39 Tc (MIN) = 5.00 I = 9.04 6.95 0 (cfs)= 2.91 2.24 7266.50 0.17 C 882.00 0.98 864.4 46.00 0.75 34.5 1,606.00 0.75 1,204.5 20.00 0.98 19.6 4,712.50 0.20 942.5 3,065.5 10 year Wt C = 0.42 Tc (MIN) = 5.00 FO95 1 = 9.040 (cfs)= 0.64 Drainage Calculations Sub -Basin 16 Area (SF) Area (Ac) Total Sub -Basin Area 90924.80 2.09 Cover Description C Buildings 5,881.00 0.98 5,763.4 Gravel Roads / Trails 20,664.00 0.75 15,498.0 Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. 1,279.00 0.98 1,253.4 Grass/Landscape 63,100.80 0.20 12,620.2 35,135.0 10 year 2 yea Wt C = 0.39 Tc (MIN) = 6.00 1 = 8.68 7.5E Q (cfs)= 7.00 6.10 Sub -Basin 17 Area (SF) Area (Ac) Total Sub -Basin Area 258416.90 5.93 Cover Description C Buildings - 0.98 - Gravel Roads / Trails 9,070.00 0.75 6,802.5 Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 249,346.90 0.20 49,869.4 56, 671.9 10 year Wt C = 0.22 Tc (MIN) = 29.00 F4.3 1 = 4.53Q (cfs)= 5.90 Total Sub -Basin Area 55827.10 1.28 Cover Description C Buildings - 0.98 - Gravel Roads / Trails - 0.75 - Soil Roads / Trails - 0.75 - Concrete Walks, pad, etc. - 0.98 - Grass/Landscape 55,827.10 0.20 11,165.4 11,165.4 10 yearF Wt C = 0.20 Tc (MIN) = 10.40 1 = 7.72 Q (cfs)= 1.98 Sub -Basin 19 Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape Total Sub -Basin Area Cover Description Buildings Gravel Roads / Trails Soil Roads / Trails Concrete Walks, pad, etc. Grass/Landscape Calculations Area (SF) Area (Ac) 917944.00 21.07 917, 944.00 C 0.98 0.75 0.75 0.98 0.20 1 WtC= Tc (MIN) _ 1= 0 (cfs)= 274580.80 6.30 9,070.00 265, 510.80 10 year 0.20 35.00 3.96 16.70 C 0.98 - 0.75 6,802.5 0.75 - 0.98 - 0.20 53,102.2 WtC= Tc (MIN) _ I= 0 (cfs)= 10 year 0.22 17.00 5.81 8.08 / 16,07s 21tc%� gr2rs//2h�s�z�e 3.02 12.73 4 6.14 TR55 Tc Worksheet Hydratlow Express by Intelisolve Rational Basin 7 Description A B C Totals Sheet Flow Manning's n-value = 0.030 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 4.53 0.00 0.00 Land slope (%) = 0.30 0.00 0.00 Travel Time (min) = 3.86 + 0.00 + 0.00 = 3.86 Shallow Concentrated Flow Flow length (ft) = 555.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.25 0.00 0.00 Travel Time (min) = 7.40 + 0.00 + 0.00 = 7.40 Channel Flow X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 = 0.00 Total Travel Time, Tc.............................................................................. 11.00 min TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Basin 16 Description A B C Totals Sheet Flow Manning's n-value = 0.030 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 4.53 0.00 0.00 Land slope (%) = 0.33 0.00 0.00 Travel Time (min) = 3.71 + 0.00 + 0.00 = 3.71 Shallow Concentrated Flow Flow length (ft) = 142.00 70.00 0.00 Watercourse slope (%) = 0.53 2.80 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.17 3.40 0.00 Travel Time (min) = 2.01 + 0.34 + 0.00 = 2.36 Channel Flow X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (f /s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 = 0.00 Total Travel Time, Tc.............................................................................. 6.00 min TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Basin 17 Description A B C Totals Sheet Flow Manning's n-value = 0.030 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 4.53 0.00 0.00 Land slope (%) = 0.30 0.00 0.00 Travel Time (min) = 11.69 + 0.00 + 0.00 = 11.69 Shallow Concentrated Flow Flow length (ft) = 993.00 0.00 0.00 Watercourse slope (%) = 0.35 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.95 0.00 0.00 Travel Time (min) = 17.34 + 0.00 + 0.00 = 17.34 Channel Flow X sectional flow area ((sqft)) = 0.00 0.00 0.00 Wetted perimeter ((ft)) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0 + 0 + 0 = 0.00 Total Travel Time, Tc.............................................................................. 29.00 min TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Basin 18 Description A B C Totals Sheet Flow Manning's n-value = 0.030 0.011 0.011 Flow length (ft) = 229.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 4.53 0.00 0.00 Land slope (%) = 0.69 0.00 0.00 Travel Time (min) = 6.75 + 0.00 + 0.00 = 6.75 Shallow Concentrated Flow Flow length (ft) = 144.00 0.00 0.00 Watercourse slope (%) = 0.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.88 0.00 0.00 Travel Time (min) = 2.72 + 0.00 + 0.00 = 2.72 Channel Flow X sectional flow area ((sqft)) = 7.50 0.00 0.00 Wetted perimeter ((ft)) = 7.00 0.00 0.00 Channel slope (%) = 2.61 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) = 8.40 0.00 0.00 Flow length (ft) = 280.0 0.0 0.0 Travel Time (min) = 0.555323#0.0(1) + 0 = 0.56 Total Travel Time, Tc.............................................................................. 10.00 min TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Basin 19 Description A B C Totals Sheet Flow Manning's n-value = 0.030 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 4.53 0.00 0.00 Land slope (%) = 0.30 0.00 0.00 Travel Time (min) = 11.69 + 0.00 + 0.00 = 11.69 Shallow Concentrated Flow Flow length (ft) = 993.00 0.00 0.00 Watercourse slope (%) = 0.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.88 0.00 0.00 Travel Time (min) = 18.73 + 0.00 + 0.00 = 18.73 Channel Flow X sectional flow area ((sqft)) = 10.00 0.00 0.00 Wetted perimeter ((ft)) = 12.00 0.00 0.00 Channel slope (%) = 0.60 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) = 3.40 0.00 0.00 Flow length (ft) = 992.0 0.0 0.0 Travel Time (min) = 4.8559170.00 0 + 0 = 4.86 Total Travel Time, Tc.............................................................................. 35.00 min TR55 Tc Worksheet Rational Basin 20 Description Sheet Flow Manning's n-value Flow length (ft) Two-year 24-hr precip. ((in)) Land slope (%) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope (%) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow A B C = 0.030 0.011 0.011 = 300.0 0.0 0.0 = 4.53 0.00 0.00 = 0.45 0.00 0.00 = 9.94 + 0.00 + 0.00 = 235.00 0.00 0.00 = 0.45 0.00 0.00 = Unpaved Paved Paved = 1.08 0.00 0.00 Hydraflow Express by Intelisolve Totals 9.94 = 3.62 + 0.00 + 0.00 = 3.62 X sectional flow area ((sqft)) = 7.50 0.00 0.00 Wetted perimeter ((ft)) = 7.00 0.00 0.00 Channel slope (%) = 0.40 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) = 3.29 0.00 0.00 Flow length (ft) = 669.0 0.0 0.0 Travel Time (min) = 3.3892570.00 0 + 0 = 3.39 Total Travel Time, Tc.............................................................................. 17.00 min Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Swale #1 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.50 Invert Elev (ft) = 31.00 Slope (%) = 1.19 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 4.42 Elev (ft) Section 34.00 33.50 33.00 32.50 32.00 31.50 31.00 30.50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Sep 132017 = 0.42 = 4.420 = 1.79 = 2.47 = 5.66 = 0.36 = 5.52 = 0.51 0 2 4 6 8 10 12 14 16 18 20 22 Reach (ft) Depth (ft) 3.00 2.50 2.00 1.50 1.00 0.50 M us _0 50 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3139 2013 by Autodesk, Inc. Swale #2 -10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.50 Invert Elev (ft) = 31.00 Slope (%) = 2.61 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 2.60 Elev (ft) Section 34.00 33.50 [c c�iI�l 32.50 32.00 31.50 31.00 30.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Sep 132017 = 0.25 = 2.600 = 0.94 = 2.77 = 4.58 = 0.27 = 4.50 = 0.37 MEMMEMMMMM I M MMMMMMMMMMM MMMMMMMMMMM MMMMMMMMMMM MMMMMMMMMMM MEMONAME MEMMEMM MM MMMMMMMMMMMM_ 0 2 4 6 8 10 12 14 16 18 20 22 Reach (ft) 2.50 2.00 1.50 1.00 0.50 M _n sn Channel Report Hydraflow Express Extension for AutoCAD® Civil 31)® 2013 by Autodesk, Inc. Swale #3 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 31.00 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 13.22 Elev (ft) 35.00 — 34.00 33.00 32.00 31.00 30.00 Section 1 5 10 15 20 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 25 30 Wednesday, Sep 132017 = 1.05 = 13.22 = 6.46 = 2.05 = 9.64 = 0.68 = 9.30 = 1.12 Depth (ft) 4.00 3.00 2.00 1.00 1 -1.00 35 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3DO 2013 by Autodesk, Inc. Swale #4 -10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 31.00 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 10.83 Elev (ft) 35.00 — 34.00 33.00 31.00 30.00 Section 1 5 10 15 20 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 25 30 Wednesday, Sep 13 2017 = 0.95 = 10.83 = 5.56 = 1.95 = 9.01 = 0.61 = 8.70 = 1.01 Depth (ft) 4.00 3.00 2.00 1.00 � fI 1 -1.00 35 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Swale #5 -10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 32.70 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 8.27 Elev (ft) 36.00 -r 35.00 33.00 32.00 -CM11811 Section 0 5 10 15 20 Reach (ft) Wednesday, Sep 132017 Highlighted Depth (ft) = 0.83 Q (cfs) = 8.270 Area (sgft) = 4.56 Velocity (ft/s) = 1.81 Wetted Perim (ft) = 8.25 Crit Depth, Yc (ft) = 0.52 Top Width (ft) = 7.98 EGL (ft) = 0.88 25 30 Depth (ft) 3.30 2.30 1.30 0.30 -0.70 1 -1.70 35 Channel Report HydraBow Express Extension for AutoCADNJ Civil 3D@J 2013 by Autodesk, Inc. Swale #6 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 32.95 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 6.80 Elev (ft) 36.00 —, 35.00 34.00 33.00 32.00 31.00 Section 5 10 15 20 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 25 30 Wednesday, Sep 132017 = 0.75 = 6.800 = 3.94 = 1.73 = 7.74 = 0.47 = 7.50 = 0.80 Depth (ft) 3.05 2.05 1.05 0.05 -0.95 1 -1.95 35 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3131D 2013 by Autodesk, Inc. Swale #7 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 34.50 Slope (%) = 0.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 2.91 Elev (ft) 38.00 - 37.00 CM1111l 34.00 33.00 Section l 5 10 15 20 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 25 30 Wednesday, Sep 13 2017 = 0.49 = 2.910 = 2.19 = 1.33 = 6.10 = 0.28 = 5.94 = 0.52 Depth (ft) 3.50 2.50 1.50 0.50 -0.50 1 -1.50 35 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Swale #8 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.25 Invert Elev (ft) = 28.50 Slope (%) = 1.16 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 12.90 Elev (ft) 30.00 29.50 29.00 28.50 28.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Sep 132017 = 0.74 = 12.90 = 3.86 = 3.34 = 7.68 = 0.67 = 7.44 = 0.91 Section D 2 4 6 8 Reach (ft) 10 12 14 Depth (ft) 1.50 1.00 0.50 -0.50 16 Channel Report HydraOow Express Extension for AutoCADO Civil 3D(D 2013 by Autodesk, Inc. Swale #9 - 10 year Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.25 Invert Elev (ft) = 25.00 Slope (%) = 2.85 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 37.68 Elev (ft) 27.00 26.50 26.00 `4MG 25.00 24.50 2 4 6 Section 8 Reach (ft) Wednesday, Sep 132017 Highlighted Depth (ft) = 1.01 Q (cfs) = 37.68 Area (sqft) = 6.09 Velocity (ft/s) = 6.19 Wetted Perim (ft) = 9.39 Crit Depth, Yc (ft) = 1.18 Top Width (ft) = 9.06 EGL (ft) = 1.61 10 12 14 16 Depth (ft) 2.00 1.50 wllf� 0.50 1IM1111111111111 titY�l Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D®2013 by Autodesk, Inc. Swale #9 -10 year (Rip -Rap) Trapezoidal Bottom Width (ft) = 3.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.25 Invert Elev (ft) = 25.00 Slope (%) = 2.85 N-Value = 0.040 Calculations Compute by: Known Q Known Q (cfs) = 37.68 Elev (ft) 27.00 26.50 rz9t1i411 25.50 25.00 24.50 Section Wednesday, Sep 13 2017 Highlighted Depth (ft) = 1.16 Q (Cfs) = 37.68 Area (sqft) = 7.52 Velocity (fUs) = 5.01 Wetted Perim (ft) = 10.34 Crit Depth, Yc (ft) = 1.18 Top Width (ft) = 9.96 EGL (ft) = 1.55 0 2 4 6 8 10 12 14 16 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 -0.50 Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Culvert #1 - 10 year Invert Elev Dn (ft) Pipe Length (ft) Slope (%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Eln (n) MOO 35.50 35 M 3a.50 m 3 50 33(le 32.50 = 33.00 = 56.00 = 0.50 = 33.28 = 15.0 = Circular = 15.0 1 = 0.013 = Circular Concrete = Groove end projecting (C) = 0.0045, 2, 0.0317, 0.69, 0.2 = 35.35 = 25.00 = 30.00 Culvert #1 - 10 ye., GV¢vlmc.Nvt MGL Emwk Calculations Orrin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Wednesday, Sep 13 2017 = 3.83 = 3.83 = (dc+D)/2 = 3.83 = 3.83 = 0.00 = 3.57 = 3.96 = 34.02 = 34.20 = 34.45 = 0.94 = Inlet Control Hw DePlh (n) 2.72 2 22 1.72 1n on 0.22 428 -078 Renh tn) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Culvert #2 - 10 year Invert Elev Dn (ft) = 32.50 Calculations Pipe Length (ft) = 40.00 Qmin (cfs) Slope (%) = 0.50 Qmax (cfs) Invert Elev Up (ft) = 32.70 Tailwater Elev (ft) Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (fUs) Culvert Entrance = Groove end projecting (C) Veloc Up (fUs) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 36.10 Hw/D (ft) Top Width (ft) = 25.00 Flow Regime Crest Width (ft) = 30.00 El.v (fii 37.00 35 00 35 00 3w 33w 32.M 31.00 Culvert #2 - 10 year Wednesday, Sep 13 2017 = 8.27 = 8.27 = (dc+D)/2 = 8.27 = 8.27 = 0.00 = 5.06 = 4.95 = 33.81 = 34.05 = 34.45 = 1.16 = Inlet Control H D,M(a) a 30 3 30 2.30 1.w 0 30 .070 -t 70 Qi Cuter Gutven HGL Emaenk Reech(a) Culvert Report Culvert #3 - 10 year Hydraflow Express Extension for AutoCADID Civil 3DQD 2013 by Autodesk, Inc. Culvert #3 - 10 year Invert Elev Dn (ft) = 32.75 Calculations Pipe Length (ft) = 43.00 Qmin (cfs) Slope (%) = 0.51 Qmax (cfs) Invert Elev Up (ft) = 32.97 Tailwater Elev (ft) Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 36.15 Hw/D (ft) Top Width (ft) = 25.00 Flow Regime Crest Width (ft) = 30.00 Elev (a) Wednesday, Sep 132017 = 6.80 = 6.80 = (dc+D)/2 = 6.80 = 6.80 = 0.00 = 4.31 = 4.53 = 34.00 = 34.16 = 34.49 = 1.01 = Inlet Control H. Depth (a) 403 303 2.03 103 003 .097 .197 GircWer Culvert - HGL E.Whk seem ta) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Culvert #4 - 10 year Invert Elev Dn (ft) = 34.28 Calculations Pipe Length (ft) = 39.00 Qmin (cfs) Slope (%) = 0.56 Qmax (cfs) Invert Elev Up (ft) = 34.50 Tailwater Elev (ft) Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 37.10 Hw/D (ft) Top Width (ft) = 25.00 Flow Regime Crest Width (ft) = 30.00 8.e (0) 38 00 37. W 6.W 35.00 Y 00 JI W Culvert NA - 10 year GrcWerCWVM MGL EmbenV Wednesday, Sep 13 2017 = 2.91 = 2.91 = (dc+D)/2 = 2.91 = 2.91 = 0.00 = 2.86 = 3.52 = 35.25 = 35.30 = 35.48 = 0.79 = Inlet Control nw Depth (n) 3.% 2.% 1.W 0.50 0 SO 1.50 Reece lfi) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. Culvert #5 - 10 year Invert Elev Dn (ft) = 23.25 Calculations Pipe Length (ft) = 53.00 Qmin (cfs) Slope (%) = 0.47 Qmax (cfs) Invert Elev Up (ft) = 23.50 Tailwater Elev (ft) Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (Cfs) No. Barrels = 3 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 27.50 Hw/D (ft) Top Width (ft) = 24.00 Flow Regime Crest Width (ft) = 30.00 Culvert #5. 10 year 0 5 10 15 20 25 30 35 60 45 50 55 60 55 70 GmNer GNven HGL - EmOe k Wednesday, Sep 132017 = 37.68 = 37.68 = (dc+D)/2 = 37.68 = 37.68 = 0.00 = 7.26 = 7.11 = 24.67 = 25.41 = 26.13 = 1.76 = Inlet Control Hw oepth (0) J 50 3.50 2.50 1.50 0.50 -0.50 -1 50 75 Re.ch (e) Pipe Cover Calculations Invetl Pipe Size Pipe Wall road CL Road EP Pavement Cover at Up EP (below Coverat CL Cover at Down EP Culvert d length I^vert Up invert at EP Up Invert at EP [t invert at EP Down Down hn) (in) EL EL. Thickness Pavements (below Pavement( (below Pavement) 1 56 32.5 32.78 3230 32.6E 32.58 15 2.25 36.3 36.2 12 1.06 1.22 L18 2 40 32.5 32.2 32.63 32.W 32.58 18 2.5 36.2 36.2 12 0.82 0.89 0.92 3 43 32.75 32.95 32.82 3L85 32.93 18 2.5 36.4 36A 0 1.82 184 LS6 4 39 34.28 34.5 34.42 34.39 34.36 15 2.25 37A 32.1 D 1.24 L27 1.30 5 53 23.25 23.5 23.44 23.38 23.31 18 2.5 2L5 27.36 12 1.21 L42 1.34 Immersion Trainer Storm Outlet Structure DATE 07/24/17 216111 DESIGN PHASE PRELIM DESIGN REVISION RECORD OTHER (SPECIFY) Pipe No .= Q Vfull 11 = 1.10 Pipe Dia= 15 in V/Vfull = 1.10 Qto= 3.83 cfs V = 4.4 fps Qfull = 4.95 cfs Vfull = 4.03 fps From Fig. 8.06.b.1 From No. b.Ub.D.e: E � ii 1fpY Len m Zone =0 D5o = 4 in DMAX = 6 in Riprap Class = A Apron Thickness = 9 in La, Apron Length = 5.0 It A, Upstream Width = 3xDia = 3.75 It W. Downstream Width = 6.25 It Storm Outlet Structure Pipe No.— 21 Q11 = 1.03 Pipe Dia= 18 in VlVfUIl Vfull = 1.14 14 Qto = 8.27 cfs V = 5.2 fps Qfull = 8.05 cfs Vfull = 4.55 fps From Fig. 8.06.b.1 E f ffl fy� si € 83 ?ltW La. Len th Zone =0 D5o = 4 in DMAX = 6 in Riprap Class = A Apron Thickness = 9 in La, Apron Length 6.0 ft A, Upstream Width = 3xDia = 4.5 ft W, Downstream Width = 7.5 It Outlet Velocity Dissipator.xis PAGE 1 OF 3 Storm Outlet Structure Pipe IN -= Q Vfull 11 = 1.84 12 Pipe Dia= 18 in V/Vfull = 1.12 Qto= 6.80 cfs V= 5.1 fps Qfull = 8.13 cfs Vfull = 4.59 fps From Fig. 8.06.b.1 ts.ub.D.L: 4 t Pit I' R,� is ytK E U§ La, Lan 0 Zone =0 D5o = 4 in DMAX = 6 In Riprap Class = A Apron Thickness = 9 in La, Apron Length = 6.0 ft A, Upstream Width = 3xDia = 4.5 ft W, Downstream Width = 7.5 ft Storm Outlet Structure Pipe No.- 41 Q 11 = 0.56 Pipe Dia= 15 in V/Vfull Vfull = .02 Qto= 2.91 cfs V = 4.4 fps Qfull = 5.24 cfs Vfull = 4.26 fps From Fig. 8.06.b.1 t i n La. Len IM1 Zone =0 D5o = 4 in DMAX = 6 In Riprap Class = A Apron Thickness = 9 in La, Apron Length = 5.0 ft A, Upstream Width = 3xDia = 3.75 ft W, Downstream Width = 6.25 ft Outlet Velocity Dissipator.xls PAGE 2 OF 3 Storm Outlet Structure Pipe No.- 51 Q11 = 1.61 Pipe Dia= 18.00 in 3-18" RCPs V/Vfull Vfull = 1.65 Qto= 37.68 cfs V = 7.3 fps Qfull = 23.40 cfs Vfull = 4.41 fps From Fig. 8.06.b.1 yS f..n La Len t� Zone D50 DMAX Riprap Class Apron Thickness La, Apron Length A, Upstream Width = 3xDia W, Downstream Width 8 in 12 in B 18 in 9.0 ft 4.5 ft 10.5 ft 3 RCPs use 7.5 ft 13.5 ft Outlet Velocity Dissipator.As PAGE 3 OF 3 Watershed Model Schematic HydraFlow Hydrographs Extension for AutoCAD® Civil 3D®2013 by Autodesk, Inc. v10 z Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2013 by Autodesk, Inc. v10 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation 01) Total strge used (cuft) Hydrograph Description 1 Dekalb 2.956 1 25 2,652 ---- ----- ------ Sub -Basin 14 2 Dekalb 3.898 1 25 3,497 ---- ---- ----- Sub -Basin 10 3 Dekalb 1.458 1 25 1,308 ---- ------ ------ Sub -Basin 9 4 Dekalb 2.671 1 25 2,396 ---- ---- ---- Sub -Basin 3 5 Dekalb 2.302 1 25 2,064 ---- ----- ------ Sub -Basin 4 6 Reservoir 1.971 1 28 2.651 1 35.19 452 Swale 7 7 Combine 5.655 1 25 6,147 2,6 ----- ------ To Swale 6 8 Reservoir 4.098 1 28 6,147 7 34.23 911 Swale 9 Combine 5.231 1 25 7,454 3, 8 ---- ------ To Swale 5 10 Reservoir 5.013 1 28 7454 9 33.89 556 Swale 11 Combine 9.521 1 25 11,915 4, 5, 10 ---- ------ To Swale 3 and 4 12 Reservoir 0.000 1 n/a 0 11 34.87 11,915 Swale 3 and 4 Rational Swale Storage Calculations.gpw Return Period. 10 Year Wednesday, 09 / 13 / 2017 Hydrograph Report 91 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Hyd. No. 1 Sub -Basin 14 Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.830 ac Intensity = 9.133 in/hr OF Curve = Jacksonville. OF Q (cfs) 3.00 1.00 Hyd No. 1 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact Sub -Basin 14 Hyd. No. 1 -- 10 Year Wednesday, 09 / 13 / 2017 = 2.956 cfs = 25 min = 2,652 cuft = 0.39 = 5.00 min = n/a Q (cfs) 3.00 2.00 M1111111111 I I I I I I I I I I N 0.00 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 / 2017 Hyd. No. 2 Sub -Basin 10 Hydrograph type = Dekalb Peak discharge = 3.898 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 3,497 cult Drainage area = 0.970 ac Runoff coeff. = 0.44 Intensity = 9.133 in/hr Tc by User = 5.00 min OF Curve = Jacksonville- IDF Asc/Rec limb fact = n/a Q (Cfs) M 3.00 2.00 1.00 Sub -Basin 10 Hyd. No. 2 -- 10 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 w ' I I I I I I I I I I I I I I I I I I I I I I I k 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (min) Hyd No. 2 Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 / 2017 Hyd. No. 3 Sub -Basin 9 Hydrograph type = Dekalb Peak discharge = 1.458 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 1,308 cult Drainage area = 0.380 ac Runoff coeff. = 0.42 Intensity = 9.133 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = n/a Q (cfs) 2.00 1.00 Hyd No. 3 Sub -Basin 9 Hyd. No. 3 -- 10 Year Q (Cfs) 2.00 1.00 0.00 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (min) Hydrograph Report L Hydraflow Hydrographs Extension for AutoCAD® Civil 30e 2013 by Autodesk, Inc. v10 Hyd. No. 4 Sub -Basin 3 Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.750 ac Intensity = 9.133 in/hr OF Curve = Jacksonville. OF Q (cfs) 3.00 2.00 1.00 0.00 w 0 2 4 6 Hyd No. 4 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact Sub -Basin 3 Hyd. No. 4 -- 10 Year Wednesday, 09 / 13 / 2017 = 2.671 cfs = 25 min = 2,396 tuft = 0.39 = 5.00 min = n/a Q (cfs) 3.00 2.00 1.00 I I I 1 I I I I I I I I I I I I I I II IY 0.00 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Wednesday, 09l 13 / 2017 Hyd. No. 5 Sub -Basin 4 Hydrograph type = Dekalb Peak discharge = 2.302 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 2,064 cult Drainage area = 0.900 ac Runoff coeff. = 0.28 Intensity = 9.133 in/hr Tc by User = 5.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = n/a 0 (Cfs) 3.00 2.00 1.00 0 2 4 6 Hyd No. 5 Sub -Basin 4 Hyd. No. 5 -- 10 Year 0 (cfs) 3.00 2.00 1,00 I I I I I 1 I I I I I I I I I I I I I I I:nk, 0.00 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Time (min) Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 / 2017 Hyd. No. 6 Swale 7 Hydrograph type = Reservoir Peak discharge = 1.971 cfs Storm frequency = 10 yrs Time to peak = 28 min Time interval = 1 min Hyd. volume = 2,651 cult Inflow hyd. No. = 1 - Sub -Basin 14 Max. Elevation = 35.19 ft Reservoir name = Swale #7 Max. Storage = 452 cult Storage Indication method used Q (cfs) 3.00 2.00 1.00 0.00 -= 0 10 20 Hyd No. 6 — Hyd No. 1 Swale 7 Hyd. No. 6 -- 10 Year 30 40 50 60 LLLI_I1G Total storage used = 452 cuft Q (cfs) 3.00 2.00 1.00 __W_ 0.00 70 Time (min) Pond Report s Hydrafiow Hydrographs Extension for AutOCAD0 Civil 3DO 2013 by Aulodesk, Inc. v10 Wednesday, 09 / 13 / 2017 Pond No. 1 - Swale #7 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 34.50 It Stage / Storage Table Stage (ft) Elevation (ft) 0.00 34.50 0.50 35.00 1.50 36.00 2,50 37,00 3.00 3T50 Contour area (sqft) 00 917 2,397 4.569 10,000 Incr. Storage (cuft) 0 153 1,599 3,425 3,554 Total storage (cult) 0 153 1,752 5,176 8,731 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 0.00 0.00 0.00 Crest Len (ft) = 30.00 0.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 37.10 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 2.60 3,33 3,33 3.33 Invert El. In) = 34.50 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 39.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.56 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0,60 0.60 0.60 Exfil.(inthr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. In) = 0.00 Note. Culved/Onfce oufflo are analysed under inlet(ic) and Corel(m) Control. Weir risers checked for onfice Conditions(ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 34.50 0.00 --- -- -- 0.00 -- --- --- --- -- 0.000 0.05 15 34.55 0.01 is --- --- -- 0.00 --- --- --- --- --- 0,014 0.10 31 34.60 0.05 is --- --- -- 0.00 --- --- --- --- --- 0.055 0.15 46 34.65 0.12 is --- --- -- 0.00 --- --- --- --- --- 0.122 0.20 61 34.70 0.21 is --- --- -- 0.00 -- -- -- -- -- 0.213 0.25 76 34.75 0.33 is --- --- -- 0.00 -- --- --- -- -- 0.330 0.30 92 34.80 0.47 is --- --- -- 0.00 --- --- --- --- --- 0.471 0.35 107 34.85 0.63 is --- --- -- 0.00 --- --- -- --- --- 0.632 0.40 122 34.90 0.81 is --- --- -- 0.00 --- --- -- --- --- 0.815 0.45 138 34.95 1.02 is --- --- -- 0.00 -- --- --- -- -- 1.022 0.50 153 35.00 1.21 oc --- --- -- 0.00 -- --- -- -- -- 1.214 0.60 313 35.10 1.61 oc --- --- --- 0.00 -- --- --- --- --- 1.611 0.70 473 35.20 2.02 oc --- --- -- 0.00 --- --- --- --- --- 2.025 0.80 632 35.30 2.44 oc --- --- -- 0.00 -- --- --- --- -- 2,444 0.90 792 35.40 2.86 oc --- --- -- 0.00 -- --- -- -- -- 2.860 1.00 952 35.50 3.26 oc --- --- -- 0.00 -- --- -- -- -- 1261 1.10 1,112 35.60 3.64 oc --- --- --- 0.00 -- --- --- --- -- 3.639 1.20 1.272 35.70 3.98 oc --- --- --- 0.00 --- --- --- --- --- 1978 1.30 1,432 35.80 4.27 oc --- --- --- 0.00 -- --- --- -- -- 4.266 1.40 1.592 35.90 4.47 oc --- --- -- 0.00 -- --- -- -- -- 4.470 1.50 1,752 36.00 4.46 oc --- --- -- 0.00 -- --- -- -- -- 4.463 1.60 2,094 36.10 5.39 oc --- --- -- 0.00 -- --- -- -- --- 5.389 1.70 2,436 36.20 6.18 oc --- --- --- 0.00 --- --- - --- --- 6.177 1.80 2,779 36.30 6.88 oc --- --- --- 0.00 --- --- --- -- -- 6.876 1.90 3,121 36.40 7.51 oc --- --- -- 0.00 -- --- -- -- -- 7.510 2.00 3,464 36.50 8.09 oc --- --- -- 0.00 -- --- -- -- -- 8.094 2.10 3,806 36.60 8.64 oc --- --- -- 0.00 -- --- --- -- --- 8,639 2.20 4,149 36.70 9.15 oc --- --- -- 0.00 --- --- -- -- -- 9.152 2.30 4,491 36.80 9.64 oc --- --- -- 0.00 --- --- -- -- --- 9.637 2.40 4,834 36.90 10.10 oc --- --- -- 0.00 -- --- -- -- -- 10.10 2.50 5,176 37.00 10.54 oc --- --- -- 0.00 -- --- -- -- -- 10.54 2.55 5,532 37.05 10.76 oc --- --- -- 0.00 --- --- -- --- --- 10.76 2.60 5,887 37.10 10.97 oc --- --- -- 0.00 --- --- -- --- --- 10.97 2.65 6,243 37.15 11.17 oc --- --- -- 0.87 --- --- -- -- --- 12.04 2.70 6,598 37.20 11.37 oc --- --- -- 2.47 -- --- -- -- -- 13.84 2.75 6,953 37.25 11.57 oc --- --- -- 4.53 -- --- -- -- -- 16.10 2.80 7,309 37.30 11.77 oc --- --- -- 6.98 -- --- -- --- -- 18.74 2.85 7,664 37.35 11.96 oc --- --- -- 9.75 -- --- --- --- -- 21.71 Continues on next page... Swale #7 Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B It cult ft cfs cfs 2,90 8,020 37A0 12.15 oc --- 2.95 8,375 37A5 12.34 oc --- 3.00 8,731 37.50 12.52 oc --- ...End CIv C PrfRsr Wr A Wr B Wr C MID Exfil User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs --- -- 12.82 -- --- --- --- --- 24.97 --- -- 16.15 --- --- -- -- --- 28.49 --- -- 19.73 --- --- --- --- --- 32.25 Hydrograph Report 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 / 2017 Hyd. No. 7 To Swale 6 Hydrograph type = Combine Peak discharge = 5.655 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 6,147 cuft Inflow hyds. = 2, 6 Contrib. drain. area = 0.970 ac Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 To Swale 6 Hyd. No. 7 -- 10 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Time (min) — Hyd No. 7 —Hyd No. 2 —Hyd No. 6 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Wednesday, 09 / 1312017 Hyd. No. 8 Swale 6 Hydrograph type = Reservoir Peak discharge = 4.098 cfs Storm frequency = 10 yrs Time to peak = 28 min Time interval = 1 min Hyd. volume = 6,147 cuft Inflow hyd. No. = 7 - To Swale 6 Max. Elevation = 34.23 ft Reservoir name = Swale #6 Max. Storage = 911 cuft Storage Indication method used Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 10 Hyd No. 8 Swale 6 Hyd. No. 8 -- 10 Year 20 30 — Hyd No. 7 40 50 60 II_(_LI rl€ Total storage used = 911 cult Q (cfs) 6.00 5.00 m 3.00 2.00 1.00 � 0.00 70 Time (min) Pond Report 13 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. 00 Wednesday. 09 / 1312017 Pond No. 2 - Swale #6 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 32.95 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 32.95 00 0 0 0.05 33.00 ill 2 2 1.05 34.00 1,107 523 525 2.05 35.00 2,455 1,737 2,261 3.05 36.00 3,883 3,142 5,403 3.55 36.50 10,000 3,352 8,755 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18,00 0.00 0.00 0.00 Crest Len (ft) = 30.00 0.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 36.15 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 32.95 0.00 0.00 0.00 Weir Type = Broad --- --- Length (ft) = 43.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope I%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: CuNeNOnfice ouffl w are analyzed under inlet nc) and outlet (oc) control, Weir nsers cbecke0 for orifice cond,pons(ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs CIS cfs cis cfs cfs cfs cfs cfs cis 0.00 0 32.95 0.00 --- -- -- 0.00 -- -- -- -- -- 0.000 0.00 0 32.96 0.00 oc --- --- --- 0.00 --- --- -- --- --- 0.000 0.01 0 32.96 0.00 oc --- -- -- 0.00 --- -- --- --- --- 0.000 0.01 1 32.97 0.00 oc --- --- --- 0.00 --- --- -- --- --- 0.001 0.02 1 32.97 0.00 oc --- --- -- 0.00 --- -- --- -- --- 0.002 0.03 1 32.98 0.00 oc --- -- -- 0.00 -- -- -- -- -- 0.003 0.03 1 32.98 0.00 oc --- --- --- 0.00 --- -- -- --- --- 0.005 0.04 1 32.99 0.01 is --- --- -- 0.00 --- -- -- -- --- 0.007 0.04 1 32.99 0.01 is --- --- -- 0.00 --- --- --- -- --- 0.009 0.04 2 33.00 0.01 is --- -- -- 0.00 -- --- -- -- -- 0.011 0.05 2 33,00 0.01 iC --- --- -- 0.00 --- --- --- -- --- 0.014 0.15 54 33.10 0.12 is --- --- -- 0.00 --- -- --- -- --- 0.122 0.25 106 33.20 0.33 is --- --- -- 0.00 --- --- --- --- --- 0.330 0.35 159 33.30 0.63 is --- --- -- 0.00 --- --- -- -- -- 0.632 0.45 211 33.40 1.00 oc --- --- -- 0.00 --- --- --- --- --- 0.998 0.55 263 33.50 1.37 oc --- --- -- 0.00 -- --- -- -- -- 1,374 0.65 316 33.60 1.77 oc --- --- --- 0.00 --- --- --- --- --- 1.770 0.75 368 33.70 2.18 oc --- --- -- 0.00 -- --- --- -- -- 2.179 0.85 420 33.80 2.59 oc --- --- -- 0.00 --- --- -- --- --- 2.594 0.95 472 33.90 2.99 oc --- --- --- 0.00 --- --- -- -- -- 2.993 1.05 525 34.00 3.38 oc --- --- --- 0.00 --- --- -- --- --- 3.377 1.15 698 34.10 3.73 oc --- --- -- 0.00 --- --- --- --- --- 3.734 1.25 872 34.20 4.04 oc - : --- -- 0.00 --- --- -- --- --- 4.043 1.35 1,046 34.30 4.29 oc --- --- --- 0.00 --- --- -- -- --- 4.287 1.45 1,219 34.40 4.42 oc --- --- -- 0.00 --- --- -- -- -- 4,421 1.55 1,393 34.50 4.84 oc --- --- -- 0.00 --- --- --- --- --- 4.837 1.65 1,567 34.60 5.68 oc --- --- -- 0.00 -- --- -- -- --- 5.677 1.75 1,740 34.70 6.41 oc --- --- -- 0.00 --- --- --- -- --- 6.408 1.85 1,914 34.80 7.06 oc --- --- -- 0.00 -- --- -- -- -- 7.063 1.95 2,088 34.90 7,66 oc --- --- --- 0.00 --- --- -- -- --- 7.663 2.05 2,261 35.00 8.22 oc --- --- -- 0.00 -- --- -- --- --- 8.219 2.15 2,575 35.10 8.74 oc --- --- -- 0.00 --- --- --- -- --- 8.740 2.25 2,890 35.20 9.23 oc --- --- -- 0.00 -- --- -- -- -- 9.231 2.35 3,204 35.30 9.70 oc --- --- -- 0.00 --- --- -- -- --- 9.698 2.45 3,518 35.40 10, 14 oc --- --- -- 0.00 -- --- -- -- -- 10.14 2.55 3,832 35.50 10.57 oc --- --- -- 0.00 --- --- --- -- --- 10.57 2.65 4,146 35.60 10.98 oc --- --- -- 0.00 -- --- -- -- -- 10.98 Continues on next page 14 Swale #6 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B ft cuft ft cfs cfs 2.75 4,460 35.70 11.37 cc --- 2.85 4,775 35.80 11.76 cc --- 2.95 5,089 35.90 12.13 cc --- 3.05 5,403 36.00 12.48 cc --- 3.10 5,738 36.05 12.66 cc --- 3.15 6,073 36.10 12.83 cc --- 3.20 6,408 36.15 13.00 cc --- 3.25 6,744 36.20 13.17 cc --- 3.30 7,079 36.25 13.34 cc --- 3.35 7,414 36.30 13.50 cc --- 3.40 7,749 36.35 13.67 cc --- 3.45 8,084 36.40 13.83 cc --- 3.50 8,420 36.45 13.99 cc --- 3.55 8,755 36.50 14.14 cc --- ...End Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs --- --- 0.00 -- --- --- --- -- 11.37 --- -- 0.00 -- --- --- --- -- 11.76 --- -- 0.00 --- --- --- -- -- 12.13 --- -- 0.00 --- --- --- --- -- 12.48 --- -- 0.00 --- --- --- --- --- 12.66 --- -- 0.00 -- --- -- --- -- 12.83 --- -- 0.00 -- --- -- -- -- 13.00 --- -- 0.87 --- --- --- --- -- 14.04 2.47 -__ ___ ___ ___ ___ 15.81 --- -- 4.53 -- --- --- --- --- 18.03 --- -- 6.98 -- --- -- -- -- 20.64 9.75 -- --- -- -- --- 23.58 --- -- 12.82 --- --- -- --- --- 26.80 --- -- 16.15 -- --- --- -- --- 30.29 Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc, v10 Hyd. No. 9 To Swale 5 Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 3, 8 0 (Cfs) 6.00 5.00 a "I 3.00 2.00 Wednesday, 09 / 13 / 2017 Peak discharge = 5.231 cfs Time to peak = 25 min Hyd. volume = 7,454 cuft Contrib. drain. area = 0.380 ac To Swale 5 Hyd. No. 9 -- 10 Year Q (cfs) 6.00 5.00 4.00 [cwi] 2.00 1.00 0.00 Wi I I I 10.00 0 10 20 30 40 50 60 70 Time (min) — Hyd No. 9 —Hyd No. 3 —Hyd No. 8 ip Hydrograph Report Hydraflow Hydrographs Extension for AutoCA17® Civil 3130 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 I2017 Hyd. No. 10 Swale 5 Hydrograph type = Reservoir Peak discharge = 5.013 cfs Storm frequency = 10 yrs Time to peak = 28 min Time interval = 1 min Hyd. volume = 7,454 cuft Inflow hyd. No. = 9 - To Swale 5 Max. Elevation = 33.89 ft Reservoir name = Swale #5 Max. Storage = 556 cuff Storage Indication method used. Q (cfs) 6.00 5.00 M 3.00 2.00 1.00 0.00 � 0 10 Hyd No. 10 Swale 5 Hyd. No. 10 -- 10 Year 20 30 — Hyd No. 9 40 50 60 II=17=CII=P Total storage used = 556 curt Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 �_ 0.00 70 Time (min) Pond Report 17 Hydraflow Hydrographs Extension for AutoCAD® Civil 3CS 2013 by Autodesk, Inc. v10 Wednesday, 09 / 13 12017 Pond No. 3 - Swale #5 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 32.70 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 32.70 0.30 33.00 1.30 34.00 2.30 35.00 3.30 36.00 3.80 36.50 Contour area (sqft) 00 307 937 1,671 2,475 10,000 Incr. Storage (cuft) 0 31 593 1,286 2,060 2,908 Total storage (cult) 0 31 624 1,910 3,970 6,878 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 30.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 36.10 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 32.70 0.00 0.00 0.00 Weir Type = Broad -- -- -- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 Na Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note:CUNert/Onfce outtom are analyzed under inlet lid) and outlet(m) control. Weir risers checked for onitce conditions(ic) and suCmergence(s). Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cuft It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 32.70 0.00 --- -- -- 0.00 -- --- -- -- -- 0.000 0.03 3 32.73 0.01 oc --- --- --- 0.00 --- -- --- --- --- 0.006. 0.06 6 32.76 0.02 is --- -- -- 0,00 --- --- --- -- --- 0.023 0.09 9 32.79 0.05 is --- -- -- 0.00 --- -- --- -- -- 0.052 0.12 12 32.82 0.09 is --- --- --- 0.00 --- --- --- -- -- 0.092 0.15 15 32.85 0.14 is --- --- -- 0.00 -- -- -- -- -- 0.142 0.18 18 32.88 0.20 is --- --- --- 0.00 --- --- --- --- -- 0.202 0.21 21 32.91 0.28 is --- --- -- 0.00 --- -- -- --- --- 0.276 0.24 25 32.94 0.36 is --- --- --- 0.00 -- -- -- -- -- 0.358 0.27 28 32.97 0.45 is --- --- -- 0.00 --- --- --- --- --- 0.451 0.30 31 33.00 0.55 is --- --- -- 0.00 -- -- -- --- -- 0.553 0.40 90 33.10 0.96 oc --- --- -- 0.00 --- --- --- --- --- 0.963 0.50 149 33.20 1.40 oc --- --- -- 0.00 -- --- --- --- -- 1.396 0.60 209 33.30 1.88 oc --- --- -- 0.00 --- --- -- -- --- 1.876 0.70 268 33.40 2.38 oc --- --- -- 0.00 -- --- --- --- --- 2.382 0.80 327 33.50 2.90 oc --- --- -- 0.00 --- --- --- --- -- 2.904 0.90 387 33.60 3.45 oc --- --- --- 0.00 --- --- --- --- --- 3.451 1.00 446 33.70 3.99 oc --- --- -- 0.00 -- --- -- -- -- 3.993 1.10 505 33.80 4.54 oc --- --- -- 0.00 -- --- -- -- -- 4.545 1.20 565 33.90 5.09 oc --- --- -- 0.00 --- --- --- --- --- 5.093 1.30 624 34.00 5.62 oc --- --- -- 0.00 -- --- -- --- -- 5.617 1.40 753 34.10 6.13 oc --- --- --- 0.00 --- --- --- --- --- 6.127 1.50 881 34.20 6.61 oc --- --- -- 0.00 -- --- -- -- -- 6.613 1.60 1,010 34.30 7.05 oc --- --- --- 0.00 -- --- --- --- -- 7.055 130 1,139 34.40 7.45oc --- --- -- 0.00 --- --- --- --- --- 7.449 1.80 1,267 34.50 7.78 oc --- --- --- 0.00 -- --- --- --- -- 7.776 1.90 1,396 34.60 8.00 oc --- --- -- 0.00 --- --- --- --- -- 8.003 2.00 1,524 34.70 7.99 oc --- --- -- 0.00 -- --- -- -- -- 7.989 2A0 1,653 34.80 9.78oc --- --- --- 0.00 --- --- --- --- -- 9.780 2.20 1,782 34.90 11.29 oc --- --- -- 0.00 -- --- -- -- -- 11.29 2.30 1,910 35.00 12.63 oc --- --- --- 0.00 --- --- --- --- -- 12.63 2.40 2,116 35A0 13.83oc --- --- -- 0.00 --- --- -- -- -- 13.83 2.50 2,322 35.20 14.94 oc --- --- -- 0.00 -- --- -- -- -- 14.94 2.60 2,528 35.30 15.97 oc --- --- -- 0.00 --- --- -- -- --- 15.97 2.70 2,734 35,40 16.94 oc --- --- -- 0.00 -- --- -- -- -- 16.94 2.80 2,940 35.50 17.86 oc --- --- -- 0.00 --- --- -- -- -- 17.86 2.90 3.146 35.60 18.73 oc --- --- -- 0.00 -- --- -- -- -- 18.73 Continues on next page M Swale #5 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B ft Cuft ft Cfs Cfs 3.00 3,352 35.70 19.56 oc --- 3.10 3,558 35.80 20.36 oc --- 3.20 3,764 35.90 21 A 3 oc --- 3.30 3,970 36.00 21.87 oc --- 3.35 4,261 36.05 22.23 oc --- 3.40 4,552 36.10 22.59 oc --- 3 45 4,942 36.15 22.94 oc --- 3.50 5,133 36.20 23.28 oc --- 3.55 5,424 36.25 23.62 oc --- 3.60 5,715 36.30 23.96 oc --- 3.65 6,006 36.35 24.29 oc --- 3.70 6,296 36.40 24,61 oc --- 3.75 6,587 36.45 24.93 oc --- 3.80 6,878 36.50 25.25 oc --- ...End Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total Cfs Cfs Cfs Cfs cfs Cfs cfs Cfs Cfs ___ ___ 0.00 __ --- --- ___ ___ 19.56 ___ ___ 0.00 ._ --- --- ___ ___ 20,36 0.00 __ ___ ___ __ --- 21.13 -_- ___ 0.00 __ ___ ___ ___ __- 21.87 --- --- 0.00 -- --- -- -- -- 22.23 --- -- 0.00 -- --- -- -- -- 22.59 --- --- 0.87 --- --- --- -- -- 23.81 _-_ ___ 2.47 ___ ___ ___ ___ --- 25.75 ___ ___ 4,53 ___ ___ ___ ___ --- 28.15 --- --- 6.98 -- --- --- -- -- 30.93 ___ --- 9.75 -_ .-. ___ ___ ___ 34,04 --- 12.82 --- --- --- --- --- 37.43 --- --- 16.15 --- --- -- --- --- 41.09 --- --- 19.73 --- --- -- -- --- 44.99 Hydrograph Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2013 by Autodesk, Inc. v10 Hyd. No. 11 To Swale 3 and 4 Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 4, 5, 10 Q (cfs) 10.00 : M M M41111 Wednesday, 09 / 13 12017 Peak discharge = 9.521 cfs Time to peak = 25 min Hyd. volume = 11,915 cuff Contrib. drain. area = 1.650 ac To Swale 3 and 4 Hyd. No. 11 -- 10 Year 0 (cfs) 10.00 Of we] MKIR 2.00 0.00 �� ' ' I I MID 0 10 20 30 40 50 60 70 Time (min) — Hyd No. 11 —Hyd No. 4 —Hyd No. 5 —Hyd No. 10 Hydrograph Report 20 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2013 by Autodesk, Inc. 00 Wednesday, 09 / 13 12017 Hyd. No. 12 Swale 3 and 4 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 1 min Hyd. volume = 0 cult Inflow hyd. No. = 11 - To Swale 3 and 4 Max. Elevation = 34.87 ft Reservoir name = Swale #3 and #4 Max. Storage = 11,915 cuft Storage Indication method used Q (cfs) 10.00 : M am 4.00 2.00 0.00 0 10 Hyd No. 12 Swale 3 and 4 Hyd. No. 12 -- 10 Year 20 30 — Hyd No. 11 40 50 60 ll l_I1L➢ Total storage used = 11,915 cuff Q (cfs) 10.00 rt � Q1I41 2.00 MEWI- 0.00 70 Time (min) Pond Report 21 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2013 by Autodesk, Inc. v10 Pond No. 4 - Swale #3 and #4 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 31.50 It Stage / Storage Table Stage (ft) Elevation (fit) 0.00 31.50 0.50 32.00 1.50 33.00 2.50 34.00 3.50 35.00 4.00 35.50 Contour area (sqft) 00 416 2,461 5,578 9,937 20,000 Incr. Storage (cult) 0 69 1,296 3,914 7,653 7,338 Total storage(cuft) 0 69 1,365 5,280 12,932 20,271 Wednesday, 09 113 12017 Culvert / Orifice Structures [A] Rise (in) = 0.00 Span (in) = 0.00 No. Barrels = 0 Invert El. (fit) = 0.00 Length (ft) = 0.00 Slope I[%) = 0.00 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a [B] 0.00 0.00 0 0.00 0.00 0.00 .013 0.60 No [C] 0.00 0.00 0 0,00 0.00 0.00 .013 0.60 No [PrfRsr] 0.00 0.00 0 0.00 0.00 n/a n/a 0,60 No Weir Structures [A] [B] Crest Len (ft) = 100.00 0.00 Crest El. (fit) = 35.00 0.00 Weir Coeff. = 3.33 3.33 Weir Type = Rect -- Multi -Stage = No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (fit) = 0.00 [C] 0.00 0.00 3.33 --- No [D] 0.00 0.00 3.33 -- No Note: culvervonsed oumows are analyzed under inlet (re) and outlet(oc) control. Weis risers checked for orrice conditions nc) and submergence(a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cuff ft cfs cfs cis cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 31.50 -- --- --- --- 0.00 -- --- --- -- --- 0.000 0.05 7 31.55 -- --- --- --- 0.00 -- -- --- --- --- 0.000 0.10 14 31.60 --- --- -- -- 0.00 -- -- --- --- --- 0.000 0.15 21 31.65 -- --- --- --- 0.00 -- -- --- -- --- 0.000 0.20 28 31.70 -- --- --- --- 0.00 -- -- --- -- --- 0.000 0.25 35 31.75 --- --- --- -- 0.00 -- -- --- --- --- 0.000 0.30 42 31.80 -- --- --- -- 0.00 -- -- --- --- -- 0.000 0.35 49 31.85 -- --- -- -- 0.00 -- -- --- -- --- 0.000 0.40 55 31.90 --- --- -- --- 0.00 -- --- --- -- --- 0.000 0.45 62 31.95 -- --- --- --- 0.00 -- --- --- --- --- 0.000 0.50 69 32.00 -- --- --- --- 0.00 -- -- -- -- --- 0.000 0.60 199 32.10 -- --- -- -- 0.00 -- -- -- -- --- 0.000 0.70 329 32.20 -- --- -- -- 0.00 -- --- -- -- --- 0.000 0.80 458 32.30 --- --- --- --- 0.00 -- --- --- -- --- 0.000 0.90 588 32.40 -- --- --- --- 0.00 -- --- --- -- -- 0,000 1.00 717 32.50 -- --- -- -- 0.00 -- -- -- -- -- 0,000 1.10 847 32.60 -- --- -- -- 0.00 -- -- -- -- --- 0.000 1.20 977 32.70 --- --- --- --- 0.00 --- --- --- -- --- 0.000 1.30 1,106 32.80 -- --- --- --- 0.00 -- --- --- -- --- 0.000 1.40 1,236 32.90 -- --- --- -- 0.00 -- -- --- -- -- 0.000 1.50 1,365 33.00 -- --- -- -- 0.00 -- -- -- -- -- 0.000 1.60 1,757 33.10 --- --- -- -- 0.00 -- -- -- --- --- 0.000 1.70 2,148 33.20 --- --- --- --- 0.00 --- --- --- --- --- 0.000 1.80 2,540 33.30 -- --- -- --- 0.00 -- --- -- -- --- 0.000 1.90 2,931 3340 -- --- -- -- 0.00 -- -- -- -- -- 0.000 2.00 3,323 33.50 --- --- -- --- 0.00 -- --- -- --- --- 0.000 2.10 3,714 33.60 --- --- -- -- 0.00 --- --- -- --- --- 0.000 2.20 4,105 33.70 -- --- -- -- 0.00 -- -- -- -- -- 0,000 2.30 4,497 33.80 -- --- -- -- 0.00 -- -- -- -- -- 0.000 2.40 4,888 33.90 --- --- -- -- 0.00 -- -- -- --- -- 0.000 2.50 5,280 34.00 --- --- -- -- 0.00 --- --- --- --- --- 0.000 2.60 6,045 34.10 --- --- -- -- 0.00 --- --- -- -- --- 0,000 2.70 6,810 34.20 -- --- -- -- 0.00 -- --- -- -- -- 0.000 2.80 7,576 34.30 -- --- -- -- 0.00 -- -- -- -- -- 0.000 2.90 8,341 34.40 --- - --- -- 0.00 -- --- --- --- -- 0.000 3.00 9,106 34.50 --- --- -- -- 0.00 --- --- --- --- - 0.000 3.10 9.871 34.60 -- --- -- -- 0.00 --- -- -- -- -- 0.000 Continues on next page 22 Swale #3 and #4 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft Cuft fl Cfs 3.20 10,637 34.70 -- 3.30 11,402 34.80 -- 3.40 12,167 34.90 -- 3.50 12,932 35.00 --- 3.55 13,666 35.05 -- 3.60 14.400 35.10 -- 3.65 15,134 35.15 -- 3.70 15,868 35.20 -- 3.75 16,602 35.25 --- 3.80 17,335 35.30 --- 3.85 18,069 35.35 -- 3.90 18,803 35.40 --- 3.95 19,537 3545 --- 4.00 20,271 35.50 -- ...End Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total Cfs cfs Cfs Cfs Cfs cfs Cfs cfs Cfs Cfs ... --- ___ 0.00 __ __ ___ ___ ___ 0.000 ... --- __ 0.00 __ ___ __ ___ __ 0.000 ___ --- _- 0.00 -_ __ ___ ._ --- 0.000 ._. ..- _. 0.00 __ __ ___ ___ __ 0.000 ___ ___ __ 3.72 -_ _. __. --- __- 3,723 ___ ___ __ 10.53 __ ___ __. ___ ___ 10.53 --- --- -- 19.35 -- --- -- -- -- 19.35 --- --- -- 29.78 -- --- --- --- -- 29.78 --- --- ... 41.62 __ ___ ___ ___ .__ 41.62 --- --- -- 54.72 -- --- --- -- -- 54.72 --- --- -- 68.95 -- --- -- -- -- 68.95 --- --- -- 84.24 -- --- -- -- -- 84.24 --- --- --- 100.52 --- --- --- --- --- 100.52 --- --- -- 117.73 -- --- --- --- --- 117.73 + Por OEP'R use ONLY Reviewer. North Carolina Department of Environment and �y Natural Resources " —i�7�� NCDENR Request for Express Permit Review ".7 Q' cenarin FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a)_ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4204; david.lee(alncdenr.gov • Mooresville & Winston Salem Region - Marcia Allocco 704-235-2107 or marcia.allocco(&,ncdenrgov • Washington Region -Lyn Hardison 252-948-3842 or Ivn.hardisonomcdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver(@)ncdenr.gov NOTE. Project application received after 12 noon will be stamped in the following work day. Project Name: P1479 OUTDOOR INFANTRY IMMERSION TRAINER County: ONSLOW Applicant: US MARINE CORPS BASE CAMP LEJEUNE Company: _ Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, Slate: INC Zip 28547- Phone: 910-451-3238, Fax: _-_ Email: lhomas.bradshaw@usmc.mil Physical Localion:NORTH OF THE EXISTING MOBILE MOUT OFF F-3 RANGE RD, NW OF LYMAN RD & 172 , SW SW SW NPDES _ NPDES _ WO _ WD _ E&S _ E&S _ Other Project Drains into UT TO BEAR CREEK waters - Water classification SA (for classification see- http://podal.nodenr.org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? IN, within X2 mile and draining to class SA waters Y. or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ROBIN AUSTIN Company: CATLIN ENGINEERS & SCIENTISTS Address: 220 OLD DAIRY RD City: WILMINGTON, Slate: INC Zip: 28405- Phone: 910-452-5861, Fax: 910-452-7563, Email: robin austin@catlinusa.com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE REI; D JUL 1 9 20170 S #_ JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWO, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please allach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please allach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear ft or _acres) FT Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ® Other ® Low Density, ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site[SW 8110611 (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ® MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW 8110611 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ® Erosion and Sedimentation Control Plan with 10 acres to be dislurbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No For DFNR use only Fee Split for multiple permits: (Check It 1 Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: [:]Yes ® No Permit SUBMITTAL DATES Fee i SUBMITTAL DATES Fee CAMA $ 1 Variance (❑ Mal; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) 5 401: 5 Los $ Stream Deter— S NCDENR EXPRESS August 2015 .. P1479 OUTDOOR INFANTRY IMMERSION TRAINER (IIT) CAMP LEJEUNE, NC STORMWATER NARRATIVE The P1479 Outdoor IIT project site is located north of the Mobile MOUT P-1063 site, north of . Lyman Road and west of Hwy 172, east of the New River at Camp Lejeune, in Onslow County North Carolina. Latitude and Longitude are 34.67, -77.25 respectively. The area currently consists of a former tree farm, with no built -upon area. This project will use urban structures designed to replicate a geo-specific village for small -unit training and platoon/squad leader decision making assessments. The mock village will be modular and reconfigurable for the purposes of using the trainer for a range of training missions and scenarios. The mock village will contain a marketplace area, several Government operations structures, dwellings, courtyard walls, faux features such as a well and crops, and a ditch for training purposes. The project site is located within the White Oak river basin. It is located outside of one-half mile of an SA water. However, it is located within a 1,083 acre area that is currently permitted for low density development under an active state stormwater permit (SW8 110611) and considered within a''/2 mile and draining to SA waters. The site is generally flat with elevations ranging from 35' to 37' per the vertical NAVD 1988 datum. No part of the project site is within the 100 year flood per Flood Insurance Rate Map (FIRM) 3720532200J, effective 11/3/2005. Drainage from the site sheet flows south and eventually flows to an unnamed tributary to Bear Creek. Bear Creek is classified as an SA, HOW water by the State. No wetlands fall within the proposed project limits. There is a small isolated wetland to the north that was identified by a previous wetland delineation, however, the project limits are not within 50 feet of this isolated wetland. The US Department of Agriculture (USDA) Natural Resource Conservation Services soil mapping indicates that most of the site contains Onslow loamy fine sandy (64%), with some Baymeade fine sand (36%). Based on a subsurface investigation conducted at the site for this project, the water table varies across the site, but is generally between 4.9 and 8.4 ft BLS. The existing stormwater permit SW8 110611 is for overall low density with areas of higher density (SA waters). The drainage area included under the current permit is 1,083 acres, with 28.8 acres of existing BUA and 95.48 acres of future allocated BUA. The addition of approximately 2.3 acres of BUA with the proposed Outdoor IT project maintains the low density of the permit. A low density maximum BUA of < 12% will be maintained. Vegetative conveyances will be used to the maximum extent practicable, with no discrete collection system. One of the objectives of the Outdoor IIT is to have completely relocatable facilities, meaning all buildings, walls, etc. can be moved around within the project boundary, for training purposes. The majority of the project site is composed of the mock village, clusters of relocatable structures that represent a village in a third world country. An after -action review (AAR) facility, where marines get a chance to review what happened during their training in the village, will be located east of the village. Proposed impervious surfaces for this project consist of shipping containers, precast buildings, courtyard walls, gravel roads, and a temporary modular AAR building with gravel parking lot and concrete sidewalk to the building. The parking lot includes a single concrete accessible parking space and aisle. The project has been designed as low density with options for reducing impervious surfaces incorporated. These include reduced road width, minimal parking, no curb & gutter, and the use of cluster developments. The original design included 24 ft wide gravel roads, most of these have been reduced to 12 ft wide gravel roads. The original design also included gravel road for both the administrative road along the south side of the Outdoor IIT and the 10 ft wide path between Lanes 2 and 3; these have been changed to dirt. The Government has indicated that they can use a tactical vehicle lot on an adjacent MOUT; therefore, the proposed parking lot adjacent to the AAR building was reduced to 24 spaces next to the AAR for use by cars/trucks/Humvees only. In accordance with UFC 1-200-01, the finished floor elevations of the precast structures will be a minimum of 6 inches above finished grades. The shipping containers will reside on pedestal footings and will be elevated 6 — 8 inches off the ground, to promote air flow under the containers for corrosion protection. Runoff from the proposed shipping containers, precast buildings, and gravel roads within the central portion of the mock village area will sheet flow to the swale with level spreader. Runoff from the other areas including the AAR facilities will sheet flow off the project site to areas of natural vegetative conveyances to the maximum extent practicable. The objective for drainage at the site is to maximize dispersed flow through vegetated areas and minimize the channelization of flow. A central swale was required for this project as a training obstacle; it will also serve to convey runoff from the central portion of the village to a level spreader on the west side of the site for dispersed discharge. The only stormwater pipe associated with this project consists of cross pipes under the gravel roads within the central swale. t I I I I P1479 OUTDOOR INFANTRY IMMERSION TRAINER US MARINE CORPS BASE CAMP LEJEUNE, NC - N Fumpkn ' ^;.Bi L'eNet Jacksonville r.. `� Svron-Eoro PROJECT'=' AREA cemn l:ryeune Snojas FCrr/ y Rlaq¢ Nash to0sall leach 0 aw wore VICINITY MAP T roi is xu[ PROJECT SITE MAP /T1 I'll ra .1 2 y ME 1 � G 0 u J 01 cu ME O r ME 3 Rw esnw. �J OVERALL SITE LAYOUT PLAN T /y I 3 I �. G♦u„uwl Gu E .Ti(faR GCLKfE ] CdIDryattaµt )S(E .CEN W65) ♦ tttEilflw/.9CC GR 5 4R 6 rub RRC E. PLRI.&E ICYR P LM3 MT E ix W pnI R.m IEm <Rncrl .s rxnul G SJ EIW9 pJR[H 11 I5. E[1SL SV11 P 0 EC a;x I]. HIKiaW CtR �' wwx la C�r .; <RaE .KRxo ws� WAN Mw P. WON m il.cSw:I ..o ..r cwr — EI.Iz'v..aroc � zr. v m1a.HI u .5 "I'll tR.�IiI v. cR.,n vo.o B.Ml Es. LMCPCIL .vllE£L SIM$ 77 (CI 2d —. 11, no:R 06.16-17 Ww D •rN oazmc s9.4s n.xo EID LEGEND END i .q� MRGR Cr4WIs NOTES I &RbG MNCSR I. Z. IR. ]I. 6L 55. 4. YC .ttxILCIIF4 R45 R♦ GRS vq UtYllfxU HCWRN ppI.WJ YLLS \ a E q e HwR4�% RUE ICR UPPf.W 1 p L W s. R,TSIp3 mix wm ssn. u5 959 Ld 5 z • RK ma ss¢Eo. v5�a_ i LL I �O CS-100 I I I un[ 1 _ \ / / \ IANE ] \ / / \ LANE 3 � I CZ p II l � ' ur I L `_III.-�\ l / UnE 3 11\ InnDiv . �- LI -- � o � \Y >" \ � EROSION CONTROL PLAN �•M O KEY NOTES _ uva som�n - fNHxI N( pSw tlY 1 Rx[L s z¢+Pa .rn Puorzcwx e. YV—W° QIM1Lt AMRIyF f ). WYSTLC1Cn e\T.%KC WCIxa1 51. WJ IJY JCv'v /.PIJ e �YJ R dVRI LAM LEGEND QUNL MWYx� / P1M wa iYn rc o-slumwva /j 17 06.16.17 sP v Dunn worzc-m 11 wc. nP xn woYamx v wa wx CAI T NOTES IN es vee .tic. use v. se mom rues roP ... . mw'�uw .ws (ro. ssa � L,u ulEz arts .w _ J YC (IFCI#tA P S�M}IO.W RF Ip "¢ z^ �a Z' Y Q O 00 I ��-- �CG-100 Attachment 1 - Permitting History Wallace Creek Regimental Complex - High Density Portion Permit No. SW8 081015 Approval PermitAclion BIMS Description ofthe Changes Date Version 11/19/2010 Original Approval 1.0 4/1/2011 Modification 1.1 various revisions to the I I permitted DAs Adding DA 12-15 (w/ offsite from S\V8 090630) DA 2: reducine DA and 13UA to include in DA 13 5/3/2017 Modification 1.2 DA 3: reducing DA to include in DA 12 and 13 DA 11: reducine DA to include in DA 3 Off -site West: reducing project area to include in DA 12 Adding DA 16 and 17 5/30/2012 Modification 1.3 DA 13: Using future BUA for the construction of a multi -use trail Adding DA 18 DA 3: reducing DA and BUA to include in DA 18 7/18/2012 Modification 1.4 DA 11 : increasing DA. Using future 13UA for the construction of sidewalk DA 13: reducing DA to create DA 18 4/23/2015 Modification 1.5 DA 3: Using future BUA for the construction of sidewalk 2/23/2017 Modification 1.6 DA 15: reducing DA to include in SW8 110906 DA 3: Using future 13UA for the construction of a boiler building and 7/18/2017 Minor Modification 1.7 associated infrastructure Page 1 of 1 i I Pow �P 2 fjc"I ECEIVE SEP 14 2017 BY: a u Weaver, Cameron From: Robin Austin <robin.austin@catlinusa.com> Sent: Wednesday, July 19, 2017 2:55 PM To: Weaver, Cameron Cc: Thomas Bradshaw Subject: P1479 Outdoor T[T - Express Review Request Attachments: P1479 Outdoor IIT REQUEST FOR EXPRESS DEQ SW 0719 17.pdf Cameron, See attached request for express review of the P1479 Outdoor IIT project. This will be a low density minor modification to existing permit SW8 110611. We will plan to submit the erosion control package for standard review, rather than express. Please let me know what appointment times your team has available. Thanks, Robin M. Robin Austin, P.E. Catlin Engineers and Scientists 220 Old Dairy Road Wilmington, NC 28405 Phone: 910.452,5861 x116 Fax: 910.452.7563 www.catlinusa.com CATLIN Enginoersand Scientists 1 1 t � �! '3 1Y( H � �r G�� ta- , x t � t � A < �V�i ' • {•�t Y+F x uY •� � Ip, S�,�Y,. Fys' .-e.,.5..]a.. Tom' \i... � a [� h�� � � -' -� pp � a � 'i � � y; 1 r-, `5', { A 1 � '.(9 ! }�4, � y � hl 1 5 •l _ � �i t'T h-Fr .. Y � � Y .-• t u s_ .. i � ';'-y,.t i t � � � � ' • v On [B_aaB Iz lo • i _ 33 i l2 % K v '� t sue, i'1 � +v. Q .'6'' ,�'` f w� �� 1 1 •• �d [ �. ; { �'� . b _ y •:ate,. +3�. r a� F / b .� ,� r i'��rr t $1#. z:. * r � tw' �. P 1 �� � L`" � t ,.e-•m'� u'M1 *s' ' ;'� .,Yr � �1 r � r'+M. +" r 1.,; \>•�`'"n' _ Soil Map—Onslow County, North Carolina P1479 Outdoor IIT Map Unit Legend Onslow County, North Carolina (NC133) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Bab Baymeade fine sand, 0 to 6 percent slopes 2.8 28.5°/ MaC Alarvyn loamy fine sand, 6 to 15 percent slopes 0.1 0.7 % On Onslow loamy fine sand 6.91 70.8% Totals for Area of Interest 9.71 100.0% ISD,% Natural Resources Web Soil Survey 9/1312017 Conservation Service National Cooperative Soil Survey Page 3 of 3 I 7 A 1� CPT 19"4 / DCP_ 1 CPT 16 3 CPT I II t �I? CPT 1a1 CPT 2" SPr60_4 - 8 i I � i 2 , A _ SOUNDING AND BORING COORDINATES POINT r MNG NORTHING CBR 1 B26747 3M9 CBR2 3536IB9 33M2 CBR3 252IO31 339801 3M6 339814 "[2527287 339579339558 3B774 C I 35270 332 252726 339 CPT 5 2527211 39 CPT6 2527175 339956 CPT] 2W7189 3nV6 CPT8 25272% 3"9 CPi9 M31 339713 CPi 10 ]53]1P3 3396n CPi 11 25271Oi 33 CPi 12 Z5210.56 3397E CPT 13 2527g 339824 CPn4 35269as 339n6 CPi 15 3526913 119110 CPT16 2526801 33 CPT 17 252R 3 339932 CPT 18 2W6715 339581 CPT19 IS2W]9 3M9 CPT 2526 3339956 'UT O1 352]58b 3398]5 SCPT 02 352I599 3398I3 SPTE l 2526417 339781 SPTE6F64 2 252I252]322 339121 SPTC 33053 SPT4 2]3 25]3 9M 339]88 SP7( 5 25263M 339 74 9CP-1 2526798 339655 DCP-2 M269n 339763 OCP 3 M3]I05 IM OC11 252]49] 3397M DC 35Z]853 339638 M4 1 252]12B 33983] HA 2 1 2517606 339718 .3 1 252A22 339W] 60' 30' 0 60' 120' 1-=60'0-� — I 19-040� Po0 — oQ y Q PRE FlNnL 09-08.17 ?. sueumu � CATLIN lelnesn and scientism Hood D,Ra] VMnylm. NC 2Bf05 Epp ry Sr.¢aCd555 l 7 7 7 T A c I I I I I STANDARD PENETRATIONCATLIN STANDARD PENETRATIONCATLIN STANDARD PENETRATIONCATLIN TESTING LOG TESTING LOG TESTING LOG m ,..mw wr.m xexwr I� I � r 15 w,r i i I . rr.-re.uxnua i dSTANDAROPENETRATION w+xra w n m- m Iry 'ail u w o (e hl �— ..... 1 wvr.l vrm:ex Iman wvpw Ixmr,.x° Iw Iwmc.n I , of m'✓ta T. J A I v.ar w u L j( tw CATll_N STANDARD PENETRATION CATLIN TESTING LOG '� CATLIN rn: tsor.�.. I¢awn: c.enn em wrmox.,ra.rx. ixxExvo,.wi.Ex- oa �..� i�pra.xwn�ra.a. 1.'rt LcuurFuv, x I,.*�®,x m ¢wmrc:x I a. e. u-v n �j »�I.I rax,�r is I I KEY TO SOIL SYMBOLS AND TERMS s I - __ -- 3 } I�i Y� — �I13/i%i to F = I. S I.. I I I I E c MAO man u:!i7w �pESS pR Qp° PRE—FlNn1 �. 09.08.17 °R CONStpJ CATLIN eneiMem nd Sciemuls zzc oN Cam Rma EN^MmS Semae GtKBa umr.Kiw w 1cR c fJ SK Mc IU� art E ~ Bw w z �Z_ Z 0 `Q U) Y2 Q 0 3p LU O z z } K 0 Z ¢ m z Z �a w LL LL Z F ?zi a0 U 0 LL .0 lac �p f z€ �0 5q1� B-101 7 c n 7 c 14 C :I I 1 7 z n ONEI SOIL BEHAVIOR TYPE IESTINITEDI GROUPING USCS 1 ive Fine-grainetl HIMHii. SENSITIVE SILT and CLAY 2 NIC Material OVOMIP PEAT and ORGANIC FINES 3 HIC H.'CL CLAY and CLAY MIXTURES CtJMH6 4 Silty CLAY 5 Y to Clayey SILT ILT to Sandy SILT AN'. 1 MwM SILT and SILT MIXTURES LSM•8 T LT le Silty SAND ::::S' D to SAND 'SINSPffi�:9 ;;`::ySP:f': SAND and SAND MIXTURES 10Gravelly SAND-SwIGwB11 titl Finegrainetl'_ _•/'CEM to Clayey SAND' G5 HARDIINDURATED FINES_ HARpIINDDRATED SANDS 1 7 7 A C - CATLiN I KESSLER DCP TEST DATA VRO]ECT.. P1479117 E LOCATION: C,:T,lrv+ :E DATE "ll" AlA1.1. Ell NERAGN.D, L URPT. E,wrs MATER E. nWNER TVIEANDUPACE CONUNTAGASCra, MILT DATA AGREEING I... INLE, Bn NBC 61 w Inl•R •rn0ial n� VO v W 60 ). x IIE.A ) v E r E ) 30 0 MR.11 R I 60 A M RI CID ITC Al M u x MC x u tt x xe.o AO — rtx R, I BEARInc wacrzr p 11 R x ss o "e ]zPAR L RAN AAM IAN, 1— P+, ,o lY M IN • 11AS BECAPACITY, p:1 Wry`.v:ry ..aue.n.r9,x orv.,u,.wwv rrrrvuv wvrcwrA.ma,a.mRnsur. ,e'..--LAN1 - - x-.me,.a..r..4�.m�.N.ar'm.: a..ao..-,L-Y..�......,,r.._..-. a..,.x�a...rm, m.,.x....r•N,w...r...N3 N.DCP. L...N.uNror DI'LA ..,.s<N:m.- C.ivcNNNNPTill" E.w.m, CATLIN KESSLER DCP TEST DATA PRICEID... PUIIIRL P.RCINUENEN, YR L.A. finp LR,Plm IGRI50CAMx: K3.p3 All, IELPpE .3., PRIMEMIT IPE: M'. SURFACECONd3ONS DAI AYe.. ONTwxG; -� IDEC61 uwlnn C Iml CP�'.xrr0.e mml CBR IRA • - x Ell D o m RE, I i.sx BU 0 BIG o sN 4AllCL J 3 IU.a ] WE t 0 JE a10 — — R J 90 aGE cL IO u ] - ..._ - a Bi1. ss l 6iC M U R J 3 MD M1 b[ 6 e, ,n Tun p MEANINGARN TC 4 "R 9O t Y cL 3 AAA CL 1 p,l ,° �11 3Y Y, E .............. ___. IL AR mE ill 11 • ,• IN Il IN •• NEARING CMacm. Pci Cw,xsN,9xw ®ve.wnrv.oeniw.aaer.ewwnmanv..-z rsrr.vs.wava.. -.1ww• Lnr,.......R_��..,rmR::xP..r..:..w.e.�.�ro:,..a..,I-n.. :°.'--..wn'aa".�`.°".... W�o.m.:• �®"axes.:.-.,oti�m:,.�r.-�ra,..._.. ..Lm•=•.ticwx rrxx ra�•.,.=�N.r. -''-`� CATLIN KESSLER DCP TEST DATA ..I. N.NE� PI.flnl ATIELOICATION LY.'VI„x.. TEST WEAn1EA_ RUAMNII I Wpl. SlmaR TABLE 1, LAWYER11.1- xw TDATA NGR.NG. M1gn nNNnl - u GBR - TW IV]C61 R Iml ImmlRl ttI zc _x u To µE 11 L— R 60 .L6 R x ss AM x c C 3 x6l M 711 - ,em DL 11 ] 0 BEM NG CAPACITY, psi Tl L ] MC, P5+ a Pow •ox ewo ewo ,o ,x.Ma M E w ,. x. A, N IN tl BEARING CPPACNV, Ill P.-.mye�.As,uomrir.w,av r®Nnmvwasa gr-x.m,r�am�na-a . L.e.P.,1ow] uxu'Er-.�. -,f sorrnn L k r` -W,®\ ®®®m O NP:� GµE55 pA O Re PRE-FlNAL s D9-08.17 �. SUBMITTAL ti -''�.� CATLIN 1Bm EWA NGa sDlYDrulB uG cu W, R. tw„A,,L-, N. xsa s �vs. �•,cDis CATLIN KESSLER DCP TEST DATA CATLIN KESSLER DCP TEST DATA x. .I. PANE'. ,.191R RRaEO, PAYE. u,9R, RRD,ECT NUMBER_ E I..T., c Rlw..:. iE DEP EE AmN u:.n,.,.:.. o-- `�"x W CRIBy mw„ Uge,6U..'Cu EGA.: z,Exn 1rpw, bo na® INGUAGI L. r,e+r.SWv .RILAGN ¢: L. wYRT. spasm SK BWYEit'll e+„- )VREACE CON�DigiLAWYER TYRE;n eUREKE CONdIOXR: C— MC will O.IA NORTHING BR 1 ^ A IN O.Cd 6W Rrn,rv:INA MCNINn'w,Ai YmlR.rcx,ma ,a DMiI Y R as 1 a I a I.AlAI B- 1 3 V E ^ x _4N 0D� 6t x _41 x0 - OZ Z W n 0 u — B., D _ ...., _. .. ,Y g z 'a su" x eo'- U v, e' W 5 -xN n u F g W D B. x 0 i i 1. R1 3 C Yf _ .... . __ _ N E V o a x uo t R E ,Re ]a . >dY n� "CL' J ,e0 5 _a5 'n Y H 0 II Z IN ] me Y - +e,' E O 3 Q _ _ _ u2 . S55 CL ] ]5R ....610.... N .CL ....J x,0.._..et4._. „ _ I• RN iQ vi _CI. _J x60 GA B CL 1 3B0 o, ,o 1016 38 CL 5 MO —]tl tl i ]0 LL ]DD x W.O_-. W CI ]J __,ex o, ____ fn Too O Iff ]3 ""'" "" IxBEARING CARACT". psi xz CL e '110_" "'.1, BEARING CAPACITY 1 (i L CL > �x 0 N CL CL J6o uo . � � ]6 z a m m+ o o Ja a x1 o p Q Y Y z s ,.,E „ ., E 0 z ..... Mil.uPY - Am. W ¢ Q on use Ovfro AN w zA . tl, Y 1. J_ N CC o AN AM o K O uU .O • ECEABING cA1ACm. psi •• • BEARING CAJACm B.,• k? CC / Z 0 ..ra,..-....:.>em.1.w ....�.,e�n '...:.. e.... dx.��d....._.v..:.ua....mr:.�... .....a.-....os„-., n.x.:..w.ri...t.r,... ,.Cm...e...a,.e,.m,d�....N.w,.: r....... "A.0RE. N. ..rrcP_L.P..N.1pc.R, CAE:yP., r. ...NPx�. L.x..N c.TvY.w,IAR: I'll" s.x'�xpn uT`E,.•+CBe.x,»: i+.+x P•Na-x.11 B-106 7 -z I A �. .....w..,a N:. e a �,.�^�^g, BORING LOGT`'yq, BORING LOG BORING LOG^Iyg mmFcnv.: 216111 31AR NC CV.x1r'. ONSLDW toulnn:Came Lejeune RRWEn xm 218, 11 �9tA1E'. NC 1Gaw.: ONSLOW EauIRK Cam Le cone vRelFn xG.: 216111 ISTMe NC cwxn'. ONSLOW Louiprr. Camp Leieune p0.G1ERw3E: P1479 OUTDWR INFANTRY ILIXXMW LiWWV Pupnlag o R61ER Mu¢: P147o OUTDOORINFANTRV 1.0 BY: Lindsa Pu 11 ECWN4R [WIF...: P1479 OUTDDOR INFANTRY III16GE. LrrW., P,h IWNG m: IMMERSION TRAINER - GEOTECHI OKtiie IMMERSION TRAINER -GEOTECH IMMERSION TMINER-GEOTECN quia: E .G: 33983]IEAs1Nc'. 252)1281cREw: CATLIN : HA41 NgnevG. 339]]8 fASTvw: 252]60B crew. CATLIN M42 xOR11wG: 3396a] F slsG: 252]9221[REw. CATLIN -03 sY3TEx NCSPNAD83 US8 amlxc L041W 1tANp FFn.: 6151ER: NCSPNAD83 USIt la WGIttATq. .F:ty.'. SY81FY: NGSP NAD 83 USit aL1Wl'LDGI tX. I..- g WCKNF: HandA er MEN. Hand Au(f.1 4HWRDM N'A!TOT.LLOFTN. 4.0 g w,,HINE: Hanc Au er uE1 . Hand Au ,[ ONgIRUTV: NIA TOI.--E AO II...NF'. Hantl Au eF SS1MA. HanE Auger rFV.. NIA MT..TN: 40 ll.T.11 y1]ll] FM51WR'. X17117 ZAM DTN. NIAJw RMYIH'. — UMTM ylill] 1[a UTE 2117117 NIWaa1W. WA M1RIAg: — 'T. WIE y1]11] 11W 11AII y17117 HICUP GIW. NiA ftlR IH. — Z £ RpYCtlM 'JEiFi 6mm"IWi U9. 5[{A.9F &O.V CQAI[ FlW5 GFAEW CEPiX IA9 o SA MG9Yv $pr CpllR OF➢TX 6CW5[ER fCOf lI8 Y_l Ar9 FCCH 6 b r e� A .W i (FpIN OESfARTKA ey as p.I- A 0 W 1W v CETN uEYA F'r. as er .r or0 S Q T Po W' g LEY1Y GE°Aa3'TON y _Or • e,, UNV SVRFACE I L le.AIJRFACF 111 f_ CO LAND SURFACE -L I41 Sua[CW gWttrDEN Fb. I- Inu cun[N sa¢ MEN m, a scn+r 0 9 � RMI AL S, T •J/ Cti r. - '�: CATLIN _ Eri,l—m and Scientlste 220 Cn Davy iwo WA�rplq. xC 38 n 40 'd a,y..oX.N�xo�.c.o3as w .fin ow. �VR 1 W 5K MC 3 $B0 V E 5 5 LJz w ¢p�Q =o - z 0 :p W � U � � � � w z — � cr w ¢ a z F Z z z w LL = w Z_ t zJ ry� iQ `LL o0 .0 q <s=o f az� 0 Nis ,KE, B-107 7 Z A .ter...® �.... n,. C D A A' CPT.20 CPT-17 CPT-13 MA41 CK48 CPT42 DCPO4 CPT-0l -'--PUN SPT45— — —CPT47—P1479 SPT4X! --- -- APPROXIMATE 40 - I SO 4 1. S 20 0 i /�VWO SURFACE MFOLAA STIFF TTIP I SANDY CLAY AND SIT rd D i (-3V --- LOOSE TO MEDI 4DENSE.9PN0 _� _ iYIC EY S^rv0 STn ___ ME vL 901 __ �/E Fv WET TO SOFT 9F. D -. DCLAY SOME RESETTLE L au YWITH P P C1 _ SOFT VE WSE MrtOREQ E-- s D DP- ALE ORGA cs EDO E Y TO SILTY IAO SHAD iBECTE E0 r � 1 IirI UST AND C RICH LAXL UYE ., ___ _________ ' vE9v LTOMEDMDEN9e Is TERECTUM SAD I: L -------------------------- C MEDIUM DENSE TODED MODERATELY LI FAPCOELL INWM EDLMESrORBYN - i wEPTXEXE siOHEwRS urEBBEDDED ..... SAND UVFRs __ . .. ... .... __ rnl4L �i _ _ E E '• ____ xmE LY PARTI-Ir xnwm eT suwr aouwx. 0 Chi' 0 =5 SOILS LEGExv zW Am TOO e00 DA.-µYID BURR LF Irvl EDISM "THARA El IIT, > Iw ® maa ® shuJas.mssYe ED u PaP E]r_— Xw — m PAAML_ � _~~ 0 O'REA, ®M:Yn,a,.� B CPT-05 CPT46 CPT-11 RIM SPIT42 �i CPT-13 I :J B' Pi4i9_SPTdl DCP41 CPT-18 CPT-15 -- --- RO i[ _u D cE __ LONSC TO MIECLUM DENSE, .1. TO sa sANo RREDDED Z A \ WITH s2 M'DCUV RICH LAVE , OFT I VERV LDOSE. M IRORE.1 C iERgE00EDCLhV SLT Li) �� 7 ____ 0 0 Avo9ANDAND POSSIBLE ORGAN ICE ..-____ ... VERY 1. 1. . sum TO UTY SA'D ^, ' C_ ?______ C� CAM - � ME TO DENSE. MODERATELY - -- - FWRDENSE OJR STWE AND ; WEATHERED LMESTOhE E OEDDED 20 •.___. .. -.. ......�... a. __.... ._.... SAND L E C� µY. d \H O IDO 200 300 a0O 50O USCS 9gL5 LEGEND 0. AUDI Baselim Ill)-1 T�APEAXMP FAMAY AA SUBSURFACE PROFILE FlQIRE 0 wm�°i~�+vA' Z waw¢ ®'I'p'�" aura •'SOY rww ® P ;;may m A... / \ 2527211.12 f SPi60- - 339996.37 - . CPI 20 >• nE - /CPT 1I V 5 SPi60 3 2526735.58 LF-T CB`R �2 �" " / ( - 339956.31'PI �17 DCP 3 \'r C t7 C'+ �� Y�C' T 4- - 10^. SPT60 2 i q V CPT 6 IT PT 161,) 1 --fie I CPT 3 CPT 19l SPT60 1 CPTu \ .�,�r scP7 oz )SCPr 01- -�� CATLIN I°1wE1O°°""XS"Y'�- SUBSURFACE PROFILE FlGO3 Ep B B 3B > CPT 15 / 2526696 73 �, / 33963062 / > OF�V'P"-t 4�51 ! 'C / \ 'CPT 12 t _} t 11 I i> \ BR 5. �- t \^14 PT.,PCPT6D- Q DCP 7 ; \ CBR 4� 2 _ CPT 10 4VCB6 a g-DCP 4 `~ pR�FQ ( CPT IE LEGEND T I I SOUNDING _- e 3 ®SPT 60' BORING ., -. - - d DCP 3 BORING -_ / T A BR 6 - ;q7 CBR BORING Nun D AUGER 2527949 48 -,! PT 1 -- 339558 - - 100' 50' 0 Too' 200' n 7 A G E GpC55 °q� aQD PRE-FlNPL ?. D9.08.17 \uBMmu - NO CI 0. r, Rme UATuT,TEn. I-2"D5 EIp..".r.rc�c ' FU��CL E g wz w¢ r z o's O o Fn Lu a 9� VDU W � Z Z O Z } m O z � z a w w laL z z o rK 2 D iLL DO O oQB w� I_5 �0 CATLIN Engineers and Scientists TRANSMITTAL TO: NCDEQ 127 Cardinal Drive Extension Wilmington, NC 28405 910-796-7215 Attn: Linda Lewis We Are Transmitting Herewith The Following: ITEM 2 Drawings Specifications Shop Drawings Contract Documents Correspondence Reports ACTION 220 Old Dairy Road Wilmington, NC 28405 Telephoner (910) 452-5861 Fax: (910) 452-7563 DATE: 09-14-2017 RE: P1479 Outdoor IIT Express State SW CATLIN Project No. 216111 1. For Your Use 2. For Review 3. Please Comment 4. Reply ASAP 5. Urgent 6. Returned TRANSMITTED BY US Mail Messenger Next Day Service X Other M-I0 0 'D5Z2 (�i and. -.1>4V2✓A) NO. OF COPIES DESCRIPTION ACTION CODE 1 Check for $2,000 1 1 Original and 1 Copy of Stormwater Application Form 2 1 Detailed Narrative 2 1 USGS Map 2 1 Copy of Calculations (Signed and Sealed 2 2 Two set of Plans (Signed and Sealed 2 1 Soils Map and Subsurface Profiles B-100 thru B-108 1 COMMFNTS- COPY TO: www.catlinusa.com mumxwsnr¢u.ou U o: 07; ®�a KII, NIP A r f -91 r "1111C 14 TTV 5 vl.� , - *Mm� 7 kn b q. F-,4 .. Wo, I bn .41, y lee k 4E� � R 2T, ,ea - rl � q v IcL z x, .Z, n sssnm • For DENR Use ONLY Lr North Carolina Department of Environment and Natural Resources �C®��R Request for Express Permit Review Time: Confirm: FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4204; david.lee@ncdenr.gov • Mooresville & Winston Salem Region - Marcia Allocco 704-235-2107 or marcia.allocco@ncdenr.gov •. Washington Region -Lyn Hardison 252-948-3842 or Iyn.hardison@ncdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P1479 OUTDOOR INFANTRY IMMERSION TRAINER County: ONSLOW Applicant: US MARINE CORPS BASE CAMP LEJEUNE Company: _ Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 252-466-4599, Fax: _ _ _, Email: aeorge.radford@usmc.mil Physical Location:NORTH OF THE EXISTING MOBILE MOUT, OFF F-3 RANGE RD, NW OF LYMAN RD & 172 SW _ SW _ SW NPDES _ NPDES _ WQ _ WQ _ E&S _ E&S _ Other Project Drains into UT TO BEAR CREEK waters - Water classification SA (for classification see- hnp:/Iportal.ncdenr,org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within 1/2 mile and draining to class SA waters Y or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ROBIN AUSTIN Company: CATLIN ENGINEERS & SCIENTISTS Address: 220 OLD DAIRY RD City: WILMINGTON, State: NC Zip: 28405-_ Phone: 910-452-5861, Fax: 910-452-7563, Email: robin.austin@catlinusa.com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $ #_JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ® DWO, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ It of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ® Other ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site jSW 8110611 (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /® MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permits) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (tor DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No For DENR use mdv Fee Solit for multiole oermits: (Check # 1 Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee LAMA $ Variance (❑ Mai; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LDS $ Stream Deter,_ $ NCDENR EXPRESS August 2015